Professional Documents
Culture Documents
Elementary Surveying Field Manual: Course and Section: Ce120-02F - A7
Elementary Surveying Field Manual: Course and Section: Ce120-02F - A7
FIELD MANUAL
2006
SUBMITTED BY:
SUBMITTED TO:
ELEMENTARY SURVEYING 40
CHIEF OF PARTY: SUMANDE,
GROUP NO. 5 CEDRIX V.
MEMBERS:
41 Paras, Andrei Philip A. 47 Sumande, Cedrix
42 Pimentel, Sahara Mae F. 48 Tenebroso, Angelo
43 Santos, Arden Clarenze 49 Viclar, John Laurence Emmanuel
44 Sarcia, Aicrasely 50 Vytingco, Antonio Lorenzo
46 Simsuangco, Denzel John
PROFILE LEVELING
OBJECTIVES:
INSTRUMENTS:
1. Precise level
2. 1 leveling rod
3. tape
4. 1 set of marking pins
5. plumb bob
6. range pole
7. millimeter paper
8. French curve
ORGANIZATION OF PARTY:
ELEMENTARY SURVEYING 41
PROCEDURE:
1. The professor assigns the end points of the extent of profile leveling
work. The location is preferably with considerable up and down terrain,
near a benchmark and about 500m-1000m.
2. Establish stakes at every full station along the center of the proposed
roadway say at a convenient 10m or 20m station.
3. Set-up the level on a suitable location and take the BS of BM-1 (point of known
elevation) while the rod man is holding the level exactly at BM1. Compute the
height of the instrument by using the formula: HI Elev of the po int BS .
4. The rod man now transfers to the initial point on the prescribed centerline of the
roadway and the first intermediate foresight is to be measured. Compute the
0 000
8. Follow procedures 2-7 until one has reached his assigned length of
profile leveling work.
9. Tabulate the computed values and plot the profile output of the road.
QUESTIONS AND PROBLEMS:
A. PROFILE LEVELING
COMPUTATIONS:
As we do the certain field work via google earth where we can use the certain topic to plot some
point specially in profile levelling. This field work via online is easy to complete because the only
thing to do is to plot the points label them as Benchmark and set up the Location of the
Instrument between BM to TP. After completion for setting up the basic plot you need to plot the
IFS and provide some legend icon to avoid confusion and later computation. We start from
North Avenue for Benchmark 1 and the last will be the Taft Avenue and after the field work was
done we go for computation as we see the altitude of TP and BM as BS and FS for our data.
This kind of field work is the same as differential levelling, but the difference is Profile levelling
I still want to do this field work outside when you can use the proper materials to visualize
everything when you record your data as completion of surveying. I only recommend when
doing this kind of field work in online you must have stable connection and your laptop can use
google earth properly because if you continuously do this FW in online and your laptop cannot
process the given action it will turn to waste. As well as the whole team must coordinate in
participating this field work and the computation team for better results. As a chieftain of this
team, I divide my members into 3 teams as: gathering data, computation and completion of the
paper this will helps the team to participate in a way the contribution of works is given in the
same manner.
PHOTO DOCUMENTATION:
Legend:
BM1 TP
STA
Back sight
Foresight
IFS
Setting the location of profile leveling preferable for the said necessities with
benchmarks near about 500m to 1000m.
Build up stakes at each full station along the focal point of the proposed street.
Placing level on an appropriate location to take the back sight of the BM1, and then to
compute for the HI.
Moving to the underlying point on the recommended centerline of the street and the
main middle of the road is to be valued for IFS.
Next is to move to another area in order to take the back sight of the TP1.
Follow the steps from 2-7 until one has arrived at his relegated length of profile
leveling work.
https://earth.google.com/earth/rpc/cc/drive?state=%7B%22ids%22%3A%5B
%221PfuUzN1S1AV5b0w6ae8h7wmNRmjL3uB_%22%5D%2C%22action%22%3A
%22open%22%2C%22userId%22%3A
%22114442512884634608731%22%7D&usp=sharing