Professional Documents
Culture Documents
New Backup Pump P&id (Rev16)
New Backup Pump P&id (Rev16)
CV 7116A
REV(16)
DRAWN BY: ASHRAF NEW
15
FROM
PIC PIC 6801
PI PI
7124A SHEET-3
KV 7115A
TRV 7102A TRV 7104A 7108A 7110A TRV 7125A
V 7114A
DPS
FAIL OPEN
DN10 DN10 DN10
15
15
PN 6 PN 6 7109A PI PN30
V 7111A
V 7107A
XV TE XV TRV 7127A
7101A 7124A 7126A
V 7102A V 7104A 7112A V 7125A DN10
PN30
10 V 7103A 10 CV 7123A V 7124A 10
10
P 701A
V 7127A
KV 7101A 50 25
50-O-SS316L
PV 7126A
10
FH 7105A ST 7106A FH 7113A
50-O-SS316L
V 7128A
50 25 TRV 7129A
FAIL CLOSE FAIL CLOSE
40
DN10
BEARING TE SEAL LEAK PN30
TRV 3503 7135A
From LOX HEATER DETECTION
DN10 To
Storage Tank
V 7129A
PN 6 TC TE M TSW MOTOR WINDING
TRV 7131
Vaporizers
10
7130A
NOZZEL F 7132A 701A DN10
40
7133A 7134A THERMOSTAT
25-O-SS316L
SHEET 4 V 3511 H 701A PN30 SHEET 3
V 7131
150x100 100x50 10
40x50
10 50-O-67-AJ/ESXX
50-O-SS316L
CV 7116B
V 3501
150
15
50x40
PIC FROM
PI
7124B PIC 6801
V 7130B V 7128B
PI
TRV 7102B SHEET-3
50-O-SS316L
40
DN10 RV 7125B
KV 7115B
DN10 DPS
V 7114B
FAIL OPEN
PN 6 PN 6 DN10 XV TRV 7129B
7109B
15
15
PI
V 7107B
PN30 7126B
V 7111B
XV TE DN10
7124B PN30
V 7129B
7101B
50-O-SS316L
V 7102B V 7104B 7112B
10
V 7125B
40
10
V 7103B 10 CV 7123B V 7124B
10
10 TRV 7127B
P 701B DN10
KV 7101B 50 FH 7113B 25
FH 7105B PN30
V 7127B
ST 7106B PV 7126B
50
10
50-O-SS316L
PV 7117B
PV 7117A
FAIL CLOSE 25
FAIL OPEN
SEAL LEAK
FAIL OPEN
TE FAIL CLOSE
25
25
BEARING 7135B DETECTION
HEATER
TC TE M TSW
25X50
25X50
7132B 7133B TRV 7118A
701B 7134B TRV 7118B
H 701B MOTOR WINDING DN10 DN10
PN30 PN30
THERMOSTAT
V 7118A
V 7118B
10
V 7119B10
V 7119A
TRV 7121
50
50
DN10
FOM
PN25
HPTANK
Recycle Line
V 7121
10
SHEET 2
Back to LOX V 7122 CV 7120
Storage Tank
NOZZEL T 50 50-O-SS316L
50
SHEET 4