ead mek OEE Ae ie sneer ot
_bifferent Section of @ Pipe layout.
Practica) significance
Bernou)i's tnearern states ‘Fara Pa onl
incampressible Suid Pawing (aa _cantinuols —
cream, the toto) eneng Of a! particle rerndins
Same uibile cooving from one paiar to other?
to use He resists.
nica) EngineeringResource Required
p—Mame of | suggested broad
No.| Resource specification
erimento) | straage tanki made up of
p esist. corrosion. capacity
he aaa JOO Ltr. Mono -blOck purnp’ : 4
Mess: | shencanch ca. | phase 1/2 HP constant head |
anks +2 aurnbers. 2€ suitor
counted on Stand, |
{ze OF cry
FRE Lining and Htted with
Plezorneser tube anc] scale r
ionfag copecity 23 nrgProcedure
Stafr the pump ciad pater will How +
Pipe line
rhe
al
2.
ine Pipe OF varying cross secton :
2 VOIVE so thae the water can enter in
Open the outlet vawe afer rising «woter in
pier ornate
malotain Jevel of wwoter
Record inead shawn jn tne prezoMerer_
ieasiure discharge in the measuring ‘unk.
For Collecting gf wottr
Repeat tne procedure a> abore *
Plot tHe following gr=Ph \ 7
5. of etezomerr tube YS pressure head)
Velo ch
10. OF Piezomerer tube US freccre head
NO. 0€ Prezomoter tube VS tora head.——_2— Pmerical erected @uesttiong oe
ee swe Jd iit z
——__|_water {s Sonlag in 4 fire bore ef Wiha
velocity of @l.01)s and 2 pressure OF 20 =
____|| Pa. Ab te nozzle tne presaure cecreases fo __
abonesp beri there: is) Mo jenger change in
heigint.Use the Bernowl|i's equation fo cocu! aie.
He veloc af He water existing the noz2te
a) ev = yenls, Pie 2% 10) Py Qe 21.63 107
i) ou iG Heo ren. a
| Pie ee Vie pb 0S Po ae Vout 2h 2
a a Benes a
013 10% 4 VE =
axib?
PE Oem = [974O)
guy, 2yro]s