Professional Documents
Culture Documents
Activity in Dec: Specific LN Supply Operations Blntunl
Activity in Dec: Specific LN Supply Operations Blntunl
....
-'~ ~
~
/u1 lv,w
I'---------------- Activity Specific Operational Guidelines (ASOG and SIMOPS) for Anggrek 7501 ln Logistic Supply Operations In Blntunl /18 Dec 2019 )
YELLOW
Advisory Yellow
Not:-fv Maste· Ch1e 1 Engineer. Office r and Engineer duty,
q,c OIM. BP Manne in/around the 500m No Yes Yes Yes
,-:..
\ essel operating as Class 2 Vessel working as Class 2 setup ' Possible the DP redundancy
Vessel in working as Class 1
as per CAM could be lost
e
0 Drift Test or DP system Slack Water and Changing
'I: Drrft Off Operations (Down Current) Drift On
•
0..
predictions indicated drift off Current
)
..
19
Thruster and SG/ DG Loading <40 % Approaching 50% >50%
> On DP for more than 20 mins
"l Pre 500m Entry
Checklist Approved by OIM
On DP fo r less than 20 mins Checklist not approved by OIM
.>.
c;
0
Vesse l Footprint I Weather Related Excursion (from I< 3 meters > 3 meters > 5 meters <Sm from Rig Legs
set po int)
i0
(.)
Heading Excursion < 3 degrees > 3 degrees > 5 degrees
...
• < 50 kN -+ Any Direction
I•
.c
50 - 60 kN -,. +150i-150 Deg Unable to maintain the resultant
!Resultant Force Direction 60 - 70kN -+ +160i-160 Deg N/A fo rce directir,r, ·,vith the green
> 70 kN - • +170/-170 Deg limits or ~urrent .' 3 .J Kts "
:- '::IU ,,.: , ... - - c;t- !?5 Deg
Current > 1llkb v·a-n-ab_l_ e---1-- - - -
mode
Thruster Allocation Modd NI!\ Any other condition
Current less than 1.0 1-{:.: - f'.\lr.4s
f i}itt.:;lJIS f fJ lv .... "- ~~ ' · · --- -~·--·- _______ __.
- -
I
.§ All running standby outside 500m must be in a Not in a drift off area
~ Standby position outside 500m drift off area from the offshore installation
Master standing order must include "ASOG must Master standing order do not include "ASOG must be
Master Standing order must include ASOG be followed for all DP operations" followed for all DP operations"
I another DP vessel
.....
Sign and Date
<:jr V-:'
.ed by All DPOs and ECR team
pEL\WGt llJI L O AN l.?t~ Sy ~ ,S.R/ .e-,l\111 I) f
I ~ t
eA_I) 7' , k uS M ( .o-<>
.ehalf of Charter I. \ ~ ;
I
,r
ofi.r
7£ l<~P..l<AL. ¾ P. 1..#0 I (2A I S' % 'bU,lltfeT' l,,t- 1t111J 1ft' 3 / e, (2 UO I e--ro ~LA-Mer.
I
C:
0
Fire - E/R or Elsew here
~ No fire , no fire alarms Any fire alarm Fire confirmed
0
u
::a0 Flood No bilge alarms active , no
One bilge alarm Flood confirmed
0 flooding
u::
...
"i Collision No colli sion imminent / minimum
Minimum approach will be < 500r If collision possible
u: approach > 500m Collision imminent
Thruster wash not affecting other Thruster wash not affecting other
Cl) Thruster wash from own vessel Affecting Station Keeping
a.. vessels vessels
0
~ NORMAL OPERATING CONFIRMED EMERGENCY OR
Cl)
Rig or Platform Status FIRST ALARM NOTIFICATION CONFIRMED EMERGENCY
CONDITIONS RIG/PSV PIC DECISION.
ILJw r1-
On beha lf of Charter ..t:1::_IJ 9'ref)...._ ~ . I< (.f,t ,nor,c,
n
- I LJ..- I ,,,., LJ n ,-..,. \
{2 •
'I-
lt/ll l)14 N
..J • {: 7 A 1V'7
~R.., ,S4
H~Y
Cd, , tvJO
D...J?H07
s . ~o
·'I . ~
t" . C$
~f'c:>
l) p::>
;r·
S · p. ti( (h ~ /< U '1..l<-A·l