ELEVASI TEBAL LAPISAN TEKANAN

yang ini jangan di tulis (M) ɋ TON/M


ϒ1 = 1.829 0 0 0
ϒ2 = 1.729 0.50 0.50 0.50
ϒ3 = 1.929 1.00 0.50 0.9145 +
ϒ4 = 1.629 1.50 0.50 1.829 +
2.00 0.50 2.7435 +
2.29 0.29 3.658 +
h1 = 2.29 2.50 0.21 4.18841 +
3.00 0.50 4.5515 +
3.50 0.50 5.416 +
h2 = 3.29 4.00 0.50 6.2805 +
4.50 0.50 7.145 +
5.00 0.50 8.0095 +
h3 = 4.29 5.50 0.50 8.874 +
5.58 0.08 9.7385 +
6.00 0.42 9.87682 +
h4 = 6.29 6.50 0.50 10.687 +
7.00 0.50 11.6515 +
7.50 0.50 12.616 +
8.00 0.50 13.5805 +
8.50 0.50 14.545 +
9.00 0.50 15.5095 +
9.50 0.50 16.474 +
9.87 0.37 17.4385 +
10.00 0.13 18.15223 +
10.50 0.50 18.364 +
11.00 0.50 19.1785 +
11.50 0.50 19.993 +
12.00 0.50 20.8075 +
12.50 0.50 21.622 +
13.00 0.50 22.4365 +
13.50 0.50 23.251 +
14.00 0.50 24.0655 +
14.50 0.50 24.88 +
15.00 0.50 25.6945 +
15.50 0.50 26.509 +
16.16 0.66 27.3625 +
TEKANAN TOTAL TEKANAN AIR
TON/M2 TON/M2
0 0.00 . 1 = 0.00
0.50 . 1.829 = 0.9145 0.50 . 1 = 0.50
0.50 . 1.829 = 1.829 1.00 . 1 = 1.00
0.50 . 1.829 = 2.7435 1.50 . 1 = 1.50
0.50 . 1.829 = 3.658 2.00 . 1 = 2.00
0.29 . 1.829 = 4.18841 2.29 . 1 = 2.29
0.21 . 1.729 = 4.5515 2.50 . 1 = 2.50
0.50 . 1.729 = 5.416 3.00 . 1 = 3.00
0.50 . 1.729 = 6.2805 3.50 . 1 = 3.50
0.50 . 1.729 = 7.145 4.00 . 1 = 4.00
0.50 . 1.729 = 8.0095 4.50 . 1 = 4.50
0.50 . 1.729 = 8.874 5.00 . 1 = 5.00
0.50 . 1.729 = 9.7385 5.50 . 1 = 5.50
0.08 . 1.729 = 9.87682 5.58 . 1 = 5.58
0.42 . 1.929 = 10.687 6.00 . 1 = 6.00
0.50 . 1.929 = 11.6515 6.50 . 1 = 6.50
0.50 . 1.929 = 12.616 7.00 . 1 = 7.00
0.50 . 1.929 = 13.5805 7.50 . 1 = 7.50
0.50 . 1.929 = 14.545 8.00 . 1 = 8.00
0.50 . 1.929 = 15.5095 8.50 . 1 = 8.50
0.50 . 1.929 = 16.474 9.00 . 1 = 9.00
0.50 . 1.929 = 17.4385 9.50 . 1 = 9.50
0.37 . 1.929 = 18.15223 9.87 . 1 = 9.87
0.13 . 1.629 = 18.364 10.00 . 1 = 10.00
0.50 . 1.629 = 19.1785 10.50 . 1 = 10.50
0.50 . 1.629 = 19.993 11.00 . 1 = 11.00
0.50 . 1.629 = 20.8075 11.50 . 1 = 11.50
0.50 . 1.629 = 21.622 12.00 . 1 = 12.00
0.50 . 1.629 = 22.4365 12.50 . 1 = 12.50
0.50 . 1.629 = 23.251 13.00 . 1 = 13.00
0.50 . 1.629 = 24.0655 13.50 . 1 = 13.50
0.50 . 1.629 = 24.88 14.00 . 1 = 14.00
0.50 . 1.629 = 25.6945 14.50 . 1 = 14.50
0.50 . 1.629 = 26.509 15.00 . 1 = 15.00
0.50 . 1.629 = 27.3235 15.50 . 1 = 15.50
0.66 . 1.629 = 28.43764 16.16 . 1 = 16.16
TEKANAN EFEKTIF TEKANAN EFEKTIF
TON/M2 RATA-RATA TON/M2
0 0.207
0.41 0.207
0.83 0.622
1.24 1.036
1.66 1.451
1.90 1.778
2.05 1.975
2.42 2.234
2.78 2.598
3.15 2.963
3.51 3.327
3.87 3.692
4.24 4.056
4.30 4.268
4.69 4.492
5.15 4.919
5.62 5.384
6.08 5.848
6.55 6.313
7.01 6.777
7.47 7.242
7.94 7.706
8.28 8.110
8.36 8.323
8.68 8.521
8.99 8.836
9.31 9.150
9.62 9.465
9.94 9.779
10.25 10.094
10.57 10.408
10.88 10.723
11.19 11.037
11.51 11.352
11.82 11.666
12.28 12.051
ELEVA
∆P ∆Pr
SI B/Z = M L/Z = N IƮ
(Z) (t/m2) (t/m2) B L
0 ~ ~ 0.300 1.860 0.930 11.29 4.29
0.50 22.58 8.580 0.236 1.463 1.662 11.29 4.29
1.00 11.29 4.290 0.222 1.377 1.420 11.29 4.29
1.50 7.53 2.860 0.209 1.294 1.336 11.29 4.29
2.00 5.65 2.145 0.196 1.213 1.253 11.29 4.29
2.29 4.93 1.873 0.188 1.168 1.190 11.29 4.29
2.50 4.52 1.716 0.183 1.136 1.152 11.29 4.29
3.00 3.76 1.430 0.171 1.062 1.099 11.29 4.29
3.50 3.23 1.226 0.160 0.993 1.028 11.29 4.29
4.00 2.82 1.073 0.150 0.929 0.961 11.29 4.29
4.50 2.51 0.953 0.140 0.869 0.899 11.29 4.29
5.00 2.26 0.858 0.131 0.813 0.841 11.29 4.29
5.50 2.05 0.780 0.123 0.761 0.787 11.29 4.29
5.58 2.02 0.769 0.121 0.753 0.757 11.29 4.29
6.00 1.88 0.715 0.115 0.713 0.733 11.29 4.29
6.50 1.74 0.660 0.108 0.669 0.691 11.29 4.29
7.00 1.61 0.613 0.101 0.628 0.649 11.29 4.29
7.50 1.51 0.572 0.095 0.590 0.609 11.29 4.29
8.00 1.41 0.536 0.090 0.555 0.573 11.29 4.29
8.50 1.33 0.505 0.084 0.523 0.539 11.29 4.29
9.00 1.25 0.477 0.080 0.493 0.508 11.29 4.29
9.50 1.19 0.452 0.075 0.465 0.479 11.29 4.29
9.87 1.14 0.435 0.072 0.446 0.456 11.29 4.29
10.00 1.13 0.429 0.071 0.439 0.443 11.29 4.29
10.50 1.08 0.409 0.067 0.416 0.428 11.29 4.29
11.50 0.98 0.373 0.060 0.373 0.394 11.29 4.29
12.00 0.94 0.358 0.057 0.354 0.363 11.29 4.29
12.50 0.90 0.343 0.054 0.336 0.345 11.29 4.29
13.00 0.87 0.330 0.051 0.319 0.327 11.29 4.29
13.50 0.84 0.318 0.049 0.303 0.311 11.29 4.29
14.00 0.81 0.306 0.047 0.289 0.296 11.29 4.29
14.50 0.78 0.296 0.044 0.275 0.282 11.29 4.29
15.00 0.75 0.286 0.042 0.262 0.269 11.29 4.29
15.50 0.73 0.277 0.040 0.251 0.257 11.29 4.29
16.00 0.71 0.268 0.039 0.239 0.245 11.29 4.29
16.16 0.70 0.265 0.038 0.236 0.238 11.29 4.29
LUAS = BxL = 11.29 . 4.29

q q = 6.2
6.2 4.29
6.2 A C
6.2
6.2
6.2
6.2 11.29 6.2
6.2 h1 = 2.29
6.2
6.2
6.2 h2 = 3.29 B D
6.2
6.2
6.2 h3 = 4.29
6.2
6.2
6.2 h4 = 6.29
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
7.29
E

4.2
6.29

F
Elevasi ∆P Rata- Po Rata- P1 Log P1 / H
(Z) Rata Rata P1 / Po CV / 1 + e0
Po
M ( Ton/M2 ) ( T/M2 ) ( T/M2 ) (M)
0 0.930 0.207 1.137 5.487 0.739 0.00 0.412
0.50 1.662 0.207 1.869 9.017 0.955 0.50 0.412
1.00 1.420 0.622 2.042 3.284 0.516 0.50 0.412
1.50 1.336 1.036 2.372 2.289 0.360 0.50 0.412
2.00 1.253 1.451 2.704 1.864 0.270 0.50 0.412
2.29 1.190 1.778 2.968 1.669 0.223 0.29 0.412
2.50 1.152 1.975 3.127 1.583 0.200 0.21 0.412
3.00 1.099 2.234 3.333 1.492 0.174 0.50 0.412
3.50 1.028 2.598 3.626 1.396 0.145 0.50 0.412
4.00 0.961 2.963 3.924 1.324 0.122 0.50 0.412
4.50 0.899 3.327 4.226 1.270 0.104 0.50 0.412
5.00 0.841 3.692 4.533 1.228 0.089 0.50 0.412
5.50 0.787 4.056 4.843 1.194 0.077 0.50 0.412
5.58 0.757 4.268 5.025 1.177 0.071 0.08 0.412
6.00 0.733 4.492 5.225 1.163 0.066 0.42 0.412
6.50 0.691 4.919 5.610 1.141 0.057 0.50 0.412
7.00 0.649 5.384 6.032 1.120 0.049 0.50 0.412
7.50 0.609 5.848 6.457 1.104 0.043 0.50 0.412
8.00 0.573 6.313 6.886 1.091 0.038 0.50 0.412
8.50 0.539 6.777 7.316 1.080 0.033 0.50 0.412
9.00 0.508 7.242 7.750 1.070 0.029 0.50 0.412
9.50 0.479 7.706 8.185 1.062 0.026 0.50 0.412
9.87 0.456 8.110 8.566 1.056 0.024 0.37 0.412
10.00 0.443 8.323 8.766 1.053 0.023 0.13 0.412
11.00 0.428 8.521 8.949 1.050 0.021 1.00 0.412
11.50 0.394 8.836 9.230 1.045 0.019 0.50 0.412
12.00 0.363 9.150 9.513 1.040 0.017 0.50 0.412
12.50 0.345 9.465 9.809 1.036 0.016 0.50 0.412
13.00 0.327 9.779 10.107 1.033 0.014 0.50 0.412
13.50 0.311 10.094 10.405 1.031 0.013 0.50 0.412
14.00 0.296 10.408 10.704 1.028 0.012 0.50 0.412
14.50 0.282 10.723 11.005 1.026 0.011 0.50 0.412
15.00 0.269 11.037 11.306 1.024 0.010 0.50 0.412
15.50 0.257 11.352 11.608 1.023 0.010 0.50 0.412
16.00 0.245 11.666 11.911 1.021 0.009 0.50 0.412
16.16 0.238 12.051 12.288 1.020 0.008 0.16 0.412
TOTAL
Penurunan Settlement Titik A
S
Cc / 1 + e0 . H
(M)
0.000 0.000 0 0.930 0.207
0.206 0.197 0.50 1.662 0.207 h1 = 2.29
0.206 0.106 1.00 1.420 0.622
0.206 0.074 1.50 1.336 1.036
0.206 0.056 2.00 1.253 1.451 h2 = 3.29
0.120 0.027 2.29 1.190 1.778
0.087 0.017 2.50 1.152 1.975
0.206 0.036 3.00 1.099 2.234 h3 = 4.29
0.206 0.030 3.50 1.028 2.598
0.206 0.025 4.00 0.961 2.963
0.206 0.021 4.50 0.899 3.327 h4 = 6.29
0.206 0.018 5.00 0.841 3.692
0.206 0.016 5.50 0.787 4.056
0.033 0.002 5.58 0.757 4.268
0.173 0.011 6.00 0.733 4.492
0.206 0.012 6.50 0.691 4.919
0.206 0.010 7.00 0.649 5.384
0.206 0.009 7.50 0.609 5.848
0.206 0.008 8.00 0.573 6.313
0.206 0.007 8.50 0.539 6.777
0.206 0.006 9.00 0.508 7.242
0.206 0.005 9.50 0.479 7.706
0.152 0.004 10.00 0.456 8.110
0.054 0.001 9.87 0.443 8.323
0.412 0.009 11.00 0.428 8.521
0.206 0.004 11.50 0.394 8.836
0.206 0.003 12.00 0.363 9.150
0.206 0.003 12.50 0.345 9.465
0.206 0.003 13.00 0.327 9.779
0.206 0.003 13.50 0.311 10.094
0.206 0.003 14.00 0.296 10.408
0.206 0.002 14.50 0.282 10.723
0.206 0.002 15.00 0.269 11.037
0.206 0.002 15.50 0.257 11.352
0.206 0.002 16.00 0.245 11.666
0.066 0.001 16.16 0.238 12.051
= 0.7286
= 0.7286
= 72.86
ELEVA
∆P ∆Pr
SI B/Z = M L/Z = N IƮ
(Z) (t/m2) (t/m2) B L
0 ~ ~ 0.300 1.260 0.630 6.29 7.29
0.50 12.58 14.580 0.238 1.000 1.130 6.29 7.29
1.00 6.29 7.290 0.226 0.951 0.976 6.29 7.29
1.50 4.19 4.860 0.215 0.902 0.927 6.29 7.29
2.00 3.15 3.645 0.203 0.855 0.879 6.29 7.29
2.29 2.75 3.183 0.197 0.827 0.841 6.29 7.29
2.50 2.52 2.916 0.192 0.808 0.818 6.29 7.29
3.00 2.10 2.430 0.182 0.763 0.785 6.29 7.29
3.50 1.80 2.083 0.171 0.719 0.741 6.29 7.29
4.00 1.57 1.823 0.161 0.677 0.698 6.29 7.29
4.50 1.40 1.620 0.152 0.637 0.657 6.29 7.29
5.00 1.26 1.458 0.143 0.599 0.618 6.29 7.29
5.50 1.14 1.325 0.134 0.563 0.581 6.29 7.29
5.58 1.13 1.306 0.133 0.557 0.560 6.29 7.29
6.00 1.05 1.215 0.126 0.529 0.543 6.29 7.29
6.50 0.97 1.122 0.118 0.497 0.513 6.29 7.29
7.00 0.90 1.041 0.111 0.466 0.481 6.29 7.29
7.50 0.84 0.972 0.104 0.438 0.452 6.29 7.29
8.00 0.79 0.911 0.098 0.412 0.425 6.29 7.29
8.50 0.74 0.858 0.092 0.387 0.399 6.29 7.29
9.00 0.70 0.810 0.087 0.364 0.376 6.29 7.29
9.50 0.66 0.767 0.082 0.343 0.354 6.29 7.29
9.87 0.64 0.739 0.078 0.328 0.335 6.29 7.29
10.00 0.63 0.729 0.077 0.323 0.326 6.29 7.29
10.50 0.60 0.694 0.073 0.305 0.314 6.29 7.29
11.50 0.55 0.634 0.065 0.271 0.288 6.29 7.29
12.00 0.52 0.608 0.061 0.257 0.264 6.29 7.29
12.50 0.50 0.583 0.058 0.243 0.250 6.29 7.29
13.00 0.48 0.561 0.055 0.230 0.236 6.29 7.29
13.50 0.47 0.540 0.052 0.218 0.224 6.29 7.29
14.00 0.45 0.521 0.049 0.207 0.212 6.29 7.29
14.50 0.43 0.503 0.047 0.196 0.201 6.29 7.29
15.00 0.42 0.486 0.044 0.187 0.191 6.29 7.29
15.50 0.41 0.470 0.042 0.177 0.182 6.29 7.29
16.00 0.39 0.456 0.040 0.169 0.173 6.29 7.29
16.16 0.39 0.451 0.040 0.166 0.168 6.29 7.29
LUAS = BxL = 6.29 . 7.29

q q = 4.2
4.2 4.29
4.2 A C
4.2
4.2
4.2
4.2 11.29 6.2
4.2 h1 = 2.29
4.2
4.2
4.2 h2 = 3.29 B D
4.2
4.2
4.2 h3 = 4.29
4.2
4.2
4.2 h4 = 6.29
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
4.2
7.29
E

4.2
6.29

F
Elevasi ∆P Rata- Po Rata- P1 Log P1 / H
(Z) Rata Rata P1 / Po CV / 1 + e0
Po
M ( Ton/M2 ) ( T/M2 ) ( T/M2 ) (M)
0 0.630 0.207 0.837 4.040 0.606 0.00 0.412
0.50 1.130 0.207 1.337 6.453 0.810 0.50 0.412
1.00 0.976 0.622 1.598 2.569 0.410 0.50 0.412
1.50 0.927 1.036 1.963 1.894 0.277 0.50 0.412
2.00 0.879 1.451 2.329 1.606 0.206 0.50 0.412
2.29 0.841 1.778 2.619 1.473 0.168 0.29 0.412
2.50 0.818 1.975 2.793 1.414 0.150 0.21 0.412
3.00 0.785 2.234 3.019 1.352 0.131 0.50 0.412
3.50 0.741 2.598 3.339 1.285 0.109 0.50 0.412
4.00 0.698 2.963 3.661 1.236 0.092 0.50 0.412
4.50 0.657 3.327 3.984 1.197 0.078 0.50 0.412
5.00 0.618 3.692 4.310 1.167 0.067 0.50 0.412
5.50 0.581 4.056 4.637 1.143 0.058 0.50 0.412
5.58 0.560 4.268 4.828 1.131 0.054 0.08 0.412
6.00 0.543 4.492 5.035 1.121 0.050 0.42 0.412
6.50 0.513 4.919 5.432 1.104 0.043 0.50 0.412
7.00 0.481 5.384 5.865 1.089 0.037 0.50 0.412
7.50 0.452 5.848 6.301 1.077 0.032 0.50 0.412
8.00 0.425 6.313 6.738 1.067 0.028 0.50 0.412
8.50 0.399 6.777 7.177 1.059 0.025 0.50 0.412
9.00 0.376 7.242 7.617 1.052 0.022 0.50 0.412
9.50 0.354 7.706 8.060 1.046 0.019 0.50 0.412
9.87 0.335 8.110 8.446 1.041 0.018 0.37 0.412
10.00 0.326 8.323 8.649 1.039 0.017 0.13 0.412
11.00 0.314 8.521 8.835 1.037 0.016 1.00 0.412
11.50 0.288 8.836 9.124 1.033 0.014 0.50 0.412
12.00 0.264 9.150 9.414 1.029 0.012 0.50 0.412
12.50 0.250 9.465 9.714 1.026 0.011 0.50 0.412
13.00 0.236 9.779 10.016 1.024 0.010 0.50 0.412
13.50 0.224 10.094 10.318 1.022 0.010 0.50 0.412
14.00 0.212 10.408 10.620 1.020 0.009 0.50 0.412
14.50 0.201 10.723 10.924 1.019 0.008 0.50 0.412
15.00 0.191 11.037 11.229 1.017 0.007 0.50 0.412
15.50 0.182 11.352 11.534 1.016 0.007 0.50 0.412
16.00 0.173 11.666 11.839 1.015 0.006 0.50 0.412
16.16 0.168 12.051 12.218 1.014 0.006 0.16 0.412
TOTAL
Penurunan Settlement Titik A
S
Cc / 1 + e0 . H
(M)
0.000 0.000 0 0.630 0.207
0.206 0.167 0.50 1.130 0.207 h1 = 2.29
0.206 0.084 1.00 0.976 0.622
0.206 0.057 1.50 0.927 1.036
0.206 0.042 2.00 0.879 1.451 h2 = 3.29
0.120 0.020 2.29 0.841 1.778
0.087 0.013 2.50 0.818 1.975
0.206 0.027 3.00 0.785 2.234 h3 = 4.29
0.206 0.022 3.50 0.741 2.598
0.206 0.019 4.00 0.698 2.963
0.206 0.016 4.50 0.657 3.327 h4 = 6.29
0.206 0.014 5.00 0.618 3.692
0.206 0.012 5.50 0.581 4.056
0.033 0.002 5.58 0.560 4.268
0.173 0.009 6.00 0.543 4.492
0.206 0.009 6.50 0.513 4.919
0.206 0.008 7.00 0.481 5.384
0.206 0.007 7.50 0.452 5.848
0.206 0.006 8.00 0.425 6.313
0.206 0.005 8.50 0.399 6.777
0.206 0.005 9.00 0.376 7.242
0.206 0.004 9.50 0.354 7.706
0.152 0.003 10.00 0.335 8.110
0.054 0.001 9.87 0.326 8.323
0.412 0.006 11.00 0.314 8.521
0.206 0.003 11.50 0.288 8.836
0.206 0.003 12.00 0.264 9.150
0.206 0.002 12.50 0.250 9.465
0.206 0.002 13.00 0.236 9.779
0.206 0.002 13.50 0.224 10.094
0.206 0.002 14.00 0.212 10.408
0.206 0.002 14.50 0.201 10.723
0.206 0.002 15.00 0.191 11.037
0.206 0.001 15.50 0.182 11.352
0.206 0.001 16.00 0.173 11.666
0.066 0.000 16.16 0.168 12.051
= 0.5727
= 0.5727
= 57.27
ELEVASI TEBAL LAPISAN TEKANAN
yang ini jangan di tulis (M) ɋ TON/M
ϒ1 = 1.29 0 0 0
ϒ1' = 1.49 0.50 0.50 0.50
ϒ2 = 1.49 1.00 0.50 0.645 +
ϒ2' = 1.89 1.50 0.50 1.290 +
1.82 0.32 1.935 +
2.00 0.18 2.348 +
H1 = 1.82 2.50 0.50 2.616 +
3.00 0.50 3.361 +
3.32 0.32 4.106 +
Ha = 1.5 3.50 0.18 4.583 +
4.00 0.50 4.851 +
4.50 0.50 5.596 +
Hb = 2.6 5.00 0.50 6.341 +
5.50 0.50 7.086 +
5.92 0.42 7.831 +
H3 = 2.2 6.00 0.08 8.457 +
6.50 0.50 8.608 +
7.00 0.50 9.553 +
7.50 0.50 10.498 +
8.00 0.50 11.443 +
8.12 0.12 12.388 +
TEKANAN TOTAL TEKANAN AIR
TON/M2 TON/M2
0 0.00 . 1 = 0.00
0.50 . 1.29 = 0.645 0.50 . 1 = 0.50
0.50 . 1.29 = 1.290 1.00 . 1 = 1.00
0.50 . 1.29 = 1.935 1.50 . 1 = 1.50
0.32 . 1.29 = 2.348 1.82 . 1 = 1.82
0.18 . 1.49 = 2.616 2.00 . 1 = 2.00
0.50 . 1.49 = 3.361 2.50 . 1 = 2.50
0.50 . 1.49 = 4.106 3.00 . 1 = 3.00
0.32 . 1.49 = 4.583 3.32 . 1 = 3.32
0.18 . 1.49 = 4.851 3.50 . 1 = 3.50
0.50 . 1.49 = 5.596 4.00 . 1 = 4.00
0.50 . 1.49 = 6.341 4.50 . 1 = 4.50
0.50 . 1.49 = 7.086 5.00 . 1 = 5.00
0.50 . 1.49 = 7.831 5.50 . 1 = 5.50
0.42 . 1.49 = 8.457 5.92 . 1 = 5.92
0.08 . 1.89 = 8.608 6.00 . 1 = 6.00
0.50 . 1.89 = 9.553 6.50 . 1 = 6.50
0.50 . 1.89 = 10.498 7.00 . 1 = 7.00
0.50 . 1.89 = 11.443 7.50 . 1 = 7.50
0.50 . 1.89 = 12.388 8.00 . 1 = 8.00
0.12 . 1.89 = 12.615 8.12 . 1 = 8.12
TEKANAN EFEKTIF TEKANAN EFEKTIF
TON/M2 RATA-RATA TON/M2
0 0.073
0.15 0.073
0.29 0.218
0.44 0.363
0.53 0.481
0.62 0.572
0.86 0.739
1.11 0.984
1.26 1.184
1.35 1.307
1.60 1.474
1.84 1.719
2.09 1.964
2.33 2.209
2.54 2.434
2.61 2.572
3.05 2.831
3.50 3.276
3.94 3.721
4.39 4.166
4.49 4.441
ELEVA
∆P ∆Pr
SI B/Z = M L/Z = N IƮ
(Z) (t/m2) (t/m2) B L
0 ~ ~ 0.300 22.587 11.294 7.29 7.5
0.50 14.58 15.000 0.239 18.013 20.300 7.29 7.5
1.00 7.29 7.500 0.229 17.207 17.610 7.29 7.5
1.50 4.86 5.000 0.218 16.409 16.808 7.29 7.5
1.82 4.01 4.121 0.211 15.905 16.157 7.29 7.5
2.00 3.65 3.750 0.208 15.624 15.764 7.29 7.5
2.50 2.92 3.000 0.197 14.853 15.238 7.29 7.5
3.00 2.43 2.500 0.187 14.102 14.477 7.29 7.5
3.32 2.20 2.259 0.181 13.632 13.867 7.29 7.5
3.50 2.08 2.143 0.178 13.372 13.502 7.29 7.5
4.00 1.82 1.875 0.168 12.666 13.019 7.29 7.5
4.50 1.62 1.667 0.159 11.987 12.326 7.29 7.5
5.00 1.46 1.500 0.151 11.335 11.661 7.29 7.5
5.50 1.33 1.364 0.142 10.713 11.024 7.29 7.5
5.92 1.23 1.267 0.136 10.213 10.463 7.29 7.5
6.00 1.22 1.250 0.134 10.120 10.167 7.29 7.5
6.50 1.12 1.154 0.127 9.558 9.839 7.29 7.5
7.00 1.04 1.071 0.120 9.026 9.292 7.29 7.5
7.50 0.97 1.000 0.113 8.523 8.774 7.29 7.5
8.00 0.91 0.938 0.107 8.049 8.286 7.29 7.5
8.12 0.90 0.924 0.105 7.939 7.994 7.29 7.5
LUAS = BxL = 7.29 . 7.5

q q = 75.29
75.29
75.29
75.29
75.29
75.29
75.29
75.29 H1 = 1.82
75.29
75.29
75.29 Ha = 1.5
75.29
75.29
75.29 Hb = 2.6
75.29
75.29
75.29 H3 = 2.2
75.29
75.29
75.29
75.29
75.29
Elevasi ∆P Rata- Po Rata- P1 Log P1 / H
(Z) Rata Rata P1 / Po
Po
M ( Ton/M2 ) ( T/M2 ) ( T/M2 ) (M)
0 11.294 0.073 11.366 156.772 2.195 0.00
0.50 20.300 0.073 20.372 280.998 2.449 0.50
1.00 17.610 0.218 17.827 81.965 1.914 0.50
1.50 16.808 0.363 17.171 47.367 1.675 0.50
1.82 16.157 0.481 16.639 34.563 1.539 0.32
2.00 15.764 0.572 16.336 28.565 1.456 0.18
2.50 15.238 0.739 15.977 21.634 1.335 0.50
3.00 14.477 0.984 15.461 15.720 1.196 0.50
3.32 13.867 1.184 15.051 12.708 1.104 0.32
3.50 13.502 1.307 14.809 11.331 1.054 0.18
4.00 13.019 1.474 14.493 9.835 0.993 0.50
4.50 12.326 1.719 14.045 8.173 0.912 0.50
5.00 11.661 1.964 13.625 6.939 0.841 0.50
5.50 11.024 2.209 13.233 5.992 0.778 0.50
5.92 10.463 2.434 12.897 5.299 0.724 0.42
6.00 10.167 2.572 12.739 4.952 0.695 0.08
6.50 9.839 2.831 12.670 4.476 0.651 0.50
7.00 9.292 3.276 12.567 3.837 0.584 0.50
7.50 8.774 3.721 12.495 3.358 0.526 0.50
8.00 8.286 4.166 12.451 2.989 0.476 0.50
8.12 7.994 4.441 12.436 2.800 0.447 0.12

Penurunan Settlement Titik A


S
CV / 1 + e0 Cc / 1 + e0 . H
(M)
0.412 0.000 0.000 0 11.294 0.073
0.412 0.206 0.505 0.50 20.300 0.073
0.412 0.206 0.394 1.00 17.610 0.218
0.412 0.206 0.345 1.50 16.808 0.363
0.412 0.132 0.203 1.82 16.157 0.481
0.412 0.074 0.108 2.00 15.764 0.572
0.412 0.206 0.275 2.50 15.238 0.739
0.412 0.206 0.247 3.00 14.477 0.984
0.412 0.132 0.146 3.32 13.867 1.184
0.412 0.074 0.078 3.50 13.502 1.307
0.412 0.206 0.205 4.00 13.019 1.474
0.412 0.206 0.188 4.50 12.326 1.719
0.412 0.206 0.173 5.00 11.661 1.964
0.412 0.206 0.160 5.50 11.024 2.209
0.412 0.173 0.125 5.92 10.463 2.434
0.412 0.033 0.023 6.00 10.167 2.572
0.412 0.206 0.134 6.50 9.839 2.831
0.412 0.206 0.120 7.00 9.292 3.276
0.412 0.206 0.108 7.50 8.774 3.721
0.412 0.206 0.098 8.00 8.286 4.166
0.412 0.049 0.022 8.12 7.994 4.441
TOTAL = 3.658
tlement Titik A = 3.658
= 365.763
H1 = 1.82

Ha = 1.5

Hb = 2.6

H3 = 2.2