Result 002

You might also like

Download as pdf
Download as pdf
You are on page 1of 5
E.B. TESTING CENTER, IN MATERIALS TESTING AND GEOTECHNICAL ENGINEERING LABORATORY ‘Wo. Rillpe Bev, Marui, lol ly Philppinee net sddroor: eotntingi TEST REPORT ON PORTLAND CEMENT Project +: 20GKO1S8: PREVENTIVE MAINTENANCE OF ROAD: ASPHALT WITH CORRECTION AT SPECIFIC LOCATIONS ALONG BACOLOD NORTH RD. (S00406NR) K0044+000 - 10060+000 Location +: Neg. Ove. Contractor 1BC- INTERNATIONAL BUILDERS CORPORATION Sample identification S-\ Quantity represented —: 2,000 Bags Sampled at + dobsite Type of Cement Portland Cement Type I Cement brand Conch Cement ‘Supplied by Conch Cement Spec's Item No. 2 ASTM C-150 ‘Sampled by: 2 Henry’S. Chen MEIBC December 01, 2020 Geno S. Vito ‘ME DPWH, December 01, 2020 + (Name & designation) (Office) (ate) Submitted by Henry 8. Chen ME IBC December 01, 2020 (Name & desi (Office) (Date) TESTS ‘REQUIREMENTS, ‘RESULTS ‘Magnesium Oxide (MgO), % 6.0% Max. 7 Sulfur Trioxide (SO 3), % 3.0% Max. 1.82 ‘on Dioxide (SiO2), % : - Loss on Ignition, % 3.0% Max, 28 Insoluble Residue, % 1.5 % Max 0.80 Fineness : Amount Passing e 46 No. 0.075 mm, Sieve, % Autoclave Expansion, % 0.80 Max 0.03 Time of Setting : Vicat Test, mins. Initial Set, minutes 45375 126 NORMAL CONSISTENCY, % 35Max. 2713 Compressive Strength, Avg. mortar cubes, MPa: 3 days 12.0 Min, 199 7 days 19.0 Min 210 - 28 days _ 280M 33.6 |__ Specific Gr = 3.12 REMARK: Tn SIGNS Ws SSCA Sad GT SSRI CENTER, INC. ; [Tested By: Checked by: " oe ¢ Chem ry Analyst rc [Test Witnessed by: ME IBC /ME DPWH Ist DEO, New. Oc. E.B. TESTING CENTER, INC. °°: MATERIALS TESTING AHD GEOTECHNICAL ENGINEERING LABORATORY Not8 Rape Bret, Mandurraa, lle Gil, Philpines saan Sen sees oa eons Date : December 16, 2020 Lab. Report No. LRILO-20120'-0080 TEST REPORT ON EMULSIFIED ASPHALT Projet _:20GK0188 - PREVENTIVE MAINTENANCE OF ROAD: ASPHALT WITH CORRECTION AT SPECIFIC LOCATIONS ALONG BACOLOD NORTH RD (SoO4o6NR) K0044+000 -K0060+000 7 Location: Negros Occ. Kind of Material utes papa ($-1 ; Contractor -IBC-INTERNATIONAL BUILDERS CORP. ‘Quantity Represented for every 40 tons Sampled by: Henry 8, Chen / Geno. Vito Sampled 1D :¢1 Submited by Henry 8. Chen / ME Date Sampled December 1, 2020 Source Unioi Petroium Philippines Date Submited December 1, 2020 Sample At: Jobst Spec's tem No AASHTO M140 Testedby RO. Agustin ARB. Bulgado TESTS RESULTS: REQUIREMENTS original sample » | FscosinySaybot.furo), 25%, s 68.0 20-100 Storage Stability, 96 077 1.0 Max. Cement Maing, 6 188 2.0 Max. Stee Tes, 007 0.10 Max. Residue by sition, 96 eas 57 Min Specific Gravity 103 é Residue Peneiraion, 25°C, 100. 8 173 100-200 Duc, 25°C, $ominin cm 2 40min Soluittymrhclorothytene, %6 997, 97.5 Min REMARKS: This report gives the results cari out on samples submitted to. B. TESTIN. Test Witnessed by: GENO s. RY MME IBC / ME DPWH 1st DEO, Neg. Occ TESTING CENTER, INC. MATERIALS TESTING AND GEOTECHNICAL ENGINEERING LABORATORY No® Rape Strat, Mandarina, lle Cl, Priippines “al na (033) 825-3004 039) soo Ta ‘sont eddreee ebtonglislgyenoe sam Date: December 16, 2020 ‘Lab, Report No. LRILO-201201-0083 TEST REPORT ON EMULSIFIED ASPHALT Project = 20GK-0136 - PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG BACOLOD NORTH RD (S00393NR) KO011+(-100) - KO010+K00114016 Location —_: Negros Occ. Kind of Materiat Emus Aap (55-1) Contractor _:1BC-INTERNATIONAL BUILDERS CORP. ‘Quantity Represented: for every 40 tons Sampled by: Henry S. Chen M. B. Pacete Sampled ID cr ‘Submitted by: Henry 8. Chen / ME Date Sampled December 1, 2020, Source nici Petrotium Philippines Date Submitted December 1, 2020 Sample At Jobsite ‘Spec's Item No. AASHTO M-140 Tested by: RO. Agustin ARB. Bulgado TESTS RESULTS: REQUIREMENTS original sample Viscosity (Seybolt-furo), 25 °C, 8 66.0 20-100 Storage Stabiliy, 6 076 1.0 Max. Cement Mexing, % 1.88 2.0Max. Sieve Test % 0.08 0.10 Max. Residue by distillation, % e286 87 Min Specific Gravity 1.03 E Residue Penetration, 25 °C, 100g, wm 100-200 Ductity, 25 °C, S emimin, om 15 40 Min, ‘Solubittyn ichloroetytene, 6 998 97.5 Min, REMARKS: This report gives the results carried out on samples submitted to E. 8. TESTING, ‘This laborator Responsibe forest only Tested by: 7 chemica! Analyst r Test Witnessed by: 1 ME IBC / ME DPWH 1st EO, Neg. Oce E.B. TESTING CENTER, INC.“ MATERIALS TESTING AND GEOTECHNICAL ENGINEERING LABORATORY No.0 Rape Btraet, Mandurraa, tlle Cy, Pilipplnws "Tl ha (08) 320-800 (033) soo aTa2 anal cadrone:ebtewsngislo@yehoe om Date: December 8, 2020 Lab, Report No.- LRILO-201201-0085 TEST REPORT ON BITUMINOUS MIX Project’ 20GK0158: PREVENTIVE MAINTENANCE OF ROAD: ASPHALT WITH CORRECTION AT ‘SPECIFIC LOCATIONS ALONG BACOLOD NORTH RD (SO0406NR) K0044+000 - K0060+000 Location: Neg. Occ. Contractor: IBC - INTERNATIONAL BUILDERS CORPORATION Original Source: _Unioil Petrolium Philippines. ‘Sampled by: Henry 8. Chen Gene S. Vio Sampled at: Jobsite ‘Submited by: Henry S. Chen ME. ‘Sampled LD: C1 ‘Date Sampled: December 1, 2020, (Quantity Rep.: for every 40 tons Date Submitted: December 1, 2020 Spec's. tem No.; As per submitted Jobmix Formula based on Dave Tested: December 1, 2020 Grading "0" Tested By: RO. AgustivAR.B. Bulgado Tests RESULTS | REQUIREMENTS 1. Grading Analysis: Cumulative % Passing (After Extraction) Sieve Size INCH - MM ® 25.0 3a" 19.0 12" 125 318" 95 4 475 #8 236 #16 1.18 #30 0.600 #50 0.300 #200 0.075 [2 Binumen Content, 96 by wt of Aggregates \s 3772040 [3 Bulk Specific Gravity : ~ |. Immersion / Compression Test, Pst Dry 468 0 Min, Wet oe = |s. mdex of Retained Strengih. 96, Ef [70 Mip. ‘Remarks: This report vs te Chemical ant Lal Test Witnessed by ATTESTED: J ME IBC / ME DPWH tst DEO, Neg. Occ. E.B. TESTING CENTER, INC. MATERIALS TESTING AND GEOTECHNICAL ENGINEERING LABORATORY Ne8 Reps Btret, Mandurraa, lle Cy Prilippnes "Tel Na (03) Bau 3004 (oss) soo sTa2 ‘onal saree: ebbing cm Date: December 8, 2020 Lab. Report No.: LRILO-201201-0084 TEST REPORT ON BITUMINOUS MIX Project’ 20GK-0136: PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG BACOLOD NORTH RD., (S00393NR) K0011+{-100) - KO010+K0011+016 Location: Neg. Occ. Contractor: IBC - INTERNATIONAL BUILDERS CORPORATION Original Source: Unio Petrolum Philippines Sampled by: Hoy. Chan MB. Paste ‘Sampled ai: Jobsite Submited by: Wen 8. Chn ME Sampled 1D: C1 Date Sampled: December 1, 2020 Quanity Rep for every 40 tons ate Submited: December 1, 2020 Specs lem No. As per submited Jobe Formula based on Due Test’ December 1, 2020 Gracing "0" Tested By: R.O. AgUsVAR.. Bugado ____Tests RESULTS [REQUIREMENTS | 1. Grading Analysis: Cumulative 96 Passing Afr Extraction) Sieve Size INCH ad _ ea t ~ al ao ae 700 Too 1 96 35-100 3 a5 748 mI 8-62 a5 40-48 36 30-38 28 25-33 4 Bai 6 +9 1% by wt of Aggregates Ges | s7s040 Gravity a 2x 4 tmmersion /Compresiion Test, Pa ry 496 wet = es 4 5 Index of Retained Srengh. 96 2 ‘Remarks: ‘This epor gives thre reps cari out on samples submited to EB. TESHANG CENTEI Tested by: Test Witnessed by: M.B. PACETE / HENRY S. CHEN ME IBC / ME DPWH ‘st DEO, Neg. Occ.

You might also like