API RECOMMENDED PRACTICE 14C 45

A.S Compressor Units (ASHs) should be provided to shut off all process inflow and
fuel gas to the compressor and blowdown the compressor.
A.B.1 DESCRIPTION
Compressor units transfer hydrocarbon gases within the A.B.2.3 Temperature Safety Devices (TSH)
production process and into pipelines leaving the platform. A TSH sensor should be provided to protect each compres-
Recommended safety devices for a typical compressor unit sor cylinder or case. The TSH sensor should shut off all pro-
are shown in Figure A-8. cess inflow and fuel gas to the compressor.

A.B.2 SAFETY ANALYSIS A.B.3 SAFETY DEVICE LOCATION


A.B.2.1 Safety Analysis Table The recommended location for safety devices is given in
A.8.3.I-A.8.3.S.
The Safety Analysis Table (SAT) for compressor units is
presented in SAT Table A-8.1. The SAT analyzes the com-
A.B.3.1 Pressure Safety Devices (PSH, PSL, and
pressor cylinder or case and the suction, discharge, and fuel
PSV)
gas piping of a compressor unit. Hydrocarbon handling
equipment associated with compressors, other than compres- The PSH and PSL sensors should be located on each suc-
sor cylinders or cases, should be protected in accordance with tion line as close to the compressor as is practical, and on
appropriate sections of this recommended practice. The com- each discharge line upstream of the FSY and any block valve.
pressor and prime mover are nonnally furnished with devices The PSYs should be located on each suction line as close to
to prevent mechanical damage. The undesirable events that the compressor as is practical, and on each discharge line so
can affect a compressor unit are overpressure, leak, and that the PSY cannot be isolated from the compressor. If a
excess temperature. PSY is located inside a building, its discharge outlet should
be piped to a sate location outside the building.
A.B.2.2 Safety Analysis Ckecklist
A.B.3.2 Flow Safety Devices (FSV)
The Safety Analysis Checklist (SAC) for compressor units
is presented in SAC Table A-8.2. A check valve (FSY) should be located on each compres-
sor unit's final discharge line to minimize backAow. If the
A.B.2.2.1 Pressure Safety Devices (PSH, PSL, and compressor unit is inside a building, the FSY should be
PSV) located outside the building.

PSH and PSL sensors should be provided on each suction


A.B.3.3 Gas Detecting Devices (ASH)
line of a compressor unit unless each input source is protected
by PSH and PSL sensors that will also protect the compres- Should the compressor unit be installed in an inadequately
sor. Also, PSH and PSL sensors should be provided on each ventilated building or enclosure, gas detectors (ASHs) should
compressor discharge line. The PSH and PSL sensors should be located in areas where combustible gases can accumulate.
shut off all process inflow and fuel gas to the compressor. A
PSY should be provided on each compressor suction line, A.B.3.4 Temperature Safety Devices (TSH)
unless each input source is protected by a PSY that will pro-
A TSH sensor should be located in the discharge piping of
tect the compressor. A PSY should be provided on each com-
each compressor cylinder or case is as close as practical to the
pressor discharge line. A PSY is not necessary on the
cylinder or case.
discharge of a kinetic energy compressor if the compressor is
incapable of developing a pressure greater than the maximum
A.B.3.5 Shutdown Devices (SDV)
allowable working pressure of the compressor or discharge
piping. A SOY should be located on each process inflow line and
fuel gas line so that the compressor can be isolated from all
A.B.2.2.2 Flow Safety Devices (FSV) input sources. If the compressor unit is installed in a building,
SOYs should be located outside the building. All SOYs
A check valve (FSY) should be provided in each final dis- should be actuated by a signal from the ESD system and fire
charge line to minimize backflow. loop, and by any abnonnal pressure condition sensed in the
suction and discharge lines. A blowdown valve should be
A.B.2.2.3 Gas Detecting Devices (ASH) located on the compressor unit final discharge line(s). The
blowdown valve(s) may be actuated by a signal from the
If a compressor unit is installed in an inadequately venti- compressor's fire loop, gas detectors, and compressor ESD
lated building or enclosure, as defined in C.IA, gas detectors system.
API RECOMMENDED PRACTICE 14C 79

MU-6-009 SHEET~OFJLSHEETS
o
w
::;;
cr:
FIGURE E.1.2 o
u.
SAFETY ANALYSIS a::
w
FUNCTION EVALUATION CHART 0..
(SAFE) Z
o
f=
u
Z
:J
u.

PLATFORM IDENTIFICATION

EXAMPLE

DATE: I

BY: I REVISIONS
PROCESS COMPONENT
IDENT-
» »»»»»»»
(/)(/)00000000000000
SERVICE W(/)(f)(f)(f) (/)(f) ffi(/)(f)(f)(/) (f)(/) (f)(/)
IFICATION
FAl A14D UPSTREAM
FLOWLINE SEG
PSV A.1C.2

V FSV FA2 A14D

••
FA2 A14D DOWNSTREAM PSH
FLOWLINE SEG PSL
PSV IA.
FSV •
FAl A9T UPSTREAM PSH A.1A.2 PSH FA2 A9T
FLOWLINE SEG. PSL A.1B.2
SV A.1D.2

FA2 A9T DOWNSTREAM PSH •


FLOWLINE SEG. PSL
psv • ••
FSV

FAl A3D UPSTREAM PSH A.1A.2 PSH FA2 A3D


FLOWLINE SEG. PSL
P V A.1C.2

FSV A.1D.2 FSV FA2 A3D

FA2 A3D DOWNSTREAM PSH •


FLOWLINE SEG. PSL
psv A.1C.2

FSV •
JAS 1000 GAS LIFT LINE PS .2A.2 PSH MB suu
PSH MBD 4000
PS CBA 00
PSL A.2B.2 PSL MAF 1000
PS IA.2C
A.2G.3 psv MAF 1000
F V •
GAY 1000 LOW PRESSURE PSL A.3A.2 PSH FA2 A14D
PROD. HEADER PSH A2 A9T
PSL A.3B.2 PS FA2 A14D
PSL FA2 A9T
PSV A.3C.2 PSV FA2 A9

GAY 2000 LOW PRESSURE PSL A.3A.2 PSH FA2 A14D


TEST HEADER P0H f-A; A9
PSL A.3B.2 PSL FA2 A14D
PSL FA2 A9T
PSV A.3C.2 PSV FA A9T

GAY 3000 HIGH PRESSURE PSH A.3A.2 PSH FA2 A3D


PROD. HEADER PSL A.3B.2 PSL FA2 A3D
PSV IA.3l.

GAY 4000 HIGH PRESSURE PSH A.3A.2 PSH FA2 A3D


TEST HEADER .3 . PSL
PS A.3C.2

MBD 1000 LOW PRESSURE ••• • •••


PROD. SEPARATOR PSL
PSV
••• ••••
LS
LSL 1 AA.3
••• ••••
LSL 2 AAE.3

FSV 2
FSV 3

Figure E-1.2-Safety Analysis Function Evaluation Chart (SAFE) Example


80 ANALYSIS, DESIGN, INSTALLATION, AND TESTING OF BASIC SURFACE SAFTEY SYSTEMS FOR OFFSHORE PRODUCTION PLATFORMS

MU-6-010 SHEET~OFiLSHEETS
o
w
:;;
0::
FIGURE E.1.2 (cant'd) ou..
SAFETY ANALYSIS 0::
W
FUNCTION EVALUATION CHART (L

(SAFE) Z
o
f=
o
z
~
u..

PLATFORM IDENTIFICATION
EXAMPLE

DATE: I

BY: I
PROCESS COMPONENT DEVICE ALTERNATE PROTECTION
~ »I~>Pn»» »»>
IDENT-
IFICATION
SERVICE 1.0. SAC REF
NUMBER ALTn~tGumCE (J)(J)I~o
'" woo Ooo~~~lpoOOOO
wwwwwro oowoowww
MBD 2000 LOW PRESSURE
TEST SEPARATOR
PSH
PSL
••
ps'
LSH • •
_SL 1 AAE.3
LSL .3
FSV
S
••
3 •
MBD 3000 HIGH PRESSURE H •
PROD. SEPARATOR PSL
PSV
• •
LSH
LS AAE.3

LSL

•••
FSV 1
FSV 2
FSV 3

••
MBD 4000 HIGH PRESSURE Pst-
TEST SEPARATOR PSL
PSV
LSH • •
LSL A.4E.3
2 A.4E.3
1 •
••
FSV 2
FSV 3

••
MBD 5000 GLYCOL FLASH SEP. P
P L
PSV
LSH • •
S
LSL 1 AAE.3
LSl 2 AAE.3
FSV
;V
1
AAF.3

S 3 AAF.3

MBF 3000 FLARE SCRUBBER 'st- A.4A.6


A.4B.2
PSV
.st- ••• •
_Sl I AAE.3
FSV 1 AAt-.
FSV 2 AAF.2

••
MBF 4000 FUEL & INSTRUMENT PSH
GAS SCRUBBER PSL
PSV
LSH • •
LSL AAE.3
FSV 1 AAF.2
FSV

MBM 1000 SKIMMER TANK PSH
PSL A.4B.2
••• •••• •
PSV
••• •
••• •••• ••
LSH
_Sl 1 ••••
S
FSV 1
••• •••• • •
S 2 AAF.2
FSV 3 2

Figure E-1.2-Safety Analysis Function Evaluation Chart (SAFE) Example


API RECOMMENDED PRACTICE 14C 81

MU-6-011 SHEET~OFjLSHEETS
o
w
:;;
0:
FIGURE E.1.2 (CONTO)
SAFETY ANALYSIS °0:u-
W
FUNCTION EVALUATION CHART "-
(SAFE) Z

°;::o
z
ii'
PLATFORM IDENTIFICATION

EXAMPLE

o::~ ~ ggg
~~ fd:f(~~oo
~o .
0-'0
,_
-_--
_-_-_
-_--
_-_-_
-_-_
--
-1i 0 0 --' <{
>- <{ >-o~ <{
>-g:
>- <{co~ co
1-_ _ _ _ _ _ _ _ _ _ _-1 ~z a :;;~o
DATE: 1- enO
I
I-------------~ 0 ..
BY: I REVISIONS
PROCESS COMPONENT
I--IFI".IICiD"'E"';'i~';'~I'-"-N:":;'==-=-=S::":E"-R-=Vc..IC:'=E::':":'-~ D~'8CE
MAJ 2000 GLYCOL FILTER P
P A.4B.
P
_SH
A.4 .
AAL3
P V
erma

LSL AAE.2
FSV

MBF 6000 SUCTION SCRUBBER fi~,i;S<rtT--t----I---I-----i-----iI-------iH-+-H~:~:P.:~:~-H-+-I--/-+t--t-++-I-++H+-H-++-H+H-+-HI-+-l


P!;V
LSH •••• •
LSL
FSV 1 AA~.2
••••
~!;V 2

MBF 7000 ~Z~~~l~~E fi~~~~tT--t----I---t----i-----iI-------iH-+-H~:~:P.:~:~-H-+-I--/-+t--t-++-I-++H-+-H-++-H+t--t-+-HI-+-l
PSV
•••• •
~!;V 1 AAF.2
••••
FSV 2 •
MBF 7500 INTERSTAGE PSH A.4A.3 CBA 1000
SCRUBBER PSL AAB.3 CBA 1000
PSV A.4C.3 P B
LSH
LSL A.4E.3
••••
FSV 1 AAF.2
FSV •
MBF 8000 HIGH PRESSURE PSH A.4A.3 PSH MBD 3000
SCRUBBER P H MBD 4000
PSH 6 CBA 1000
PSL AAB. PSL MBD
PSL MBD 4000
PSL 6 B 1000
PSV
LSH A.4D.2

L L AAE.3
~!;V
,v
1
2 ••
MAF 1000 CONTACTOR P H A4 1MB 3000
PSH MBD 4000
PSH 6 CBA 1000
PSL
PSV
• •••• •
LSH AAD.2
AAD.3
LSL AAc.
FSV 1
FSV 2 A.4F.3

ABJ 1000 ATMOSPHERIC TANK Vent
PSV
••
••
L
_SI •••
••• ••••
••••
ABJ 2000 GLYCOL SURGE TANK ent
PSV A.5B.3
••
A.5C.2
L!;L A.5D.2

ABH 1000 SUMP Vent ••


••
LSH
L!;L IA.oLIA
•••

Figure E-1.2-Safety Analysis Function Evaluation Chart (SAFE) Example


82 ANALYSIS, DESIGN, INSTALLATION, AND TESTING OF BASIC SURFACE SAFTEY SYSTEMS FOR OFFSHORE PRODUCTION PLATFORMS

MU-6-012 SHEET~OFiLSHEETS
0 a::

~~
UJ
:2 0
(f)
a:: (f)
FIGURE E.1.2 (cont'd) 0 UJ (f)(f)
"- a::
SAFETY ANALYSIS
FUNCTION EVALUATION CHART
a::
UJ
"-
5: 5:5: :2 5:
"-
5: 5:"- ~~ LL
W
Z
O...J OO...JO...J O
...J~ ...JO...J 0:2 W"'LL :::J
:2a::w W
w w...Jw LL"-
...J --.Jli
W w~~ ~~~~~~ LL~LL Zz
(SAFE) ...J ««-
Q ~LL~ ...J,,-...J 0:
f- LL(f)W W
0 ~~~~~~
5: 5:LLLL LLLLLL LLLLLL ~5: f-f-O:
Z LLll. LLLLLL LLO zz:2 gjllt
::J I~~ ~~t) 000 0 00 000 00
~~s
~II
"- f- f-f-f-
~~~~~~ f-f-f- f-f-
I~j!
~::J~ ~~~ ~~
I I I II--.JII III II
W!j!()
PLATFORM IDENTIFICATiON (fJ (fJ(f)(fJ I
if)(f)(fHn(fJCf) (fJ(fJ(fJ (fJ(fJ g:1l=~
EXAMPLE

w
~~ 0 0 g~ g g~~~I~~~~~1
00
0:0
0;;
zw «« o~ ~..-- a
5: 0 .
O...JO
0 0 --' 0
f-a::
~f-
;ii;ii;ii;ii~:;;«~;ii;;!:i;
~~ §l~ OUUUa...a...
IZ wa.w:2:
DATE: I (fJ0
0 ~NO)

BY: I REVISIONS
PROCESS COMPONENT

IFllg~~;6N
DEVICE ALTERNATE PROTECTION
ALTFE~~t~~2~~JCE
"- » »>
(fJ(fJ (fJ00
»»>
(fJ(fJ (fJ(f)(f) 00000
»»»
00000
~~~~~~
'"
SERVICE 1.0. C/)C/)(f)COC/) (/)(f)(/Hf)(f)(/)

NBK 1000 HEATER TREATER PSH


PS
•••
••• •••••
•••••
S
_SI ••• ••••• •
_SI
_SI
1
2
•••
•• • •••••
•••••
f-S
-S
1
2 A.4F.

FSV
TSH
3
••• ••••• •
BAP 2000 LINE HEATER
(INDIRECT)
Vent
.5
••
_SH 1 A.5C.2

TSH A.~t.

BBC 3000 REBOILER Vent ••
(GLYCOL) PSV
;:>r A.5C.2
••
••
SL
TSH 1

EAW 1000 FIRED COMPONENT TSH 1 A.6A.1 TSH 1 NBK 1000


(NATURAL DRAFT I::;H 2 ••• •
FOR HEATER
TREATER)
PSH
PSL A.6F.2

BSL
f-SL A.6H.2

f-A
,SA
••
PSV A.6L.2

EAW 2000 FIRED COMPONENT TSH 1 A.6A.3


(NATURAL DRAFT
FOR LINE HEATER)
rSH 2
PSH ••
PSL A.6F2
BSL
FSL A.6H.2

SA
••
PSV A.bL.

EAL 3000 FIRED COMPONENT TSH 1


(FORCED DRAFT TSH 2 A.6A.1 TSH BBC 1000 ••
FOR REBOILER) J:':ili
PSL
• ••
PSL
BSL
::;L A.bt;.

MI
FA A.6J.2

SA A.6K.2
PSv •
PAX 1000 PIPELINE PUMP PSH ••
••
FSV ••
PBA 1000 GLYCOL PUMPS f';:;jj A.7B.6
2000 (TYPICAL OF TWO) PSL 1