Professional Documents
Culture Documents
3D-VIEW.: Designed By: Client: Notes
3D-VIEW.: Designed By: Client: Notes
15 15
62 62
0 0
CH CH
IPE 200-22KG/M EC EC IPE 200-22KG/M
C5-BP-2 K K C10-BP-2
DI DI
M M
EN EN
SI SI
O O
N N
. .
NOTES:
1. ANY DISCREPANCIES SHOULD BE BROUGHT TO THE NOTICE
PLT 400*250*15mm OF STRUCTURAL ENGINEER AS EARLY AS POSSIBLE.
THCK. BASE PLATE.
2.NO ANY JOINT SPLICING SHALL BE MADE TO ANY OF THE
MEMBERS WITHOUT NOTIFYING THE STRUCTURAL ENGINEER.
VIEW ALONG GRID LINE 5.
(SCALE 1:75)
2MM THICK
FISH PLATES
UB-203*133*25KG/M PFC-200*200*23KG/M
PLT 400*250*15mm FOR ALL EAVE COLUMNS FOR DOOR FRAMES
PLT 400*250*12mm IPE 200-22KG/M
THCK. BASE PLATE.
THCK. BASE PLATE. FOR ALL GABLE COLUMNS.
4.NO 20DIA.H.D
4.NO 20DIA.H.D BOLTS.400mm LONG.
BOLTS.500mm LONG.
CLADDING DOOR TO
ARCHITECTS
CONN.DETAIL DETAILS.
PFC-200*200*23KG/M PFC-200*200*23KG/M
FOR DOOR FRAMES FOR DOOR FRAMES
Z-150-2-20-50
FOR ALL CLADDINGS
DOOR TO
ARCHITECTS DOOR TO
DETAILS. ARCHITECTS
DETAILS.
PFC-200*200*23KG/M PFC-200*200*23KG/M
FOR DOOR FRAMES FOR DOOR FRAMES
DOOR TO
ARCHITECTS DOOR TO
DETAILS. ARCHITECTS
DETAILS.
25
ROOF SHEET TO
ARCHITECTS DETAILS.
PLT337*135*10mm.THCK
END PLATE Z-150-2-20-50
PURLINS @ 1300 c/c
14MM DIAMETER HOLES PURLIN WITH
16DIA.XOX STAYS
FOR FOR 12MM DIA. XOX BOLTS
12.DIA ANTI-SAG
127
BOLTS
127
RODS.
32 64 64 64 32
40
256
40
PROFILE DETAILS OF
EAVES GUTTER IPE 160 HAUNCH APEX
500mm LONG MIN.
2NO.PLT10*135
END PLATE
IPE 160 HAUNCH APEX
500mm LONG MIN.
MAX DEPTH ADOPTED MAX DEPTH ADOPTED
2MM THICK FISH IPE 160 FOR
PLATES APEX HAUNCH ALL RAFTERS
Z-150-2-20-50
33 ZED PURLIN CONN.(DET.B)
33 VIEW B - B
25
25
77
77
TYPICAL PURLIN
CONN.DETAILS.
ROOF SHEET TO
ARCHITECTS DETAILS.
218 218
910mm-GIRTH VALLEY
GUTTER OUT OF 2mm Z-150-2-20-50 12.DIA ANTI-
PLT352*135*12mm.THCK 12.DIA ANTI-SAG G.I PLATE. PURLINS @ 1300 c/c SAG RODS.
END PLATE RODS.
204
16DIA.XOX 16DIA.XOX
BOLTS BOLTS
C C
VALLEY -GUTTER DETAILS.
IPE 160 FOR IPE 160 HAUNCH IPE 160 HAUNCH IPE 160 FOR
ALL RAFTERS 1000mm LONG MIN. 1000mm LONG MIN. ALL RAFTERS
PLT12*135 PLT12*135
MAX DEPTH TO BE MAX DEPTH TO BE
END PLATE
ADOPTED. END PLATE
C ADOPTED.
UB-203*102*23KG/M
FOR ALL VALLEY COLUMNS.
VIEW C - C.
DET.B VALLEY HAUNCH
CONN. (DET.C)
IPE 160-16Kg/m FOR IPE 160-16Kg/m FOR
ALL RAFTERS ALL RAFTERS PS1
DET.A DET.C
PLT352*135*12mm.THCK
END PLATE 16DIA.XOX Z-150-2-20-50 12.DIA ANTI-SAG
BOLTS PURLINS @ 1300 c/c RODS.
IPE 120.TIE
BEAM
GUTTER STRAP.
2mm .THCK
RSA 50*50*6
GUTTER BRACKETS.
VIEW A - A
910mm-GIRTH
VALLEY GUTTER
200DIA.DOWN
TAKE PIPE
12.DIA ANTI-
SAG RODS.
RSA 63*63*4
FOR ROOF BRACINGS
RSA 50*50*2
CLAD ANGLE ALL Z-150-2-20-50 610mm-GIRTH
THROUGHOUT THE PURLINS @ 1300 c/c EAVE GUTTER
GABLE ENDS.
50
58
64 115 PLT10 PLT10
33
63
33
150
33
PLT35
PLT9
54
34
PLT9 2 * D 18 8 * D 18
50
5100 60 110 60 50
137
83
902 1000 1248 100 1803 173 169
35
83 64 32
2 * D 14
34 65 34
A
15 3135 100 1803 62 60 43 67 60 42 8 E 4 * D 18
50 150 50
C D
50
B
50
8 * D 18
2 * D 18
M1
98
PLT43
PLT43
PLT51
PLT51
300
PLT35 PLT43 BS
203
300
PLT43 BS
38
38
PLT10 PLT9 PLT10 PLT35 8 * D 18
98
PLT9
50
50
58 133 58 4 * D 18 34 65 34
D
A-A C E E-E
PLT35
50
278
2 * D 18
34
PLT10
33
150
33
119
PLT9
PLT9
34
PLT10 PLT10 8 * D 18
PLT35
50
PLT35
PLT10
45
45
1199 27 2592 57 1435
57 27
28 32 32 28 28 32 32 28
B-B C-C
120
8
8
2 * D 14 116
60
PLT10
160
26
120
64
188 PLT43
PLT35
30
PLT9
28
PLT9
45 75
44
150
Contract BLOCK 6
Tekla Structures
50 300 50 PLT9 PLT4*120 S275 2 146 0.1 1.1 Modelled By KAM. Issued
PHASE QTY. FINISH PLT10 PLT4*26 S275 2 116 0.0 0.1 Contract No. J-NO. Scale 1:5 1:10
1 1 S.B. & PRIME Total 5.5 151.7 Drawing No. [C.1] Revision No. A2
GRID LOCATION
C2 C/3 3135 100 1803 165 177
50
PLT51
PLT10 PLT10
34
150
65
8 * D 18
34
PLT9 PLT9 2 * D 18
50
887 1000 3213 60 110 60 50
50
B 8 * D 18
2 * D 18
M1
50
102
300
PLT43 BS
PLT43 BS
A B B
887 1000 3213 60 110 60 50
50
58 133 58 PLT51
PLT9 PLT9 2 * D 18
50
34
A-A
150
65
PLT10 PLT10
34
50
8 * D 18
902 1002 3149 165 169
400
278
PLT51
120
8 8
PLT9
PLT9
4 * D 22
PLT10 PLT43
250
150
30
120
64
45
PLT9
8
60
28 32 32 28
28
50
B-B 188
2 * D 14 45 75
50 300 50
PLT51
50
34
150
65
63
63
34
8 * D 18
PLT35
58
58
50
PLT35
1184 27 2592 57 1435
57 27
15 5038 62 60 110 60 50
B D
50
50 75 75 50
C 8 * D 18
M2 4 * D 18
74 60 70
PLT35 PLT35
PLT51
50
300
98
38
38
203
300
50
B
1187 1403
C 1403 1190 79 21 58
PLT51 A D
39
58 133 58
A-A
PLT15 PLT15
32
116
150
70
PLT10 PLT15 PLT10 PLT10 PLT10
32
26
64 115
120
PLT35 2 * D 14
54
284
137
120
64
PLT35
83
35
30
28
PLT15
2 * D 14 PLT15
284
39 81
PLT35 83 64 32
284
39
28 32 32 28
1 No. COLUMN REQUIRED AS DRAWN MARKED C3
PLT15
PLT15
D-D
All Holes Are: 22.0 mm UNLESS NOTED
39
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
39
28 32 32 28 MATERIAL LIST FOR ASSEMBLY MK'D C3 1 No. Required No REV MARK REVISION DESCRIPTION REV. DATE
28 32 32 28
C-C Mark Profile Material No. Length Area Weight GOVERNMENT OF UGANDA
B-B M2 UB203*133*25 S275 1 5380 5.0 132.9
PLT51 FLT15*250 S275 1 400 0.2 11.8
PLT43 FLT8*60 S275 6 188 0.2 4.2
Drawing Title FABRICATION DRAWING OF COLUMNS.
PLT15 PLT4*120 S275 3 146 0.1 1.6
Contract BLOCK 6
Tekla Structures
50
58
58
PLT15
34
63
63
150
65
PLT10 PLT15 PLT10
34
8 * D 18
50
5100 60 110 60 50
50
58 133 58 C
4 * D 18
74 60 70
PLT51
PLT35
50
PLT35
300
98
PLT35
4 * D 18
38
38
284
150
203
C D
A 1187 B 1403 1403 1190 79 21 58
39
150
39
28 32 32 28
98
D-D
50
32
50 75 75 50
150
70
A-A
PLT10
32
PLT10 4 * D 18
PLT35
50
PLT35
8 8 1226 57 2592 57 1435
27
PLT43
60
188
39 81 115 64
400
2 * D 14 PLT35
116
54
50 300 50
30
PLT10
137
120
64
26
48
PLT51
PLT15
28
35
PLT15
2 * D 14 4 * D 22
250
150
32 64 83
284
PLT35
50
PLT10
284
PLT10
2 No. COLUMN REQUIRED AS DRAWN MARKED C4
All Holes Are: 22.0 mm UNLESS NOTED
PLT15
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
PLT15
39
MATERIAL LIST FOR ASSEMBLY MK'D C4 2 No. Required No REV MARK REVISION DESCRIPTION REV. DATE
39
PLT16 PLT16
PLT16 PLT11 PLT16 PLT11 PLT16 PLT11
PLT11 PLT11 PLT42
50
PLT50
40
150
40
30
40
3150 100 2863
50
6060 (IPE200 x 6101)
50 75 75 50
B D D D E
31 34
B
50
PLT16 PLT16
M62 PLT16 PLT11 PLT16
40
200
300
PLT42
PLT50
PLT42
250
120
300
PLT50
100
PLT11
47
75 100 75
2 * D 18
50
18
A-A 80 40 20 40
20
D D
300
B B D E-E
A
PLT50 2 * D 18
PLT42
40
30
150
40
120
40
40
222
PLT16 PLT16
40
PLT11 PLT11
6 * D 14
65 60 60 65
39
1204 1401 591 811 1102 1004
400
39 222 PLT50
50
257
2 * D 14
225 39 PLT16 4 * D 22
50 225 39
250
150
PLT16
PLT11
46
120
64
PLT16
28
28
28
50
PLT11
32 32
PLT11 50 300 50
32 32
50
PLT51 PLT15 PLT15 PLT15
34
33
150
33
PLT10 PLT10 PLT10
30
8 * D 18
50
15 5100 60 110 60 50
A
15 5038 62 60 110 60 42 8
58 133 58 B
50
B
B 8 * D 18
M3
50
98
32
284
PLT51
PLT10
300
3x PLT43 BS
150
28
PLT51
203
PLT15 4 * D 18
PLT15 PLT15 PLT10 PLT10
PLT10 4 * D 18
PLT15
150
50
39
98
B B
50
A-A
32
150
70
PLT10 PLT10
32
PLT10 4 * D 18
50
400 39 81 116
2 * D 14
50 300 50
30
PLT10
26
PLT15
120
64
PLT51
PLT15
28
PLT34 PLT35 8 * D 18
50
58
PLT51
58
PLT10 PLT10
34
63
33
150
33
57
PLT9
34
PLT11 PLT9
264
50
PLT16 PLT11 PLT11 PLT11
PLT16 PLT16 PLT16
C D 8 * D 18
PLT16 PLT16
50
PLT43 BS
PLT51
38
38
PLT11 PLT11
PLT9 PLT11 PLT43 BS
203
300
PLT51
8 * D 18
887 1000 3213 60 110 60 50
B C D
A E
98
50
58 133 58
A-A
902 302 698 705 1401 1102 66 110 60 50
PLT9 PLT9
M4
34
33
150
33
278
PLT10 PLT10
PLT10
34
PLT51
PLT34
50
PLT35
1211 27 2592 57 1435
400
45 27
PLT9
PLT51
45
28 32 32 28
4 * D 22
250
150
C-C
50
50 300 50 PLT16
28
28 PLT16
PLT16 116 PLT11
28
PLT11
PLT11 PLT10
32 32
64
26
32 32
58
PLT34
28
28
261
39 225 PLT35
28
36
39 225
2 * D 14 39 225 E-E
PLT16 D-D
83
PLT16
120
64
PLT9
257
50
45
28
39 222
28 32 32 28 PLT11
46
B-B
1 No. COLUMN REQUIRED AS DRAWN MARKED C7
All Holes Are: 22.0 mm UNLESS NOTED
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
120
115 64
2 * D 14 64 115 MATERIAL LIST FOR ASSEMBLY MK'D C7 1 No. Required
PLT35 8 8
PLT34 Mark Profile Material No. Length Area Weight
54
PLT9 PLT43
54
120
64
8
30
28
83
28
PLT34 PLT35 8 * D 18
50
58
58
PLT51 PLT10 PLT15
32 32
34
63
PLT34
57
150
65
28
34
225
225
225
PLT16 PLT11 PLT16
50
PLT11 PLT11 PLT10
119
PLT16 PLT11 PLT16
PLT15
39
39
39
39
1189 1401 1403 1102 286
39 165 28 32 32 28
B-B
50 75 75 50
PLT16
50
42 28 32 32 28 42
15 5100 60 102 8 8 50
98
52
A D E
8 * D 18
C PLT43 BS PLT43
50
PLT11 B
PLT11
PLT11 PLT16 4 * D 18
M3 PLT16 PLT16
203
300
42
42
42
PLT43
74 60 70
PLT51
39 225
300
PLT43 BS E-E
106
38
38
PLT16 PLT43 BS
PLT11
98
50
PLT15
1187 1403 1403 1102 88 100 97
PLT51 A
58 133 58
B C D E
PLT16
28
A-A
28 32 32
15 1189 1401 1403 1104 86 100 97 PLT11
PLT35
123
PLT15
PLT16
PLT16 PLT11 PLT16
PLT11 PLT11
PLT16
PLT51
50
PLT11
39
PLT10 PLT15 PLT15
32
39 165 28 32 32 28
150
70
D-D
PLT10
32
PLT15 PLT10 4 * D 18
50
PLT34 PLT35
1193 30 2592 57 1462
45
115 64
PLT35 PLT16
28
261
54
400
32 32
8 8
137
4 * D 22
48
284
PLT43
PLT16
35
28
8
32 64 83 2 * D 14
2 * D 14
60
120
64
250
50
150
PLT15
188
28
50
39 222
50 300 50
39 165 28 32 32 28
C-C
64 115
257
PLT34 120
PLT11
46
89
120
GENERAL NOTES:
64
26
28
PLT16
50
PLT16
PLT16 PLT11 PLT16 PLT11 PLT16
PLT51 PLT11 PLT11
50
261
33
39 222
57
150
63
33
PLT16
116 PLT15 PLT10 8 * D 18
58
58
PLT34
50
PLT35
PLT10
120
64
26
28
5395 (UB203*133*25 x 5380)
50 75 75 50
C 8 * D 18 4 * D 18
98
D E
50
B PLT16
PLT11 PLT43 BS PLT16
28
M3 PLT16
74 60 70
PLT16 PLT43
32 32
PLT34
PLT51
PLT51
PLT35
300
PLT43 BS
203
300
PLT11
106
PLT11
38
42
38
4 * D 18
28
PLT11
PLT15 PLT10 PLT43 BS
PLT15 PLT10 PLT15 4 * D 18 PLT43
PLT10
50
E 4 * D 18 32 35 35 190 39
98
A C
58 133 58
B D
A-A
225 39
28
18
PLT34
28 32 32
PLT35
50
32
PLT34
54
35
150
35
137
123
35
PLT15 4 * D 18
32
PLT15
50
PLT11 PLT16
48
39
28 32 32 28
1204 1401 1403 1102 286
D-D
400
4 * D 22
PLT51
225 39
250
150
225 39
120
8 8
PLT16 2 * D 14
28
PLT16
28
257
PLT43
50
50 300 50
32 32
120
64
28 32 32
60
30
PLT34 PLT11
46
28
PLT10 188
PLT15 39 81
151
123
PLT15
PLT15
64 115 PLT10
PLT35 28 32 32 28 165 39
28 32 32 28 2 No. COLUMN REQUIRED AS DRAWN MARKED C9
54
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
83
400
PLT50
50 300 50 PLT42
50
35
250
150
50
PLT50 65 120 65
PLT16
35
50
225
225
225
225
PLT16
PLT16
4 * D 22 PLT16 PLT11 PLT11 PLT11 PLT11 PLT42
PLT11
250
150
PLT16
50
120
39
39
39
39
50
6 * D 14
35
1196 1401 587 811 1102 1004
75 100 75
100
B E
50
B PLT16 C C C
31 34
34
PLT16 PLT16
PLT16 PLT16
M63
200
PLT50
300
PLT42
120
PLT50
150
198
PLT42
PLT11 PLT11
40
2 * D 18
47
50
50
18
18
B B C C 80
10 100 10
50 150 50
C
A
300
E-E
A-A
PLT50 PLT11
50
261
PLT11 2 * D 18
40
39 222
32 32
150
40
2 * D 14
PLT16
20
2 * D 18
40
PLT16
28
PLT42
120
3138 100 2863
64
50
28
70 30
C-C
50
39 225 50 PLT16
4 No. COLUMN REQUIRED AS DRAWN MARKED C10
32 32 28 40
MATERIAL LIST FOR ASSEMBLY MK'D C10 4 No. Required GOVERNMENT OF UGANDA
PLT11
46
50
PLT51 PLT9
PLT10
30
150
65
63
63
PLT9
34
PLT10 4 * D 18
PLT35 PLT35
58
58
50
1184 27 2592 57 1435
57 27
A
5395 (UB203*133*25 x 5380)
50 75 75 50
15 5038 62 60 43 67 60 50
B
50 8 * D 18
50
B
98
M4
PLT35 PLT35
300
PLT43 BS
PLT51
203
300
38
38
PLT9 PLT10 PLT43 BS
PLT9 PLT10
PLT51
8 * D 18
50
B
887 1000 3213 60 110 60 50
A B
98
50
58 133 58
1211 57 619 1974 57 1155 60 110 60 50
A-A
27
PLT35 PLT35
PLT51 PLT9 PLT9
50
34
150
65
PLT10 PLT10 8 * D 18
34
50
120
8 8
2 * D 14
PLT43 116
400
30
278
PLT10
120
60
64
8
26
PLT10
PLT51 PLT9
28
188
PLT9
4 * D 22 45 75
250
150
PLT9
45
28 32 32 28 50 300 50
All Holes Are: 22.0 mm UNLESS NOTED
GENERAL NOTES:
B-B All Welds Are: 6.0 mm F.W UNLESS NOTED
MATERIAL LIST FOR ASSEMBLY MK'D C11 1 No. Required No REV MARK REVISION DESCRIPTION REV. DATE
64 115 Mark Profile Material No. Length Area Weight GOVERNMENT OF UGANDA
PLT35 M4 UB203*133*25 S275 1 5380 5.0 132.9
54
50
PLT9 PLT10
34
67 225 39
57
150
65
63
34
PLT10 PLT9 PLT16
28
58
58
PLT34
50
PLT35 8 * D 18
1196 27 2592 57 1435
32 32
45 27
PLT35
PLT11
30
28
50 75 75 50
E-E
A 5395 (UB203*133*25 x 5380)
D E F
B
50
15 5038 62 60 43 67 60 50
98
50
PLT16 PLT16 8 * D 18
M4 PLT11 PLT16 PLT11
150
PLT51
PLT34 PLT35
300
PLT43 BS 34 65 193 39
203
PLT11
38
42
38
PLT16 PLT43 BS
PLT51
PLT9 PLT11 8 * D 18
PLT10 PLT10
150
50
32 32
C PLT43 BS
98
A
50
F
58 133 58 PLT16
A-A PLT43
8 * D 18
887 309 27 2592 57 1155 60 110 60 50 34 33 33 193 39
45 27 F-F
PLT34 PLT35 8 * D 18
PLT51
50
PLT9 PLT9
34
150
65
PLT10
34
PLT10 225 39
50
28
116 902 302 698 703 1403 1102 286
32 32
26
PLT11
PLT10
28
D-D
225 39
PLT16
28
64 115 400
8 8
28 32 32
278
54
PLT11
46
4 * D 22
60
8
250
150
137
117
83
188
PLT9
35
50
PLT9
45
179 50 300 50
45
28 32 32 28
83 64 32
28 32 32 28
C-C
B-B
115 64
PLT34 261 120
2 * D 14
54
39 222
2 * D 14 1 No. COLUMN REQUIRED AS DRAWN MARKED C12
PLT9
137
35
50
120
PLT16
64
GENERAL NOTES:
30
120
28
32 64 83 PLT16
MATERIAL LIST FOR ASSEMBLY MK'D C12 1 No. Required
PLT9 45 75
28
PLT16
PLT11
PLT44 PLT15 PLT15 PLT15 PLT41
PLT15
35
35
21 40 21
32
56
65
65
2 * D 14
90 32
39 81
PLT15
60
35
35
28
PLT24 PLT24
PLT32 PLT24
PLT36 PLT37
64
51
28
PLT15
57 234 21 1896 56 118 2416 57 45 152 12
44 21 25
30
PLT15
C
B
300
E
10
32
40
60
A PLT11 PLT16
M101 G
58
60
PLT44
90
PLT24 PLT24
110
52
53
52
352
PLT36 PLT32
110
PLT41
337
PLT24
53
PLT41
PLT44
60
C H2
H1
E
60
62
47
300
80 29
10
27 82 27
80
10
300
A-A B G 27 82 27
A
G-G
28 64 28 28 64 28
28 64 28 524
PLT15 56 21 92 25 45
39
39
39
PLT15 PLT15
72 60 110 60 50 78 78 83 2 * D 14
2 * D 14
8 * D 18 300
35
199
80
241
152
27
36
118
345
135
65
14
15
60
59
PLT44 PLT24
64
42
64
11
352 44 H2
120
111
27 44 41
524
C-C B-B
E-E
PLT32
240
58 118
PLT37 261
67 1018
50 60 110 60 57
51
257 2 * D 14
134
PLT16 PLT16
35
83
153
PLT11
120
64
35
135
65
80 64 32 2 * D 14
50
46
28
14
PLT41 42 27
8 * D 18 39 222
337
69
PLT24
59
1 No. RAFTER REQUIRED AS DRAWN MARKED R1
34
9
All Holes Are: 22.0 mm UNLESS NOTED 9
GENERAL NOTES:
44 All Welds Are: 6.0 mm F.W UNLESS NOTED
300
80
6 * D 14 43 5085 Mark Profile Material No. Length Area Weight
M101
21 20 21
127
35
337
PLT32
8 * D 18 PLT36 PLT24
PLT41 PLT24 PLT37 PLT41
68
PLT24
35
35
60
32 82
21 40 21
135
65
65
65
56
42 27
35
32
PLT15 PLT15 PLT15 PLT15 PLT24
35
35
50 60 110 60 57 PLT15
PLT16
PLT44
59
25
PLT11
9
9
333 700 1300 995 120 185 1300 152
35 65 35
300
C
39
10
B
80
40
60
PLT15 PLT15
A PLT15 PLT15 PLT15
PLT11
60
G
PLT44
M101
58
110
352
PLT41
90
PLT24 PLT24
46
46
46
PLT32
110
337
PLT36 PLT37
60
53
22
PLT41
PLT44 PLT16
60
H1
62
H2
47
43 43 986 2214 85 31 60 181
E 1300 113 43
10
27 82 27 C 29
10
80 27 82 27
A-A B G
300
G-G
A
28 64 28 28 64 28
28 64 28
PLT15
39
PLT15 PLT37
39
PLT16
51
PLT11
199
PLT16 300
199
134
48
345
80
50
152
2 * D 14
120
64
35
34
PLT16 2 * D 14
42
44 PLT24 32 64 80
PLT24 21 40 21
28
11
B-B H2
E-E 39 222 524
C-C
39 81
2 * D 14 45 25 78 1 56
13 21 67 1018
2 * D 14
28
352 44 2 * D 14
257
PLT36
36
27
64
72 60 110 60 50
44
PLT11
51 6
111 8 10
PLT15
153
28
PLT44 8 * D 18
127
64
64
194
83
46
14
135
65
48
2 * D 14
30
73 64 32 240
PLT32
35
PLT15
35
35
58
25
65
65
PLT24 PLT24
9
PLT24
35
35
PLT44 PLT24
PLT41 9 1 * D 14
35 65 35
11
10
300
B C D
60
40
80
A
PLT15 PLT15 PLT15 PLT15 PLT15
60
PLT44
F
110
352
PLT24 PLT24
PLT41
PLT24 PLT24
110
337
60
PLT41
PLT44
60
H2
62
D
C
80
57
10
35 33 33 35 B
300
A F F-F
A-A
57 229 800 2600 1300 113 43
524
28 32 28
PLT15 28 32 28
28 32 28 32
32
32
PLT15
39
28 32 28
39
32
39
352 300
PLT15
152
80
39
81
72 60 110 60 50 PLT15
81
81
PLT44 8 * D 18 PLT24
PLT24
118
PLT24
81
11
PLT24
118
PLT24 PLT24 H2
118
135
65
34
160
34
27 44 44 27
35
34
44 44
149
27 44 44 27
C-C D-D
E-E 67 1018
B-B
120
153
2 * D 14
14
337
2 No. RAFTER REQUIRED AS DRAWN MARKED R3
120
64
39 79
H1 IPE160 S275 1 1084 0.4 16.5
H2 IPE160 S275 1 524 0.2 8.0
PLT44 PLT12*135 S275 1 352 0.1 4.5
Drawing Title FABRICATION DRAWING OF RAFTER.
PLT41 PLT10*135 S275 1 337 0.1 3.6
Contract BLOCK 6
Tekla Structures
35
35
PLT24
65
65
59
25
PLT24 PLT24 PLT24
35
35
PLT44 PLT24
9
PLT41
9 1 * D 14
300
B C D
18
10
80 80
PLT15 PLT15
32
PLT15
40
PLT15 PLT15
300
F
60
60
PLT24 PLT24 PLT24 PLT24
PLT44
PLT41
110
110
337
352
PLT41
PLT44
D H2
60
60
80 B
62
57
F
300
A
45 43 286 700 2600 1300 113 43
10
F-F
A-A
28 32 28
28 32 28 28 64 28 28 32 28
32
72 60 110 60 50 32 32 524
PLT15
39
39
39
PLT15 PLT15
39
8 * D 18 PLT15
35
300
135
65
152
80
199
199
199
PLT44 PLT24 PLT24 PLT24 PLT24 PLT24 PLT24
241
352
34
11
H2
34
34
27 44 44 27
102
27 44 44 27
44 44
C-C
D-D
B-B
E-E
67 1018
120
153
2 * D 14
2 No. RAFTER REQUIRED AS DRAWN MARKED R4
14
120
64
GENERAL NOTES:
28
39 79 337
H1 IPE160 S275 1 1084 0.4 16.5
H2 IPE160 S275 1 524 0.2 8.0
PLT44 PLT12*135 S275 1 352 0.1 4.5
Drawing Title FABRICATION DRAWING OF RAFTER.
PLT41 PLT10*135 S275 1 337 0.1 3.6
Contract BLOCK 6
Tekla Structures
35
120
65
60 60
62
119
39 81
35
PLT24
2 * D 14 PLT38 PLT37 PLT24
59
63
PLT33
120
64
PLT24
59
5143 (IPE160 x 5085)
25
30
9
43 190 800 1300 1300 1300 152 1 * D 14
PLT15 B 9
C D E
300
PLT15 80
PLT38 PLT15 PLT24 BS PLT15
A PLT15 PLT33 135
35 65 35
G
10
46 PLT24 BS PLT24
46
46
PLT37
11
40
39
PLT41
60
PLT44
60
D H2
PLT41
E
110
57 1029 C 2600 1300 113 43
110
80
G
300
60
A
60
47
62
10
35 65 35
44
10
135 28 64 28 G-G
PLT38 28 64 28
44
A-A 28 64 28 28 64 28
39
39
127
PLT15
39
48
39
PLT15
PLT15
81
81
524
35
81
2 * D 14
118
160
234
32 64 73
PLT33
118
300
PLT24 PLT38
34
80
D-D 44 44
PLT24
152
34
C-C PLT24
56 21 78 1 57
E-E
2 * D 14 2 * D 14 337 B-B
11
1 25 H2
524
PLT41
27
36
14
10
135
60
59
65
64
222
67 1018
120
117
35
50 60 110 60 57
8 * D 18 All Holes Are: 22.0 mm UNLESS NOTED
240 PLT33 GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
153
MATERIAL LIST FOR ASSEMBLY MK'D R5 1 No. Required
Mark Profile Material No. Length Area Weight
14
352 M102 IPE160 S275 1 5085 3.2 76.8
58 118
H1 IPE160 S275 1 1084 0.4 16.5
72 60 110 60 50
No REV MARK REVISION DESCRIPTION REV. DATE
H2 IPE160 S275 1 524 0.2 8.0
8 * D 18 PLT37
PLT44 PLT12*135 S275 1 352 0.1 4.5 GOVERNMENT OF UGANDA
51
65
83
80 64 32
2 * D 14 Drawing Title FABRICATION DRAWING OF RAFTER.
PLT37 PLT6*134 S275 1 176 0.0 0.8
Contract BLOCK 6
Tekla Structures
35
35
32
65
65
32
39 81
28
29
119
2 * D 14 PLT24
60
35
PLT15
PLT38 PLT37 PLT24
28
59
63
PLT33
64
42 27
222 21 1896 56 81 25 2371 57 197
PLT15
28
56 21 57 25 PLT24
59
25
30
9
9
PLT15 B E
45 43 290 700
C 1300 D 1300 1300 109 43
300
35 65 35 PLT15 80 35 65 35
PLT15 PLT15 PLT15 PLT15
A M102 PLT24
PLT33
81
10
18
40
PLT24
32
53
53
53
PLT38 PLT37
60
60
PLT44 PLT41
D
PLT44
H1 H2
110
PLT41
337
110
60
300
60
G
B
47
A
62
10
135
10
135
G-G
A-A 28 64 28 28 32 28
32
28 64 28
39
39
PLT15
PLT15
39
44 PLT38
PLT15
PLT38 534
199
PLT24
44
241
PLT24
241
127
48
B-B 300
PLT33
34
35
80
41 41 27 89 27
152
2 * D 14 D-D
32 64 73 C-C E-E
11
H2
524
56 21 78 1 57 50 60 110 60 57
2 * D 14 2 * D 14
1 25
35
27
36
65
10
60
59
64
222
8 * D 18 GENERAL NOTES:
120
117
153
MATERIAL LIST FOR ASSEMBLY MK'D R6 1 No. Required
240 PLT33
Mark Profile Material No. Length Area Weight
14
M102 IPE160 S275 1 5085 3.2 76.8
58 118
H1 IPE160 S275 1 1084 0.4 16.5
72 60 110 60 50 No REV MARK REVISION DESCRIPTION REV. DATE
PLT37 H2 IPE160 S275 1 524 0.2 8.0
8 * D 18
51
35
65
83
59
PLT24 PLT15 PLT24 PLT15 PLT41
35
42 27
64
62
PLT24
65
PLT15
28
59
25
PLT15 PLT15 PLT15
35
PLT24 PLT24 PLT24
9
57 335 698 1300 1300 1300 152 12 9 1 * D 14
30
PLT15
35 65 35
35 65 35 B C E
30 303 700 1300 1300 1300 152 G
10
300
PLT15
11
PLT15
40
PLT15 PLT15 80
8
A M102 PLT15
32
60
60
PLT24
52
52
52
53
PLT38 PLT33 PLT37
110
PLT41
337
PLT44
PLT24
110
H1 H2
60
E
60
47
80
62
10
B G
135
300
A
10
135
G-G
A-A
28 32 28
28 64 28 524
28 64 28 32
39
39
118 58
39
39
PLT37 PLT15 PLT15 300
PLT38
81
44
80
51
152
199
44
199
134
345
83
92
83
35
2 * D 14 PLT24
11
H2
42
34
32 64 80
35
2 * D 14 44 44 PLT24 524
PLT24
73 64 32 27 89 27 B-B
C-C
E-E
67 1018
337 1 No. RAFTER REQUIRED AS DRAWN MARKED R7
35
GENERAL NOTES:
65
153
83 78 78
2 * D 14 2 * D 14 PLT41 8 * D 18 MATERIAL LIST FOR ASSEMBLY MK'D R7 1 No. Required
35
14
50 60 110 60 57 Mark Profile Material No. Length Area Weight
36
27
60
59
64
65
PLT33
120 PLT38 PLT37
PLT44 PLT24
59
39 81 PLT24 PLT15 PLT24 PLT15 PLT41
35
42 27
2 * D 14 PLT24
62
65
59
25
120
PLT15
64
PLT15
35
PLT24 PLT15 PLT24 PLT24
9
PLT15 235 798 1300 1300 1300 152 12 9 1 * D 14
28
30
B C E
10
G
35 65 35 43 190 800 1300 1300 1300 152
40
300
PLT15
22
PLT15 PLT15 80
60
A M102 PLT15
28
PLT41
60
46
46
46
46
PLT33
110
PLT37
337
PLT38
PLT44
60
H2
H1
E
47
60
10
80 135
62
B G
300
A G-G
10
135
A-A
28 32 28 524
32
28 32 28 28 32 28
39
39
32 32 300
118 58 39
80
39
PLT37
81
PLT38 PLT15 PLT15
152
44
51
118
44
345
199
199
134
92
83
11
H2
83
524
35
2 * D 14 PLT24
35
42
2 * D 14
34
32 64 80 44
44 44 PLT24
PLT24
73 64 32 27 89 27 B-B
C-C
E-E
67 1018
153
57 25 81 21 56 All Holes Are: 22.0 mm UNLESS NOTED
135
GENERAL NOTES:
65
14
83 78 78
2 * D 14 2 * D 14 337 MATERIAL LIST FOR ASSEMBLY MK'D R8 1 No. Required
35
8 * D 18
Mark Profile Material No. Length Area Weight
36
27
60
63
72 60 110 60 50
PLT44 PLT12*135 S275 1 352 0.1 4.5 GOVERNMENT OF UGANDA
PLT33
PLT41 PLT10*135 S275 1 337 0.1 3.6
135
240
65
35
39 81
18 32
42 27
2 * D 14
65
60 60
12
PLT24
119
28
PLT15
35
PLT24
59
PLT24
25
PLT38 PLT37 PLT24
59
63
64
PLT33
9
9 1 * D 14
PLT15
28
PLT15
5143 (IPE160 x 5085)
35 65 35
C D E
10
B
300
43 290 700 1300 1300 1300 152
40
35 65 35 PLT15 80
PLT15 PLT15 PLT15
PLT24
60
22
A PLT15 PLT33
M102
G
28
PLT41
46
46
46
110
PLT37
337
PLT38
60
60
110
H2
352
H1
D
E
47
43 1029 C 2600 1300 113 43
60
10
80
135
B
300
G
62
A G-G
10
135
A-A
28 64 28
28 64 28 28 64 28 28 64 28
524
39
39
44 PLT15
39
PLT15
39
PLT15
PLT38
300
44
199
80
199
152
241
345
127
48
PLT33
PLT24
35
34
PLT24
42
2 * D 14 32 64 73 D-D
11
44 44 H2
PLT24 27 89 27
B-B 524
C-C E-E
56 21 78 1 57
2 * D 14
2 * D 14 1 25
50 60 110 60 57 67 1018
1 No. RAFTER REQUIRED AS DRAWN MARKED R9
27
36
PLT41
14
10
60
59
64
135
65
64
GENERAL NOTES:
153
120
337
35
8 * D 18
MATERIAL LIST FOR ASSEMBLY MK'D R9 1 No. Required
14
240 PLT33
Mark Profile Material No. Length Area Weight
M102 IPE160 S275 1 5085 3.2 76.8
58 118 H1 IPE160 S275 1 1084 0.4 16.5
No REV MARK REVISION DESCRIPTION REV. DATE
H2 IPE160 S275 1 524 0.2 8.0
PLT37
PLT44 PLT12*135 S275 1 352 0.1 4.5 GOVERNMENT OF UGANDA
51
72 60 110 60 50
8 * D 18 PLT41 PLT10*135 S275 1 337 0.1 3.6
99
83
65
35
35
18 32
65
39 81
60 60
12
119
PLT15
35
2 * D 14 PLT24 PLT24
PLT38 PLT37 42 27
28
59
63
PLT33 PLT24
PLT24
64
58
25
PLT15 14 43 222 21 1896 56 81 25 2371 57 197 12
28
56 21 57 25
9
9 1 * D 14
30
300
30 203 800 1300 1300 1300 152 35 65 35
35 65 35 PLT15 80
PLT15
10
PLT15 PLT24 PLT15
A PLT15 PLT33
40
18
G
PLT24
60
32
52
52
53
PLT38 PLT37
60
PLT24 PLT41
110
PLT41
PLT44
337
D H2
110
352
60
45 43 986 C 2600 1300 113 43
80
60
47
B G
300
10
62
135
10
135 G-G
A-A
28 64 28
28 64 28 28 64 28 28 64 28
524
39
39
39
39
44
39
PLT15 PLT15
PLT15
81
PLT38 300
44
80
199
199
345
152
241
PLT38
127
48
PLT33
35
PLT24
34
PLT24
42
2 * D 14 32 64 73 D-D
11
44 44 H2
PLT24 27 89 27 B-B 524
C-C E-E
56 21 78 1 57 337
2 * D 14
2 * D 14 1 25
35
67 1018
1 No. RAFTER REQUIRED AS DRAWN MARKED R10
27
36
135
65
14
10
59
PLT41
64
GENERAL NOTES:
222
153
50 60 110 60 57
120
117
14
240 PLT33 Mark Profile Material No. Length Area Weight
M102 IPE160 S275 1 5085 3.2 76.8
H1 IPE160 S275 1 1084 0.4 16.5
58 118 No REV MARK REVISION DESCRIPTION REV. DATE
H2 IPE160 S275 1 524 0.2 8.0
72 60 110 60 50 PLT37 GOVERNMENT OF UGANDA
PLT44 PLT12*135 S275 1 352 0.1 4.5
51
35
65
83
63
59
PLT15 PLT24 PLT15 PLT24
35
35
28
32 87
62
42 27
65
65
64
PLT24
32
PLT15 PLT24 PLT15 PLT24
28
35
35
PLT24 PLT15 PLT24
59
25
333 700 1300 1300 1300 152
9
1 * D 14
30
PLT15
5143 (IPE160 x 5085)
B C 135
35 65 35
300
43 290 700 1300 1300 1300 152
E
10
PLT15 80
PLT15 PLT15
40
A PLT15 M102 PLT15
39
81
60
60
PLT24
PLT24
46
46
46
PLT38 PLT33 PLT37
PLT41
110
PLT24
110
PLT44 PLT41
H1 H2
60
C E
60
47
80
62
B G
300
10
A
35 33 33 35
10
135
A-A G-G
337 524
352
28 64 28
50 60 110 60 57 28 64 28
72 60 110 60 50 PLT15
46
39
300
PLT38
39
PLT41
PLT15
80
152
81
135
81
65
135
65
118
8 * D 18
118
8 * D 18
35
B-B
11
H2
35
PLT24 524
34
PLT24
34
44 44
PLT24 PLT24
57 25 81 21 56
300
C-C E-E
43 5042
80 67 1018
83 78 78
2 * D 14 2 * D 14 M102
1 No. RAFTER REQUIRED AS DRAWN MARKED R11
36
27
153
14
60
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
64
64
80
14
5042 43
120
117
83
Contract BLOCK 6
35
2 * D 14
Tekla Structures
63
59
2 * D 14 PLT24 PLT15 PLT24
35
35
32 87
28
62
65
65
64
32
PLT15 PLT24 PLT15 PLT24 PLT24
35
35
PLT15 PLT24 PLT15
28
42 27
30
PLT24
PLT15
58
25
5131 (IPE160 x 5085)
9
B C 9 1 * D 14
30 12 190 800 1300 1300 1300 152
300
27 82 27 E
PLT15 80
PLT15 PLT15
11
A M102 35 65 35
PLT15 PLT15
81
39
10
PLT24
PLT24
60
52
52
52
PLT38 PLT33 PLT37
40
PLT24 PLT41
PLT44
60
110
H1 H2
C E
110
PLT41
337
45 30 999 2600 1300 113 43
60
80
G
62
B
300
60
A
10
135
47
A-A
10
G-G
337
72 60 110 60 50 28 64 28
PLT41 28 64 28 28 64 28
35
524
35
PLT15
39
39
39
135
PLT15
65
135
65
81
8 * D 18
8 * D 18 300
199
199
80
50 60 110 60 57
152
52
PLT38
118 58 PLT24 PLT24
34
PLT37
42
44 44
PLT24 PLT24
11
44 H2
51
C-C 524
PLT38 E-E B-B
44
134
48
92
83
32 64 80 67 1018
35
2 * D 14 2 * D 14
73 64 32 All Holes Are: 22.0 mm UNLESS NOTED
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
153
57 25 81 21 56
MATERIAL LIST FOR ASSEMBLY MK'D R12 1 No. Required
Mark Profile Material No. Length Area Weight
14
83 78 78
300
27
64
64
PLT32 PLT37
PLT36
PLT44 PLT24 PLT41
59
PLT24 PLT24
PLT15 PLT15
35
35
21 40 21
62
65
65
PLT15 PLT15
35
35
PLT15
PLT16
PLT11
44
11
79
8
300
B
32
83
E 80
2 * D 14
48
60
58
110
352
90
PLT24 PLT24
53
52
52
53
PLT36 PLT32 PLT37
PLT24
60
53
PLT44 PLT41
PLT11 35 65 35
H2
62
H1
E
10
43 43 986 2214 85 31 60 181 1300 113 43
10
135
40
C 29
80
A-A
B G
60
300
110
PLT41
337
60
39 81 524
28 64 28 28 64 28
47
28 64 28
2 * D 14
28
39
10
39
39
64
80
28
81
152
300 G-G
199
199
153
30
11
H2
34
42
PLT15 PLT24
98
44 524
27
PLT24 6 * D 14
C-C E-E
21 20 21
B-B
20
3328 60 60 1637
45 25 92 21 56 67 1018
83 78 78 337
2 * D 14 2 * D 14
35
300
153
36
27
135
65
43 5085 80
14
15
60
14
59
PLT41
222
64
118 58
35
M101
64
8 * D 18
PLT37
120
50 60 110 60 57
111
51
PLT32 240
257
134
48
80
3328 60 60 1594 43
300
PLT11
35
2 * D 14 32 64 80
46
42 27
4 * D 18 72 60 110 60 50
PLT24
1 No. RAFTER REQUIRED AS DRAWN MARKED R13
4 * D 18
58
35
65
9
MATERIAL LIST FOR ASSEMBLY MK'D R13 1 No. Required
352
Mark Profile Material No. Length Area Weight
M101 IPE160 S275 1 5085 3.2 76.8
H1 IPE160 S275 1 1084 0.4 16.5
H2 IPE160 S275 1 524 0.2 8.0
PLT44 PLT12*135 S275 1 352 0.1 4.5
No REV MARK REVISION DESCRIPTION REV. DATE
PLT41 PLT10*135 S275 1 337 0.1 3.6
PLT15 PLT4*120 S275 5 146 0.2 2.7 GOVERNMENT OF UGANDA
PLT32 PLT6*221.7 S275 1 240 0.1 2.4
PLT16 PLT4*120 S275 1 307 0.1 1.2
PLT37 PLT6*134 S275 1 176 0.0 0.8
Drawing Title FABRICATION DRAWING OF RAFTER.
PLT36 PLT6*126.8 S275 1 169 0.0 0.7
Contract BLOCK 6
Tekla Structures
PLT11
PLT16
PLT44 PLT41
PLT15 PLT15 PLT15
PLT15 PLT24
35
35
21 20 21
20
65
65
PLT24
35
35
PLT37 PLT15
PLT36 PLT24
PLT32 42 27
59
34
9
9
35 65 35 35 65 35
43 190 800 1300 1300 1300 152
22
10
B C E
28
300
40
PLT15 PLT15 PLT15 PLT15 PLT15
60
80
A M101 PLT37
60
PLT11
58
90
PLT41
PLT24 PLT24
110
PLT44
352
46
46
46
PLT36 PLT32
110
337
PLT24
53
PLT44 PLT16
PLT41
60
H2
60
C
H1
300
E
62
47
43 30 986 2214 85 31 60 181 1300 113
80 43
80 12 29
10
27 82 27
10
B G 27 82 27
300
A-A
A G-G
28 64 28
28 64 28
28 64 28 524
PLT15
39
39
39
PLT15 PLT15
50 60 110 60 57
300 39 81
35
257
241
80
234
118
28
241
152
118
135
65
PLT11
30
PLT36
64
8 * D 18
35
46
44 27 44 PLT15 PLT15
112
28
PLT41
11
337 H2
C-C E-E 524
B-B
261
56 21 118 45
PLT16
78 78 83 PLT36 44 58 118
2 * D 14 2 * D 14 PLT16
72 60 110 60 50
2 * D 14
44
120
67 1018
64
PLT37
50
27
36
51
127
35
14
15
99
60
135
59
65
28
222
83
64
48
153
64
8 * D 18
120
2 * D 14
111
32 64 73
35
35
352 80 64 32 2 * D 14
39 222
14
170 70 PLT32
PLT32
PLT36
PLT24 PLT37 PLT15 PLT41
68
PLT15
35
35
60
32 82
21 40 21
65
65
56
2 * D 14 PLT15
32
PLT15 PLT15
35
35
39 81
PLT16
28
PLT44 PLT11
64
PLT15
30
PLT15
C 35 65 35
300
35 65 35 B
E 80
10
18
40
A PLT37
32
M101 G
58
60
60
90
PLT24
52
52
52
PLT36 PLT32
PLT44
110
PLT41
337
53
110
PLT41
352
PLT44
H1 C E H2
60
60
47
80
62
B
300
10
G
10
135 A 27 82 27
A-A G-G
524
28 64 28 28 64 28
72 60 110 60 50 28 64 28
45 25 78 1 56
39
8 * D 18 44 PLT15
39
13 21 2 * D 14
35
2 * D 14 300
39
PLT36 PLT15
80
44
52
27
135
152
65
199
14
127
PLT44
345
60
59
83
PLT36
241
64
64
352
120
48
2 * D 14
111
11
H2
34
73 64 32 524
PLT24
240 PLT32 C-C 42 27
B-B
E-E
67 1018
50 60 110 60 57
300
43 5085 80
35
153
M101
21 20 21
M101
135
20
65
14
PLT41 8 * D 18
6 * D 14
337
3328 60 60 1637 80 3328 60 60 1594 43 1 No. RAFTER REQUIRED AS DRAWN MARKED R15
300
PLT11
PLT16
PLT44 PLT41
PLT15 PLT15
PLT15
35
35
21 20 21
20
65
65
PLT15
82
PLT15
35
35
PLT24 PLT37
68
PLT36 PLT32
C G
18
300
E
PLT15
32
58
46
42 27
PLT24
90
46
46
PLT36 PLT32 PLT37
110
59
PLT44
352
34
PLT41
53
PLT44
9
PLT16 9
H2
60
C
H1
E
43 43 3200 85 31 60 181 1413 43
62
29
80
10
27 82 27 B G
300
A 35 65 35
A-A
10
40
60
PLT41
524
110
337
28 64 28 28 64 28
28 64 28
4 * D 18
PLT41 PLT15
39
35
39
PLT15 300
60
39
257 PLT15
80
135
152
65
47
PLT11
241
241
35
118
50 60 110 60 57
234
46
10
337
11
H2 135
524
27 44 G-G
C-C
112
E-E
B-B
44 58 118
PLT36 67 1018
44
PLT37 72 60 110 60 50
51
39 81
8 * D 18 2 * D 14
28
127
83
134
153
83
64
135
48
65
2 * D 14 32
35
64 73 2 * D 14 PLT15
28
14
35
352
80 64 32
30
PLT15
261
56 21 118 45 39 222
80
64
27
36
GENERAL NOTES:
M101 All Welds Are: 6.0 mm F.W UNLESS NOTED
21 20 21
14
15
28
60
64
64
6 * D 14
111
50
PLT11
PLT16
PLT44 PLT41
PLT15 PLT15
PLT15 PLT15
35
35
21 20 21
20
65
65
42 27
PLT24 PLT15
35
35
69
PLT24 PLT37 PLT24
PLT36
PLT32
58
34
44 21 45 25
9
9
10
C
300
B E
40
PLT15 PLT15 PLT15 PLT15 PLT15 80
35 65 35
A M101 PLT37
60
PLT11
58
18
90
PLT24 PLT24
52
53
53
PLT32
32
110
PLT41
337
PLT36
PLT24
53
60
PLT44 PLT16
PLT41
H2
60
C
PLT44
H1
E
110
352
47
43 43 986 2214 85 31 89 181 1300 113 43
80
10
135
G
60
B
300
G-G
A
62
10
135
A-A
28 32 28
28 32 28 28 32 28
32
32 32 524
337
39
PLT15
39
39
50 60 110 60 57 PLT15 2 * D 14
300
35
257 39 81
241
80
118
234
28
241
152
118
135
65
PLT11
30
64
35
PLT41
46
8 * D 18 PLT15
44 27 44 PLT15
112
28
11
H2
C-C E-E 524
B-B
261
352
PLT36 44 58 118 PLT16
72 60 110 60 50
44
67 1018
35
PLT37 PLT16
51
120
127
64
35
135
65
50
99
8 * D 18
83
48
153
2 * D 14 2 * D 14
28
32 64 73
35
80 64 32 2 * D 14
39 222
14
56 21 118 45
300
78 78 83 43 5085 80
2 * D 14 2 * D 14
20
36
3328 60 60 1637
15
60
59
222
64
120
80 3328 60 60 1594 43
H1 IPE160 S275 1 1084 0.4 16.5
PLT32
300
44
PLT44 PLT24
59
PLT24 PLT24 PLT41
79
35
83
21 40 21
62
2 * D 14
48
65
PLT15 PLT15 PLT15 73 64 32
PLT15
35
PLT15
PLT11
PLT16
10
43 190 800 1300 1300 1300 152
B C
40
G
300
E
35 65 35
60
PLT15 80
PLT15 PLT15 PLT15 PLT15
M101 PLT16
A
22
PLT41
58
110
337
90
28
PLT24 PLT24
46
46
46
46
PLT36 PLT32 PLT37
60
PLT24
60
PLT41
53
PLT44
PLT11
H2
47
110
H1
PLT44
352
10
43 43 986 2214 85 31 60 181 1300 113 43
C 135
29
60
80
B G G-G
300
62
A
10
135
A-A
28 64 28
28 64 28 524
39
39
28 64 28
39
PLT15 257
39 81
2 * D 14
PLT15
81
39
127
118 58 300
28
PLT11
80
PLT37
152
199
64
46
PLT36
51
199
223
PLT15
28
134
83
34
11
PLT24 H2
524
35
27
42
2 * D 14
30
32 64 80 44 B-B
PLT24 E-E
PLT15 C-C
261
2 * D 14
67 1018 PLT16
50
120
64
300
PLT16
28
43 5042
153
3328 60 60 1637 80 50 60 110 60 57 39 222
M101
14
PLT41
35
M101
21 20 21
20
135
65
6 * D 14
35
27
60
135
65
64
64
GOVERNMENT OF UGANDA
120
35
PL
T3
1
113
2 * D 14 2 * D 14
M108
25
25
127
32 64 3012 241 41 57 3012 64 32
L63*63*4 x 6555
28 18 240 85
60
2 * D 14
PLT31
44
22
147
12
64 64
147
12
22
44
85 240 60 28 2 * D 14
18
PLT31
2 * D 14
2 * D 14
64
M108
25
25
176
3108 57 6 35 241 3108
85 240 60 28
18
2 * D 14
PLT31
44
22
147
64
12
64
147
12
22
44
28 18 240 85
2 * D 14
60
L63*63*4 x 3190
32 64 2998 64 32
2 * D 14 2 * D 14
M109
25
25
No REV MARK REVISION DESCRIPTION REV. DATE
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M109 L63*63*4 S275 1 3190 0.8 12.2 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 12 S.B. & PRIME Total 0.8 12.2 Drawing No. [BR.11] Revision No. A3
GRID LOCATION
C13 D/5 1187 1403 1403 1046 62 60 43 67 60 50
PLT51
50
PLT15 PLT15 PLT10 PLT15
PLT10
30
150
65
63
63
PLT10
34
8 * D 18
PLT35
58
58
50
PLT35
1184 27 2592 57 1435
57 27
284
15 5038 62 60 110 60 50
PLT15
D
50
PLT10 D C
8 * D 18
39
4 * D 18
M3
28 32 32 28
74 60 70
PLT35
PLT51
300
C-C
38
38
PLT15 PLT15 PLT10 PLT10 3x PLT43 BS
PLT10 PLT15 4 * D 18
50
50 75 75 50 D
C
A D
50
150
203
PLT15 PLT15
50
32
PLT51
58 133 58
150
70
A-A
PLT15 PLT10 PLT10 PLT10
32
4 * D 18
1202 1403 1403 1388
50
102
115 64
120 PLT35
2 * D 14
400
116
PLT35
120
54
4 * D 22
183
64
PLT51
30
8 8 PLT10
26
137
28
PLT15
48
PLT43 39 81
PLT15 39 81
250
150
35
60
8
39
2 * D 14
188
50
32 64 83 28 32 32 28
50 300 50
D-D
1 No. COLUMN REQUIRED AS DRAWN MARKED C13
All Holes Are: 22.0 mm UNLESS NOTED
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
MATERIAL LIST FOR ASSEMBLY MK'D C13 1 No. Required No REV MARK REVISION DESCRIPTION REV. DATE
1300
1300
M26
974 317
M11
80
300
39
300
1 * D 12
1 * D 12 1 * D 12 1 * D 12 1 * D 12
M26
25
25
25
25
179 800 1300 1300 1300 189
39
322
300
5058 11
M11
5
M26
M11
5 174 800 1300 1300 1300 189
80
300
300
39
1 * D 12 1 * D 12 1 * D 12
1 * D 12 1 * D 12
25
25
25
25
25
189 1300 1300 1300 800 179 301
M17
39
300
5379 (L40*40*2 x 5068)
322
M76 M17
82
M17
300
11 178 1300 1300 1300 800 174 5 301 10
80
80
300
300
39
300
1 * D 12 11 5068
1 * D 12 1 * D 12 1 * D 12 1 * D 12 39
M76 M76
25
25
25
25
25
189 1300 1300 1300 800 179
80 5
300
1 * D 12 1 * D 12
1 * D 12 1 * D 12 1 * D 12
25
25
25
25
189 1300 1300 1300 700 274
L40*40*2 x 5063
M75
80
300
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M75 L40*40*2 S275 1 5063 0.8 6.2 Contract No. J-NO. Scale 1:7.5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 0.8 6.2 Drawing No. [CA.3] Revision No. A3
GRID LOCATION
CA4 A/2-3
CA4 E/3-4
1 * D 12 1 * D 12 1 * D 12 1 * D 12
1 * D 12
25
25
25
25
974 1300 1300 1300 189
L40*40*2 x 5063
80
300
No REV MARK REVISION DESCRIPTION REV. DATE
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M81 L40*40*2 S275 1 5063 0.8 6.2 Contract No. J-NO. Scale 1:7.5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 0.8 6.2 Drawing No. [CA.4] Revision No. A3
GRID LOCATION
CR1 A/2-3
CR1 E/3-4
ZZ150-2-25-50 x 3498
M21
75
75
75
2 * D 14
2 * D 14
1 * D 14
30 64 1571 1699 64 70
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M21 ZZ150-2-25-50 S275 1 3498 2.1 16.0 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.0 Drawing No. [CR.1] Revision No. A3
GRID LOCATION
CR2 A/4-5
CR2 E/1-2
ZZ150-2-25-50 x 3606
74 64 1635 1699 64 70
1 * D 14 1 * D 14
M22
1 * D 14
75
75
75
1 * D 14 1 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M22 ZZ150-2-25-50 S275 1 3606 2.1 16.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.5 Drawing No. [CR.2] Revision No. A3
GRID LOCATION
CR3 A/1-3
CR3 E/3-5
ZZ150-2-25-50 x 3406
70 64 1635 1504 64 70
M23
75
75
75
2 * D 14
1 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M23 ZZ150-2-25-50 S275 1 3406 2.0 15.6 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.0 15.6 Drawing No. [CR.3] Revision No. A3
GRID LOCATION
CR4 A/3-5
CR4 E/1-3
ZZ150-2-25-50 x 3406
70 64 1504 1635 64 70
M24
75
75
75
2 * D 14
1 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M24 ZZ150-2-25-50 S275 1 3406 2.0 15.6 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.0 15.6 Drawing No. [CR.4] Revision No. A3
GRID LOCATION
CR5 A-B/1
CR5 D-E/5
ZZ150-2-25-50 x 6298
2 * D 14 1 * D 14
M25
75
75
75
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M25 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 3.7 28.9 Drawing No. [CR.5] Revision No. A3
GRID LOCATION
CR6 A-B/1
CR6 D-E/5
ZZ150-2-25-50 x 6298
M27
75
75
75
2 * D 14
1 * D 14
1 * D 14 1 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M27 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 3.7 28.9 Drawing No. [CR.6] Revision No. A3
GRID LOCATION
CR7 A-B/5
CR7 D-E/1
ZZ150-2-25-50 x 6298
1 * D 14
M28
75
75
75
1 * D 14 1 * D 14 1 * D 14 1 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M28 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 3.7 28.9 Drawing No. [CR.7] Revision No. A3
GRID LOCATION
CR8 A-B/5
CR8 D-E/1
ZZ150-2-25-50 x 6298
M29 2 * D 14
75
75
75
2 * D 14
1 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M29 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 3.7 28.9 Drawing No. [CR.8] Revision No. A3
GRID LOCATION
CR9 B-C/1
CR9 B-C/5
CR9 C-D/1
CR9 C-D/3
CR9 C-D/5
ZZ150-2-25-50 x 5996
30 64 2872 2936 64 30
M30
75
75
75
2 * D 14 2 * D 14
1 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M30 ZZ150-2-25-50 S275 1 5996 3.5 27.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 6 S.B. & PRIME Total 3.5 27.5 Drawing No. [CR.9] Revision No. A3
GRID LOCATION
CR10 B-C/1
CR10 B-C/5
CR10 C-D/1
CR10 C-D/5
ZZ150-2-25-50 x 5996
30 64 2936 2872 64 30
1 * D 14
M31
75
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M31 ZZ150-2-25-50 S275 1 5996 3.5 27.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 3.5 27.5 Drawing No. [CR.10] Revision No. A3
GRID LOCATION
CR11 A/4-5
CR11 E/1-2
ZZ150-2-25-50 x 3502
74 64 1635 1635 64 30
M32
75
75
75
2 * D 14
2 * D 14 1 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M32 ZZ150-2-25-50 S275 1 3502 2.1 16.1 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.1 Drawing No. [CR.11] Revision No. A3
GRID LOCATION
CR12 A/1-2
CR12 E/4-5
ZZ150-2-25-50 x 3606
70 64 1699 1635 64 74
1 * D 14
M33
75
75
75
2 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M33 ZZ150-2-25-50 S275 1 3606 2.1 16.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.5 Drawing No. [CR.12] Revision No. A3
GRID LOCATION
CR13 A/3-4
CR13 E/2-3
ZZ150-2-25-50 x 3498
70 64 1699 1571 64 30
1 * D 14
M34
75
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M34 ZZ150-2-25-50 S275 1 3498 2.1 16.0 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.0 Drawing No. [CR.13] Revision No. A3
GRID LOCATION
CR14 A/3-4
CR14 E/2-3
ZZ150-2-25-50 x 3395
30 64 1635 1571 64 30
1 * D 14
M35
75
75
75
2 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M35 ZZ150-2-25-50 S275 1 3395 2.0 15.6 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.0 15.6 Drawing No. [CR.14] Revision No. A3
GRID LOCATION
CR15 B-C/3
ZZ150-2-25-50 x 1498
30 64 1272 64 68
M36
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M36 ZZ150-2-25-50 S275 1 1498 0.9 6.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 0.9 6.9 Drawing No. [CR.15] Revision No. A3
GRID LOCATION
CR16 A/2-3
CR16 E/3-4
ZZ150-2-25-50 x 3395
30 64 1571 1635 64 30
1 * D 14
M37
75
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M37 ZZ150-2-25-50 S275 1 3395 2.0 15.6 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.0 15.6 Drawing No. [CR.16] Revision No. A3
GRID LOCATION
CR17 A/1-2
CR17 E/4-5
ZZ150-2-25-50 x 3502
30 64 1635 1635 64 74
1 * D 14
M38
75
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M38 ZZ150-2-25-50 S275 1 3502 2.1 16.1 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.1 Drawing No. [CR.17] Revision No. A3
GRID LOCATION
CR18 A/3-5
CR18 E/1-3
ZZ150-2-25-50 x 3603
68 64 1604 1735 64 68
1 * D 14
M40
75
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M40 ZZ150-2-25-50 S275 1 3603 2.1 16.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.5 Drawing No. [CR.18] Revision No. A3
GRID LOCATION
CR19 A/1-3
CR19 E/3-5
ZZ150-2-25-50 x 3603
68 64 1735 1604 64 68
1 * D 14
M41
75
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M41 ZZ150-2-25-50 S275 1 3603 2.1 16.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.5 Drawing No. [CR.19] Revision No. A3
GRID LOCATION
CR20 B-C/3
ZZ150-2-25-50 x 1498
68 64 1272 64 30
M42
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M42 ZZ150-2-25-50 S275 1 1498 0.9 6.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 0.9 6.9 Drawing No. [CR.20] Revision No. A3
GRID LOCATION
CR21 A-B/1
CR21 D-E/5
ZZ150-2-25-50 x 6298
M43 2 * D 14
75
75
75
2 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M43 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 3.7 28.9 Drawing No. [CR.21] Revision No. A3
GRID LOCATION
CR22 A-B/5
CR22 D-E/1
ZZ150-2-25-50 x 6298
2 * D 14 2 * D 14
M44
75
75
75
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M44 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 3.7 28.9 Drawing No. [CR.22] Revision No. A3
GRID LOCATION
CR23 B-C/1
CR23 B-C/5
CR23 C-D/1
CR23 C-D/5
ZZ150-2-25-50 x 5996
30 64 2872 64 2872 64 30
M45
75
75
75
2 * D 14 2 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M45 ZZ150-2-25-50 S275 1 5996 3.5 27.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 3.5 27.5 Drawing No. [CR.23] Revision No. A3
GRID LOCATION
CR24 A/4-5
CR24 E/1-2
ZZ150-2-25-50 x 3606
74 64 1635 64 1635 64 70
M46
75
75
75
75
2 * D 14
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M46 ZZ150-2-25-50 S275 1 3606 2.1 16.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.5 Drawing No. [CR.24] Revision No. A3
GRID LOCATION
CR25 A/4-5
CR25 E/1-2
ZZ150-2-25-50 x 3502
74 64 1635 64 1571 64 30
M47
75
75
75
75
2 * D 14
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M47 ZZ150-2-25-50 S275 1 3502 2.1 16.1 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.1 Drawing No. [CR.25] Revision No. A3
GRID LOCATION
CR26 A/1-2
CR26 E/4-5
ZZ150-2-25-50 x 3606
70 64 1635 64 1635 64 74
M48
75
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M48 ZZ150-2-25-50 S275 1 3606 2.1 16.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.5 Drawing No. [CR.26] Revision No. A3
GRID LOCATION
CR27 A/3-4
CR27 E/2-3
ZZ150-2-25-50 x 3498
70 64 1635 64 1571 64 30
M49
75
75
75
75
2 * D 14
2 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M49 ZZ150-2-25-50 S275 1 3498 2.1 16.0 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.0 Drawing No. [CR.27] Revision No. A3
GRID LOCATION
CR28 A/1-3
CR28 E/3-5
ZZ150-2-25-50 x 3199
30 64 1571 64 1376 64 30
M50
75
75
75
75
2 * D 14
2 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M50 ZZ150-2-25-50 S275 1 3199 1.9 14.7 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 1.9 14.7 Drawing No. [CR.28] Revision No. A3
GRID LOCATION
CR29 A/2-3
CR29 A/3-4
CR29 E/2-3
CR29 E/3-4
ZZ150-2-25-50 x 3395
30 64 1571 64 1571 64 30
M51
75
75
75
75
2 * D 14 2 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M51 ZZ150-2-25-50 S275 1 3395 2.0 15.6 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 2.0 15.6 Drawing No. [CR.29] Revision No. A3
GRID LOCATION
CR30 A/3-5
CR30 E/1-3
ZZ150-2-25-50 x 3199
30 64 1376 64 1571 64 30
M52
75
75
75
2 * D 14 2 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M52 ZZ150-2-25-50 S275 1 3199 1.9 14.7 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 1.9 14.7 Drawing No. [CR.30] Revision No. A3
GRID LOCATION
CR31 A/2-3
CR31 E/3-4
ZZ150-2-25-50 x 3498
30 64 1571 64 1635 64 70
2 * D 14
M53
75
75
75
75
2 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M53 ZZ150-2-25-50 S275 1 3498 2.1 16.0 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.0 Drawing No. [CR.31] Revision No. A3
GRID LOCATION
CR32 A/1-2
CR32 E/4-5
ZZ150-2-25-50 x 3502
30 64 1571 64 1635 64 74
2 * D 14
M54
75
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M54 ZZ150-2-25-50 S275 1 3502 2.1 16.1 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 2.1 16.1 Drawing No. [CR.32] Revision No. A3
GRID LOCATION
CR33 D-E/3
ZZ150-2-25-50 x 6065
35 64 2872 3000 64 30
M55
75
75
75
2 * D 14
2 * D 14
1 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M55 ZZ150-2-25-50 S275 1 6065 3.6 27.8 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 3.6 27.8 Drawing No. [CR.33] Revision No. A3
GRID LOCATION
CR34 A-B/3
ZZ150-2-25-50 x 6065
30 64 3022 2850 64 35
M56
75
75
75
2 * D 14
2 * D 14
1 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M56 ZZ150-2-25-50 S275 1 6065 3.6 27.8 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 2 S.B. & PRIME Total 3.6 27.8 Drawing No. [CR.34] Revision No. A3
GRID LOCATION
DB1 B-C/3
PLT19 2 * D 18 2 * D 18
50
50
37
37
PLT19
38
38
50
50
5978 8
50 50
5994 (PFC-200*75*23 x 5978) A
A
8 1334 100 3110 100 1334 8
60
M77
50
PLT19
60
60
50
2 * D 18 2 * D 18
100
100
60
PLT19 PLT19
A-A
60
60
A A
220
60 100 60
2 * D 18
PLT19
100
50
14 75 14
A 3003 (PFC-200*75*23 x 2987) 14 75 14
20
B
M79
70
70
70
PLT18
150
100
100
100
PLT18
PLT18
PLT18
50
50
70
70
71 31
20
A-A 8 2987 8 31 20 51
B B-B
A
240
PLT18
102
31
2 * D 18
70 100 70
PLT23 PLT23
PLT13 PLT13
PLT2
214 45
60 60
60 60
PLT23 28
32 PLT29
32
PLT13
B-B 10 892 1000 1190 8
A B B C
M78 PLT23
23 75 23
23 75 23
65
70
PLT13
PLT2
15
PLT29
100
60 100
15
PLT13
100
65
PLT29
50
PLT2
PLT23
230
45 55
100
A B C
B
50
15
60 60
15
60 60
230
C-C
A-A
PLT29
2 * D 18 180
120
PLT13
26
60
70 100 60
PLT23 PLT23
PLT13 PLT13
214 45 PLT29
60 60
60 60
PLT23
28
PLT2
64
28
23 75 23
3100 (PFC-200*75*23 x 3082)
B-B A C
15
B B
M78
50
65
PLT2
PLT13 PLT13
100
PLT2
100
60 60
50
65
PLT23 PLT23
15
8 1190 1000 892 10
70
60 60
A
PLT29
B
230
B C
100
C-C
60
120
A-A 70 100 60
PLT29 2 * D 18 180
60
PLT13
26
60
23 5950 23
2 * D 12
2 * D 12
4 * D 12
32
32
308 (PLT2*604 x 5996)
64 64 64
64 64 64
84
84
2 * D 12 M57
23 5950 23 4 * D 12
2 * D 12 25 50
2 * D 12
25
32
31
2 * D 12 2 * D 12
64
64
32
32
32 64 64 64 32
4 * D 12 4 * D 12
2 No. EAVEGUTTER
REQUIRED AS DRAWN MARKED EG1 GOVERNMENT OF UGANDA
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M57 PLT2*604 S275 1 5996 7.2 56.6 Contract No. J-NO. Scale 1:5 1:10
PHASE QTY. FINISH
3 2 S.B. & PRIME Total 7.2 56.6 Drawing No. [EG.1] Revision No. A3
GRID LOCATION
EG2 C-D/1
23 5950 23
2 * D 12
2 * D 12
4 * D 12 M93
32
32
308 (PLT2*604 x 5996)
128
64 64 64
64 64 64
180
84
84
M58
23 5799 151 23 4 * D 12
2 * D 12 25 50
2 * D 12
25
32
31
M93
2 * D 12 2 * D 12
64
64
32
32
150
32 64 64 64 32
4 * D 12 4 * D 12
M93
150
128 128
6275 23 2 * D 12
32
32
308 (PLT2*604 x 6298)
128
64 64 64
64 64 64
180
84
84
M59
122 153 50 5950 23 4 * D 12
2 * D 12
25 50
M93 PLT3
32
25
31
94 65 94
2 * D 12
64
150
64
PLT3
32
31
40
40
32 64 64 64 32
150 4 * D 12
83
M93
252
128 128
2 No. EAVEGUTTER
REQUIRED AS DRAWN MARKED EG3
No REV MARK REVISION DESCRIPTION REV. DATE
All Holes Are: 22.0 mm UNLESS NOTED GOVERNMENT OF UGANDA
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
MATERIAL LIST FOR ASSEMBLY MK'D EG3 2 No. Required
Mark Profile Material No. Length Area Weight
Drawing Title FABRICATION DRAWING OF EAVE GUTTER.
M59 PLT2*604 S275 1 6298 7.6 59.2
Contract BLOCK 6
Tekla Structures
6275 23
2 * D 12
32
32
308 (PLT2*604 x 6298)
128
64 64 64
64 64 64
180
84
84
M60
122 153 50 5950 23
50
25
PLT3 25
32 94 65 94
31
M93
PLT3
64
64
4 * D 12
40
40
32
31
150
2 * D 12 2 * D 12
83
32 64 64 64 32
M93
150
252
128 128
2 No. EAVEGUTTER
REQUIRED AS DRAWN MARKED EG4
No REV MARK REVISION DESCRIPTION REV. DATE
All Holes Are: 22.0 mm UNLESS NOTED GOVERNMENT OF UGANDA
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
MATERIAL LIST FOR ASSEMBLY MK'D EG4 2 No. Required
Mark Profile Material No. Length Area Weight
Drawing Title FABRICATION DRAWING OF EAVE GUTTER.
M60 PLT2*604 S275 1 6298 7.6 59.2
Contract BLOCK 6
Tekla Structures
23 5950 23
2 * D 12
2 * D 12 4 * D 12
32
32
308 (PLT2*604 x 5996)
128
64 64 64
64 64 64
180
84
84
M61
4 * D 12
23 5799 151 23
50
25
25
32
31
2 * D 12 M93
64
64
2 * D 12
32
150
32 64 64 64 32
4 * D 12
M93
150
128 128
ZZ150-2-25-50 x 6298
A 2 * D 14 1 * D 14
M18
2 * D 14
75
75
75
1 * D 12
25 6273
25 25
A - A
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M18 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 3.7 28.9 Drawing No. [P.1] Revision No. A3
GRID LOCATION
P2 B-C/1
P2 B-C/3
P2 C-D/3
P2 C-D/5
ZZ150-2-25-50 x 5996
1 * D 14 1 * D 14
M5
75
75
75
75
2 * D 14 2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M5 ZZ150-2-25-50 S275 1 5996 3.5 27.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 3.5 27.5 Drawing No. [P.2] Revision No. A3
GRID LOCATION
P3 A-B/3
P3 A-B/5
P3 D-E/1
P3 D-E/3
ZZ150-2-25-50 x 6298
75
75
2 * D 14
1 * D 12
6273 25
25 25
A - A
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M19 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 3.7 28.9 Drawing No. [P.3] Revision No. A3
GRID LOCATION
P4 A-B/1-2
P4 A-B/3-4
P4 D-E/2-3
P4 D-E/4-5
ZZ150-2-25-50 x 6298
A
2 * D 14 2 * D 14
M9
2 * D 14
75
75
75
1 * D 12
25 6273
25 25
A - A
No REV MARK REVISION DESCRIPTION REV. DATE
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M9 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 3.7 28.9 Drawing No. [P.4] Revision No. A3
GRID LOCATION
P5 A-B/2-3
P5 A-B/4-5
P5 D-E/1-2
P5 D-E/3-4
ZZ150-2-25-50 x 6298
A
30 64 2872 64 2936 64 268
M10 2 * D 14 2 * D 14
75
75
75
2 * D 14
1 * D 12
6273 25
25 25
A - A
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M10 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 3.7 28.9 Drawing No. [P.5] Revision No. A3
GRID LOCATION
P6 B-C/1-2
P6 B-C/2
P6 B-C/2-3
P6 B-C/3-4
P6 B-C/4
P6 B-C/4-5
P6 C-D/1-2
P6 C-D/2
P6 C-D/2-3
P6 C-D/3-4
P6 C-D/4
P6 C-D/4-5
ZZ150-2-25-50 x 5996
1 * D 14
1 * D 14
M20
75
75
75
75
75
2 * D 14 2 * D 14
2 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M20 ZZ150-2-25-50 S275 1 5996 3.5 27.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 24 S.B. & PRIME Total 3.5 27.5 Drawing No. [P.6] Revision No. A3
GRID LOCATION
P7 A-B/1-2
P7 A-B/2
P7 A-B/3-4
P7 A-B/4
P7 D-E/2
P7 D-E/2-3
P7 D-E/4
P7 D-E/4-5
ZZ150-2-25-50 x 6298
A
2 * D 14 1 * D 14 2 * D 14 1 * D 14
M13
75
75
75
75
75
2 * D 14
1 * D 12
25 6273
25 25
A - A
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M13 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 12 S.B. & PRIME Total 3.7 28.9 Drawing No. [P.7] Revision No. A3
GRID LOCATION
P8 A-B/2
P8 A-B/2-3
P8 A-B/4
P8 A-B/4-5
P8 D-E/1-2
P8 D-E/2
P8 D-E/3-4
P8 D-E/4
ZZ150-2-25-50 x 6298
1 * D 14 A
2 * D 14 1 * D 14 2 * D 14
M14
75
75
75
75
75
2 * D 14
1 * D 12
6273 25
25 25
A - A
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M14 ZZ150-2-25-50 S275 1 6298 3.7 28.9 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 12 S.B. & PRIME Total 3.7 28.9 Drawing No. [P.8] Revision No. A3
GRID LOCATION
P9 B-C/3
P9 B-C/5
P9 C-D/1
P9 C-D/3
ZZ150-2-25-50 x 5996
M15 75
75
75
75
2 * D 14 2 * D 14
1 * D 14 1 * D 14
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M15 ZZ150-2-25-50 S275 1 5996 3.5 27.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 4 S.B. & PRIME Total 3.5 27.5 Drawing No. [P.9] Revision No. A3
GRID LOCATION
P10 B-C/1-2
P10 B-C/2-3
P10 B-C/3-4
P10 B-C/4-5
P10 C-D/1-2
P10 C-D/2-3
P10 C-D/3-4
P10 C-D/4-5
ZZ150-2-25-50 x 5996
2 * D 14
M7
75
75
75
2 * D 14 2 * D 14
30 64 2872 64 2872 64 30
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M7 ZZ150-2-25-50 S275 1 5996 3.5 27.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 8 S.B. & PRIME Total 3.5 27.5 Drawing No. [P.10] Revision No. A3
GRID LOCATION
PLT5 A/3
PLT5 B/3
PLT5 C/3
PLT5 D/3
PLT5 E/3
PLT27
606
PLT26 49
51 64 3 * D 12
64 64 3 * D 12
64 40 PLT27
25
40
41 64 64 38
50
25
51 64 64 428
6 * D 12
186 40 64 64 38 184
25
PLT27
51 49
6 4
50
64 6 6 4
4 40
40
PLT26
40 64 64 38
25
219 217
206
44
44
PLT26 223
223
206
19
19
PS1 D/2-3
PS1 D/3-4
21
21
PS1 D/4
PS1 D/4-5 30 340 30
PS1 E/1-2
PS1 E/2
PS1 E/2-3
PS1 E/3-4
PS1 E/4
PS1 E/4-5
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M8 L40*3 S275 1 400 0.1 0.7 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 104 S.B. & PRIME Total 0.1 0.7 Drawing No. [PS.1] Revision No. A3
GRID LOCATION
S-PLT A/3
S-PLT B/3
S-PLT C/3
S-PLT D/3
S-PLT E/3
630
C 1 * D 12 C
1 * D 12
40
36 30
3 * D 12 3 * D 12
36
53
53 64
64 64
64 39
39
37 64 64 39
3 * D 12
250 64 64 252
2 * D 12
25
25
50
50
6 * D 12
25
25
6 * D 12 6 * D 12
2 * D 12
C - C
5 No. GUTTERSTRAP
REQUIRED AS DRAWN MARKED S-PLT GOVERNMENT OF UGANDA
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
PLT4 PLT2*100 S275 1 733 0.2 1.2 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
3 5 S.B. & PRIME Total 0.2 1.2 Drawing No. [S-PLT.1] Revision No. A3
GRID LOCATION
S-PLT B/1
S-PLT B/5
S-PLT C/1
S-PLT C/5
S-PLT D/1
S-PLT D/5
260 34 64 64 64 34
2 * D 12 2 * D 12
25
25
31
2 * D 12 2 * D 12
64
50
50
34
2 * D 12
25
8 * D 12
34 64 64 64 34
8 * D 12 2 * D 12
6 No. GUTTERSTRAP
REQUIRED AS DRAWN MARKED S-PLT GOVERNMENT OF UGANDA
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
PLT12 PLATE2*100 S275 1 514 0.1 0.8 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
3 6 S.B. & PRIME Total 0.1 0.8 Drawing No. [S-PLT.2] Revision No. A3
GRID LOCATION
S-PLT A/1-2
S-PLT A/2-3
S-PLT A/3
S-PLT A/3-4
S-PLT A/4-5
S-PLT B/1
S-PLT B/1-2
S-PLT B/2 PLT2*80 x 256
S-PLT B/2-3
S-PLT B/3
1 * D 14
S-PLT B/3-4
S-PLT B/4
32
S-PLT B/4-5
S-PLT B/5
S-PLT C/1
64
S-PLT C/1-2
S-PLT C/2
S-PLT C/2-3
S-PLT C/3
256
64
S-PLT C/3-4
S-PLT C/4
S-PLT C/4-5
S-PLT C/5
64
S-PLT D/1
S-PLT D/1-2
S-PLT D/2
S-PLT D/2-3
32
S-PLT D/3
S-PLT D/3-4
S-PLT D/4 3 * D 14
40 40
S-PLT D/4-5
S-PLT D/5
S-PLT E/1-2
S-PLT E/2-3
S-PLT E/3
S-PLT E/3-4
S-PLT E/4-5
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
PLT5 PLT2*80 S275 1 256 0.0 0.3 Contract No. J-NO. Scale 1:3
PHASE QTY. FINISH
1 108 S.B. & PRIME Total 0.0 0.3 Drawing No. [S-PLT.3] Revision No. A3
CLIENT:
GOVERNMENT OF UGANDA
JOB:
BLOCK 6
TITLE:
ANTI-SAG RODS DETAILS
JOB:
BLOCK 6
TITLE:
ANTI-SAG RODS DETAILS
JOB:
BLOCK 6
TITLE:
ANTI-SAG RODS DETAILS
JOB:
BLOCK 6
TITLE:
ANTI-SAG RODS DETAILS
JOB:
BLOCK 6
TITLE:
ANTI-SAG RODS DETAILS
JOB:
BLOCK 6
TITLE:
ANTI-SAG RODS DETAILS
JOB:
BLOCK 6
TITLE:
ANTI-SAG RODS DETAILS
JOB:
BLOCK 6
TITLE:
ANTI-SAG RODS DETAILS
JOB:
BLOCK 6
TITLE:
ANTI-SAG RODS DETAILS
A B
M6
40
40
PLT39
60
60
PLT39
40
40
A B
30 64 30
30 60 30 140
10
4
40 30 30 40
40 60 40
10
120
PLT39
40 30 30 30
PLT39 4 * D 18
140
PLT39
10
124
60
34 30 60 34
30 64 30 B-B
A-A
RHS60*40*3.0 x 5994
M125
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M125 RHS60*40*3.0 S275 1 5994 1.2 26.5 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 8 S.B. & PRIME Total 1.2 26.5 Drawing No. [TM.1] Revision No. A3
GRID LOCATION
VG1 B-C/3
VG1 C-D/3
33
33
1 * D 12
25
42
42
1 * D 12
25
3 * D 12
77
77
34
34
51 51
64 6 6 4
4 6 4 3 * D 12
39 39
3 * D 12
37 64 64 39
218 218
204
23 5950 23
3 * D 12
3 * D 12
102
102
64
64
3 * D 12
64
64
3 * D 12
425
425
3 * D 12
3 * D 12
23 5950 23
2 No. VALLEYGUTTER
REQUIRED AS DRAWN MARKED VG1 GOVERNMENT OF UGANDA
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M80 PLT2*947.9 S275 1 5996 10.8 84.7 Contract No. J-NO. Scale 1:10 1:15
PHASE QTY. FINISH
3 2 S.B. & PRIME Total 10.8 84.7 Drawing No. [VG.1] Revision No. A3
GRID LOCATION
VG2 D-E>/3
PLT1
33 33
1 * D 12 1 * D 12
25
25
42
42
150
34
34
3 * D 12 3 * D 12 289 45 289
3 * D 12
M92
51
40
40
64 51
64 64
39 39 64 64 37 64
35
35
131
39
PLT1
200
56
56
209 203 209
622
313 313
23 5950 2 * D 12 50 575
6 * D 12 6 * D 12
3 * D 12
287 64 284
287 64 284
349
1 00
R
64
64
349
6 * D 12
23 5950 50 430 145
1 No. VALLEYGUTTER
REQUIRED AS DRAWN MARKED VG2
No REV MARK REVISION DESCRIPTION REV. DATE
All Holes Are: 22.0 mm UNLESS NOTED GOVERNMENT OF UGANDA
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
MATERIAL LIST FOR ASSEMBLY MK'D VG2 1 No. Required
Mark Profile Material No. Length Area Weight
Drawing Title FABRICATION DRAWING OF COLUMNS.
M73 PLT2*947.9 S275 1 6598 11.8 92.7
Contract BLOCK 6
Tekla Structures
33 33 289 45 289
PLT1
25
1 * D 12
40
40
42
42
25
77
77
35
35
3 * D 12
131
34
34
3 * D 12
3 * D 12 1 * D 12 PLT1
56
56
51 51
64 64
64 64 209 203 209
39 39
37 64 64 39 218
218
622
204
M92
313 313
23 5950 50 575
1 * D 12 6 * D 12
3 * D 12 2 * D 12
284 64 287
284 64 287
00
349
R 1
64
64
PLT1
349
3 * D 12
6 * D 12
1 * D 12 6 * D 12
23 5950 50 430 145
1 No. VALLEYGUTTER
REQUIRED AS DRAWN MARKED VG3
No REV MARK REVISION DESCRIPTION REV. DATE
All Holes Are: 22.0 mm UNLESS NOTED GOVERNMENT OF UGANDA
GENERAL NOTES:
All Welds Are: 6.0 mm F.W UNLESS NOTED
MATERIAL LIST FOR ASSEMBLY MK'D VG3 1 No. Required
Mark Profile Material No. Length Area Weight
Drawing Title FABRICATION DRAWING OF VALLEY GUTTER.
M87 PLT2*947.9 S275 1 6598 11.8 92.7
Contract BLOCK 6
Tekla Structures
25
BKT1 E/5
48
FLT6*130 x 178
50
4 * D 18
100
M90
M89
25
30
A-A
42 64 64 64 139
133 64 64 64 42
4 * D 12 M90
178
M91
25
M89
M89
25
367
PLT25
130
70
30
367
215 4 * D 18 48 100 30
4 * D 12
M90
25
79
25
PLT25 42 64 64 64 133
2 * D 14 2 * D 14
65
M12
25
25
168
PLT
30
488
56 326 61 24
2 * D 14 2 * D 14
21
PLT30
18
79
139
64 64
219
158
139
18
18
43
24 21 326 56
61
105
2 * D 14
2 * D 14
M12
25
25
128
3 0
PLT
L63*63*4 x 6232
488
24 21 326 56
61
2 * D 14
PLT30
43
64
18
139
18
64
219
18
139
79
43
56 326 61 24 2 * D 14
21
L63*63*4 x 2969
32 64 2777 64 32
2 * D 14
M16 2 * D 14
25
25
38
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M16 L63*63*4 S275 1 2969 0.7 11.4 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 8 S.B. & PRIME Total 0.7 11.4 Drawing No. [BR.3] Revision No. A3
GRID LOCATION
BR4 A-B/1-2
BR4 A-B/2-3
BR4 A-B/3-4
BR4 A-B/4-5
BR4 D-E/1-2
BR4 D-E/2-3
BR4 D-E/3-4
BR4 D-E/4-5
L63*63*4 x 3035
32 64 2843 64 32
2 * D 14 2 * D 14
M39
25
25
No REV MARK REVISION DESCRIPTION REV. DATE
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M39 L63*63*4 S275 1 3035 0.8 11.6 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 8 S.B. & PRIME Total 0.8 11.6 Drawing No. [BR.4] Revision No. A3
GRID LOCATION
BR5 A-B/2-3
BR5 A-B/4-5
BR5 D-E/1-2
BR5 D-E/3-4 L63*63*4 x 6411
PLT
28
111
2 * D 14 2 * D 14
M105
25
25
127
32 64 2897 262 44 57 2959 64 32
27 19 262 76
60
2 * D 14
PLT28
44
21
146
14
64 64
146
14
21
44
76 262 60 27 2 * D 14
19
2 8
PL T
111
2 * D 14 2 * D 14
25 M105
25
127
32 64 2959 57 44 262 2897 64 32
L63*63*4 x 6411
76 262 60 27
19 2 * D 14
PLT28
44
21
146
14
64 64
146
14
21
2 * D 14
44
27 19 262 76
60
L63*63*4 x 3144
32 64 2952 64 32
2 * D 14 2 * D 14
M106
25
25
No REV MARK REVISION DESCRIPTION REV. DATE
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M106 L63*63*4 S275 1 3144 0.8 12.0 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 8 S.B. & PRIME Total 0.8 12.0 Drawing No. [BR.7] Revision No. A3
GRID LOCATION
BR8 A-B/1-2
BR8 A-B/2-3
BR8 A-B/3-4
BR8 A-B/4-5
BR8 D-E/1-2
BR8 D-E/2-3
BR8 D-E/3-4
BR8 D-E/4-5
L63*63*4 x 3081
32 64 2889 64 32
2 * D 14 2 * D 14
M107
25
25
No REV MARK REVISION DESCRIPTION REV. DATE
Mark Profile Material No. Length Area Weight Modelled By KAM. Issued
M107 L63*63*4 S275 1 3081 0.8 11.8 Contract No. J-NO. Scale 1:5
PHASE QTY. FINISH
1 8 S.B. & PRIME Total 0.8 11.8 Drawing No. [BR.8] Revision No. A3