Professional Documents
Culture Documents
PQ - (주) 대도볼트 2
PQ - (주) 대도볼트 2
Company Profile
A complete fastener supply service
to the Oil,Gas, Petrochemical, Power Generation,
Construction and Shipbuilding Industry...
DAEDO
BOLT
Contents
1 Company Profile
1-1. Introduction 01
1-2. History 02
1-3. Organization Chart 03
CEO Choi,Sung-Do
Daedo Bolt Co., Ltd. is providing the customers with differentiated high
value added products and solutions as a partner in the plant industry based
on the knowledge accumulated in the fields of basic material.
We have pioneered the path with the spirit of a master craftsman since
our establishment in 1989.
Our objective is to remain as a constant partner who comes across the first to
our customers’mind being their‘First Choice’in the fields of our business.
▶World Best
Quality Aim
▶Zero Defect
1-1. Introduction 01
Jun.1996 Expanded the nationwide sales network of stud bolt & nut
Moved to a larger office
Jan. 2000 Constructed a new head office building in Sihung-Si and Moved
Jun. 2006 Acquired ISO 9001 Quality Management System Certification from KIC
Nov. 2009 A Promising Small & Medium Enterprise designated from Woori Bank
Nov. 2014 Purchased a rolling M/C 100 Ton and Auto Sawing M/C Ø100
1-3. Organization Chart 03
President
Material
Inspection
Q.M
Dep.
Q.M
Guarantee
Accoun Production
Manager Sales Release Production
-tancy Inspection
2-1. Major Facility of Manufacture 04
No. Machine Spec Q‘ ty Maker Year
1 Auto Nut Tapping M/C D1/2 ~ 1” 1 SamJin 2008
2 Rolling M/C 60 ton 1 DongIl Rolling 2009
3 Rolling M/C 50 ton 1 DongIl Rolling 2010
4 Rolling M/C 20 ton 1 DongIl Rolling 2009
5 Rolling M/C 20 ton 1 DongIl Rolling 2010
6 Rolling M/C 100 ton 1 DongIl Rolling 2014
7 Stud Bolt Setting M/C - 2 SamJin 2000
8 Lathes 750 x 3000 1 HanKuck M/C 2009
9 Lathes 460 x 1000 3 Tongll 2009
10 Lathes 550 x 2000 1 NamSung 2010
11 Bench Lathes ø32 1 DongHyub 2009
12 Power Press 1 ton 1 DongSin 2009
13 Hydraulic Press C-Type 20 ton 1 SinPyung 2009
14 Four Legged Hydraulic Press 80 ton 1 SinPyung 2009
15 Metal Rod Extrusion M/C - 1 HanYang M/C 2009
16 Round Bar Power Cutting M/C ø6~ ø30 1 DaeHo 2009
17 Auto Sawing M/C 100ø 1 TSUNE 2009
18 Bend Sawing M/C 250 x 250 1 Daito 2009
19 Drilling M/C 12 ø 2 SamChulLi 2009
20 Air Compressor 10HP 1 SeWon 2009
21 Air Compressor 5HP 1 SeWon 2009
22 Chamfering M/C 6~24 ø 1 DaeHo 2009
23 Chamfering M/C 24~ 65ø 1 DaeHo 2009
24 Four Legged Hydraulic press 250ton 1 TAE-A 2012
25 Bench Rathes 50ø 2 DAEDO 2012
26 Chanfering M/C ø20~ ø49 1 GI SOUNG 2014
27 Sawing M/C ø170 1 Optimum 2014
28 Auto Sawing M/C ø100 1 Amada 2014
29 Semi Auto Chamfer & Punching M/C ø10~ ø75 1 Dongil Rolling 2014
30 CM840-100 CNC ø100 1 Amada 2014
31 PUMA-400 CNC 1 Doosan 2014
32 Nuckle Press ø42 1 Gun Woo 2016
33 High Precision Semi-CNC Lathes Protec-7NB(Φ176*4000) 1 Han Kook 2016
2-2. Laboratory Inspection Equipment List 05
Cutting
Mechanical
If Required Testing
Edge Cutting
Marking If Required
Mechanical
Testing
Thread Rolling
Coating If Required
Coloring, Galvanizing
Hot Dip Galvanizing, Dacro...etc
Check If Required
Packing
Final check
Delivery
2-3. Flow Chart of Production 07
2.3.2 Nuts
Material
Cutting
Mechanical
If Required Testing
Forming
Cooling If Required
Shot If Required
Mechanical
Testing
Tapping
Checking If Required
Packing
Final check
Delivery
3. Experience List 08
2015.03.20 DONGYANG PNP PACO POWER PLANT ANCHOR B/2N/W MINERA PANAMA S.A.
DOOKDO WATER
2015.01.23 SAMSUNG MULSAN PURIFICATION CENTRE STUD BOLTS
2015.01.20 HPM CORP INDORAMA FERTILIZER STUD B/2N DAEWOO ZIGERIAL LTD.
TAEAN THERMAL POWER PLANT
2014.12.10 DAELIM IND UNIT 9&10 BOILER SUPPLY STUD B/2N
SUMITOMO CHEMICAL
2014.11.30 SAMSIN ENC RABIGH ll PETROCHEMICAL ANCHOR B/N/W CO, LTD.
2014.11.24 GS NEOTECK KWANGJU ENERGY EQUIPMENT ANCHOR B/N/W
2014.05.14 BANDO CRANES CO.,LTD. Shin-Hanul #1,2 H.HEX B/N Korea Hydro &
Nuclear Power co
2014.05.14 Korea Hydro &
HAISUNG Good Three Shin-Hanul #1,2 H.HEX B/N Nuclear Power co
2014.05.14 SYSTEM INDUSTRIES Shin-Hanul #1,2 H.HEX B/N Korea Hydro &
Nuclear Power co
2014.04.29 HPM CORPORATION Ghana Takoradi T2 STUD B/2N KEPCO
2013.06.19 SINA INDUSTRIES TAEAN IGCC POWER PLANT ANCHOR B/N KEPCO
2011.08.30. Han Joo Machine Industrial Co.,Ltd. Lldpe Elastomer Debottlene(King project) Stud Bolt & Nut
Daelim Industrial Co.,Ltd. - WELDING Korea Gas Safety
2011.08.26 Woongnam SAMCHUK LNG GAS STUD BOLT Corporation
2011.03.31 K.P.F SULB Steel Mill Project Anchor bolt,
Anchor bracket, Sleeve Bahrain
Hyundai Industrial United Steel Company.
2011.08.24 & Machnery Co.,Ltd. Habshan-5 Process Plant Project Stud Bolt & Nut Kinetic Therm Asia
2011.08.19. Han Joo Machine Industrial Co.,Ltd. Habshan-5 Process Plant Project Stud Bolt & Nut Kinetic Therm Asia
2011.08.11 Aha M-Tech Co.,ltd. South Pars 16 & 16 Project Stud Bolt & Nut
2011.07.21 Aha M-Tech Co.,ltd. Ruwals Refinery Expansion #4 Project collar Bolt & Nut Takree, S.A.
Korea Gas Safety
2011.07.15 GS NEOTECK SAMCHUK LNG GAS WELDING STUD BOLT Corporation
HEX BOLT & NUT
2011.07.15 Aha M-Tech Co.,ltd. JUBAIL EXPORT REFINERY PROJECT (A193-B7/A194-2H) Saudi Aramco
2011.04.29~ Hanwha Engineering & Construction Marafiq STG 5 & 6 Project Stud Bolt & Nut Power & Water
Utility Company, S.A.
2010.01 GOYang-Samsong Social Stud B/N, Hinge-Bar, Jack,
Korea Distri Heating Corp. Energy System Foundation B.N...etc
2010.01 PyungTaek LNG Gas Base Stud B/N, Anchor B/N,
Korea Gas Safety Corporation 2nd Factory #22, #23 Project U-B/N, Hex B/N...etc
2010.01 Korea Gas Safety Corporation PyungTaek LNG Gas Base Stud B/N, Anchor B/N,
2nd Factory #20, #21 Project U-B/N, Hex B/N...etc
3. Experience List 10
2009.12 HanHwa L&C Corp. HCC CNP Project(VCM Transfer Line) Stud B/N, Anchor B/N
2009.11 S-Oil U-2800 RICH MAED CARBON FILTER Stud B/N, Anchor B/N,
Hex B/N, Eye B/N...etc
Stud B/N, Anchor B/N,
2009.11 JORD INTERNATIONAL AMBATOVY (GASKET) Project
Hex B/N, Eye B/N...etc
Stud B/N, Anchor B/N,
2009.11 Taiyo Nippon Sanso Co.,Ltd MPG52000 AIR Separation Plant
Hex B/N, Eye B/N...etc
2009.11
~ 2010.03 DaeLim Industrial Co.,Ltd QATARGAS 3&4 ONSHORE Project Stud B/N, Anchor B/N
2009.11 S-OIL Onsan Refinery Expansion
~ 2010.04 SamSung Engineering Co.,Ltd Project (Heat Exchager) Stud B/N, Anchor B/N
2009.11 CJ TOYDA TUSHO PHILIPPINES INC. S-Project B/N, Dowel Pin, Eye B/N...etc
Stud B/N, Anchor B/N, Hex
2009.11 HanHwa L&C Corp. E-150 TUBE BUNDLE Stud B/N, Anchor B/N
2009.09 SamSung Total Petrochemicals Co.,Ltd JET A-1 Project (CLAY TREATOR) Stud B/N, Anchor B/N
2009.08 DaeLim Industrial Co., Ltd SAUDI HDPE Project Stud B/N, Anchor B/N
(Ladder & Platform for Tower)
2009.08 Cameron Petreco International Ltd ASAB FFD Project (CLAD VESSELS) Stud B/N, Anchor B/N, Hex
B/N, /Dowel Pin, Eye B/N...etc
2009.08 SamSung Engineering Co.,Ltd DUAL FEED Ethylene Cracker Project Stud B/N, Anchor B/N
2009.08 Flowtech Co.,Ltd GoYang Samsong Project Stud B/N, Anchor B/N
2009.08 L-CON Dynamic Fuel Plant Project (TOWERSI) Stud B/N, Anchor B/N
2009.07 KNM Corporation NCP Project (CHAIN HOIST) Stud B/N, Anchor B/N
ARZEW Refinery Rehabilitation Stud B/N, Anchor B/N, Hex
2009.07 HyunDai Engineering Co.,Ltd
& Adaptation Project B/N, Dowel Pin, Eye B/N...etc
2009.06 POSCO Construction Co.,Ltd GwangYang No.5 Cokes Oven Stud B/N, Anchor B/N
2009.06 ELAB LAB Project / 2YR Spare Parts for Column Stud B/N, Anchor B/N
2009.06 PETROFAC ASAB FFD Project (CLAD VESSELS) Stud B/N, Anchor B/N
3. Experience List 11
2009.03 DaeLim Industrial Co.,Ltd NCP Project Stud B/N, Anchor B/N
2009.03 Korea Gas Safety Corporation ChungCheong Branch Line Maintenace Project Stud B/N, Anchor B/N
2009.03 HyunDai Engineering Co.,Ltd ARZEW REFINERY Project Stud B/N, Anchor B/N
2009.02 GS Engineering & Construction Co.,Ltd No.3 HOU Project Stud B/N, Anchor B/N
2009.02 LG CHEM Co.,Ltd NCC Tower Expansion Project (DaeSan) Stud B/N, Anchor B/N
2009.01 CTCI Corporation TALIN CPC RFCC COMPLEX Project Stud B/N, Anchor B/N
2009.01 Wonll T&I Co.,Ltd Culf LNG SCV Stud B/N, Anchor B/N
2008.09.08~ MAP TA PHUT TANK
JEIL TOTAL ENG MTT TANK FARM EXPANSION STUD B/2N TERMINAL CO LTD, THAILAND
2009.01.16
2009.07 WoongJin Polysilicon Co.,Ltd SP Project Stud B/N, Anchor B/N
Stud B/N, Anchor B/N,
2009.07 KNM Corporation NCP Project (PLATE SUPPLY) Hex B/N, Eye B/N...etc
2008.08 Peerless Euroup Limited MA’ADEN AMMONIA Project Stud B/N, Anchor B/N
2008.08 Korea Gas Safety Corporation WolSeo Control Center Stud B/N, Anchor B/N
M/C Installation Project
2008.08 Korea Gas Safety Corporation ChilSeo Control Center Stud B/N, Anchor B/N
M/C Installation Project
PyungTaek LNG Gas Base
2008.09 Korea Gas Safety Corporation 2nd Factory #18, #19 Project Stud B/N, Anchor B/N
2008.10 ToYo Engineering Korea Limited PMF Project Stud B/N, Anchor B/N
2008.11
~ 2009.05 HyunDai Steel Co.,Ltd Product Line Extension Project Stud B/N, Anchor B/N
2008.11 DaeGyung Industrial.Co.,Ltd GaZwa-Dond, Drain Line Separate Project H/T B.N, Anchor B/N
Stud B/N, Anchor B/N, Hex
2008.11 Korea Kumho Petrochemical Co.,Ltd YDR-S-O BR Extension Project B/N, Dowel Pin, Eye B/N...etc
2008.11 SeongJin Band Co.,Ltd KOGAS Stud B/N, Anchor B/N
2008.07 PoongLim Industrial Co.,Ltd RUSSIA Stud B/N, Anchor, B/N Hex
(SEIC BS2 COMPRESSION PJT) B/N, Dowel Pin, Eye B/N...etc
TAIWAN MTP Tank Terminal Co.,Ltd
2008.07 STX Jeil Engineering Co.,Ltd (MTP Tank Terminal Project) Stud B/N, Anchor B/N
2008.07 Seoul Machinery Co.,Ltd KCS REACTOR Project Stud B/N, Anchor B/N
2008.07 GuckDO Chemical Co.,Ltd MPL Project Stud B/N, Anchor B/N
2008.07 HyoSung Ebara Co.,Ltd BoRyung Thermoelectric Power Plant Stud B/N, Anchor B/N
3. Experience List 12
2008.06 DooSan Heavy Ind&Const. Co.,Ltd SHUWAIKH RO Desalination Plant Stud B/N, Anchor B/N
(KUWAIT)
2008.06 HyunDai Heavy Ind.Co.,Ltd P 1 Project Stud B/N, Anchor B/N
2008.06 Stud B/N, Anchor, B/N Hex Arabian Amiens
HyunDai Engineering Co.,Ltd SAUDI ARABIA (AAC Project) Company, S.A.
~ 2008.11 B/N, Dowel Pin, Eye B/N...etc
2008.05 GS CALTAX No. 3 HOU Project Stud B/N, Anchor B/N
2008.05 DaeLim Industrial Co.,Ltd NCP SOUTH PLOP Project Stud B/N, Anchor B/N
InCheon GyungSeo Branch
2008.04 Korea Gas Safety Corporation Supply Control Center Stud B/N, Anchor B/N
2008.04 HanKuck Machinery Co.,Ltd MiWon Trading-Nutsche Filer Stud B/N, Anchor B/N
2008.04 DooSan Heavy Ind&Const.Co.,Ltd RAS LAFFAN C HRSG Project Stud B/N, Anchor B/N
2008.04 GS Construction Co.,Ltd InCheon Thermoeletric Power Plant Stud B/N, Anchor B/N
2008.04 Wonll T&I Co.,Ltd SangHai SCV Stud B/N, Anchor B/N
2008.04
STX Jeil Engineering Co.,Ltd HUCHEMS MNB Plant (YeoSu) Stud B/N, Anchor B/N
~ 2008.12
2008.03 Fusi Electric System Co.,Ltd UNIT 1 Project Stud B/N, Anchor B/N
2008.03 Wonll T&I Co.,Ltd LGPC-HPR Project Stud B/N, Anchor B/N
2008.03 SongDo Control Center
~ 2008.06 Korea Gas Safety Corporation M/C Installation Project Stud B/N, Anchor B/N
2008.02 HyunDai Greenpower Thermal
Korea Gas Safety Corporation Power Plant #1~#4 Stud B/N, Anchor B/N
2008.01 Wonll T&I Co.,Ltd NIKKISO-EXMAR LNG Stud B/N, Anchor B/N
2007.12 HanKuck Machinery Co.,Ltd DongA Pharmaceutical. Stud B/N, Anchor B/N
Product Line Build-Up Project
GunSan Combined Cycle Power
2007.12 Korea Western Power Co.,Ltd Plant Supply Control Center Stud B/N, Anchor B/N
2007.08 HanKuck Machinery Co.,Ltd Win-Tech Eng. System Project Stud B/N, Anchor B/N
2007.08 Seoul Machinery Co.,Ltd DongHo Eng. System Project Stud B/N, Anchor B/N
MAAG PUMP
2007.08 Seoul Machinery Co.,Ltd (Filter Production System) Stud B/N, Anchor B/N
2007.07 HanKuck Machinery Co.,Ltd SinMyung H.A REACTOR Project Stud B/N, Anchor B/N
Busan JungGwan Area /
2007.06 Korea Gas Safety Corporation Energy System Installation Project Stud B/N, Anchor B/N
2007.06.01 Aha M-Tech Co.,ltd. Samsung Engineering-Skikda Refinery Project Stud Bolt & Nut
2007.02 SinSeung Civil Engineering Co.,Ltd Lower Han River Development H/T B.N, /abcgir B/N
2007.01 HyunDai Oil Bank Co.,Ltd Oil Refinery System...etc H/T B.N, /abcgir B/N
2007.01 SK Energy Co.,Ltd Oil Refinery System...etc H/T B.N, /abcgir B/N
2007.01 Lotte Daesan Chemical Co.,Ltd Oil Refinery System...etc H/T B.N, /abcgir B/N
3. Experience List 13
2006.08 Korea Gas Safety Corporation MiYang Branch Bubuk B/V Stud B/N, Anchor B/N
2006.02 Korea Gas Safety Corporation WaiGwoan Control Center Stud B/N, Anchor B/N
M/C Installation Project
Main Supply Line Installation Between Stud B/N, Anchor B/N,
2006.01 Korea Gas Safety Corporation ChungJu and JeCheon U-B/N, hex B/N...etc
Stud B/N, Anchor
2004.07 Korea Gas Safety Corporation Boryung Thermal Plant #5, #6 B/N, M/C-B/N
Stud B/N,
2004. 01 Korea Gas Safety Corporation Heat Sourcing Project / DongBack Area Anchor B/N
2003. 03 SangAm Worldcup Stadium SangAm Worldcup Stakium Anchor B/N
Stud B/N,
2002. 10 Korea Gas Safety Corporation SeoSan Base Construction Project Anchor B/N...etc
2002. 07 Korea Railroad Construction Corp. GangCheon 3th Tunnel Anchor B/N
Electric Power System Between BaeckAmRi Anchor B/N,
2002. 06 Korea Railroad Construction Corp. and ChunCheon (GyungChun Line) Insulation B/N
2002. 05 HyunDai Construction Co.,Ltd YoungHeung Thermoelectric power plant H/T Anchor B/N
2002. 03 WunYang Construction Co.,Ltd Ojung-Ro Water Supply Facilities H/T B.N, Anchor B/N
2001. 11 DaeBang Civil Engineering DaeJun Wide-Area Water Supply Facilities SUS Anchor B/N...etc
2001. 02 HanJin Heavy Industrial Co.,Ltd Central Highway Construct Area 10th Anchor B/N
1999. 10 HanJin Heavy Undustrial Co.,Ltd High Speed Railrod 6th Area Anchor B/N
1998. 12 SunMyung Construction Co.,Ltd GuangYang Double Water Supply Facilities of H/T B.N, Anchor B/N
1997. 11 YeungDeung-Po, Yongln-HeungDuck Area, HaNam-GwangJu H/T B.N, Anchor B/N
~ 2009. 04 Jaehyun Industrial Co.,Ltd Wide-Area Water Supply Facilities 2Th, BanWol-Filtraiton Plant Stud B/N
1997. 01 Hanam Construction Co.,Ltd PalDang Wide-Area Water Supply Facilities H/T B.N, Anchor B/N
1997. 01 DaeChun-JinHeung HaengJu-SanSung (Mountain Portress Wall) H/T B.N, Anchor B/N
Construcion Co.,Ltd
1997. 01 HanGuck Pipe Co.,Ltd HaengJu-SanSung (Mountain Portress Wall) H/T B.N, Anchor B/N
1997. 01 HanSin Engineering Co.,Ltd GwangJu Wide-Area Water Supply Facilities H/T B.N, Anchor B/N
1996. 05 ToSung Construction Co.,Ltd Asan-Bay Water Supply Facilities of manufacturer H/T B.N, Anchor B/N
1996. 03 ToSung Construction Co.,Ltd JeonJu Samsung Filtration Plant H/T B.N, Anchor B/N
1995. 06 DongBu Construction Co.,Ltd GwaCheon Wide-Area Water Supply Facilities H/T B.N, Anchor B/N
1995. 03~ HaeJun Construction Co.,Ltd AmSa-Filtration Plant H/T B.N, Anchor B/N
1995. 03~ ToSung Construction Co.,Ltd Daechung-Dam H/T B.N, Anchor B/N
14
Production Range
Description Specification Grade Range (Nominal Dia)
ASTM A193 B7 / B7 M / B16 / B8 / B8M
ASTM A193M B8 CL2 / B8M CL2
2H
2HM
ASTM A194 4L 1/2″~ 8″
Heavy Hex Nuts
ASTM A194M 7L M12 ~ M200
7M
Gr8 / Gr8M
Heavy Hex Nuts 16
H B C
Diameter Pitch
Max. Min. Max. Min. App.
M 12 1.75 12.3 11.9 21.0 20.16 24.3
M 16 2.0 17.1 16.4 27.0 26.16 31.2
M 20 2.5P 20.7 19.4 34.0 33.0 39.3
M 22 2.5P 23.6 22.3 36.0 35.0 41.6
M 24 3.0P 24.2 22.9 41.0 40.0 47.4
M 27 3.0P 27.6 26.3 46.0 45.0 53.2
M 30 3.5P 30.7 29.1 50.0 49.0 57.8
M 36 4.0P 36.6 35.0 60.0 58.8 69.3
M 42 4.5P 42.0 40.4 70.0 67.9 80.9
M 48 5.0P 48.0 46.4 80.0 77.6 92.4
M 56 5.5P 56.0 54.1 90.0 87.2 103.9
M 64 6.0P 64.0 62.1 100.0 96.6 115.5
M72 6.0P 72.0 70.1 110.0 106.4 127.0
M80 6.0P 80.0 78.1 120.0 116.0 138.6
M90 6.0P 90.0 87.7 135.0 130.5 155.9
M100 6.0P 100.0 97.8 150.0 145.0 173.2
Projent Name
Grade C (%) Mn (%) P (%) S (%) Si (%) Cr (%) Mo (%) V (%) Ni (%)
ASTM A 193 Gr. B7 0.37~0.49 0.65~1.10 0.035 Max. 0.040 Max. 0.15~0.35 0.75~1.20 0.15~0.25
ASTM A 193 Gr. B7M 0.37~0.49 0.65~1.10 0.035 Max. 0.040 Max. 0.15~0.35 0.75~1.20 0.15~0.25
ASTM A 193 Gr. B16 0.36~0.47 0.45~0.70 0.035 Max. 0.040 Max. 0.15~0.35 0.80~1.15 0.50~0.65 0.25~0.35
ASTM A 193 Gr. B8 0.08 Max. 2.00 Max. 0.045 Max. 0.030 Max. 1.00 Max. 18.0~20.0 8.0~11.0
ASTM A 193 Gr. B8M 0.08 Max. 2.00 Max. 0.045 Max. 0.030 Max. 1.00 Max. 16.0~18.0 2.00~3.00 10.0~14.0
ASTM A 320 Gr. L7 0.38 ~0.48 0.75~1.00 0.035 Max. 0.040 Max. 0.15~0.35 0.80~1.10 0.15~0.25
BOLT
ASTM A 320 Gr. B8 0.08 Max. 2.00 Max. 0.045 Max. 0.030 Max. 1.00 Max. 18.0~20.0 8.0~11.0
ASTM A 320 Gr. B8M 0.08 Max. 2.00 Max. 0.045 Max. 0.030 Max. 1.00 Max. 16.0~18.0 2.00~3.00 10.0~14.0
JIS G4105 SCM 440 0.38 ~0.48 0.60~0.85 0.030 Max. 0.030 Max. 0.15~0.35 0.90~1.20 0.15~0.30
JIS G4107 SNB 5 0.10 Min. 1.00 Max. 0.040 Max. 0.030 Max. 1.00 Max. 4.00~6.00 0.40~0.65
JIS G4107 SNB 7 0.38 ~0.48 0.70~1.00 0.040 Max. 0.040 Max. 0.20~0.35 0.80~1.10 0.15~0.25
JIS G4107 SNB 16 0.36~0.44 0.45~0.70 0.040 Max. 0.040 Max. 0.20~0.35 0.80~1.15 0.50~0.65 0.25~0.35
ASTM A194 Gr.2 H 0.40 Min 1.00 Max. 0.040 Max. 0.050 Max. 0.40 Max.
ASTM A194 Gr. 2HM 0.40 Min 1.00 Max. 0.040 Max. 0.050 Max. 0.40 Max.
ASTM A194 Gr.4 0.40~0.50 0.70~0.90 0.035 Max. 0.040 Max. 0.15~0.35 0.20~0.30
NUT ASTM A194 Gr.7 0.37~0.49 0.65~1.10 0.040 Max. 0.040 Max. 0.15~0.35 0.75~1.20 0.15~0.25
ASTM A194 Gr.8 0.08 Max. 2.00 Max. 0.045 Max. 0.030 Max. 1.00 Max. 18.0~20.0 8.0~11.0
ASTM A194 Gr.8 M 0.08 Max. 2.00 Max. 0.045 Max. 0.030 Max. 1.00 Max 16.0~18.0 2.00~3.00 10.0~14.0
JIS G4051 S45C 0.42~0.48 0.60~0.90 0.030 Max. 0.035 Max. 0.15~0.35
Pressure-temperature Piping
General Purpose
Unit: inch
Projent Name
Min. Tempering Tensile Strength Yield Strength Elongation Reduction Brinell Recommended Bolting Temperature Range
Material
Temperature℉(℃) (Min.) (Min.) % (Min.) % (Min.) Hardness Min.℃ Max.℃
AISI 4140, 4142, 4145 1,100(593℃) 125,000 psi 105,000 psi 16 50 -100 400
AISI 4140, 4142, 4145 1,150(620℃) 100,000 psi 80,000 psi 18 50 235 Max. -100 400
AISI 4140, 4142, 4145 125,000 psi 105,000 psi 16 50 -100 400
AISI 304 75,000 psi 30,000 psi 35 50 223 Max. -250 575
AISI 316 75,000 psi 30,000 psi 35 50 223 Max. -250 600
AISI 4140, 4142, 4145 530~630℃ 100 kgf/mm
² 85 kgf/mm
² 12 45 285~352
JIS G 4105 SCM 4
AISI 501 (595℃) 70 kgf/mm
² 56 kgf/mm
² 16 50
AISI 4140, 4142, 4145
JIS G 4107 SNB 7 (595℃) 88 kgf/mm
² 74 kgf/mm
² 16 50
Unit: mm
Basic 18 20 22 25 28 30 32
S
+19 +2.2 +2.6 +3 +5
Tolerance
0 0 0 0 0
Basic 12 15 18 20 22 25
Class 1
+1.1 +1.3
Tolerance
0 0
t Class 2 Basic 11 15 18 21 24 27 30
Basic 16 20 24 28 32 36 40
Class 3 +1 +1.3 +1.6
Tolerance 0 0 0
20-30 ±0.42
32-50 ±0.5
L Basic 55-80 Tolerance ±0.6
90-120 ±0.7
140-150 ±0.8
High Strength Bolts, Nuts & Washers 19
Production Range
Description Specification Range(Nominal Dia)
Production Range
ℓ
Basic dimension 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120
Tolerance on ℓ ±1.0 ±1.4
ℓ
Basic dimension 125 130 135 140 145 150 155 160 165 170 175 180 190 200 210 220
Tolerance on ℓ ±1.8
KSB1010, JISB1186
High Strength Bolts, Nuts & Washers 21
Grade F 8T F 10 T F 11T
Diameter M 16 M 20 M 22 M 24 M 16 M 20 M 22 M 24 M 16 M 20 M 22 M 24
T Ton 9.18 14.5 17.9 20.7 11.3 17.9 22.3 25.7 12.1 18.9 23.4 27.1
k= ×1,000 Coefficient
d×N
0.110 16.2 31.9 43.3 54.6 19.9 39.4 54.0 67.8 21.3 41.6 56.6 71.5
k : torque coefficient
T : torque (moment to 0.115 16.9 33.4 45.3 57.1 20.8 41.2 56.4 70.9 22.3 43.5 59.2 74.8
fasten nut)kgf-m
0.120 17.6 34.8 47.3 59.6 21.7 43.0 58.9 74.0 23.2 45.4 61.8 78.0
d : basic thread
outside diameter 0.125 18.4 36.3 49.2 62.1 22.6 44.8 61.3 77.1 24.2 47.2 64.4 81.3
of bolt (mm)
N :axial force of bolt 0.130 19.1 37.7 51.2 64.6 23.5 46.5 63.8 80.2 25.2 49.1 66.9 84.6
(kgf) 0.135 19.8 39.2 53.2 67.1 24.4 48.3 66.2 83.3 26.1 51.0 69.5 87.8
0.140 20.6 40.6 55.1 69.6 25.3 50.1 68.7 86.4 27.1 52.9 72.1 91.1
0.145 21.3 42.1 57.1 72.0 26.2 51.9 71.1 89.4 28.1 54.8 74.6 94.3
0.150 22.0 43.5 59.1 74.5 27.1 53.7 73.6 92.5 29.0 56.7 77.2 97.6
0.155 22.8 45.0 61.0 77.0 28.0 55.5 76.0 95.6 30.0 58.6 79.8 100.8
0.160 23.5 46.4 63.0 79.5 28.9 57.3 78.5 98.7 31.0 60.5 82.4 104.1
0.165 24.2 47.9 65.0 82.0 29.8 59.1 80.9 101.8 31.9 62.4 84.9 107.3
0.170 25.0 49.3 66.9 84.5 30.7 60.9 83.4 104.9 32.9 64.3 87.5 110.6
0.175 25.7 50.8 68.9 86.9 31.6 62.6 85.9 107.9 33.9 66.2 90.1 113.8
0.180 26.4 52.2 70.9 89.4 32.5 64.4 88.3 111.0 34.8 68.0 92.7 117.1
0.185 27.2 53.7 72.9 91.9 33.4 66.2 90.8 114.1 35.8 69.9 95.2 120.3
0.190 27.9 55.1 74.8 94.4 34.4 68.0 93.2 117.2 36.8 71.8 97.8 123.6
Weight of KSB1010 & JIS B1186 H.T.BOLTS, NUTS with 2 Washers Unit : g
Length 40 45 50 55 60 65 70 75 80 85 90 95 100 110 120 Nut Washer
Diameter
Set 107 112 116 121 125 130 134 138 143 147 152 156 - - - 30 10
M 12
Bolt 57 62 66 71 75 80 84 88 93 97 102 106 - - -
Set 202 210 217 225 233 241 249 257 265 273 281 289 296 312 328 57 20
M 16
Bolt 105 113 120 128 136 144 152 160 168 176 184 192 199 215 231
Set 336 348 361 373 385 398 410 422 435 447 459 472 484 509 533 97 32
M 20
Bolt 175 187 200 212 224 237 249 261 274 286 298 311 323 348 374
Set - 481 496 510 525 540 555 570 585 600 615 630 645 674 704 137 52
M 22
Bolt - 240 255 269 284 299 314 329 344 359 374 389 404 433 463
Set - - 648 666 683 701 719 737 754 772 790 808 825 861 896 201 62
M 24
Bolt - - 323 341 358 376 394 412 429 447 465 483 500 536 571
Set - - - - - 954 976 999 1021 1044 1066 1088 1111 1153 1198 263 93
M 27
Bolt - - - - - 505 527 550 572 595 617 639 662 704 749
Set - - - - - - 1248 1276 1304 1332 1359 1387 1409 1464 1519 340 134
M 30
Bolt - - - - - - 640 668 696 724 751 779 801 856 911
23
24
MANUFACTURED PRODUCTS
Foundation Bolts (Anchor Bolts) 25
KS B1016 JIS B1178 ASTM A307 GrB, GrC, ASTM F1554 Gr36, 55, 105 Unit : mm
d1 S L1 R a b
K
Basic Tolerance L.J LA.JA Tolerance L.LA J L.J h LA LA JA JA
M8 8 20 +6.3 32 8 41 1.2
M10 10 ±0.4 25 30 0 40 45 20 10 51 50 35 1.5
M12 12 32 35 50 56 25 12 64 65 40 2
+8
M16 16 40 40 0 63 71 32 16 81 85 55 2
M20 20 ±0.5 50 50 80 90 40 20 102 105 70 2.5
M24 24 63 80 100 112 50 24 127 125 80 3
M30 30 ±0.6 80 90 +10 125 140 63 30 158 155 100 3.5
M36 36 ±0.7 90 110 0 140 160 71 36 181 190 120 4
M42 42 ±0.8 112 125 180 200 90 42 226 220 140 4.5
d +12.5
M48 48 ±0.9 125 150 0 200 244 100 48 252 250 160 5
Unit : inch
d1 S L1 R a b
K
Basic Tolerance L.J LA.JA Tolerance L.LA J L.J h LA LA JA JA
3/8 9.5 25 20 +6.3 40 45 20 8 41 40 35 1.2
1/2 12.7 ±0.5 30 35 0 50 56 25 12 64 65 40 2
5/8 15.8 40 40 63 71 32 16 81 85 55 2
+8
3/4 19 50 50 0 80 90 40 20 102 105 70 2.5
7/8 22 ±0.5 56 56 90 100 45 22 110 125 75 3
1 25 63 63 100 112 50 24 127 127 80 3
11/8 28 ±0.56 71 71 +10 112 125 58 30 158 155 100 3.5
11/4 32 ±0.64 80 80 0 125 140 63 32 181 160 110 3.5
11/2 38 ±0.76 100 110 160 180 80 38 226 190 120 4
+10
13/4 44 ±0.88 112 125 0 180 200 90 44 235 220 140 4.5
2 +12.5
50 ±1 125 150 0 200 244 100 50 252 250 160 5
U-Bolts 26
Size Range :
15A through 750A outer diamter
Material :
A : Carbon Steel (KS D 3503 SS41 or ASTM A 36)
B : Alloy Steel (KS D 3711 SCM 435 or AISI 4135 )
C : Stainless Steel (KS D 3706 STS 304
ASTM A 276 TP 304)
Finish :
Black Unless Otherwise Specified
Metric Unit : mm
Unified (Ref) Unit : mm
Applica- U-BOLTS Pipe U-BOLT
Nomi- ble Out Nomi-
nal Type A Type B Type C nal Pipe Type Pipe Type A Type B Type C
Size Diameter R d1 d1 Size of R d1 d2
o f Pipe H E H E H E A B Dia H E H E H E
15 21.7 12 10 M10 - - 16 24 16 30 15 15 1/2 21.7 11 10 3/8 - - 38 16 47 25
20 27.2 15 10 M10 - - 22 24 22 30 20 20 3/4 27.2 14 10 3/8 - - 44 16 53 25
25 34.0 18 10 M10 - - 29 24 29 30 25 25 1 34.0 18 10 3/8 - - 50 16 59 25
32 42.7 23 10 M10 - - 37 24 37 30 32 32 114 42.7 22 10 3/8 - - 58 16 67 25
40 48.6 26 10 M10 - - 43 24 43 30 40 40 112 48.6 25 10 3/8 - - 64 16 73 25
50 60.5 32 10 M10 - - 55 24 55 30 50 50 2 60.5 31 10 3/8 - - 76 16 85 25
65 76.3 40 12 M12 - - 70 28 70 35 65 65 212 76.3 39 13 1/2 - - 96 20 106 30
80 89.1 46 12 M12 - - 83 28 83 35 80 80 3 89.1 45 13 1/2 - - 110 20 120 30
90 101.6 52 12 M12 - - 96 28 96 35 90 90 312 101.6 51 13 1/2 - - 122 20 132 30
100 114.3 59 16 M16 90 50 - - - - 100 100 4 114.3 58 16 5/8 140 50 - - - -
125 139.8 72 16 M16 116 50 - - - - 125 125 5 139.8 71 16 5/8 166 50 - - - -
150 165.2 85 16 M16 142 50 - - - - 150 150 6 165.2 84 16 5/8 192 50 - - - -
175 190.7 98 16 M16 168 50 - - - - 175 175 7 190.7 97 16 5/8 218 50 - - - -
200 216.3 111 20 M20 188 60 - - - - 200 200 8 216.3 110 19 3/4 248 60 - - - -
225 241.8 124 20 M20 214 60 - - - - 225 225 9 241.8 122 19 3/4 274 60 - - - -
250 267.4 137 20 M20 240 60 - - - - 250 250 10 267.3 135 19 3/4 300 60 - - - -
300 318.5 163 24 M24 284 70 - - - - 300 300 12 318.5 161 25 1 359 75 - - - -
350 355.6 181 24 M24 320 70 - - - - 350 350 14 355.6 179 25 1 395 75 - - - -
400 406.4 207 24 M24 370 70 - - - - 400 400 16 406.4 205 25 1 445 75 - - - -
450 457.2 233 30 M30 412 85 - - - - 450 450 18 457.2 230 32 114 507 95 - - - -
JIS F3022 Dimension : KSV3032 JIS F3022
ANCHOR 앙카
ANCHOR TYPE (앙카 종류)
• 세트앙카 • 꽈배기앙카
• 스트롱앙카 (컷앙카) • 계단앙카
• 웨지앙카
• 드롭인앙카
세트앙카 설치방법
세트앙카 규격표
Full Length Screw Length Cap Length Drill Bit Min. Drill Depth Max. Tensile Max. Shear
Sleve Size
L (mm) b (mm) d (mm) d1 (mm) (mm) Strength (Kgf) Strength (Kgf)
Set Anchor는 스리브와 본체로 되어있어 볼트에 타격을 가하면 스리브가 인출(引出)되어 hole 내경과 더욱 밀착되어 고정됩니다.
특히 인재내력(引材耐力)의 강도가 많이 요구될 때 유리하며,ELEVATOR, GUIDE RAIL 등 취부용에 사용됩니다.
용도에 따라 SUS와 STEEL 두 가지로 제작됩니다
사용설명
세트앙카는 콘크리트 타설선 위치를 잡아야하는 불편함을 보안
하여 고정시키고자 하는 상대물을 어떠한 장소에도 용이하게
부착할 수 있도록 고안된 제품으로 시공방법의 순서대로 시공을
한 후 너트를 조이면 파이프와 볼트가 조여져 고정을 시키는데
사용하는 제품입니다.
사용용도
다리위의 방호책, 냉난방공사, 간판공사, 기계설치 등
제품의 재질
일반강, 스텐레스강, 일반용융도금
기타 앙카
ANCHOR 앙카
2. STRONG ANCHOR 스트롱앙카 (컷앙카)
사용설명
콘크리트 타설 후 어떤물체를 연결하기 위해 사용되는 앙카로
전산, 육각볼트 등을 이용하여 물체를 고정하기 위해 사용되는
최적의 앙카입니다.
사용용도
건설공사, 전기공사, 냉난방공사, 조작부대공사, 칸막이공사,
천장(天障)공사, 기계설치공사 등 스트롱앙카는 어떤공사에도
활용됩니다.
제품의 재질
일반강, STS강, 일반용융도금 등
스트롱앙카 설치방법
스트롱앙카 규격표
Sleeve Pin Size (mm)
Total Length Screw Length Drill Size Tensile Strength
Sleve Size Outside(Φ)
L (mm) L1 (mm) e f g (mm) (Kgf)
b (mm)
M6 (W1/4) 30 15 10.5 5.0 7.0 14.0 11.0 901
M8 (W5/16) 35 17 12.0 5.5 9.0 16.0 12.5 1,848
M10 (W3/8) 40 18 14.3 7.5 11.0 19.0 14.5 2,220
M12 (W1/2) 50 22 17.5 9.5 14.0 23.5 18.0 3,785
M16 (W5/8) 60 27 21.5 12.5 17.5 30.0 22.0 5,180
M20 (W3/4) 80 35 25.5 16.0 20.0 32.0 26.5 5,500
M22 (W7/8) 90 40 28.5 19.0 25.5 40.0 29.5 6,200
M24 (W1) 110 50 31.5 20.0 30.0 45.0 33.0 8,000
ANCHOR 앙카
3. WEDGE ANCHOR 웨지앙카
사용설명
빠르고 신뢰성 있는 관통 부착형 앙카. 냉간소성(Cold-forming)
가공으로 재질이 강하면서도 견고합니다. 관통부착시 베이스플레이트
구멍과 앙카구멍 위치가 일정하지 않더라도 별 문제없이 사용이
가능하도록 고안된 제품으로 세트앙카와 달리 다른공구없이 삽입 후
너트를 약 5번 정도 회전 시키면 세팅이 완료되어 세트앙카보다
빠른 시공이 가능하고 인발력을 발휘합니다.
사용용도
세트앙카를 사용하는 곳이면 어디나 가능합니다.
웨지앙카 규격표
Tensile
Total Length Thread Length Large Boole Depth Small Fastenable Drill Size
Sleve Size Strength
L (mm) L1 (mm) b (mm) (mm) (mm)
(Kgf)
75 25 65 10
M8 95 25 65 30 8 2,500
115 25 65 50
80 30 70 10
90 30 70 20
M10 110 35 70 40 10 3,500
120 35 100 20
140 35 100 30
70 30 60 10
90 30 70 20
M12 110 35 90 20 12 4,250
120 35 95 25
140 35 95 45
120 40 110 10
145 40 115 30
M16 16 7,000
160 40 115 45
220 40 170 50
150 45 115 35
170 45 130 40
M20 20 12,250
220 45 150 70
270 45 240 70
28
29
Chemical Compositon 30
BOLTS Unit : mm
Grade Material C Mn P S Si Cr Ni Mo V B
CARBON (B) 0.15 max max
0.35 0.04 0.05
8.8
CARBON 0.25 max max
0.55 0.04 0.05
CARBON (B) 0.15 max max
0.35 0.035 0.05
10.9
Alloy STEEL 0.20 max max
0.55 0.35 0.035
0.20 max max
12.9 Alloy STEEL
0.50 0.035 0.035
0.37 0.65 max max 0.15 0.75 0.15
B7, B7M AISI 4140
0.49 1.10 0.035 0.040 0.35 1.20 0.25
0.36 0.45 max max 0.15 0.80 0.50 0.25
B16
0.47 0.70 0.035 0.040 0.35 1.15 0.65 0.35
max max max max max 18.00 8.00
B8 AISI 304
0.08 2.0 0.045 0.030 1.0 20.00 10.50
max max max max max 16.00 10.00 2.0
B8M AISI 316
0.08 2.0 0.045 0.030 1.0 18.00 14.00 3.0
0.38 0.75 max max 0.15 0.8 0.15
L7, L7M AISI 4140
0.48 1.00 0.035 0.040 0.35 1.10 0.25
max max max max max
A, B
0.30 1.0 0.04 0.05 0.5
CARBON 0.30 0.60 max max 0.15
0.52 min 0.04 0.05 0.35
A325
CARBON (B added) 0.30 0.60 max max 0.0005
0.52 min 0.04 0.05 0.003
0.30 max max
BC, BD
0.53 0.035 0.040
0.28 max max
5
0.55 0.048 0.058
0.28 max max
8
0.55 0.04 0.045
0.15 max max 0.0005
8.2
0.25 0.048 0.058 min
NUTS
Grade Material C Mn P S Si Cr Ni Mo V
0.40 max max
2H, 2HM
min 0.40 0.050
0.40 0.70 max max 0.15 0.20
4 AISI 4042 0.50 0.90 0.035 0.040 0.35 0.30
0.37 0.65 max max 0.15 0.75 0.15
7.7M AISI 4140 0.49 1.10 0.04 0.04 0.35 1.20 0.25
max max max max max 18.00 8.00
8(A194) AISI 304 0.08 2.00 0.045 0.030 1.00 20.00 10.50
max max max max max 16.00 10.00 2.00
8M AISI 316 0.08 2.00 0.045 0.030 1.00 18.00 14.00 3.00
max max max
A, B, C
0.55 0.12 0.15
max max max
2(SAE)
0.47 0.12 0.15
max 0.30 max max
5(SAE)
0.55 min 0.05 0.15
max 0.30 max max
8(SAE)
0.55 min 0.04 0.05
max max max
4T
0.50 0.110 0.150
max 0.30 max max
8T
0.58 min 0.060 0.150
max 0.30 max max
10T
0.58 min 0.048 0.058
Pitch & Hardness Table 31
Pitch
Diameter UNC UNF UN Diameter Coarse Fine UN
1/2 13 20 M12 1.75 1.25
5/8 11 18 M16 2.0 1.5
3/4 10 16 M20 2.5 2.0
7/8 9 14 M22 2.5 2.0
1 8 12 8 M24 3.0 2.0 3.0
1 1/8 8 12 8 M27 3.0 2.0 3.0
1 1/4 8 12 8 M30 3.5 2.0 3.0
1 3/8 8 12 8 M33 3.5 2.0 3.0
1 1/2 8 12 8 M36 4.0 2.0 3.0
1 5/8 8 12 8 M39 4.0 2.0 3.0
1 3/4 8 12 8 M42 4.5 2.0 3.0
1 7/8 8 12 8 M48 5.0 2.0 3.0
2 8 12 8 M52 5.0 2.0 3.0
In line with the worldwide trend imposing a great importance on Quality Assurance, Daedo Bolt initiated a
strict Quality Assurance Management System for the purpose of cost saving, improving productivity and
high quality.
Over the past decade, the strict Q.A. programme has provided Daedo Bolt with a solid reputation as a
company who utilizes the new technology to guarantee the highest quality of its products.
Head Office 172-21, Gum Oh-Ro, Sihung-Si, Gyeonggi-Do, Korea
Tel. 82-31-316-1116 Fax.82-31-316-1118
E-mail : daedobolt@naver.com
www.daedobolt.co.kr