Professional Documents
Culture Documents
General Notes: REV APP CH'D BY Date Description APP
General Notes: REV APP CH'D BY Date Description APP
(4) STIRRUPS SHALL BE ARRANGED WITHIN THE OVERLAPPING LENGTH OF LONGITUDINAL STRESSED REINFORCEMENT. WHEN THE PIPING GENERAL ARRANGEMENT DRAWING FOR
9686-8230-51-711-5001
SEAWATER INTAKE AREA
REINFORCEMENT IS IN TENSION, THE STIRRUP SPACING SHALL NOT BE GREATER THAN 5 TIMES OF THE SMALLER DIAMETER 9686-8320-RP-000-4501 GEOTECHNICAL INVESTIGATION REPORT
Ⅱ Ⅰ Ⅱ Ⅰ Ⅱ Ⅰ Ⅱ OF THE OVERLAPPING REINFORCEMENT AND SHALL NOT BE GREATER THAN 100MM. CALCULATION REPORT FOR SECANT PILES
9686-8320-CA-711-4503
C
(5) MECHANICAL CONNECTION: EQUAL STRENGTH STRAIGHT THREAD MECHANICAL CONNECTION SHALL BE PREFERRED FOR OF SEA WATER INTAKE WELL
C
CALCULATION REPORT FOR INNER SUPPORT
(2) THE OCCLUDED PILES ARE CONSTRUCTED BY FULL CASING DRILLING MACHINE AND TREMIE PIPE SHALL BE USED FOR CONCRETING. MECHANICAL CONNECTION OF REINFORCEMENT. 9686-8320-CA-711-4504
OF SEA WATER INTAKE WELL
THE PILES ARE ARRANGED IN A OCCLUSIVE ARRANGEMENT WITH A DIAMETER OF 1000MM AND A LENGTH OF 250MM.THE (6) THE JOINT AREA OF THE TENSILE REINFORCEMENT LOCATED IN THE SAME JOINT CONNECTION SECTION SHALL NOT BE REINFORCEMENT DETAILS FOR SECANT PILES
9686-8320-44-711-4504
CONSTRUCTION OF PILE II IS COMPLETED BEFORE THE PILE I CONCRETE INITIAL SETTING TIME,SUPER RETARDING CONCRETE OF SEA WATER INTAKE WELL
GREATER THAN 50%, AND THE JOINT POSITION SHALL BE AWAY FROM THE PLACE WITH LARGE STRESS. DETAILS FOR INNER SUPPORT
(MORE THAN 80HOURS INITIAL SETTING TIME) SHALL BE USED FOR PILE I. 9686-8320-44-711-4505
OF SEA WATER INTAKE WELL
(3) THE CASING SHALL BE PULLED OUT ONE BY ONE ALONG WITH THE PILE CONCRETE POURING, AND IT IS STRICTLY PROHIBITED REINFORCEMENT DETAILS FOR INNER SUPPORT
9686-8320-44-711-4506
TO PULL UP BY FORCE 2.5 QUALITY INSPECTION MEASURES FOR ENCLOSURE STRUCTURE OF SEA WATER INTAKE WELL
(4) THE VERTICAL ACCURACY OF THE BORED PILE SHALL BE 3 ‰, THE PILE DIAMETER SHALL NOT BE LESS THAN 10 MM OF THE (1) THE NUMBER OF TEST PILES SHALL NOT BE LESS THAN 2 GROUPS, AND EACH GROUP SHALL NOT HAVE LESS THAN 3
DESIGN DIAMETER, AND THE ALLOWABLE DEVIATION OF THE PILE POSITION SHALL NOT BE GREATER THAN 50 MM. PILES.
(5) CONSTRUCTION ERROR IS NOT CONSIDERED IN THIS DESIGN. DURING CONSTRUCTION SETTING OUT, VERTICAL CONSTRUCTION
(2) THE PILE TEST PROCESS SHALL BE RECORDED IN DETAIL, INCLUDING CONSTRUCTION EQUIPMENT, PROCESS PARAMETERS,
ERROR AND HORIZONTAL CONSTRUCTION ERROR SHALL BE CONSIDERED ACCORDING TO THE ENCLOSURE STRUCTURE
COORDINATE DIAGRAM, AND THE MAXIMUM ALLOWABLE HORIZONTAL DISPLACEMENT OF THE ENCLOSURE STRUCTURE SHALL BE HOLE FORMING TIME, CONFINED WATER, VERTICALITY TEST, DRILLING PARAMETER TEST, ETC...
CONSIDERED FOR SETTING OUT, SO AS TO ENSURE THE REQUIREMENTS OF INTERNAL CLEARANCE SIZE AND SIDE WALL (3) PILE INTEGRITY TESTING - ULTRASONIC PILE TESTING - CROSS-HOLE SONIC LOGGING (CSL), "SONIC LOGGING" OR "SONIC
THICKNESS. CORING" AS PER ASTM D6760 FOR REINFORCED PILES AND PILE ECHO TESTER (PET) AS PER ASTM D5882 FOR
(6) THE VERTICAL REINFORCEMENT SYSTEM OF THE REINFORCEMENT CAGE IS CONFIGURED ACCORDING TO THE INTERNAL FORCE UNREINFORCED PILES.
ENVELOPE DIAGRAM, AND THE LENGTH AND POSITION OF THE ADDITIONAL REINFORCEMENT CANNOT BE CHANGED AT WILL
D (4) INCLINATION OF THE PILE -VERTICALITY TESTS USING BOREHOLE INCLINATION TESTER. THE LIMITS OF VERTICAL ACCURACY D
DURING THE CONSTRUCTION.
(7) BEFORE POURING CONCRETE, THE SPECIFIC GRAVITY OF SLURRY WITHIN 500MM OF THE HOLE BOTTOM SHALL BE LESS THAN AND ALLOWABLE DEVIATION SHALL BE AS PER CLAUSE 4 OF SECTION 2.2.
1.25; THE SAND CONTENT SHALL NOT BE GREATER THAN 8%; AND THE VISCOSITY SHALL NOT BE GREATER THAN 28S. FRESH 3.MATERIAL
MUD SHALL BE STORED FOR 24 HOURS BEFORE USE. (1) STEEL BARS: ALL BAR REINFORCEMENT SHALL BE DEFORMED TYPE 2, COMPLYING WITH BS 4449:2005 + A3:2016, GRADE
(8) UNDERWATER CONCRETE MUST BE CONSTRUCTED CONTINUOUSLY. THE POURING TIME OF EACH PILE SHALL BE CONTROLLED B500B, MINIMUM GUARANTEED YIELD STRESS OF 500 N/MM2 .REPRESENTATION BY THE LETTER "T" IN THE DRAWING. NRH/
03 29/11/20 ISSUED FOR CONSTRUCTION WITH HOLD GPS/RKK HP MJH
ACCORDING TO THE INITIAL SETTING TIME OF THE INITIAL PLATE CONCRETE. ALL FAULTS IN THE POURING PROCESS SHALL BE ZZ
(2) STEEL PLATE:HOT-ROLLED STRUCTURAL STEEL, MINIMUM YIELD STRENGTH SHOULD NOT LESS THAN 275N/MM2.
RECORDED AND FILED. 02 31/05/20 ISSUED FOR CONSTRUCTION WITH HOLD
NRH/
GPS/RKK HP MJH
(3) CONCRETE:CONCRETE CUSHION :GRADE C16/20;SECANT PILE ,PRECAST SECONDARY BEAM,PRIMARY BEAM,CORBEL,WATERPROOF ZZ
(9) CONTROL THE LAST POURING AMOUNT, THE PILE TOP SHALL NOT BE TOO LOW, AND THE BLEEDING HEIGHT TO BE CHISELED NRH/
MUST ENSURE THAT THE EXPOSED PILE TOP CONCRETE REACHES THE STRENGTH DESIGN VALUE. REINFORCED CONCRETE LINING WALL IN PILES AND PILE CAP:GRADE C40/50; 01 05/04/20 ISSUED FOR CONSTRUCTION GPS/RKK HP MJH
ZZ
(10) AFTER ENTERING INTO THE BEDROCK, IF THE DEVIATED HOLE IS FOUND, THE RUBBLE SHALL BE BACKFILLED TO THE PLACE 300 (4) GUIDE WALL: THICKNESS 300, C16/20, HEIGHT 1500MM , EQUIPPED WITH A LAYER OF T10 @ 200 STEEL MESH. A1 20/02/20
ISSUED TO COMPANY FOR JGP/
GPS HP MJH
REVIEW/COMMENTS ZZ
MM-500 MM ABOVE THE DEVIATED HOLE, AND THEN THE DRILLING SHALL BE CARRIED OUT AGAIN.
(11) AFTER ENTERING INTO THE BEDROCK, THE HOLE SHALL BE CLEANED AND SAMPLED ONCE EVERY 100-500MM OF DRILLING FOR REV DATE DESCRIPTION BY CH'D APP APP
4.CONCRETE COVER: CONCRETE PROTECTION ON EXPOSED SURFACE AND TO EARTH OF PILE IS 75MM.
FINAL HOLE ACCEPTANCE. REVISIONS
(12) BEFORE THE REINFORCEMENT CAGE IS HOISTED AND POURED WITH CONCRETE, THE THICKNESS OF BALLAST AT THE BOTTOM OF CLIENT:
5.PILE CUT-OFF LENGTH:250MM.
THE ENCLOSURE PILE HOLE SHALL NOT BE GREATER THAN 100MM, AND THE MIDDLE TEMPORARY PILE HOLE. THE THICKNESS OF
E BOTTOM BALLAST SHALL NOT BE MORE THAN 50MM. E
6.SHOTCRETING OMAN TANK TERMINAL COMPANY (OTTCO)
(13) THE DESIGN ELEVATION OF THE REINFORCEMENT CAGE EXPOSED TO THE PILE TOP SHALL NOT BE LESS THAN 30D, AND THE
(1) AGGREGATE TO CEMENT RATIO SHALL BE AS PER INDUSTRY NORMS. A RATIO OF 3:1 IS RECOMMENDED TO ENSURE ENOUGH
POURING CONCRETE ELEVATION SHALL BE 500MM HIGHER THAN THE DESIGN ELEVATION. BEFORE POURING THE PILE CAP,
THE TOP SCUM AND ULTRA-HIGH PART OF THE CONCRETE SHALL BE REMOVED. CEMENT TO COVER THE AGGREGATE SURFACES. EPC CONTRACTOR:
(14) THE REINFORCEMENT CAGE SHALL BE ASSEMBLED AS A WHOLE AS MUCH AS POSSIBLE. WHEN IT MUST BE SEGMENTED, THE JOINT (2) FOR THE DRY-MIX PROCESS AGGREGATES NO LARGER THAN 41 INCH (7mm), FOR WET MIX AGGREGATES SHALL BE NO
POSITION SHALL BE SELECTED AT THE PLACE WITH LESS STRESS AS MUCH AS POSSIBLE, AND SHALL BE STAGGERED WITH EACH 中国石油管道局工程有限公司
LONGER THAN 38 OF AN INCH (10mm). CHINA PETROLEUM PIPELINE ENGINEERING CO., LTD.
OTHER TO ENSURE THAT THE JOINT OF THE STRESSED REINFORCEMENT IS NOT MORE THAN 50% AT THE SAME SECTION. DURING (3) SHOTCRETING APPLICATION SHALL, BE IN LINE WITH THE GUIDELINES, SPECIFICATIONS SET BY SPRAYED CONCRETE
THE CONSTRUCTION, ATTENTION SHALL BE PAID TO THE ACCURACY OF THE ALIGNMENT OF THE UPPER AND LOWER STEEL BARS PROJECT TITLE:
11/29/2020 4:47
ASSOCIATION, UK (SCA) AND EUROPEAN FEDERATION OF NATIONAL ASSOCIATION RE-PRESENTING FOR CONCRETE
TO ENSURE THE STRAIGHTNESS OF THE REINFORCEMENT CAGE. RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)
(EFNARC)/ACI 506R.
(15) THE THICKNESS OF THE PROTECTIVE LAYER OF THE MAIN REINFORCEMENT OF THE UNDERWATER CONCRETE PILE CAGE IS 75MM, DRAWING TITLE:
03
A1 (841 x 594)
DRAWING No: PROJECT
(4) PRECAUTIONARY MEASURES SHALL BE EXERCISED TO AVOID DAMAGING OF HDPE LAYER WHILE COMPACTING THE SUB-BASE No. 9686
LAYER ABOVE.
9686-8320-44-711-4503
SCALE DOC. CLASS/CAT. : SHEET REV.
1:1 2 01 OF 04 03
This document contains information which is subject to obligations of non-disclosure and is to be returned to Oman Tank Terminal Company L.L.C. upon request. The contents may not be copied, disclosed or made available to any third party or used other than
for the intended purpose for which it has been provided unless Oman Tank Terminal Company L.L.C. provides written consent for such copy, disclosure, availability and/or use. 4 5 6 7 CAD FILE NAME: 9686-8320-44-711-4503_03.DWG
PLANT
1 2 3
2 4 5 6 7
KEY PLAN
8
NORTH TRUE
NORTH PLANT NORTH /
THIS DRAWING
TRUE NORTH PREVAILING WIND
7° 20° PREVAILING WIND DIRECTION
58.
(SSW)
MECCA DIRECTION .70
°
E 578000.000
(SSW) 78
MECCA
N 2121000.000
BAFFLE ~ BAFFLE
+5.000 (TOC)
730 770
2120152465.03
578162500.00N
E
770 730 N 2120500.000
(TOP OF WELL)
1
+4.800 FGL
730
20 20 20 20 20 20
500
+4.500
1500
300
770
750
750
750
PILE CAP
1500
1500
GRAVEL
600
3000
N 153.100 PILE CAP
2476
E 149.015
00.000
PRECAST 250 250 CORBEL REFERENCE 1000 520 250 250
SECONDARY DRAWING NO:
BEAM 100 9686-8320-44-711-4505 100
PRECAST SECONDARY REINFORCED CONCRETE PRIMARY GENERAL NOTES
4800
+0.200 0.980 (HAT)
BEAM SIZE:400X750 BEAM SIZE:1500X1000
400 400 (groundwater table)
1000
CL OF PIPE/ REFERENCE DRAWING NO: REFERENCE DRAWING NO: SECANT PILES 1. ALL DIMENSIONS ARE IN MILLIMETERS (mm), CO-ORDINATES AND LEVELS
N 150.124 OPENING 9686-8320-44-711-4505 9686-8320-44-711-4505 ARE IN METERS (m) UNLESS OTHERWISE SPECIFIED.
3000
E 155.015 2. PLANT CO-ORDINATES E. 100.000 & N. 100.000 CORRESPONDS TO UTM
(REFER CLAY/SILT
WGS-84, ZONE 40N CO-ORDINATES E.579780.640 & N.2121005.135
2000
NOTE-4) RESPECTIVELY.
B 3. FOR OTHER NOTES AND REFERENCE DRAWINGS REFER SHEET 01. B
1000
WATERPROOF REINFORCED 4. LOCATION AND ELEVATION SHALL BE IN LINE WITH FINAL INPUTS FROM
9000
CONCRETE LINING WALL INTAKE PIPELINE SUB-CONTRACTOR. BEFORE CONSTRUCTION, THE VALUE
SHALL BE VERFIED AT SITE.
PRIMARY
1000
CL OF PIPE/
BEAM OPENING
N 147.124 -2.970 (MIN WATER LEVEL) LEGEND
16200
E 155.015 -3.420 HAT - HIGHEST ASTRONOMICAL TIDE
(REFER
NOTE-4) 2 (REFER NOTE-4)
6100
COATED WITH GLASS FLAKE
19500
03 REINFORCED POLYESTER PROTECTIVE
2 2 HOLD-2 CONNECTION BETWEEN BOTTOM SLAB
AND PILE REFERENCE DRAWING NO: COATING AT LEAST 600 MICRON THICK.
9686-8320-44-711-4504 Sht. No. 3
400 400
REINFORCED CONCRETE HOLD
-6.000 BOTTOM SLAB 1. FIXING DETAILS OF SLUICE GATE.
500
12000
1000
CALCISILTITE
50MM THICK C16/20 CONCRETE CUSHION
300 THK. GRANULAR MATERIAL SUBBASE
COMPACTED TO 95% OF MDD
C C
5200
HDPE LINER MINIMUM 1.5mm THK TO BE
INSTALLED IN ACCORDANCE WITH 03
MANUFACTURERS INSTRUCTIONS
400 400
5600
17000
SECTION 1-1
-11.200
N 136.600 1000
E 155.015
+5.000 (TOC)
+4.800 FGL
1500
400
500
+4.500
300
750
1
GRAVEL
1500
730 770 770 730
600
3000
D UNREINFORCED CONCRETE PILE CORBEL PILE CAP D
1500 2200 2100 1700 1500
REINFORCED CONCRETE PILE
300
REINFORCED CONCRETE PILE 500
250 250 250 250
==
9000
100 100
9000
A1 20/02/20 GTM HP MJH
AFTER THE TRENCH OUTSIDE THE WATER REVIEW/COMMENTS ZZ
INTAKE WELL IS EXCAVATED,THE HOLE LOCATION OF CUT OUT
SHALL BE OPENED BEFORE THE PIPELINE HOLD-1 FOR INTAKE PIPELINE REV DATE DESCRIPTION BY CH'D APP APP
INSTALLATION. -3.420
DETAIL-2
-2.970 (MIN WATER LEVEL)
(REFER NOTE-4) REVISIONS
16200
1000
CLIENT:
900
==
==
COATED WITH GLASS FLAKE
E REINFORCED POLYESTER E
PROTECTIVE COATING AT 36'' INLET PIPE OMAN TANK TERMINAL COMPANY (OTTCO)
LEAST 600 MICRON THICK.
500 250 250 500 250 250 500 REINFORCED CONCRETE NON-SHRINK WATER
03
UN-REINFORCED CONCRETE PILE BOTTOM SLAB PROOF GROUT FILLING EPC CONTRACTOR:
(PRIMARY PILE-Ⅰ) -6.000
500
REINFORCED CONCRETE PILE
(SECONDARY PILE-Ⅱ) 中国石油管道局工程有限公司
12000
11/29/2020 4:47
COMPACTED TO 95% OF MDD
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)
5200
A1 (841 x 594)
CONCRETE LINING WALL 0 1.5m 3.0m 4.5m 6.0m 7.5m DRAWING No: PROJECT
COATED WITH GLASS FLAKE No. 9686
DETAIL-1 REINFORCED POLYESTER 03 SECTION 2-2 9686-8320-44-711-4503
PROTECTIVE COATING AT SCALE DOC. CLASS/CAT. : SHEET REV.
LEAST 600 MICRON THICK. SCALE 1:75
1 : 75 2 02 OF 04 03
This document contains information which is subject to obligations of non-disclosure and is to be returned to Oman Tank Terminal Company L.L.C. upon request. The contents may not be copied, disclosed or made available to any third party or used other than
for the intended purpose for which it has been provided unless Oman Tank Terminal Company L.L.C. provides written consent for such copy, disclosure, availability and/or use. 4 5 6 7 CAD FILE NAME: 9686-8320-44-711-4503_03.DWG
1 2 3
3 4 5 6 7
GENERAL NOTES
8
PILE CAP
GUIDE WALL PRIMARY BEAM
B B
THE FIRST STEP : CONSTRUCTION OF GUIDE WALL THE SECOND STEP : CONSTRUCTION OFⅠSECANT PILE THE THIRD STEP : CONSTRUCTION OF Ⅱ SECANT PILE AND THE FOURTH STEP:EXCAVATION OF FOUNDATION PIT TO THE SUPPORT
DEMOLISH GUIDE WALL AFTER CONSTRUCTION OFⅡSECANT CONSTRUCTION OF PILE CAP,PRIMARY BEAM,BAFFLE AND CORBEL
PILE
C C
+4.800 FGL +4.800 FGL +4.800 FGL +4.800 FGL +4.800 FGL +4.800 FGL +4.800 FGL +5.000 TOC +4.800 FGL
PRECAST COVER SLAB
PRECAST SECONDARY
BEAM
WATERPROOF REINFORCED
CONCRETE LINING WALL LOCATION OF CUT OUT
D BY SHOTCRETING COATED WITH GLASS FLAKE FOR INTAKE PIPELINE D
REINFORCED POLYESTER PROTECTIVE
HDPE LINER MINIMUM 1.5mm THK TO BE
COATING AT LEAST 600 MICRON THICK.
INSTALLED IN ACCORDANCE WITH
MANUFACTURERS INSTRUCTIONS REINFORCED CONCRETE BOTTOM SLAB 3
300 THK. GRANULAR MATERIAL SUBBASE
COMPACTED TO 95% OF MDD 03
03
NRH/
03 29/11/20 ISSUED FOR CONSTRUCTION WITH HOLD GPS/RKK HP MJH
50MM THICK C16/20 CONCRETE CUSHION ZZ
WELL COMPACTED 03
SUBGRADE TO 95% MDD 03 NRH/
02 31/05/20 ISSUED FOR CONSTRUCTION WITH HOLD GPS/RKK HP MJH
SECANT PILES SECANT PILES SECANT PILES SECANT PILES SECANT PILES SECANT PILES ZZ
SECANT PILES SECANT PILES NRH/
01 05/04/20 ISSUED FOR CONSTRUCTION GPS/RKK HP MJH
ZZ
ISSUED TO COMPANY FOR JGP/
A1 20/02/20 GTM HP MJH
REVIEW/COMMENTS ZZ
REV DATE DESCRIPTION BY CH'D APP APP
THE FIFTH STEP:EXCAVATE FOUNDATION PIT STEP BY STEP. THE SIXTH STEP:POURING CONCRETE CUSHION THE SEVENTH STEP:INSTALLATION OF AUXILIARY FACILITIES THE EIGHTH STEP:INSTALLATION OF PRECAST SECONDARY BEAM
SHOTCRETING WATERPROOF REINFORCED AND BOTTOM SLAB REVISIONS
IN FOUNDATION PIT (REFER NOTE 3) AND COVER SLAB CLIENT:
CONCRETE LINING WALL BETWEEN PILES, PROVIDING HDPE 03
E LAYER AT THE BOTTOM OF BASE SLAB E
OMAN TANK TERMINAL COMPANY (OTTCO)
WATERPROOF REINFORCED
CONCRETE LINING WALL
BY SHOTCRETING EPC CONTRACTOR:
SEA WATER INTAKE WELL CONSTRUCTION SEQUENCE
COATED WITH GLASS FLAKE
REINFORCED POLYESTER PROTECTIVE (NOT TO SCALE ONLY FOR REPRESENTATION) 中国石油管道局工程有限公司
COATING AT LEAST 600 MICRON THICK.
REINFORCED CONCRETE CHINA PETROLEUM PIPELINE ENGINEERING CO., LTD.
BOTTOM SLAB
-6.000 PROJECT TITLE:
11/29/2020 4:47
SECANT PILES
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)
500
DRAWING TITLE:
25
50
A1 (841 x 594)
INSTALLED IN ACCORDANCE WITH DRAWING No: PROJECT
MANUFACTURERS INSTRUCTIONS No. 9686
DETAIL-3 9686-8320-44-711-4503
SCALE DOC. CLASS/CAT. : SHEET REV.
N.T.S 2 03 OF 04 03
This document contains information which is subject to obligations of non-disclosure and is to be returned to Oman Tank Terminal Company L.L.C. upon request. The contents may not be copied, disclosed or made available to any third party or used other than
for the intended purpose for which it has been provided unless Oman Tank Terminal Company L.L.C. provides written consent for such copy, disclosure, availability and/or use. 4 5 6 7 CAD FILE NAME: 9686-8320-44-711-4503_03.DWG
PLANT
NORTH TRUE
1 2 3
4 4 5 6 7
GENERAL NOTES
8
NORTH
20° PREVAILING WIND 1. ALL DIMENSIONS ARE IN MILLIMETERS (mm), CO-ORDINATES AND LEVELS
7 °
MECCA 58. DIRECTION ARE IN METERS (m) UNLESS OTHERWISE SPECIFIED.
(SSW) 2. FOR OTHER NOTES AND REFERENCE DRAWINGS REFER SHEET 01.
A A
P68 P67 P66 P65 P64 P63 P62 P61 P60 P59 P58 PILE SCHEDULE-1 PILE SCHEDULE-2
SETTING OUT CO-ORDINATES DISPLACEMENT MOMENT SHEAR FORCE SETTING OUT CO-ORDINATES
PILE NO DISPLACEMENT MOMENT SHEAR FORCE
PILE NO
NORTHING EASTING (mm) (kN*m/m) (kN/m) NORTHING EASTING (mm)
~ (kN*m/m)
~ (kN/m)
~
P1 P57
P1 153.10 148.265 ~ ~ ~ P35 136.60 155.765 ~ ~ ~
P2 P56 P2 152.35 148.265 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
MAX:1.3 MAX:1003.94 MAX:824.92 P36 137.35 155.765
MAX:1.3 MAX:1003.94 MAX:824.92
P3 P55 P3 151.60 148.265 ~ ~ ~ P37 138.10 155.765 ~ ~ ~
B B
P4 150.85 148.265 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
P4 P54 MAX:1.3 MAX:1003.94 MAX:824.92 P38 138.85 155.765
MAX:1.3 MAX:1003.94 MAX:824.92
P5 150.10 148.265 ~ ~ ~ P39 139.60 155.765 ~ ~ ~
P5 P53
P6 149.35 148.265 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
MAX:1.3 MAX:1003.94 MAX:824.92 P40 140.35 155.765
P6 P52 MAX:1.3 MAX:1003.94 MAX:824.92
P7 148.60 148.265 ~ ~ ~ P41 141.10 155.765 ~ ~ ~
P7 P51 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-692.47 MIN:-639.98
P8 147.85 148.265 P42 141.85 155.765 MIN:-6.4
MAX:1.3 MAX:1003.94 MAX:824.92 MAX:1.3 MAX:1003.94 MAX:824.92
P8 P50 P9 147.10 148.265 ~ ~ ~ P43 142.60 155.765 ~ ~ ~
P9 P49 P10 146.35 148.265 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
MAX:1.3 MAX:1003.94 MAX:824.92 P44 143.35 155.765
MAX:1.3 MAX:1003.94 MAX:824.92
P10 P48 P11 145.60 148.265 ~ ~ ~ P45 144.10 155.765 ~ ~ ~
P12 144.85 148.265 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
MAX:1.3 MAX:1003.94 MAX:824.92 P46 144.85 155.765
P11 P47 MAX:1.3 MAX:1003.94 MAX:824.92
P13 144.10 148.265 ~ ~ ~ P47 145.60 155.765 ~ ~ ~
P12 P46
P14 143.35 148.265 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
MAX:1.3 MAX:1003.94 MAX:824.92 P48 146.35 155.765
MAX:1.3 MAX:1003.94 MAX:824.92
P13 P45
P15 142.60 148.265 ~ ~ ~ P49 147.10 155.765 ~ ~ ~
C C
P14 P44 P16 141.85 148.265 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
MAX:1.3 MAX:1003.94 MAX:824.92 P50 147.85 155.765
MAX:1.3 MAX:1003.94 MAX:824.92
P15 P43 P17 141.10 148.265 ~ ~ ~ P51 148.60 155.765 ~ ~ ~
P18 140.35 148.265 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
P16 P42 MAX:1.3 MAX:1003.94 MAX:824.92 P52 149.35 155.765
MAX:1.3 MAX:1003.94 MAX:824.92
P19 139.60 148.265 ~ ~ ~ P53 150.10 155.765 ~ ~ ~
P17 P41
P20 138.85 148.265 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
MAX:1.3 MAX:1003.94 MAX:824.92 P54 150.85 155.765
P18 P40 MAX:1.3 MAX:1003.94 MAX:824.92
P21 138.10 148.265 ~ ~ ~ P55 151.60 155.765 ~ ~ ~
P19 P39 P22 137.35 148.265 MIN:-6.4 MIN:-692.47 MIN:-639.98 P56 MIN:-6.4 MIN:-692.47 MIN:-639.98
152.35 155.765
MAX:1.3 MAX:1003.94 MAX:824.92 MAX:1.3 MAX:1003.94 MAX:824.92
P20 P38 P23 136.60 148.265 ~ ~ ~ P57 153.10 155.765 ~ ~ ~
MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
P21 P37 P24 135.85 148.265 P58 153.85 155.765
MAX:1.3 MAX:1003.94 MAX:824.92 MAX:1.3 MAX:1003.94 MAX:824.92
P25 135.85 149.015 ~ ~ ~ P59 153.85 155.015 ~ ~ ~
P22 P36
MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
P26 135.85 149.765 P60 153.85 154.265
MAX:1.3 MAX:1003.94 MAX:824.92 MAX:1.3 MAX:1003.94 MAX:824.92
P23 P35
D P27 135.85 150.515 ~ ~ ~ P61 153.85 153.515 ~ ~ ~ D
P24 MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
P28 135.85 151.265 P62 153.85 152.765
MAX:1.3 MAX:1003.94 MAX:824.92 MAX:1.3 MAX:1003.94 MAX:824.92
P25 P26 P27 P28 P29 P30 P31 P32 P33 P34 P29 135.85 152.015 ~ ~ ~ P63 153.85 152.015 ~ ~ ~
MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
P30 135.85 152.765 P64 153.85 151.265
MAX:1.3 MAX:1003.94 MAX:824.92 MAX:1.3 MAX:1003.94 MAX:824.92
PILE LAYOUT P31 135.85 153.515 ~ ~ ~ P65 153.85 150.515 ~ ~ ~ 03 29/11/20 ISSUED FOR CONSTRUCTION WITH HOLD
NRH/
GPS/RKK HP MJH
ZZ
MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-6.4 MIN:-692.47 MIN:-639.98
P32 135.85 154.265 P66 153.85 149.765 NRH/
MAX:1.3 MAX:1003.94 MAX:824.92 MAX:1.3 MAX:1003.94 MAX:824.92 02 31/05/20 ISSUED FOR CONSTRUCTION WITH HOLD GPS/RKK MJH MJH
ZZ
P33 135.85 155.015 ~ ~ ~ P67 153.85 149.015 ~ ~ ~ NRH/
01 05/04/20 ISSUED FOR CONSTRUCTION GPS/RKK HP MJH
MIN:-6.4 MIN:-692.47 MIN:-639.98 MIN:-692.47 MIN:-639.98 ZZ
P34 135.85 155.765 P68 148.265 MIN:-6.4
MAX:1.3 MAX:1003.94 MAX:824.92 153.85 MAX:1.3 MAX:1003.94 MAX:824.92 ISSUED TO COMPANY FOR JGP/
A1 20/02/20 GTM HP MJH
REVIEW/COMMENTS ZZ
REV DATE DESCRIPTION BY CH'D APP APP
REVISIONS
CLIENT:
E E
OMAN TANK TERMINAL COMPANY (OTTCO)
EPC CONTRACTOR:
中国石油管道局工程有限公司
CHINA PETROLEUM PIPELINE ENGINEERING CO., LTD.
PROJECT TITLE:
11/29/2020 4:47
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE 1)
DRAWING TITLE:
A1 (841 x 594)
DRAWING No: PROJECT
No. 9686
9686-8320-44-711-4503
SCALE DOC. CLASS/CAT. : SHEET REV.
1 : 70 2 04 OF 04 03
This document contains information which is subject to obligations of non-disclosure and is to be returned to Oman Tank Terminal Company L.L.C. upon request. The contents may not be copied, disclosed or made available to any third party or used other than
for the intended purpose for which it has been provided unless Oman Tank Terminal Company L.L.C. provides written consent for such copy, disclosure, availability and/or use. 4 5 6 7 CAD FILE NAME: 9686-8320-44-711-4503_03.DWG