Professional Documents
Culture Documents
Coventry Log Homes: Foundation Plan
Coventry Log Homes: Foundation Plan
1'-0"
8'-0" 8'-0"
4x4 Post
Bunk Beds
4'-4"
By Owner
S262-3068 R
6'-2 1/4"
6'-2 1/4"
6'-2 1/4"
6'-2 1/4"
3'-6"
2'-11"
10
Elevation B
Elevation D
V-Match Door
Covered Porch
4x4 Post
Built On Site
2'-1"
244GW3030
12'-4 1/2"
12'-4 1/2"
12'-4 1/2"
12'-0"
2468
3'-4"
3'-9"
1/2 Bath PT 6x6 Support Post PT 2x8 Floor Joists 16" o.c.
244GW3030
10
(2)-2x8 Box
3'-4"
6'-2 1/4"
6'-2 1/4"
6'-2 1/4"
6'-2 1/4"
6'-0"
4'-1 1/2"
4'-4"
Bunk Beds
By Owner
2'-1"
4x4 Post
8'-0" 8'-0"
244GW5040 8'-2 1/4" 8'-2 1/4" 4'-1/4" 3'-1 1/4" 5'-1" 8'-2 1/4" 4'-1/4"
9'-4" 5'-4" 1'-4" 3'-11"
C Of Post Above
L
16'-4 1/2"
Elevation A
Dashed Line Represents Outside Of Floor Frame
All Materials For Exterior Stairs
And Stair Railings By Others
PT 6x6x8' Posts Supplied. Posts Should Be Set On
A Concrete Footing At A Point Below The Frost Line 4x4 Post Above Sheathing
2 2 12 12
Log Blocking Between Rafters 4x 4x
2x Ripped To Thickness Of Insulation
4x
1" V-Match OJ 8x 9 1" V-Match OJ 8x 9 OJ 8x
sC 10 sC 10
sC 10
Blocking For
4x8 Fly Rafter 4x8 Fly Rafter V-Match
4x4x10' Post COJ 4x4x10' Post COJ
V-Match
Gable Wall Collar Tie Below Collar Tie Below 1x8 Skirtboard 1x8 Skirtboard
Solid Blocking Solid Blocking
PT (2)-2x8 Floor Joists 16" O.C. 2x4 Bathroom Frame
Note: COJ Indicates That Pieces Are Sent Longer Than Necessary. Note: COJ Indicates That Pieces Are Sent Longer Than Necessary. Note: COJ Indicates That Pieces Are Sent Longer Than Necessary.
2x Ripped To Thickness
Exact Length Needs To Be Determined On Site Exact Length Needs To Be Determined On Site Exact Length Needs To Be Determined On Site
4x8 Fly Rafter Of Insulation
Note: Actual Pitch Of Roof Determined By Assembled Gable. Note: Actual Pitch Of Roof Determined By Assembled Gable. Note: Actual Pitch Of Roof Determined By Assembled Gable.
Actual Pitch May Vary Slightly From That Noted On Plan Actual Pitch May Vary Slightly From That Noted On Plan Actual Pitch May Vary Slightly From That Noted On Plan
2x4 Strapping
Section A2 Section B2 Section C2
SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0"
11 1/2"
2'-4 1/2" 2'-8" 2'-8" 2'-8" 2'-8" 2'-8" 2'-8" 2'-8"
Olylogs (Typ.)
Foam Insulation
At Top Of Radius
C
Roof Frame Notes
2
- 4x8 Rafters 32" O.C.
- 1" V-Match Ceiling 4x8 Blocking Between Rafters
- 15# Felt Paper Over V-Match Bead Of Caulking Outside Of Foam
Roof Frame
SCALE: 3/8" = 1'-0"
"
2x4 Strapping /4 Foam Insulation
43 Peak Of 1x8 Rake Boards
Caulking
1 3/4" x 11 7/8" LVL Ridge
2" Rigid Insulation
1/2
" "A" Row Log Wall
12 10
1'-
Steel Roofing
Olylog
2" Rigid Insulation 9 Plywood Starter Strip Nailed
4x 1/2
"
COJ 8x
10 1'-
10
Into Groove Of "A" Row 1/2"x7" Lag Bolts
(By Others) Every
s Caulking Sill Seal
r 'R Other Row
afte af 12
'R te /2" Detail 10
rs 01
10
9 1
1" V-Match x CO 2x4 Strapping 1'-
8 Caulking Under Starter Strip
4x J Side View
15# Felt Paper Over V-Match
4x8x10' Collar Ties COJ 1/
4" 1x8 Skirtboard Studs 16" O.C.
2'- (2)-PT 2x8 Box
2x4 Strapping Log Wall
Actual Pitch Of Roof Determined By Assembled Gable.
1/2" x 7" Lag "
1/2 Actual Pitch May Vary Slightly From That Noted On Plan
1/2" x 5" Lag 2
2x4 Roof Box 1'- Log Wall
W/ Washers
(By Others) Dimensions Given Are For Reference Only.
Actual Dimensions May Vary On Site.
Top Of Radius Of Log
Log Blocking Between Rafters Should Line Up With Top
Of Rafter Place Top 2x4 Near Ridge To PT 6x6 Post Bottom Plate
Accommodate Fastening Of Ridge Cap
1x8 Facia
Rip Scrap Pine to Hold Insulation
Until Strapping Is In Place
3-2x4 Studs At
Intersection Of
Top View Log Wall
12
244GW3030
244GW5040
S-262-3068 R
ELEVATION A
SCALE: 3/8" = 1'-0" ELEVATION B
SCALE: 3/8" = 1'-0"
244GW3030
244GW5040
ELEVATION C ELEVATION D
SCALE: 3/8" = 1'-0" SCALE: 3/8" = 1'-0"