IMS PEI Training – Final Quiz (NLNG

Aug 2021)
Please complete the quiz to test your IMS PEI knowledge. The quiz consists of both theoretical
questions and exercises in IMS. Please use the same INSP## ID used this week during the training.
Where links are requested, copy and paste the IMS link from your browser

* Required

Participant Details

Name *

INSP## ID *

Email *

8/12/2021
Theoretical Exercises

In which case must two Measurement Sets be created?


(2 Points)

When inputting thickness readings on two pieces of equipment

When inputting thickness data for 8 circuits on the same Equipment ID

When there are over 50 CMLs on a circuit

When inputting thickness readings that were taken on 2 different days

For one specific circuit, what is the maximum number of Measurement Sets that
can exist in the “Draft” status?
(2 Points)

As many as desired

What turns the Default schedule on and off?


(2 Points)

8/12/2021
7

What are four things you can do from the Equipment Details page?
(2 Points)

Over the last 30 years, a specific CML has had 8 thickness readings with no (zero)
warnings or errors. To calculate the long and short corrosion rates, how many of
these thickness readings (in total) are used in these calculations?
(2 Points)

All the readings

How is the total interval factor determined for Calc Method 1?


(2 Points)

CIRCUIT IF  +  DSCF IF

(CIRCUIT IF  x  DSCF IF  x  PERF IF)/2

CIRCUIT IF

 CIRCUIT IF  +  DSCF IF  +  PERF IF

CIRCUIT IF  x  DSCF IF  x  PERF IF

8/12/2021
10

What is the default suggested corrosion rate for Equipment Group PIPING?  

Please provide answer in mm/year or inch/year (format: X.XXX)


(1 Point)

11

Which Calc Method uses the Data Scatter Compensation Factor? 


(1 Point)

12

A Class 2 piping circuit has 20 active CMLs.  What is the minimum number of
CMLs that should be inspected without getting a “PERF IF penalty”?
(2 Points)

15

10

20

8/12/2021
13

When thickness readings are taken at a very short interval, the prior reading will
be considered a “Time Error” and will not be used in the calculations. The “Time
Error” takes effect when thickness readings are taken less than:
(1 Point)

< 6 months apart

< 2 years apart

< 90 days apart

< 1 year apart

14

A reading is considered a “Growth Error” if the reading is:


(2 Points)

Greater than 10% thicker than any previous reading and less than 15% thicker than a non-
adjacent reading

Greater than 10% thicker than the previous (adjacent) reading or greater than 15% thicker
than a non-adjacent reading

6.35mm / 0.25 in thicker than any previous reading

6.35mm / 0.25 in thicker than the previous reading

8/12/2021
15

What does not apply when the Renewal/Baseline checkbox in the measurement
set is selected?
(1 Point)

Resets the base reading

Deletes all previous measurement data

Makes all previous measurements historical

Activates the historical rate

8/12/2021
Navigation Exercises - Equipment ID INSPxx-C-100  

Answer the following questions for Equipment ID INSPxx-C-100 in the


same IMS training site used this week. Remember to work on your own
equipment according to your INSPxx user ID!

16

What is the Operating Pressure?


(1 Point)

17

What are the Base Materials for the Internals?


(1 Point)

18

What component ID’s have been created, other than GENERAL


(1 Point)

8/12/2021
Navigation Exercises

Answer the following questions for the items in the same IMS training site
used this week

19

For Equipment ID INSPxx-F-10, how many circuits are assigned to this


equipment?
(1 Point)

20

For Equipment ID INSPxx-AC-204, how many Active CMLs are assigned to Circuit
B?
(1 Point)

21

For Equipment ID INSPxx-AC-203, what is the interval for the external schedule?


(1 Point)

8/12/2021
22

For Component ID INSPxx-V-101, what RBI Degradation Mechanisms has been


assigned to the Shell component ?

(1 Point)

8/12/2021
Navigation Exercises - Equipment ID INSPxx-AC-200

Equipment ID INSPxx-AC-200; Circuit ID B: Determine the following for


the last recalculation event of 2007:

23

Calculated Next Inspection Date (DD/MMM/YYYY)


(1 Point)

24

Controlling Corrosion Rate (mm/yr)


(1 Point)

25

The CML ID which limits the Calculated Interval


(1 Point)

26

 Max/Ave Long Ratio


(1 Point)

8/12/2021
Navigation Exercises - Unit INSPxx-DISTILLING

Answer the following questions for your unit INSPxx-


DISTILLING. Remember to work on your own unit according to your INSPxx
user ID!

27

How many category 1 INSPECTION Schedules are overdue/past due?


(2 Points)

28

How many schedules are not final approved for more than 1 year at your INSPxx-
DISTILLING unit?
(2 Points)

29

How many CAIR Category 1 schedules are overdue in your INSPxx-


DISTILLING unit?
(2 Points)

8/12/2021
30

Determine how many active schedules on ACTIVE equipment are due in your
INSPxx-DISTILLING unit during the current calendar year in order to provide the
report to operations and maintenance planning.
(2 Points)

31

How many active Exchangers are in your INSPxx-DISTILLING unit?


(2 Points)

8/12/2021
Practical Exercises - Hierarchy and Measurements

A pipe, INSPxx-PL-200 (Kerosene to Coolers), in INSPxx-DISTILLING, is


shown on the attached sketch.  This pipe has been inspected, but all of the
data was not entered into IMS. 

8/12/2021
32

A. Create the new Circuit “A” and the CML’s below.

B. Circuit “B” along with measurements, have already been added and calculated in
IMS. 

C. Create a Measurement Set, enter the thickness readings for Circuit “A” and
calculate.

D. Analyze and Approve A and B Calculation Summaries.

Please provide the URL for each of the circuits (copy and paste to the text box
below)
(8 Points)

8/12/2021
Circuit Calculation Results
Fill in the following table based on Circuit A and Circuit B calculated in the previous section

33

#A1 - Calculated Next Inspection Date


(1 Point)

34

#A2 - Recommended Next Inspection Date


(1 Point)

35

#A3 - List Driving CML


(1 Point)

8/12/2021
36

#A4 - Governing Rate Basis


(1 Point)

37

#A5 - Max/Ave Long Ratio


(1 Point)

38

#A6 - Max/Ave Short Ratio


(1 Point)

39

#B1 - Calculated Next Inspection Date


(1 Point)

8/12/2021
40

#B2 - Recommended Next Inspection Date


(1 Point)

41

#B3 - List Driving CML


(1 Point)

42

#B4 - Governing Rate Basis


(1 Point)

43

#B5 - Max/Ave Long Ratio


(1 Point)

8/12/2021
44

#B6 - Max/Ave Short Ratio


(1 Point)

8/12/2021
Condition History

45

Create a turnaround event with date (one year from today) at INSPxx-DISTILLING.
Copy and paste the link from IMS here

46

Vessel Inspection: Complete a Condition History for INSPxx-V-200 per the


following:

1)    Condition Date: Use current date

2)    Description: Internal Inspection

3)    Current Event: Turnaround

4)    Credit the Intrusive schedule for internal inspection

5)    Complete Appropriate Codes Templates

6)    Write the Narrative

7)    Create a CAIR to replace N-2 and N-3 at the 2023 turnaround.

8)    Approve the Equipment Condition History.

Inspection Findings: (Vessel was inspected during the Turnaround)

UT thickness readings were performed throughout.  A localized area in the shell near N-


1 was corroded below the renewal thickness.  Weld buildup was performed to a 60 sq. in or
390 cm2 area to bring this area back up to original thickness.

Nozzle N-4 was corroded and replaced in kind.  The remaining wall thickness was
only 0.381 cm / 0.15 in.  Nozzles N-2 and N-3 were also corroded but are estimated to
make the next turnaround.

(15 Points)
Copy and paste the link from IMS to here

8/12/2021
47

Leak: Complete an Equipment Condition History per the following:

Equipment ID: INSPxx-PL-001                

Condition Date:  Use current date

1) Description: Leak at Elbow A01B


2) Complete Appropriate Code Template

3) Write the Narrative

4) Create appropriate CAIR to make permanent repair by 1/Feb/2022

5) Approve the Equipment Condition History

Details of the leak: 

INSPxx-PL-001 had a leak on the backside of the first elbow downstream of INSPxx-ES-


170A. The leak was a result of Corrosion Under Insulation (CUI). On the elbow was a
localized corroded area about 100 x 150 mm (3,9 x 5,9 in). The actual leak was a pit about
0.02 mm (less than 0.25 in) diameter. The insulation on this elbow had been damaged. A
Temporary Leak Repair was installed.

The RAM criticality for this equipment is Medium.  This pipe was part of the RBI process
and the mechanism was expected.

The leak was clamped. The elbow should be replaced by 1/Feb/2022. The total impact of
this leak was USD 110,000 (USD 10,000 to perform the repairs, and USD 100,000 process
loss).
(15 Points)
Copy and paste the link from IMS to here

8/12/2021
Schedules, Components, Specifications

48

Change the External visual schedule interval on INSPxx-ES-140A.  You are


changing this interval because of a change in regulatory requirement.

New External visual interval: 120 months

(4 Points)
Copy and paste the link from IMS to here

49

Create a new component to address Amine Stress Corrosion Cracking type


mechanism for INSPxx-ES-200 channel
(2 Points)
Copy and paste the link from IMS to here

8/12/2021
50

Add the following specs to the pipe INSPxx-PL-200 Kerosene to Coolers

At Equipment Level:

Design Pressure actual:  6 barg

Design Temp actual:       148 °F / 64 °C

Hydrotest New:              10.3 barg

MDMT:                           -5 °F / -21 °C

PWHT:                             Yes
(3 Points)
Copy and paste the link from IMS to here