Daily Production Sheet: Date: Work Center

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Daily Production Sheet

Work Center : Date :


Oper. Status(CNF/ Work Description Setup Idle Time in minutes
Time Part Name/P.O. Sap Hrs. Autonomous Preventive
No. PCNF) Target Actual Time No Load No crane No Tool No Material B/D No Decision Wait Insp Wait Inst. Training 5S
Maintenance Maintenance Details

Planned Time:- 460 min.


7.30AM-11.30AM

Total Idle Time:-


A-Shift

Operator Name.
12.00PM-4.00PM

Supervisor Sign.

Planned Time:- 460 min.


4.00PM-8.00PM

Total Idle Time:-


B-Shift

Operator Name.
8.30PM-00.30AM

Supervisor Sign.

Planned Time:- 370 min.


00.30AM-4.00AM

Total Idle Time:-


C-Shift

Operator Name.
4.30AM-7.30AM

Supervisor Sign.

P HI QC2 7701/8
1 of 4/15/2011 Issue Date : 01.03.11
CNF-After completion of all parts in a docket.

P HI QC2 7701/8
2 of 4/15/2011 Issue Date : 01.03.11

You might also like