I. FOUNDATION CRITERIA
1. Soil Density : 1600 kg/m3
2. Soil Density Submerge : 800 kg/m3
3. Concrete Density : 2400 kg/m3
4. Concrete Density Submerge : 1400 kg/m3

II. FOUNDATION ANALYSIS


DESCRIPTION OF FOUNDATION
No Criteria Unit.
1 Foundation type Pilecap Foundation + Borepile
2 Pad Dimension 2.50 x 2.50 m
3 Depth of Pad 0.80 m
4 Borepile Dimension (Ø) 0.50 m
5 Depth of Borepile 38.00 m
6 Number of Borepile 4.00 pcs

CAPACITY OF FOUNDATION
No Checking point Allowable Actual Note Unit
1 Bearing Capacity 0.17 0.11 ok ! kg/cm2
2 Borepile :
Uplift cap. individual pile's 2523.45 0.00 Ok ! kN
Compress cap. individual pile's 2526.65 879.10 Ok ! kN
Uplift cap. group pile's 8026.25 0.00 Ok ! kN
Compress cap. group pile's 8036.43 3195.68 Ok ! kN
3 Punching Shear :
Two way shear 2418.22 1758.20 Ok ! kN
4 Horizontal Load Analysis 205.13 14.84 Ok ! kN

REINFORCEMENT OF FOUNDATION
No Checking point Allowable Actual Note Unit
1 Pad Foundation
Upper Reinforcement D19 - 150 D19 - 150 Ok ! mm
Lower Reinforcement D22 - 150 D22 - 150 Ok ! mm
2 Borepile :
Longitudinal Rebar 7 D19 8 D19 Ok ! mm
Shear Reinforcement D10 - 100 D10 - 100 Ok ! mm

CONCLUSION
Note :
Foundation structure is still strong enought to support loading on building structure
SUPPORT REACTION DATA
RSKP JATISARI - KARAWANG
JAWA BARAT
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
1 Comb11 7.9894 7.48070 962.29860 -12.56640 10.97080 0.16640
1 Comb12 6.8708 7.93990 1110.33900 -16.98350 13.92970 -0.11560
1 Comb13-1 7.9972 7.46450 969.68270 -12.43240 11.02250 0.17010
1 Comb13-2 7.9972 7.46450 969.68270 -12.43240 11.02250 0.17010
1 Comb14-1 7.1564 7.81300 1078.86700 -15.77870 13.22880 -0.04240
1 Comb14-2 7.1564 7.81300 1078.86700 -15.77870 13.22880 -0.04240
1 Comb15-1 -17.4709 7.48020 927.42310 -14.57160 -79.20060 0.03890
1 Comb15-2 4.8897 -16.71550 862.61360 67.55290 3.69880 -1.19370
1 Comb15-3 33.4497 7.48110 997.17410 -10.56120 101.14220 0.29400
1 Comb16-1 -11.0999 7.46820 941.68010 -13.96980 -56.61900 0.07350
1 Comb16-2 5.6705 -10.67860 893.07290 47.62360 5.55560 -0.85100
1 Comb16-3 27.0905 7.46890 993.99330 -10.96200 78.63810 0.26480
1 Comb17-1 -11.0999 7.46820 941.68010 -13.96980 -56.61900 0.07350
1 Comb17-2 5.6705 -10.67860 893.07290 47.62360 5.55560 -0.85100
1 Comb17-3 27.0905 7.46890 993.99330 -10.96200 78.63810 0.26480
1 Comb18-1 -20.6666 4.48790 542.50370 -9.54500 -83.58890 -0.02770
1 Comb18-2 1.6939 -19.70780 477.69420 72.57950 -0.68950 -1.26030
1 Comb18-3 30.2539 4.48890 612.25470 -5.53470 96.75390 0.22740
1 Comb19-1 Max 8.695 8.11780 1040.41200 -13.48170 12.06450 0.18510
1 Comb19-1 Min 8.578 8.05540 1040.07760 -13.68690 11.65430 0.17470
1 Comb19-2 Max 8.695 8.11780 1040.41200 -13.48170 12.06450 0.18510
1 Comb19-2 Min 8.578 8.05540 1040.07760 -13.68690 11.65430 0.17470
1 Comb19-3 Max 8.695 8.11780 1040.41200 -13.48170 12.06450 0.18510
1 Comb19-3 Min 8.578 8.05540 1040.07760 -13.68690 11.65430 0.17470
1 Comb19-4 Max 8.695 8.11780 1040.41200 -13.48170 12.06450 0.18510
1 Comb19-4 Min 8.578 8.05540 1040.07760 -13.68690 11.65430 0.17470
1 Comb20-1 Max 8.6702 8.13960 1040.48000 -13.41030 11.97620 0.18780
1 Comb20-1 Min 8.6028 8.03350 1040.00960 -13.75830 11.74260 0.17200
1 Comb20-2 Max 8.6702 8.13960 1040.48000 -13.41030 11.97620 0.18780
1 Comb20-2 Min 8.6028 8.03350 1040.00960 -13.75830 11.74260 0.17200
1 Comb20-3 Max 8.6702 8.13960 1040.48000 -13.41030 11.97620 0.18780
1 Comb20-3 Min 8.6028 8.03350 1040.00960 -13.75830 11.74260 0.17200
1 Comb20-4 Max 8.6702 8.13960 1040.48000 -13.41030 11.97620 0.18780
1 Comb20-4 Min 8.6028 8.03350 1040.00960 -13.75830 11.74260 0.17200
1 Comb21-1 Max 7.6636 8.27030 1134.80570 -16.43060 14.01890 -0.02890
1 Comb21-1 Min 7.5759 8.22340 1134.55490 -16.58450 13.71120 -0.03660
1 Comb21-2 Max 7.6636 8.27030 1134.80570 -16.43060 14.01890 -0.02890
1 Comb21-2 Min 7.5759 8.22340 1134.55490 -16.58450 13.71120 -0.03660
1 Comb21-3 Max 7.6636 8.27030 1134.80570 -16.43060 14.01890 -0.02890
1 Comb21-3 Min 7.5759 8.22340 1134.55490 -16.58450 13.71120 -0.03660
1 Comb21-4 Max 7.6636 8.27030 1134.80570 -16.43060 14.01890 -0.02890
1 Comb21-4 Min 7.5759 8.22340 1134.55490 -16.58450 13.71120 -0.03660
1 Comb22-1 Max 7.645 8.28660 1134.85670 -16.37710 13.95270 -0.02680
1 Comb22-1 Min 7.5945 8.20710 1134.50390 -16.63800 13.77750 -0.03860
1 Comb22-2 Max 7.645 8.28660 1134.85670 -16.37710 13.95270 -0.02680
1 Comb22-2 Min 7.5945 8.20710 1134.50390 -16.63800 13.77750 -0.03860
1 Comb22-3 Max 7.645 8.28660 1134.85670 -16.37710 13.95270 -0.02680
1 Comb22-3 Min 7.5945 8.20710 1134.50390 -16.63800 13.77750 -0.03860
1 Comb22-4 Max 7.645 8.28660 1134.85670 -16.37710 13.95270 -0.02680
1 Comb22-4 Min 7.5945 8.20710 1134.50390 -16.63800 13.77750 -0.03860
1 Comb23-1 Max 7.6636 8.27030 1134.80570 -16.43060 14.01890 -0.02890
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
1 Comb23-1 Min 7.5759 8.22340 1134.55490 -16.58450 13.71120 -0.03660
1 Comb23-2 Max 7.6636 8.27030 1134.80570 -16.43060 14.01890 -0.02890
BW
1 D=
Comb23-2 Min 7.5759 8.22340 1134.55490 -16.58450 13.71120 -0.03660
50

1 Comb23-3 Max 7.6636 8.27030 1134.80570 -16.43060 14.01890 -0.02890


1 Comb23-3 Min 7.5759 8.22340 1134.55490 -16.58450 13.71120 -0.03660
1 Comb23-4 Max 7.6636 8.27030 1134.80570 -16.43060 14.01890 -0.02890
1 Comb23-4 Min 7.5759 8.22340 1134.55490 -16.58450 13.71120 -0.03660
1 Comb24-1 Max 7.645 8.28660 1134.85670 -16.37710 13.95270 -0.02680
1 Comb24-1 Min 7.5945 8.20710 1134.50390 -16.63800 13.77750 -0.03860
1 Comb24-2 Max 7.645 8.28660 1134.85670 -16.37710 13.95270 -0.02680
1 Comb24-2 Min 7.5945 8.20710 1134.50390 -16.63800 13.77750 -0.03860
1 Comb24-3 Max 7.645 8.28660 1134.85670 -16.37710 13.95270 -0.02680
1 Comb24-3 Min 7.5945 8.20710 1134.50390 -16.63800 13.77750 -0.03860
1 Comb24-4 Max 7.645 8.28660 1134.85670 -16.37710 13.95270 -0.02680
1 Comb24-4 Min 7.5945 8.20710 1134.50390 -16.63800 13.77750 -0.03860
1 Comb25-1 Max 4.205 3.91370 499.60020 -6.41940 5.89890 0.09160
1 Comb25-1 Min 4.088 3.85120 499.26580 -6.62460 5.48870 0.08120
1 Comb25-2 Max 4.205 3.91370 499.60020 -6.41940 5.89890 0.09160
1 Comb25-2 Min 4.088 3.85120 499.26580 -6.62460 5.48870 0.08120
1 Comb25-3 Max 4.205 3.91370 499.60020 -6.41940 5.89890 0.09160
1 Comb25-3 Min 4.088 3.85120 499.26580 -6.62460 5.48870 0.08120
1 Comb25-4 Max 4.205 3.91370 499.60020 -6.41940 5.89890 0.09160
1 Comb25-4 Min 4.088 3.85120 499.26580 -6.62460 5.48870 0.08120
1 Comb26-1 Max 4.1802 3.93550 499.66820 -6.34800 5.81060 0.09420
1 Comb26-1 Min 4.1128 3.82940 499.19780 -6.69600 5.57700 0.07850
1 Comb26-2 Max 4.1802 3.93550 499.66820 -6.34800 5.81060 0.09420
1 Comb26-2 Min 4.1128 3.82940 499.19780 -6.69600 5.57700 0.07850
1 Comb26-3 Max 4.1802 3.93550 499.66820 -6.34800 5.81060 0.09420
1 Comb26-3 Min 4.1128 3.82940 499.19780 -6.69600 5.57700 0.07850
1 Comb26-4 Max 4.1802 3.93550 499.66820 -6.34800 5.81060 0.09420
1 Comb26-4 Min 4.1128 3.82940 499.19780 -6.69600 5.57700 0.07850
3 Comb11 9.3218 -7.29450 1381.84150 10.98430 10.92770 0.44540
3 Comb12 8.9679 -6.14720 1584.17260 13.24120 13.00920 0.33880
BW
3 D=
Comb13-1 9.331 -7.31400 1396.75320 11.13860 10.96430 0.44940
50

3 Comb13-2 9.331 -7.31400 1396.75320 11.13860 10.96430 0.44940


3 Comb14-1 9.0632 -6.44870 1544.77360 12.79270 12.51630 0.36850
3 Comb14-2 9.0632 -6.44870 1544.77360 12.79270 12.51630 0.36850
3 Comb15-1 -16.8268 -6.68980 1334.56370 8.15000 -79.11480 0.22330
3 Comb15-2 11.2005 -29.63220 1427.97000 88.69130 17.66130 -0.96140
3 Comb15-3 35.4705 -7.89920 1429.11940 13.81870 100.97010 0.66750
3 Comb16-1 -10.2828 -6.85560 1357.56690 8.97430 -56.57670 0.28190
3 Comb16-2 10.7377 -24.06240 1427.62170 69.38030 16.00540 -0.60660
3 Comb16-3 28.9402 -7.76270 1428.48370 13.22580 78.48700 0.61500
3 Comb17-1 -10.2828 -6.85560 1357.56690 8.97430 -56.57670 0.28190
3 Comb17-2 10.7377 -24.06240 1427.62170 69.38030 16.00540 -0.60660
3 Comb17-3 28.9402 -7.76270 1428.48370 13.22580 78.48700 0.61500
3 Comb18-1 -20.5556 -3.77200 781.82710 3.75630 -83.48590 0.04520
3 Comb18-2 7.4717 -26.71440 875.23340 84.29760 13.29020 -1.13950
3 Comb18-3 31.7418 -4.98140 876.38280 9.42490 96.59910 0.48930
3 Comb19-1 Max 10.1354 -7.85650 1493.90270 11.97370 12.01280 0.48710
3 Comb19-1 Min 10.0184 -7.91430 1493.63870 11.77440 11.61290 0.47580
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
3 Comb19-2 Max 10.1354 -7.85650 1493.90270 11.97370 12.01280 0.48710
3 Comb19-2 Min 10.0184 -7.91430 1493.63870 11.77440 11.61290 0.47580
3 Comb19-3 Max 10.1354 -7.85650 1493.90270 11.97370 12.01280 0.48710
3 Comb19-3 Min 10.0184 -7.91430 1493.63870 11.77440 11.61290 0.47580
3 Comb19-4 Max 10.1354 -7.85650 1493.90270 11.97370 12.01280 0.48710
3 Comb19-4 Min 10.0184 -7.91430 1493.63870 11.77440 11.61290 0.47580
3 Comb20-1 Max 10.1135 -7.83620 1493.90380 12.04300 11.93830 0.48960
3 Comb20-1 Min 10.0403 -7.93450 1493.63760 11.70520 11.68740 0.47340
3 Comb20-2 Max 10.1135 -7.83620 1493.90380 12.04300 11.93830 0.48960
3 Comb20-2 Min 10.0403 -7.93450 1493.63760 11.70520 11.68740 0.47340
3 Comb20-3 Max 10.1135 -7.83620 1493.90380 12.04300 11.93830 0.48960
3 Comb20-3 Min 10.0403 -7.93450 1493.63760 11.70520 11.68740 0.47340
3 Comb20-4 Max 10.1135 -7.83620 1493.90380 12.04300 11.93830 0.48960
3 Comb20-4 Min 10.0403 -7.93450 1493.63760 11.70520 11.68740 0.47340
3 Comb21-1 Max 9.6478 -6.85010 1625.01950 13.50450 13.30010 0.39860
3 Comb21-1 Min 9.5601 -6.89340 1624.82140 13.35500 13.00020 0.39010
3 Comb21-2 Max 9.6478 -6.85010 1625.01950 13.50450 13.30010 0.39860
3 Comb21-2 Min 9.5601 -6.89340 1624.82140 13.35500 13.00020 0.39010
3 Comb21-3 Max 9.6478 -6.85010 1625.01950 13.50450 13.30010 0.39860
3 Comb21-3 Min 9.5601 -6.89340 1624.82140 13.35500 13.00020 0.39010
3 Comb21-4 Max 9.6478 -6.85010 1625.01950 13.50450 13.30010 0.39860
3 Comb21-4 Min 9.5601 -6.89340 1624.82140 13.35500 13.00020 0.39010
3 Comb22-1 Max 9.6313 -6.83490 1625.02030 13.55640 13.24420 0.40040
3 Comb22-1 Min 9.5765 -6.90860 1624.82060 13.30310 13.05610 0.38830
3 Comb22-2 Max 9.6313 -6.83490 1625.02030 13.55640 13.24420 0.40040
3 Comb22-2 Min 9.5765 -6.90860 1624.82060 13.30310 13.05610 0.38830
3 Comb22-3 Max 9.6313 -6.83490 1625.02030 13.55640 13.24420 0.40040
3 Comb22-3 Min 9.5765 -6.90860 1624.82060 13.30310 13.05610 0.38830
3 Comb22-4 Max 9.6313 -6.83490 1625.02030 13.55640 13.24420 0.40040
3 Comb22-4 Min 9.5765 -6.90860 1624.82060 13.30310 13.05610 0.38830
3 Comb23-1 Max 9.6478 -6.85010 1625.01950 13.50450 13.30010 0.39860
3 Comb23-1 Min 9.5601 -6.89340 1624.82140 13.35500 13.00020 0.39010
3 Comb23-2 Max 9.6478 -6.85010 1625.01950 13.50450 13.30010 0.39860
3 Comb23-2 Min 9.5601 -6.89340 1624.82140 13.35500 13.00020 0.39010
3 Comb23-3 Max 9.6478 -6.85010 1625.01950 13.50450 13.30010 0.39860
3 Comb23-3 Min 9.5601 -6.89340 1624.82140 13.35500 13.00020 0.39010
3 Comb23-4 Max 9.6478 -6.85010 1625.01950 13.50450 13.30010 0.39860
3 Comb23-4 Min 9.5601 -6.89340 1624.82140 13.35500 13.00020 0.39010
3 Comb24-1 Max 9.6313 -6.83490 1625.02030 13.55640 13.24420 0.40040
3 Comb24-1 Min 9.5765 -6.90860 1624.82060 13.30310 13.05610 0.38830
3 Comb24-2 Max 9.6313 -6.83490 1625.02030 13.55640 13.24420 0.40040
3 Comb24-2 Min 9.5765 -6.90860 1624.82060 13.30310 13.05610 0.38830
3 Comb24-3 Max 9.6313 -6.83490 1625.02030 13.55640 13.24420 0.40040
3 Comb24-3 Min 9.5765 -6.90860 1624.82060 13.30310 13.05610 0.38830
3 Comb24-4 Max 9.6313 -6.83490 1625.02030 13.55640 13.24420 0.40040
3 Comb24-4 Min 9.5765 -6.90860 1624.82060 13.30310 13.05610 0.38830
3 Comb25-1 Max 4.8965 -3.75690 717.30780 5.80050 5.87140 0.23680
3 Comb25-1 Min 4.7796 -3.81480 717.04370 5.60120 5.47150 0.22550
3 Comb25-2 Max 4.8965 -3.75690 717.30780 5.80050 5.87140 0.23680
3 Comb25-2 Min 4.7796 -3.81480 717.04370 5.60120 5.47150 0.22550
3 Comb25-3 Max 4.8965 -3.75690 717.30780 5.80050 5.87140 0.23680
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
3 Comb25-3 Min 4.7796 -3.81480 717.04370 5.60120 5.47150 0.22550
3 Comb25-4 Max 4.8965 -3.75690 717.30780 5.80050 5.87140 0.23680
3 Comb25-4 Min 4.7796 -3.81480 717.04370 5.60120 5.47150 0.22550
3 Comb26-1 Max 4.8746 -3.73670 717.30890 5.86980 5.79690 0.23930
3 Comb26-1 Min 4.8015 -3.83500 717.04270 5.53200 5.54600 0.22300
3 Comb26-2 Max 4.8746 -3.73670 717.30890 5.86980 5.79690 0.23930
3 Comb26-2 Min 4.8015 -3.83500 717.04270 5.53200 5.54600 0.22300
3 Comb26-3 Max 4.8746 -3.73670 717.30890 5.86980 5.79690 0.23930
3 Comb26-3 Min 4.8015 -3.83500 717.04270 5.53200 5.54600 0.22300
3 Comb26-4 Max 4.8746 -3.73670 717.30890 5.86980 5.79690 0.23930
3 Comb26-4 Min 4.8015 -3.83500 717.04270 5.53200 5.54600 0.22300
4 Comb11 14.1429 1.96430 1874.30700 -9.03820 25.58300 0.57760
4 Comb12 13.8492 1.31850 2307.60980 -11.63620 38.80370 0.57130
4 Comb13-1 14.1515 1.94740 1900.46760 -8.89530 25.63810 0.58170
4 Comb13-2 14.1515 1.94740 1900.46760 -8.89530 25.63810 0.58170
4 Comb14-1 13.9291 1.46720 2218.90460 -10.87950 35.53980 0.57590
4 Comb14-2 13.9291 1.46720 2218.90460 -10.87950 35.53980 0.57590
4 Comb15-1 -12.537 2.12730 1822.11330 -11.58200 -65.79760 0.49840
4 Comb15-2 13.9455 -21.46530 1924.10550 71.47530 24.82510 -0.72520
4 Comb15-3 40.8227 1.80130 1926.50060 -6.49440 116.96370 0.65670
4 Comb16-1 -5.8605 2.07390 1854.78220 -10.83890 -42.91120 0.52130
4 Comb16-2 14.0013 -15.62060 1931.27640 51.45410 25.05590 -0.39640
4 Comb16-3 34.1592 1.82940 1933.07270 -7.02320 94.15980 0.64000
4 Comb17-1 -5.8605 2.07390 1854.78220 -10.83890 -42.91120 0.52130
4 Comb17-2 14.0013 -15.62060 1931.27640 51.45410 25.05590 -0.39640
4 Comb17-3 34.1592 1.82940 1933.07270 -7.02320 94.15980 0.64000
4 Comb18-1 -18.1941 1.34160 1072.39050 -7.96670 -76.03080 0.26740
4 Comb18-2 8.2883 -22.25100 1174.38280 75.09060 14.59190 -0.95620
4 Comb18-3 35.1656 1.01560 1176.77780 -2.87910 106.73050 0.42570
4 Comb19-1 Max 15.3482 2.15380 2026.27410 -9.66710 27.85840 0.62970
4 Comb19-1 Min 15.2287 2.09310 2025.97760 -9.87350 27.45210 0.61910
4 Comb19-2 Max 15.3482 2.15380 2026.27410 -9.66710 27.85840 0.62970
4 Comb19-2 Min 15.2287 2.09310 2025.97760 -9.87350 27.45210 0.61910
4 Comb19-3 Max 15.3482 2.15380 2026.27410 -9.66710 27.85840 0.62970
4 Comb19-3 Min 15.2287 2.09310 2025.97760 -9.87350 27.45210 0.61910
4 Comb19-4 Max 15.3482 2.15380 2026.27410 -9.66710 27.85840 0.62970
4 Comb19-4 Min 15.2287 2.09310 2025.97760 -9.87350 27.45210 0.61910
4 Comb20-1 Max 15.3219 2.17500 2026.27070 -9.59540 27.76910 0.63210
4 Comb20-1 Min 15.2549 2.07190 2025.98100 -9.94520 27.54140 0.61670
4 Comb20-2 Max 15.3219 2.17500 2026.27070 -9.59540 27.76910 0.63210
4 Comb20-2 Min 15.2549 2.07190 2025.98100 -9.94520 27.54140 0.61670
4 Comb20-3 Max 15.3219 2.17500 2026.27070 -9.59540 27.76910 0.63210
4 Comb20-3 Min 15.2549 2.07190 2025.98100 -9.94520 27.54140 0.61670
4 Comb20-4 Max 15.3219 2.17500 2026.27070 -9.59540 27.76910 0.63210
4 Comb20-4 Min 15.2549 2.07190 2025.98100 -9.94520 27.54140 0.61670
4 Comb21-1 Max 14.7942 1.60390 2327.72560 -11.32630 37.17600 0.61340
4 Comb21-1 Min 14.7046 1.55840 2327.50320 -11.48110 36.87130 0.60540
4 Comb21-2 Max 14.7942 1.60390 2327.72560 -11.32630 37.17600 0.61340
4 Comb21-2 Min 14.7046 1.55840 2327.50320 -11.48110 36.87130 0.60540
4 Comb21-3 Max 14.7942 1.60390 2327.72560 -11.32630 37.17600 0.61340
4 Comb21-3 Min 14.7046 1.55840 2327.50320 -11.48110 36.87130 0.60540
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
4 Comb21-4 Max 14.7942 1.60390 2327.72560 -11.32630 37.17600 0.61340
4 Comb21-4 Min 14.7046 1.55840 2327.50320 -11.48110 36.87130 0.60540
4 Comb22-1 Max 14.7745 1.61980 2327.72300 -11.27250 37.10900 0.61520
4 Comb22-1 Min 14.7243 1.54250 2327.50570 -11.53490 36.93820 0.60360
4 Comb22-2 Max 14.7745 1.61980 2327.72300 -11.27250 37.10900 0.61520
4 Comb22-2 Min 14.7243 1.54250 2327.50570 -11.53490 36.93820 0.60360
4 Comb22-3 Max 14.7745 1.61980 2327.72300 -11.27250 37.10900 0.61520
4 Comb22-3 Min 14.7243 1.54250 2327.50570 -11.53490 36.93820 0.60360
4 Comb22-4 Max 14.7745 1.61980 2327.72300 -11.27250 37.10900 0.61520
4 Comb22-4 Min 14.7243 1.54250 2327.50570 -11.53490 36.93820 0.60360
4 Comb23-1 Max 14.7942 1.60390 2327.72560 -11.32630 37.17600 0.61340
4 Comb23-1 Min 14.7046 1.55840 2327.50320 -11.48110 36.87130 0.60540
4 Comb23-2 Max 14.7942 1.60390 2327.72560 -11.32630 37.17600 0.61340
4 Comb23-2 Min 14.7046 1.55840 2327.50320 -11.48110 36.87130 0.60540
4 Comb23-3 Max 14.7942 1.60390 2327.72560 -11.32630 37.17600 0.61340
4 Comb23-3 Min 14.7046 1.55840 2327.50320 -11.48110 36.87130 0.60540
4 Comb23-4 Max 14.7942 1.60390 2327.72560 -11.32630 37.17600 0.61340
4 Comb23-4 Min 14.7046 1.55840 2327.50320 -11.48110 36.87130 0.60540
4 Comb24-1 Max 14.7745 1.61980 2327.72300 -11.27250 37.10900 0.61520
4 Comb24-1 Min 14.7243 1.54250 2327.50570 -11.53490 36.93820 0.60360
4 Comb24-2 Max 14.7745 1.61980 2327.72300 -11.27250 37.10900 0.61520
4 Comb24-2 Min 14.7243 1.54250 2327.50570 -11.53490 36.93820 0.60360
4 Comb24-3 Max 14.7745 1.61980 2327.72300 -11.27250 37.10900 0.61520
4 Comb24-3 Min 14.7243 1.54250 2327.50570 -11.53490 36.93820 0.60360
4 Comb24-4 Max 14.7745 1.61980 2327.72300 -11.27250 37.10900 0.61520
4 Comb24-4 Min 14.7243 1.54250 2327.50570 -11.53490 36.93820 0.60360
4 Comb25-1 Max 7.3999 1.04980 972.91360 -4.58770 13.48070 0.30510
4 Comb25-1 Min 7.2804 0.98920 972.61710 -4.79400 13.07440 0.29450
4 Comb25-2 Max 7.3999 1.04980 972.91360 -4.58770 13.48070 0.30510
4 Comb25-2 Min 7.2804 0.98920 972.61710 -4.79400 13.07440 0.29450
4 Comb25-3 Max 7.3999 1.04980 972.91360 -4.58770 13.48070 0.30510
4 Comb25-3 Min 7.2804 0.98920 972.61710 -4.79400 13.07440 0.29450
4 Comb25-4 Max 7.3999 1.04980 972.91360 -4.58770 13.48070 0.30510
4 Comb25-4 Min 7.2804 0.98920 972.61710 -4.79400 13.07440 0.29450
4 Comb26-1 Max 7.3737 1.07100 972.91020 -4.51590 13.39140 0.30750
4 Comb26-1 Min 7.3066 0.96800 972.62050 -4.86580 13.16370 0.29210
4 Comb26-2 Max 7.3737 1.07100 972.91020 -4.51590 13.39140 0.30750
4 Comb26-2 Min 7.3066 0.96800 972.62050 -4.86580 13.16370 0.29210
4 Comb26-3 Max 7.3737 1.07100 972.91020 -4.51590 13.39140 0.30750
4 Comb26-3 Min 7.3066 0.96800 972.62050 -4.86580 13.16370 0.29210
4 Comb26-4 Max 7.3737 1.07100 972.91020 -4.51590 13.39140 0.30750
4 Comb26-4 Min 7.3066 0.96800 972.62050 -4.86580 13.16370 0.29210
5 Comb11 2.7309 -8.92600 2014.46080 12.58900 -5.93710 0.68810
5 Comb12 4.6751 -7.30660 2397.48510 17.90430 -7.20310 0.69910
5 Comb13-1 2.7427 -8.92150 2043.63150 12.71400 -5.90820 0.69240
5 Comb13-2 2.7427 -8.92150 2043.63150 12.71400 -5.90820 0.69240
5 Comb14-1 4.1979 -7.70800 2323.60700 16.66930 -6.86490 0.69960
5 Comb14-2 4.1979 -7.70800 2323.60700 16.66930 -6.86490 0.69960
5 Comb15-1 -25.5631 -8.56260 1995.89300 10.62720 -99.74250 0.53420
5 Comb15-2 4.7545 -34.73590 2067.80130 99.44850 1.06130 -0.67110
5 Comb15-3 31.0248 -9.28940 2033.02870 14.55070 87.86820 0.84210
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
5 Comb16-1 -18.4807 -8.65010 2022.41290 11.21140 -76.26950 0.57590
5 Comb16-2 4.2574 -28.28000 2076.34410 77.82740 -0.66660 -0.32810
5 Comb16-3 23.9602 -9.19520 2050.26470 14.15400 64.43860 0.80680
5 Comb17-1 -18.4807 -8.65010 2022.41290 11.21140 -76.26950 0.57590
5 Comb17-2 4.2574 -28.28000 2076.34410 77.82740 -0.66660 -0.32810
5 Comb17-3 23.9602 -9.19520 2050.26470 14.15400 64.43860 0.80680
5 Comb18-1 -26.6554 -4.99220 1190.10860 5.59160 -97.36770 0.25890
5 Comb18-2 3.6621 -31.16550 1262.01690 94.41290 3.43620 -0.94640
5 Comb18-3 29.9325 -5.71900 1227.24440 9.51510 90.24310 0.56680
5 Comb19-1 Max 3.0153 -9.61660 2177.71580 13.71650 -6.20970 0.74930
5 Comb19-1 Min 2.8888 -9.68150 2177.54860 13.50080 -6.62640 0.73840
5 Comb19-2 Max 3.0153 -9.61660 2177.71580 13.71650 -6.20970 0.74930
5 Comb19-2 Min 2.8888 -9.68150 2177.54860 13.50080 -6.62640 0.73840
5 Comb19-3 Max 3.0153 -9.61660 2177.71580 13.71650 -6.20970 0.74930
5 Comb19-3 Min 2.8888 -9.68150 2177.54860 13.50080 -6.62640 0.73840
5 Comb19-4 Max 3.0153 -9.61660 2177.71580 13.71650 -6.20970 0.74930
5 Comb19-4 Min 2.8888 -9.68150 2177.54860 13.50080 -6.62640 0.73840
5 Comb20-1 Max 2.9916 -9.59260 2177.76040 13.79640 -6.28730 0.75170
5 Comb20-1 Min 2.9125 -9.70550 2177.50400 13.42100 -6.54880 0.73600
5 Comb20-2 Max 2.9916 -9.59260 2177.76040 13.79640 -6.28730 0.75170
5 Comb20-2 Min 2.9125 -9.70550 2177.50400 13.42100 -6.54880 0.73600
5 Comb20-3 Max 2.9916 -9.59260 2177.76040 13.79640 -6.28730 0.75170
5 Comb20-3 Min 2.9125 -9.70550 2177.50400 13.42100 -6.54880 0.73600
5 Comb20-4 Max 2.9916 -9.59260 2177.76040 13.79640 -6.28730 0.75170
5 Comb20-4 Min 2.9125 -9.70550 2177.50400 13.42100 -6.54880 0.73600
5 Comb21-1 Max 4.4037 -8.20140 2440.50840 17.48030 -7.05300 0.74350
5 Comb21-1 Min 4.3088 -8.25010 2440.38300 17.31850 -7.36560 0.73540
5 Comb21-2 Max 4.4037 -8.20140 2440.50840 17.48030 -7.05300 0.74350
5 Comb21-2 Min 4.3088 -8.25010 2440.38300 17.31850 -7.36560 0.73540
5 Comb21-3 Max 4.4037 -8.20140 2440.50840 17.48030 -7.05300 0.74350
5 Comb21-3 Min 4.3088 -8.25010 2440.38300 17.31850 -7.36560 0.73540
5 Comb21-4 Max 4.4037 -8.20140 2440.50840 17.48030 -7.05300 0.74350
5 Comb21-4 Min 4.3088 -8.25010 2440.38300 17.31850 -7.36560 0.73540
5 Comb22-1 Max 4.3859 -8.18340 2440.54190 17.54020 -7.11130 0.74540
5 Comb22-1 Min 4.3266 -8.26810 2440.34960 17.25860 -7.30730 0.73360
5 Comb22-2 Max 4.3859 -8.18340 2440.54190 17.54020 -7.11130 0.74540
5 Comb22-2 Min 4.3266 -8.26810 2440.34960 17.25860 -7.30730 0.73360
5 Comb22-3 Max 4.3859 -8.18340 2440.54190 17.54020 -7.11130 0.74540
5 Comb22-3 Min 4.3266 -8.26810 2440.34960 17.25860 -7.30730 0.73360
5 Comb22-4 Max 4.3859 -8.18340 2440.54190 17.54020 -7.11130 0.74540
5 Comb22-4 Min 4.3266 -8.26810 2440.34960 17.25860 -7.30730 0.73360
5 Comb23-1 Max 4.4037 -8.20140 2440.50840 17.48030 -7.05300 0.74350
5 Comb23-1 Min 4.3088 -8.25010 2440.38300 17.31850 -7.36560 0.73540
5 Comb23-2 Max 4.4037 -8.20140 2440.50840 17.48030 -7.05300 0.74350
5 Comb23-2 Min 4.3088 -8.25010 2440.38300 17.31850 -7.36560 0.73540
5 Comb23-3 Max 4.4037 -8.20140 2440.50840 17.48030 -7.05300 0.74350
5 Comb23-3 Min 4.3088 -8.25010 2440.38300 17.31850 -7.36560 0.73540
5 Comb23-4 Max 4.4037 -8.20140 2440.50840 17.48030 -7.05300 0.74350
5 Comb23-4 Min 4.3088 -8.25010 2440.38300 17.31850 -7.36560 0.73540
5 Comb24-1 Max 4.3859 -8.18340 2440.54190 17.54020 -7.11130 0.74540
5 Comb24-1 Min 4.3266 -8.26810 2440.34960 17.25860 -7.30730 0.73360
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
5 Comb24-2 Max 4.3859 -8.18340 2440.54190 17.54020 -7.11130 0.74540
5 Comb24-2 Min 4.3266 -8.26810 2440.34960 17.25860 -7.30730 0.73360
5 Comb24-3 Max 4.3859 -8.18340 2440.54190 17.54020 -7.11130 0.74540
5 Comb24-3 Min 4.3266 -8.26810 2440.34960 17.25860 -7.30730 0.73360
5 Comb24-4 Max 4.3859 -8.18340 2440.54190 17.54020 -7.11130 0.74540
5 Comb24-4 Min 4.3266 -8.26810 2440.34960 17.25860 -7.30730 0.73360
5 Comb25-1 Max 1.4806 -4.60020 1045.58880 6.64150 -2.87300 0.36260
5 Comb25-1 Min 1.3541 -4.66500 1045.42160 6.42580 -3.28970 0.35170
5 Comb25-2 Max 1.4806 -4.60020 1045.58880 6.64150 -2.87300 0.36260
5 Comb25-2 Min 1.3541 -4.66500 1045.42160 6.42580 -3.28970 0.35170
5 Comb25-3 Max 1.4806 -4.60020 1045.58880 6.64150 -2.87300 0.36260
5 Comb25-3 Min 1.3541 -4.66500 1045.42160 6.42580 -3.28970 0.35170
5 Comb25-4 Max 1.4806 -4.60020 1045.58880 6.64150 -2.87300 0.36260
5 Comb25-4 Min 1.3541 -4.66500 1045.42160 6.42580 -3.28970 0.35170
5 Comb26-1 Max 1.4569 -4.57620 1045.63340 6.72140 -2.95070 0.36500
5 Comb26-1 Min 1.3778 -4.68900 1045.37700 6.34600 -3.21210 0.34930
5 Comb26-2 Max 1.4569 -4.57620 1045.63340 6.72140 -2.95070 0.36500
5 Comb26-2 Min 1.3778 -4.68900 1045.37700 6.34600 -3.21210 0.34930
5 Comb26-3 Max 1.4569 -4.57620 1045.63340 6.72140 -2.95070 0.36500
5 Comb26-3 Min 1.3778 -4.68900 1045.37700 6.34600 -3.21210 0.34930
5 Comb26-4 Max 1.4569 -4.57620 1045.63340 6.72140 -2.95070 0.36500
5 Comb26-4 Min 1.3778 -4.68900 1045.37700 6.34600 -3.21210 0.34930
6 Comb11 -7.1669 -7.85350 1666.51090 9.74150 -11.91380 -1.26810
6 Comb12 -7.9519 -7.01560 1973.34020 14.46570 -14.80460 -1.98670
6 Comb13-1 -7.167 -7.83560 1690.54800 9.84150 -11.89290 -1.26580
6 Comb13-2 -7.167 -7.83560 1690.54800 9.84150 -11.89290 -1.26580
6 Comb14-1 -7.7558 -7.21170 1914.66070 13.35960 -14.06620 -1.80530
6 Comb14-2 -7.7558 -7.21170 1914.66070 13.35960 -14.06620 -1.80530
6 Comb15-1 -39.1829 -7.74140 1650.66100 8.51270 -108.27140 -1.39200
6 Comb15-2 -4.9296 -35.83900 1721.01690 103.16620 -4.74910 -2.59660
6 Comb15-3 24.8492 -7.96560 1682.36080 10.97030 84.44390 -1.14410
6 Comb16-1 -31.179 -7.75600 1672.65130 8.89490 -84.16640 -1.35930
6 Comb16-2 -5.489 -28.82920 1725.41820 79.88500 -6.52460 -2.26270
6 Comb16-3 16.845 -7.92420 1696.42610 10.73810 60.37010 -1.17340
6 Comb17-1 -31.179 -7.75600 1672.65130 8.89490 -84.16640 -1.35930
6 Comb17-2 -5.489 -28.82920 1725.41820 79.88500 -6.52460 -2.26270
6 Comb17-3 16.845 -7.92420 1696.42610 10.73810 60.37010 -1.17340
6 Comb18-1 -36.3162 -4.60000 984.05670 4.61610 -103.50590 -0.88480
6 Comb18-2 -2.0629 -32.69750 1054.41250 99.26960 0.01640 -2.08940
6 Comb18-3 27.7159 -4.82420 1015.75640 7.07370 89.20940 -0.63690
6 Comb19-1 Max -7.6759 -8.45360 1801.57950 10.64940 -12.66470 -1.36550
6 Comb19-1 Min -7.8189 -8.52570 1801.41710 10.41160 -13.09280 -1.37610
6 Comb19-2 Max -7.6759 -8.45360 1801.57950 10.64940 -12.66470 -1.36550
6 Comb19-2 Min -7.8189 -8.52570 1801.41710 10.41160 -13.09280 -1.37610
6 Comb19-3 Max -7.6759 -8.45360 1801.57950 10.64940 -12.66470 -1.36550
6 Comb19-3 Min -7.8189 -8.52570 1801.41710 10.41160 -13.09280 -1.37610
6 Comb19-4 Max -7.6759 -8.45360 1801.57950 10.64940 -12.66470 -1.36550
6 Comb19-4 Min -7.8189 -8.52570 1801.41710 10.41160 -13.09280 -1.37610
6 Comb20-1 Max -7.7027 -8.42690 1801.63070 10.73810 -12.74450 -1.36310
6 Comb20-1 Min -7.7921 -8.55240 1801.36590 10.32300 -13.01310 -1.37850
6 Comb20-2 Max -7.7027 -8.42690 1801.63070 10.73810 -12.74450 -1.36310
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
6 Comb20-2 Min -7.7921 -8.55240 1801.36590 10.32300 -13.01310 -1.37850
6 Comb20-3 Max -7.7027 -8.42690 1801.63070 10.73810 -12.74450 -1.36310
6 Comb20-3 Min -7.7921 -8.55240 1801.36590 10.32300 -13.01310 -1.37850
6 Comb20-4 Max -7.7027 -8.42690 1801.63070 10.73810 -12.74450 -1.36310
6 Comb20-4 Min -7.7921 -8.55240 1801.36590 10.32300 -13.01310 -1.37850
6 Comb21-1 Max -8.1178 -7.64010 2011.37930 14.01380 -14.59670 -1.87490
6 Comb21-1 Min -8.225 -7.69420 2011.25740 13.83550 -14.91780 -1.88290
6 Comb21-2 Max -8.1178 -7.64010 2011.37930 14.01380 -14.59670 -1.87490
6 Comb21-2 Min -8.225 -7.69420 2011.25740 13.83550 -14.91780 -1.88290
6 Comb21-3 Max -8.1178 -7.64010 2011.37930 14.01380 -14.59670 -1.87490
6 Comb21-3 Min -8.225 -7.69420 2011.25740 13.83550 -14.91780 -1.88290
6 Comb21-4 Max -8.1178 -7.64010 2011.37930 14.01380 -14.59670 -1.87490
6 Comb21-4 Min -8.225 -7.69420 2011.25740 13.83550 -14.91780 -1.88290
6 Comb22-1 Max -8.1379 -7.62010 2011.41760 14.08030 -14.65650 -1.87310
6 Comb22-1 Min -8.205 -7.71420 2011.21900 13.76900 -14.85800 -1.88460
6 Comb22-2 Max -8.1379 -7.62010 2011.41760 14.08030 -14.65650 -1.87310
6 Comb22-2 Min -8.205 -7.71420 2011.21900 13.76900 -14.85800 -1.88460
6 Comb22-3 Max -8.1379 -7.62010 2011.41760 14.08030 -14.65650 -1.87310
6 Comb22-3 Min -8.205 -7.71420 2011.21900 13.76900 -14.85800 -1.88460
6 Comb22-4 Max -8.1379 -7.62010 2011.41760 14.08030 -14.65650 -1.87310
6 Comb22-4 Min -8.205 -7.71420 2011.21900 13.76900 -14.85800 -1.88460
6 Comb23-1 Max -8.1178 -7.64010 2011.37930 14.01380 -14.59670 -1.87490
6 Comb23-1 Min -8.225 -7.69420 2011.25740 13.83550 -14.91780 -1.88290
6 Comb23-2 Max -8.1178 -7.64010 2011.37930 14.01380 -14.59670 -1.87490
6 Comb23-2 Min -8.225 -7.69420 2011.25740 13.83550 -14.91780 -1.88290
6 Comb23-3 Max -8.1178 -7.64010 2011.37930 14.01380 -14.59670 -1.87490
6 Comb23-3 Min -8.225 -7.69420 2011.25740 13.83550 -14.91780 -1.88290
6 Comb23-4 Max -8.1178 -7.64010 2011.37930 14.01380 -14.59670 -1.87490
6 Comb23-4 Min -8.225 -7.69420 2011.25740 13.83550 -14.91780 -1.88290
6 Comb24-1 Max -8.1379 -7.62010 2011.41760 14.08030 -14.65650 -1.87310
6 Comb24-1 Min -8.205 -7.71420 2011.21900 13.76900 -14.85800 -1.88460
6 Comb24-2 Max -8.1379 -7.62010 2011.41760 14.08030 -14.65650 -1.87310
6 Comb24-2 Min -8.205 -7.71420 2011.21900 13.76900 -14.85800 -1.88460
6 Comb24-3 Max -8.1379 -7.62010 2011.41760 14.08030 -14.65650 -1.87310
6 Comb24-3 Min -8.205 -7.71420 2011.21900 13.76900 -14.85800 -1.88460
6 Comb24-4 Max -8.1379 -7.62010 2011.41760 14.08030 -14.65650 -1.87310
6 Comb24-4 Min -8.205 -7.71420 2011.21900 13.76900 -14.85800 -1.88460
6 Comb25-1 Max -3.6482 -4.04000 865.00040 5.17470 -5.96920 -0.65280
6 Comb25-1 Min -3.7911 -4.11200 864.83790 4.93690 -6.39730 -0.66340
6 Comb25-2 Max -3.6482 -4.04000 865.00040 5.17470 -5.96920 -0.65280
6 Comb25-2 Min -3.7911 -4.11200 864.83790 4.93690 -6.39730 -0.66340
6 Comb25-3 Max -3.6482 -4.04000 865.00040 5.17470 -5.96920 -0.65280
6 Comb25-3 Min -3.7911 -4.11200 864.83790 4.93690 -6.39730 -0.66340
6 Comb25-4 Max -3.6482 -4.04000 865.00040 5.17470 -5.96920 -0.65280
6 Comb25-4 Min -3.7911 -4.11200 864.83790 4.93690 -6.39730 -0.66340
6 Comb26-1 Max -3.6749 -4.01320 865.05160 5.26340 -6.04900 -0.65040
6 Comb26-1 Min -3.7643 -4.13870 864.78680 4.84830 -6.31750 -0.66580
6 Comb26-2 Max -3.6749 -4.01320 865.05160 5.26340 -6.04900 -0.65040
6 Comb26-2 Min -3.7643 -4.13870 864.78680 4.84830 -6.31750 -0.66580
6 Comb26-3 Max -3.6749 -4.01320 865.05160 5.26340 -6.04900 -0.65040
6 Comb26-3 Min -3.7643 -4.13870 864.78680 4.84830 -6.31750 -0.66580
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
6 Comb26-4 Max -3.6749 -4.01320 865.05160 5.26340 -6.04900 -0.65040
6 Comb26-4 Min -3.7643 -4.13870 864.78680 4.84830 -6.31750 -0.66580
7 Comb11 -5.235 -6.88610 1617.61710 10.97710 -11.57720 2.70870
7 Comb12 -7.5219 -3.78710 1901.45260 15.24740 -15.12710 3.46980
7 Comb13-1 -5.2414 -6.89950 1639.32180 11.09350 -11.57440 2.71370
7 Comb13-2 -5.2414 -6.89950 1639.32180 11.09350 -11.57440 2.71370
7 Comb14-1 -6.955 -4.57190 1846.77230 14.26710 -14.23760 3.28320
7 Comb14-2 -6.955 -4.57190 1846.77230 14.26710 -14.23760 3.28320
7 Comb15-1 -37.0817 -6.75220 1592.89720 10.25790 -107.98110 2.59680
7 Comb15-2 -2.9574 -32.37730 1680.68550 107.53820 -4.39140 1.53610
7 Comb15-3 26.6117 -7.02000 1642.33710 11.69640 84.82680 2.82070
7 Comb16-1 -29.1248 -6.79570 1615.35570 10.52500 -83.87800 2.62840
7 Comb16-2 -3.5316 -26.01450 1681.19690 83.48520 -6.18580 1.83300
7 Comb16-3 18.6452 -6.99650 1652.43560 11.60380 60.72780 2.79640
7 Comb17-1 -29.1248 -6.79570 1615.35570 10.52500 -83.87800 2.62840
7 Comb17-2 -3.5316 -26.01450 1681.19690 83.48520 -6.18580 1.83300
7 Comb17-3 18.6452 -6.99650 1652.43560 11.60380 60.72780 2.79640
7 Comb18-1 -34.9877 -3.99780 945.85030 5.86710 -103.35020 1.51330
7 Comb18-2 -0.8634 -29.62280 1033.63860 103.14740 0.23950 0.45260
7 Comb18-3 28.7057 -4.26560 995.29020 7.30550 89.45760 1.73720
7 Comb19-1 Max -5.5879 -7.40910 1748.75070 11.99690 -12.30080 2.93320
7 Comb19-1 Min -5.7301 -7.47870 1748.53750 11.73560 -12.72910 2.92310
7 Comb19-2 Max -5.5879 -7.40910 1748.75070 11.99690 -12.30080 2.93320
7 Comb19-2 Min -5.7301 -7.47870 1748.53750 11.73560 -12.72910 2.92310
7 Comb19-3 Max -5.5879 -7.40910 1748.75070 11.99690 -12.30080 2.93320
7 Comb19-3 Min -5.7301 -7.47870 1748.53750 11.73560 -12.72910 2.92310
7 Comb19-4 Max -5.5879 -7.40910 1748.75070 11.99690 -12.30080 2.93320
7 Comb19-4 Min -5.7301 -7.47870 1748.53750 11.73560 -12.72910 2.92310
7 Comb20-1 Max -5.6146 -7.38360 1748.80970 12.09240 -12.38060 2.93550
7 Comb20-1 Min -5.7035 -7.50420 1748.47850 11.64020 -12.64930 2.92080
7 Comb20-2 Max -5.6146 -7.38360 1748.80970 12.09240 -12.38060 2.93550
7 Comb20-2 Min -5.7035 -7.50420 1748.47850 11.64020 -12.64930 2.92080
7 Comb20-3 Max -5.6146 -7.38360 1748.80970 12.09240 -12.38060 2.93550
7 Comb20-3 Min -5.7035 -7.50420 1748.47850 11.64020 -12.64930 2.92080
7 Comb20-4 Max -5.6146 -7.38360 1748.80970 12.09240 -12.38060 2.93550
7 Comb20-4 Min -5.7035 -7.50420 1748.47850 11.64020 -12.64930 2.92080
7 Comb21-1 Max -7.2053 -4.94520 1940.67400 15.00170 -14.74840 3.44420
7 Comb21-1 Min -7.3119 -4.99740 1940.51410 14.80570 -15.06960 3.43650
7 Comb21-2 Max -7.2053 -4.94520 1940.67400 15.00170 -14.74840 3.44420
7 Comb21-2 Min -7.3119 -4.99740 1940.51410 14.80570 -15.06960 3.43650
7 Comb21-3 Max -7.2053 -4.94520 1940.67400 15.00170 -14.74840 3.44420
7 Comb21-3 Min -7.3119 -4.99740 1940.51410 14.80570 -15.06960 3.43650
7 Comb21-4 Max -7.2053 -4.94520 1940.67400 15.00170 -14.74840 3.44420
7 Comb21-4 Min -7.3119 -4.99740 1940.51410 14.80570 -15.06960 3.43650
7 Comb22-1 Max -7.2253 -4.92600 1940.71830 15.07330 -14.80830 3.44580
7 Comb22-1 Min -7.292 -5.01650 1940.46980 14.73410 -15.00980 3.43490
7 Comb22-2 Max -7.2253 -4.92600 1940.71830 15.07330 -14.80830 3.44580
7 Comb22-2 Min -7.292 -5.01650 1940.46980 14.73410 -15.00980 3.43490
7 Comb22-3 Max -7.2253 -4.92600 1940.71830 15.07330 -14.80830 3.44580
7 Comb22-3 Min -7.292 -5.01650 1940.46980 14.73410 -15.00980 3.43490
7 Comb22-4 Max -7.2253 -4.92600 1940.71830 15.07330 -14.80830 3.44580
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
7 Comb22-4 Min -7.292 -5.01650 1940.46980 14.73410 -15.00980 3.43490
7 Comb23-1 Max -7.2053 -4.94520 1940.67400 15.00170 -14.74840 3.44420
7 Comb23-1 Min -7.3119 -4.99740 1940.51410 14.80570 -15.06960 3.43650
7 Comb23-2 Max -7.2053 -4.94520 1940.67400 15.00170 -14.74840 3.44420
7 Comb23-2 Min -7.3119 -4.99740 1940.51410 14.80570 -15.06960 3.43650
7 Comb23-3 Max -7.2053 -4.94520 1940.67400 15.00170 -14.74840 3.44420
7 Comb23-3 Min -7.3119 -4.99740 1940.51410 14.80570 -15.06960 3.43650
7 Comb23-4 Max -7.2053 -4.94520 1940.67400 15.00170 -14.74840 3.44420
7 Comb23-4 Min -7.3119 -4.99740 1940.51410 14.80570 -15.06960 3.43650
7 Comb24-1 Max -7.2253 -4.92600 1940.71830 15.07330 -14.80830 3.44580
7 Comb24-1 Min -7.292 -5.01650 1940.46980 14.73410 -15.00980 3.43490
7 Comb24-2 Max -7.2253 -4.92600 1940.71830 15.07330 -14.80830 3.44580
7 Comb24-2 Min -7.292 -5.01650 1940.46980 14.73410 -15.00980 3.43490
7 Comb24-3 Max -7.2253 -4.92600 1940.71830 15.07330 -14.80830 3.44580
7 Comb24-3 Min -7.292 -5.01650 1940.46980 14.73410 -15.00980 3.43490
7 Comb24-4 Max -7.2253 -4.92600 1940.71830 15.07330 -14.80830 3.44580
7 Comb24-4 Min -7.292 -5.01650 1940.46980 14.73410 -15.00980 3.43490
7 Comb25-1 Max -2.6459 -3.53910 839.64990 5.82780 -5.79440 1.41090
7 Comb25-1 Min -2.788 -3.60870 839.43670 5.56650 -6.22270 1.40080
7 Comb25-2 Max -2.6459 -3.53910 839.64990 5.82780 -5.79440 1.41090
7 Comb25-2 Min -2.788 -3.60870 839.43670 5.56650 -6.22270 1.40080
7 Comb25-3 Max -2.6459 -3.53910 839.64990 5.82780 -5.79440 1.41090
7 Comb25-3 Min -2.788 -3.60870 839.43670 5.56650 -6.22270 1.40080
7 Comb25-4 Max -2.6459 -3.53910 839.64990 5.82780 -5.79440 1.41090
7 Comb25-4 Min -2.788 -3.60870 839.43670 5.56650 -6.22270 1.40080
7 Comb26-1 Max -2.6725 -3.51360 839.70890 5.92330 -5.87420 1.41320
7 Comb26-1 Min -2.7614 -3.63420 839.37770 5.47100 -6.14290 1.39850
7 Comb26-2 Max -2.6725 -3.51360 839.70890 5.92330 -5.87420 1.41320
7 Comb26-2 Min -2.7614 -3.63420 839.37770 5.47100 -6.14290 1.39850
7 Comb26-3 Max -2.6725 -3.51360 839.70890 5.92330 -5.87420 1.41320
7 Comb26-3 Min -2.7614 -3.63420 839.37770 5.47100 -6.14290 1.39850
7 Comb26-4 Max -2.6725 -3.51360 839.70890 5.92330 -5.87420 1.41320
7 Comb26-4 Min -2.7614 -3.63420 839.37770 5.47100 -6.14290 1.39850
8 Comb11 -8.0374 -1.18070 1033.69560 -3.82480 -15.07050 -0.03140
8 Comb12 -8.9915 1.39110 1164.95910 -2.70450 -18.81400 -0.30570
8 Comb13-1 -8.0495 -1.18960 1043.45130 -3.73180 -15.07220 -0.02760
8 Comb13-2 -8.0495 -1.18960 1043.45130 -3.73180 -15.07220 -0.02760
8 Comb14-1 -8.762 0.74150 1139.46000 -2.91480 -17.87930 -0.23430
8 Comb14-2 -8.762 0.74150 1139.46000 -2.91480 -17.87930 -0.23430
8 Comb15-1 -37.2989 -1.51470 1133.29900 -3.57600 -108.80060 -0.22220
8 Comb15-2 -6.0003 -26.72890 1086.28020 95.92550 -8.17520 -1.35010
8 Comb15-3 21.224 -0.84670 934.09220 -4.07350 78.65950 0.15940
8 Comb16-1 -29.9925 -1.43790 1115.71490 -3.56850 -85.36930 -0.17160
8 Comb16-2 -6.5186 -20.34860 1080.45080 71.05770 -9.90030 -1.01760
8 Comb16-3 13.8996 -0.93690 966.30980 -3.94160 55.22580 0.11460
8 Comb17-1 -29.9925 -1.43790 1115.71490 -3.56850 -85.36930 -0.17160
8 Comb17-2 -6.5186 -20.34860 1080.45080 71.05770 -9.90030 -1.01760
8 Comb17-3 13.8996 -0.93690 966.30980 -3.94160 55.22580 0.11460
8 Comb18-1 -34.0839 -1.04250 719.82080 -2.04610 -102.77240 -0.20960
8 Comb18-2 -2.7853 -26.25660 672.80200 97.45540 -2.14700 -1.33760
8 Comb18-3 24.439 -0.37440 520.61390 -2.54360 84.68770 0.17200
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
8 Comb19-1 Max -8.6231 -1.23960 1117.68380 -3.99290 -16.08310 -0.02850
8 Comb19-1 Min -8.7537 -1.31320 1117.16610 -4.27620 -16.49940 -0.03940
8 Comb19-2 Max -8.6231 -1.23960 1117.68380 -3.99290 -16.08310 -0.02850
8 Comb19-2 Min -8.7537 -1.31320 1117.16610 -4.27620 -16.49940 -0.03940
8 Comb19-3 Max -8.6231 -1.23960 1117.68380 -3.99290 -16.08310 -0.02850
8 Comb19-3 Min -8.7537 -1.31320 1117.16610 -4.27620 -16.49940 -0.03940
8 Comb19-4 Max -8.6231 -1.23960 1117.68380 -3.99290 -16.08310 -0.02850
8 Comb19-4 Min -8.7537 -1.31320 1117.16610 -4.27620 -16.49940 -0.03940
8 Comb20-1 Max -8.6476 -1.21350 1117.61460 -3.89200 -16.16070 -0.02610
8 Comb20-1 Min -8.7292 -1.33930 1117.23530 -4.37720 -16.42180 -0.04170
8 Comb20-2 Max -8.6476 -1.21350 1117.61460 -3.89200 -16.16070 -0.02610
8 Comb20-2 Min -8.7292 -1.33930 1117.23530 -4.37720 -16.42180 -0.04170
8 Comb20-3 Max -8.6476 -1.21350 1117.61460 -3.89200 -16.16070 -0.02610
8 Comb20-3 Min -8.7292 -1.33930 1117.23530 -4.37720 -16.42180 -0.04170
8 Comb20-4 Max -8.6476 -1.21350 1117.61460 -3.89200 -16.16070 -0.02610
8 Comb20-4 Min -8.7292 -1.33930 1117.23530 -4.37720 -16.42180 -0.04170
8 Comb21-1 Max -9.1792 0.70060 1199.60840 -3.03040 -18.59730 -0.23200
8 Comb21-1 Min -9.2771 0.64540 1199.22020 -3.24290 -18.90960 -0.24020
8 Comb21-2 Max -9.1792 0.70060 1199.60840 -3.03040 -18.59730 -0.23200
8 Comb21-2 Min -9.2771 0.64540 1199.22020 -3.24290 -18.90960 -0.24020
8 Comb21-3 Max -9.1792 0.70060 1199.60840 -3.03040 -18.59730 -0.23200
8 Comb21-3 Min -9.2771 0.64540 1199.22020 -3.24290 -18.90960 -0.24020
8 Comb21-4 Max -9.1792 0.70060 1199.60840 -3.03040 -18.59730 -0.23200
8 Comb21-4 Min -9.2771 0.64540 1199.22020 -3.24290 -18.90960 -0.24020
8 Comb22-1 Max -9.1976 0.72020 1199.55660 -2.95470 -18.65550 -0.23020
8 Comb22-1 Min -9.2588 0.62580 1199.27210 -3.31860 -18.85130 -0.24190
8 Comb22-2 Max -9.1976 0.72020 1199.55660 -2.95470 -18.65550 -0.23020
8 Comb22-2 Min -9.2588 0.62580 1199.27210 -3.31860 -18.85130 -0.24190
8 Comb22-3 Max -9.1976 0.72020 1199.55660 -2.95470 -18.65550 -0.23020
8 Comb22-3 Min -9.2588 0.62580 1199.27210 -3.31860 -18.85130 -0.24190
8 Comb22-4 Max -9.1976 0.72020 1199.55660 -2.95470 -18.65550 -0.23020
8 Comb22-4 Min -9.2588 0.62580 1199.27210 -3.31860 -18.85130 -0.24190
8 Comb23-1 Max -9.1792 0.70060 1199.60840 -3.03040 -18.59730 -0.23200
8 Comb23-1 Min -9.2771 0.64540 1199.22020 -3.24290 -18.90960 -0.24020
8 Comb23-2 Max -9.1792 0.70060 1199.60840 -3.03040 -18.59730 -0.23200
8 Comb23-2 Min -9.2771 0.64540 1199.22020 -3.24290 -18.90960 -0.24020
8 Comb23-3 Max -9.1792 0.70060 1199.60840 -3.03040 -18.59730 -0.23200
8 Comb23-3 Min -9.2771 0.64540 1199.22020 -3.24290 -18.90960 -0.24020
8 Comb23-4 Max -9.1792 0.70060 1199.60840 -3.03040 -18.59730 -0.23200
8 Comb23-4 Min -9.2771 0.64540 1199.22020 -3.24290 -18.90960 -0.24020
8 Comb24-1 Max -9.1976 0.72020 1199.55660 -2.95470 -18.65550 -0.23020
8 Comb24-1 Min -9.2588 0.62580 1199.27210 -3.31860 -18.85130 -0.24190
8 Comb24-2 Max -9.1976 0.72020 1199.55660 -2.95470 -18.65550 -0.23020
8 Comb24-2 Min -9.2588 0.62580 1199.27210 -3.31860 -18.85130 -0.24190
8 Comb24-3 Max -9.1976 0.72020 1199.55660 -2.95470 -18.65550 -0.23020
8 Comb24-3 Min -9.2588 0.62580 1199.27210 -3.31860 -18.85130 -0.24190
8 Comb24-4 Max -9.1976 0.72020 1199.55660 -2.95470 -18.65550 -0.23020
8 Comb24-4 Min -9.2588 0.62580 1199.27210 -3.31860 -18.85130 -0.24190
8 Comb25-1 Max -4.1061 -0.57600 536.74680 -1.84340 -7.61340 -0.01080
8 Comb25-1 Min -4.2367 -0.64960 536.22920 -2.12670 -8.02980 -0.02170
8 Comb25-2 Max -4.1061 -0.57600 536.74680 -1.84340 -7.61340 -0.01080
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
8 Comb25-2 Min -4.2367 -0.64960 536.22920 -2.12670 -8.02980 -0.02170
8 Comb25-3 Max -4.1061 -0.57600 536.74680 -1.84340 -7.61340 -0.01080
8 Comb25-3 Min -4.2367 -0.64960 536.22920 -2.12670 -8.02980 -0.02170
8 Comb25-4 Max -4.1061 -0.57600 536.74680 -1.84340 -7.61340 -0.01080
8 Comb25-4 Min -4.2367 -0.64960 536.22920 -2.12670 -8.02980 -0.02170
8 Comb26-1 Max -4.1306 -0.54990 536.67770 -1.74250 -7.69110 -0.00850
8 Comb26-1 Min -4.2122 -0.67570 536.29830 -2.22760 -7.95210 -0.02410
8 Comb26-2 Max -4.1306 -0.54990 536.67770 -1.74250 -7.69110 -0.00850
8 Comb26-2 Min -4.2122 -0.67570 536.29830 -2.22760 -7.95210 -0.02410
8 Comb26-3 Max -4.1306 -0.54990 536.67770 -1.74250 -7.69110 -0.00850
8 Comb26-3 Min -4.2122 -0.67570 536.29830 -2.22760 -7.95210 -0.02410
8 Comb26-4 Max -4.1306 -0.54990 536.67770 -1.74250 -7.69110 -0.00850
8 Comb26-4 Min -4.2122 -0.67570 536.29830 -2.22760 -7.95210 -0.02410
9 Comb11 12.7954 3.44430 2539.20490 -15.09090 1.53830 0.33870
9 Comb12 24.2593 -0.71140 3173.78340 -16.83760 2.72540 0.18440
9 Comb13-1 12.8079 3.45590 2583.29010 -15.00570 1.57930 0.34230
9 Comb13-2 12.8079 3.45590 2583.29010 -15.00570 1.57930 0.34230
9 Comb14-1 21.4027 0.33620 3048.20260 -16.33700 2.45940 0.22570
9 Comb14-2 21.4027 0.33620 3048.20260 -16.33700 2.45940 0.22570
9 Comb15-1 -15.8743 3.36380 2512.48790 -16.80750 -93.55000 0.22150
9 Comb15-2 12.4748 -24.80290 2657.99250 75.93730 0.63560 -0.93060
9 Comb15-3 41.4651 3.52480 2565.92190 -13.37440 96.62670 0.45580
9 Comb16-1 -8.6975 3.39260 2552.23100 -16.31440 -69.74720 0.25360
9 Comb16-2 12.5643 -17.73240 2661.35950 53.24420 0.89200 -0.61060
9 Comb16-3 34.307 3.51340 2592.30650 -13.73960 72.88540 0.42920
9 Comb17-1 -8.6975 3.39260 2552.23100 -16.31440 -69.74720 0.25360
9 Comb17-2 12.5643 -17.73240 2661.35950 53.24420 0.89200 -0.61060
9 Comb17-3 34.307 3.51340 2592.30650 -13.73960 72.88540 0.42920
9 Comb18-1 -20.9924 1.98610 1496.80590 -10.77110 -94.16540 0.08610
9 Comb18-2 7.3566 -26.18060 1642.31060 81.97370 0.02020 -1.06610
9 Comb18-3 36.347 2.14710 1550.23990 -7.33800 96.01140 0.32030
9 Comb19-1 Max 13.8961 3.75890 2745.04660 -16.20020 1.87440 0.37110
9 Comb19-1 Min 13.7677 3.68770 2744.71430 -16.42640 1.45150 0.36110
9 Comb19-2 Max 13.8961 3.75890 2745.04660 -16.20020 1.87440 0.37110
9 Comb19-2 Min 13.7677 3.68770 2744.71430 -16.42640 1.45150 0.36110
9 Comb19-3 Max 13.8961 3.75890 2745.04660 -16.20020 1.87440 0.37110
9 Comb19-3 Min 13.7677 3.68770 2744.71430 -16.42640 1.45150 0.36110
9 Comb19-4 Max 13.8961 3.75890 2745.04660 -16.20020 1.87440 0.37110
9 Comb19-4 Min 13.7677 3.68770 2744.71430 -16.42640 1.45150 0.36110
9 Comb20-1 Max 13.8678 3.78510 2745.15350 -16.11660 1.78140 0.37350
9 Comb20-1 Min 13.7959 3.66150 2744.60740 -16.51000 1.54450 0.35870
9 Comb20-2 Max 13.8678 3.78510 2745.15350 -16.11660 1.78140 0.37350
9 Comb20-2 Min 13.7959 3.66150 2744.60740 -16.51000 1.54450 0.35870
9 Comb20-3 Max 13.8678 3.78510 2745.15350 -16.11660 1.78140 0.37350
9 Comb20-3 Min 13.7959 3.66150 2744.60740 -16.51000 1.54450 0.35870
9 Comb20-4 Max 13.8678 3.78510 2745.15350 -16.11660 1.78140 0.37350
9 Comb20-4 Min 13.7959 3.66150 2744.60740 -16.51000 1.54450 0.35870
9 Comb21-1 Max 22.1929 0.56270 3195.60110 -17.12750 2.70720 0.24910
9 Comb21-1 Min 22.0966 0.50930 3195.35190 -17.29710 2.39000 0.24160
9 Comb21-2 Max 22.1929 0.56270 3195.60110 -17.12750 2.70720 0.24910
9 Comb21-2 Min 22.0966 0.50930 3195.35190 -17.29710 2.39000 0.24160
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
9 Comb21-3 Max 22.1929 0.56270 3195.60110 -17.12750 2.70720 0.24910
9 Comb21-3 Min 22.0966 0.50930 3195.35190 -17.29710 2.39000 0.24160
9 Comb21-4 Max 22.1929 0.56270 3195.60110 -17.12750 2.70720 0.24910
9 Comb21-4 Min 22.0966 0.50930 3195.35190 -17.29710 2.39000 0.24160
9 Comb22-1 Max 22.1718 0.58230 3195.68130 -17.06470 2.63750 0.25090
9 Comb22-1 Min 22.1178 0.48970 3195.27170 -17.35980 2.45970 0.23980
9 Comb22-2 Max 22.1718 0.58230 3195.68130 -17.06470 2.63750 0.25090
9 Comb22-2 Min 22.1178 0.48970 3195.27170 -17.35980 2.45970 0.23980
9 Comb22-3 Max 22.1718 0.58230 3195.68130 -17.06470 2.63750 0.25090
9 Comb22-3 Min 22.1178 0.48970 3195.27170 -17.35980 2.45970 0.23980
9 Comb22-4 Max 22.1718 0.58230 3195.68130 -17.06470 2.63750 0.25090
9 Comb22-4 Min 22.1178 0.48970 3195.27170 -17.35980 2.45970 0.23980
9 Comb23-1 Max 22.1929 0.56270 3195.60110 -17.12750 2.70720 0.24910
9 Comb23-1 Min 22.0966 0.50930 3195.35190 -17.29710 2.39000 0.24160
9 Comb23-2 Max 22.1929 0.56270 3195.60110 -17.12750 2.70720 0.24910
9 Comb23-2 Min 22.0966 0.50930 3195.35190 -17.29710 2.39000 0.24160
9 Comb23-3 Max 22.1929 0.56270 3195.60110 -17.12750 2.70720 0.24910
9 Comb23-3 Min 22.0966 0.50930 3195.35190 -17.29710 2.39000 0.24160
9 Comb23-4 Max 22.1929 0.56270 3195.60110 -17.12750 2.70720 0.24910
9 Comb23-4 Min 22.0966 0.50930 3195.35190 -17.29710 2.39000 0.24160
9 Comb24-1 Max 22.1718 0.58230 3195.68130 -17.06470 2.63750 0.25090
9 Comb24-1 Min 22.1178 0.48970 3195.27170 -17.35980 2.45970 0.23980
9 Comb24-2 Max 22.1718 0.58230 3195.68130 -17.06470 2.63750 0.25090
9 Comb24-2 Min 22.1178 0.48970 3195.27170 -17.35980 2.45970 0.23980
9 Comb24-3 Max 22.1718 0.58230 3195.68130 -17.06470 2.63750 0.25090
9 Comb24-3 Min 22.1178 0.48970 3195.27170 -17.35980 2.45970 0.23980
9 Comb24-4 Max 22.1718 0.58230 3195.68130 -17.06470 2.63750 0.25090
9 Comb24-4 Min 22.1178 0.48970 3195.27170 -17.35980 2.45970 0.23980
9 Comb25-1 Max 6.705 1.82320 1318.01350 -7.71910 1.00980 0.18080
9 Comb25-1 Min 6.5766 1.75200 1317.68120 -7.94530 0.58700 0.17070
9 Comb25-2 Max 6.705 1.82320 1318.01350 -7.71910 1.00980 0.18080
9 Comb25-2 Min 6.5766 1.75200 1317.68120 -7.94530 0.58700 0.17070
9 Comb25-3 Max 6.705 1.82320 1318.01350 -7.71910 1.00980 0.18080
9 Comb25-3 Min 6.5766 1.75200 1317.68120 -7.94530 0.58700 0.17070
9 Comb25-4 Max 6.705 1.82320 1318.01350 -7.71910 1.00980 0.18080
9 Comb25-4 Min 6.5766 1.75200 1317.68120 -7.94530 0.58700 0.17070
9 Comb26-1 Max 6.6768 1.84940 1318.12040 -7.63550 0.91690 0.18310
9 Comb26-1 Min 6.6048 1.72580 1317.57430 -8.02890 0.67990 0.16840
9 Comb26-2 Max 6.6768 1.84940 1318.12040 -7.63550 0.91690 0.18310
9 Comb26-2 Min 6.6048 1.72580 1317.57430 -8.02890 0.67990 0.16840
9 Comb26-3 Max 6.6768 1.84940 1318.12040 -7.63550 0.91690 0.18310
9 Comb26-3 Min 6.6048 1.72580 1317.57430 -8.02890 0.67990 0.16840
9 Comb26-4 Max 6.6768 1.84940 1318.12040 -7.63550 0.91690 0.18310
9 Comb26-4 Min 6.6048 1.72580 1317.57430 -8.02890 0.67990 0.16840
11 Comb11 -6.1475 -6.23100 2497.39570 -14.93580 -15.70020 1.87990
11 Comb12 -8.3104 -10.63300 2952.21540 -18.08360 -21.42400 2.07730
11 Comb13-1 -6.1588 -6.25660 2529.58130 -14.83340 -15.68870 1.88420
11 Comb13-2 -6.1588 -6.25660 2529.58130 -14.83340 -15.68870 1.88420
11 Comb14-1 -7.7782 -9.55170 2862.64970 -17.21990 -19.98440 2.03120
11 Comb14-2 -7.7782 -9.55170 2862.64970 -17.21990 -19.98440 2.03120
11 Comb15-1 -38.2016 -6.14360 2432.18730 -15.49840 -114.46640 1.95930
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
11 Comb15-2 -7.2282 -31.99340 2443.23760 82.32950 -17.34810 0.71930
11 Comb15-3 25.9066 -6.31830 2562.60400 -14.37320 83.06600 1.80050
11 Comb16-1 -30.1965 -6.18470 2472.62860 -15.28100 -89.76620 1.94270
11 Comb16-2 -6.9665 -25.57200 2480.91630 58.09000 -16.92750 1.01270
11 Comb16-3 17.8846 -6.31570 2570.44110 -14.43700 58.38310 1.82360
11 Comb17-1 -30.1965 -6.18470 2472.62860 -15.28100 -89.76620 1.94270
11 Comb17-2 -6.9665 -25.57200 2480.91630 58.09000 -16.92750 1.01270
11 Comb17-3 17.8846 -6.31570 2570.44110 -14.43700 58.38310 1.82360
11 Comb18-1 -35.7426 -3.65120 1433.22910 -9.52410 -108.18630 1.20730
11 Comb18-2 -4.7692 -29.50100 1444.27930 88.30380 -11.06800 -0.03270
11 Comb18-3 28.3656 -3.82590 1563.64570 -8.39880 89.34610 1.04850
11 Comb19-1 Max -6.5736 -6.70050 2699.87600 -16.01390 -16.75220 2.03670
11 Comb19-1 Min -6.7173 -6.77090 2699.49350 -16.27720 -17.19170 2.02760
11 Comb19-2 Max -6.5736 -6.70050 2699.87600 -16.01390 -16.75220 2.03670
11 Comb19-2 Min -6.7173 -6.77090 2699.49350 -16.27720 -17.19170 2.02760
11 Comb19-3 Max -6.5736 -6.70050 2699.87600 -16.01390 -16.75220 2.03670
11 Comb19-3 Min -6.7173 -6.77090 2699.49350 -16.27720 -17.19170 2.02760
11 Comb19-4 Max -6.5736 -6.70050 2699.87600 -16.01390 -16.75220 2.03670
11 Comb19-4 Min -6.7173 -6.77090 2699.49350 -16.27720 -17.19170 2.02760
11 Comb20-1 Max -6.6052 -6.67470 2699.85580 -15.91780 -16.84890 2.03900
11 Comb20-1 Min -6.6856 -6.79670 2699.51360 -16.37330 -17.09500 2.02530
11 Comb20-2 Max -6.6052 -6.67470 2699.85580 -15.91780 -16.84890 2.03900
11 Comb20-2 Min -6.6856 -6.79670 2699.51360 -16.37330 -17.09500 2.02530
11 Comb20-3 Max -6.6052 -6.67470 2699.85580 -15.91780 -16.84890 2.03900
11 Comb20-3 Min -6.6856 -6.79670 2699.51360 -16.37330 -17.09500 2.02530
11 Comb20-4 Max -6.6052 -6.67470 2699.85580 -15.91780 -16.84890 2.03900
11 Comb20-4 Min -6.6856 -6.79670 2699.51360 -16.37330 -17.09500 2.02530
11 Comb21-1 Max -8.0809 -9.88670 3007.64200 -17.98740 -20.73020 2.14370
11 Comb21-1 Min -8.1886 -9.93950 3007.35520 -18.18490 -21.05980 2.13680
11 Comb21-2 Max -8.0809 -9.88670 3007.64200 -17.98740 -20.73020 2.14370
11 Comb21-2 Min -8.1886 -9.93950 3007.35520 -18.18490 -21.05980 2.13680
11 Comb21-3 Max -8.0809 -9.88670 3007.64200 -17.98740 -20.73020 2.14370
11 Comb21-3 Min -8.1886 -9.93950 3007.35520 -18.18490 -21.05980 2.13680
11 Comb21-4 Max -8.0809 -9.88670 3007.64200 -17.98740 -20.73020 2.14370
11 Comb21-4 Min -8.1886 -9.93950 3007.35520 -18.18490 -21.05980 2.13680
11 Comb22-1 Max -8.1046 -9.86740 3007.62690 -17.91530 -20.80270 2.14530
11 Comb22-1 Min -8.1649 -9.95880 3007.37030 -18.25700 -20.98720 2.13510
11 Comb22-2 Max -8.1046 -9.86740 3007.62690 -17.91530 -20.80270 2.14530
11 Comb22-2 Min -8.1649 -9.95880 3007.37030 -18.25700 -20.98720 2.13510
11 Comb22-3 Max -8.1046 -9.86740 3007.62690 -17.91530 -20.80270 2.14530
11 Comb22-3 Min -8.1649 -9.95880 3007.37030 -18.25700 -20.98720 2.13510
11 Comb22-4 Max -8.1046 -9.86740 3007.62690 -17.91530 -20.80270 2.14530
11 Comb22-4 Min -8.1649 -9.95880 3007.37030 -18.25700 -20.98720 2.13510
11 Comb23-1 Max -8.0809 -9.88670 3007.64200 -17.98740 -20.73020 2.14370
11 Comb23-1 Min -8.1886 -9.93950 3007.35520 -18.18490 -21.05980 2.13680
11 Comb23-2 Max -8.0809 -9.88670 3007.64200 -17.98740 -20.73020 2.14370
11 Comb23-2 Min -8.1886 -9.93950 3007.35520 -18.18490 -21.05980 2.13680
11 Comb23-3 Max -8.0809 -9.88670 3007.64200 -17.98740 -20.73020 2.14370
11 Comb23-3 Min -8.1886 -9.93950 3007.35520 -18.18490 -21.05980 2.13680
11 Comb23-4 Max -8.0809 -9.88670 3007.64200 -17.98740 -20.73020 2.14370
11 Comb23-4 Min -8.1886 -9.93950 3007.35520 -18.18490 -21.05980 2.13680
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
11 Comb24-1 Max -8.1046 -9.86740 3007.62690 -17.91530 -20.80270 2.14530
11 Comb24-1 Min -8.1649 -9.95880 3007.37030 -18.25700 -20.98720 2.13510
11 Comb24-2 Max -8.1046 -9.86740 3007.62690 -17.91530 -20.80270 2.14530
11 Comb24-2 Min -8.1649 -9.95880 3007.37030 -18.25700 -20.98720 2.13510
11 Comb24-3 Max -8.1046 -9.86740 3007.62690 -17.91530 -20.80270 2.14530
11 Comb24-3 Min -8.1649 -9.95880 3007.37030 -18.25700 -20.98720 2.13510
11 Comb24-4 Max -8.1046 -9.86740 3007.62690 -17.91530 -20.80270 2.14530
11 Comb24-4 Min -8.1649 -9.95880 3007.37030 -18.25700 -20.98720 2.13510
11 Comb25-1 Max -3.1187 -3.19870 1296.33960 -7.62000 -7.92870 0.98020
11 Comb25-1 Min -3.2624 -3.26910 1295.95710 -7.88330 -8.36820 0.97110
11 Comb25-2 Max -3.1187 -3.19870 1296.33960 -7.62000 -7.92870 0.98020
11 Comb25-2 Min -3.2624 -3.26910 1295.95710 -7.88330 -8.36820 0.97110
11 Comb25-3 Max -3.1187 -3.19870 1296.33960 -7.62000 -7.92870 0.98020
11 Comb25-3 Min -3.2624 -3.26910 1295.95710 -7.88330 -8.36820 0.97110
11 Comb25-4 Max -3.1187 -3.19870 1296.33960 -7.62000 -7.92870 0.98020
11 Comb25-4 Min -3.2624 -3.26910 1295.95710 -7.88330 -8.36820 0.97110
11 Comb26-1 Max -3.1504 -3.17290 1296.31950 -7.52390 -8.02540 0.98250
11 Comb26-1 Min -3.2307 -3.29490 1295.97730 -7.97940 -8.27150 0.96880
11 Comb26-2 Max -3.1504 -3.17290 1296.31950 -7.52390 -8.02540 0.98250
11 Comb26-2 Min -3.2307 -3.29490 1295.97730 -7.97940 -8.27150 0.96880
11 Comb26-3 Max -3.1504 -3.17290 1296.31950 -7.52390 -8.02540 0.98250
11 Comb26-3 Min -3.2307 -3.29490 1295.97730 -7.97940 -8.27150 0.96880
11 Comb26-4 Max -3.1504 -3.17290 1296.31950 -7.52390 -8.02540 0.98250
11 Comb26-4 Min -3.2307 -3.29490 1295.97730 -7.97940 -8.27150 0.96880
12 Comb11 -14.9014 8.04360 1163.27590 -23.13240 -17.57220 0.55610
12 Comb12 -17.1479 6.84430 1324.29050 -26.09610 -23.75640 0.53540
12 Comb13-1 -14.9118 8.03010 1173.64240 -23.04620 -17.56490 0.55970
12 Comb13-2 -14.9118 8.03010 1173.64240 -23.04620 -17.56490 0.55970
12 Comb14-1 -16.5941 7.13400 1291.81170 -25.29050 -22.20490 0.54330
12 Comb14-2 -16.5941 7.13400 1291.81170 -25.29050 -22.20490 0.54330
12 Comb15-1 -47.3124 7.67380 1292.95890 -22.78940 -115.65880 0.30880
12 Comb15-2 -16.0523 -17.58140 1097.25780 76.70650 -19.25000 -0.67600
12 Comb15-3 17.5096 8.41350 1033.59300 -23.47550 80.51440 0.80340
12 Comb16-1 -39.2175 7.75610 1268.31300 -22.81050 -91.13170 0.37330
12 Comb16-2 -15.7724 -11.18530 1121.53720 51.81140 -18.82510 -0.36540
12 Comb16-3 9.399 8.31090 1073.78860 -23.32500 55.99820 0.74430
12 Comb17-1 -39.2175 7.75610 1268.31300 -22.81050 -91.13170 0.37330
12 Comb17-2 -15.7724 -11.18530 1121.53720 51.81140 -18.82510 -0.36540
12 Comb17-3 9.399 8.31090 1073.78860 -23.32500 55.99820 0.74430
12 Comb18-1 -41.3518 4.45640 827.64850 -13.53640 -108.62990 0.08630
12 Comb18-2 -10.0918 -20.79890 631.94750 85.95950 -12.22120 -0.89850
12 Comb18-3 23.4702 5.19600 568.28260 -14.22250 87.54330 0.58100
12 Comb19-1 Max -16.0358 8.73220 1257.82310 -24.86430 -18.77730 0.60640
12 Comb19-1 Min -16.181 8.65820 1257.17940 -25.14810 -19.21380 0.59600
12 Comb19-2 Max -16.0358 8.73220 1257.82310 -24.86430 -18.77730 0.60640
12 Comb19-2 Min -16.181 8.65820 1257.17940 -25.14810 -19.21380 0.59600
12 Comb19-3 Max -16.0358 8.73220 1257.82310 -24.86430 -18.77730 0.60640
12 Comb19-3 Min -16.181 8.65820 1257.17940 -25.14810 -19.21380 0.59600
12 Comb19-4 Max -16.0358 8.73220 1257.82310 -24.86430 -18.77730 0.60640
12 Comb19-4 Min -16.181 8.65820 1257.17940 -25.14810 -19.21380 0.59600
12 Comb20-1 Max -16.0678 8.75830 1257.76340 -24.76330 -18.87340 0.60860
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
12 Comb20-1 Min -16.149 8.63210 1257.23910 -25.24910 -19.11770 0.59370
12 Comb20-2 Max -16.0678 8.75830 1257.76340 -24.76330 -18.87340 0.60860
12 Comb20-2 Min -16.149 8.63210 1257.23910 -25.24910 -19.11770 0.59370
12 Comb20-3 Max -16.0678 8.75830 1257.76340 -24.76330 -18.87340 0.60860
12 Comb20-3 Min -16.149 8.63210 1257.23910 -25.24910 -19.11770 0.59370
12 Comb20-4 Max -16.0678 8.75830 1257.76340 -24.76330 -18.87340 0.60860
12 Comb20-4 Min -16.149 8.63210 1257.23910 -25.24910 -19.11770 0.59370
12 Comb21-1 Max -17.4039 7.62830 1359.52310 -26.52580 -23.06040 0.57940
12 Comb21-1 Min -17.5128 7.57280 1359.04040 -26.73860 -23.38770 0.57160
12 Comb21-2 Max -17.4039 7.62830 1359.52310 -26.52580 -23.06040 0.57940
12 Comb21-2 Min -17.5128 7.57280 1359.04040 -26.73860 -23.38770 0.57160
12 Comb21-3 Max -17.4039 7.62830 1359.52310 -26.52580 -23.06040 0.57940
12 Comb21-3 Min -17.5128 7.57280 1359.04040 -26.73860 -23.38770 0.57160
12 Comb21-4 Max -17.4039 7.62830 1359.52310 -26.52580 -23.06040 0.57940
12 Comb21-4 Min -17.5128 7.57280 1359.04040 -26.73860 -23.38770 0.57160
12 Comb22-1 Max -17.4279 7.64790 1359.47840 -26.45010 -23.13240 0.58110
12 Comb22-1 Min -17.4888 7.55320 1359.08510 -26.81440 -23.31570 0.57000
12 Comb22-2 Max -17.4279 7.64790 1359.47840 -26.45010 -23.13240 0.58110
12 Comb22-2 Min -17.4888 7.55320 1359.08510 -26.81440 -23.31570 0.57000
12 Comb22-3 Max -17.4279 7.64790 1359.47840 -26.45010 -23.13240 0.58110
12 Comb22-3 Min -17.4888 7.55320 1359.08510 -26.81440 -23.31570 0.57000
12 Comb22-4 Max -17.4279 7.64790 1359.47840 -26.45010 -23.13240 0.58110
12 Comb22-4 Min -17.4888 7.55320 1359.08510 -26.81440 -23.31570 0.57000
12 Comb23-1 Max -17.4039 7.62830 1359.52310 -26.52580 -23.06040 0.57940
12 Comb23-1 Min -17.5128 7.57280 1359.04040 -26.73860 -23.38770 0.57160
12 Comb23-2 Max -17.4039 7.62830 1359.52310 -26.52580 -23.06040 0.57940
12 Comb23-2 Min -17.5128 7.57280 1359.04040 -26.73860 -23.38770 0.57160
12 Comb23-3 Max -17.4039 7.62830 1359.52310 -26.52580 -23.06040 0.57940
12 Comb23-3 Min -17.5128 7.57280 1359.04040 -26.73860 -23.38770 0.57160
12 Comb23-4 Max -17.4039 7.62830 1359.52310 -26.52580 -23.06040 0.57940
12 Comb23-4 Min -17.5128 7.57280 1359.04040 -26.73860 -23.38770 0.57160
12 Comb24-1 Max -17.4279 7.64790 1359.47840 -26.45010 -23.13240 0.58110
12 Comb24-1 Min -17.4888 7.55320 1359.08510 -26.81440 -23.31570 0.57000
12 Comb24-2 Max -17.4279 7.64790 1359.47840 -26.45010 -23.13240 0.58110
12 Comb24-2 Min -17.4888 7.55320 1359.08510 -26.81440 -23.31570 0.57000
12 Comb24-3 Max -17.4279 7.64790 1359.47840 -26.45010 -23.13240 0.58110
12 Comb24-3 Min -17.4888 7.55320 1359.08510 -26.81440 -23.31570 0.57000
12 Comb24-4 Max -17.4279 7.64790 1359.47840 -26.45010 -23.13240 0.58110
12 Comb24-4 Min -17.4888 7.55320 1359.08510 -26.81440 -23.31570 0.57000
12 Comb25-1 Max -7.6613 4.21160 604.06210 -11.86390 -8.90170 0.29380
12 Comb25-1 Min -7.8064 4.13770 603.41840 -12.14760 -9.33820 0.28340
12 Comb25-2 Max -7.6613 4.21160 604.06210 -11.86390 -8.90170 0.29380
12 Comb25-2 Min -7.8064 4.13770 603.41840 -12.14760 -9.33820 0.28340
12 Comb25-3 Max -7.6613 4.21160 604.06210 -11.86390 -8.90170 0.29380
12 Comb25-3 Min -7.8064 4.13770 603.41840 -12.14760 -9.33820 0.28340
12 Comb25-4 Max -7.6613 4.21160 604.06210 -11.86390 -8.90170 0.29380
12 Comb25-4 Min -7.8064 4.13770 603.41840 -12.14760 -9.33820 0.28340
12 Comb26-1 Max -7.6932 4.23780 604.00240 -11.76290 -8.99780 0.29600
12 Comb26-1 Min -7.7744 4.11150 603.47810 -12.24860 -9.24210 0.28120
12 Comb26-2 Max -7.6932 4.23780 604.00240 -11.76290 -8.99780 0.29600
12 Comb26-2 Min -7.7744 4.11150 603.47810 -12.24860 -9.24210 0.28120
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
12 Comb26-3 Max -7.6932 4.23780 604.00240 -11.76290 -8.99780 0.29600
12 Comb26-3 Min -7.7744 4.11150 603.47810 -12.24860 -9.24210 0.28120
12 Comb26-4 Max -7.6932 4.23780 604.00240 -11.76290 -8.99780 0.29600
12 Comb26-4 Min -7.7744 4.11150 603.47810 -12.24860 -9.24210 0.28120
13 Comb11 3.4358 12.36120 1275.21180 -17.63060 -2.84180 0.41790
13 Comb12 6.983 16.30400 1475.63040 -22.77120 -5.46080 0.32450
13 Comb13-1 3.4404 12.37910 1288.27630 -17.55900 -2.80250 0.42150
13 Comb13-2 3.4404 12.37910 1288.27630 -17.55900 -2.80250 0.42150
13 Comb14-1 6.0997 15.33170 1435.32410 -21.43230 -4.77660 0.35050
13 Comb14-2 6.0997 15.33170 1435.32410 -21.43230 -4.77660 0.35050
13 Comb15-1 -23.8879 12.43000 1270.40180 -19.04470 -96.49190 0.30560
13 Comb15-2 0.6257 -16.98000 1103.33470 73.40220 -8.91090 -0.89170
13 Comb15-3 30.7594 12.29240 1280.02190 -16.21640 90.80840 0.53020
13 Comb16-1 -17.0535 12.42620 1281.40260 -18.63750 -73.04990 0.33640
13 Comb16-2 1.3317 -9.63130 1156.10240 50.69770 -7.36410 -0.56160
13 Comb16-3 23.9319 12.32300 1288.61780 -16.51630 67.42530 0.50480
13 Comb17-1 -17.0535 12.42620 1281.40260 -18.63750 -73.04990 0.33640
13 Comb17-2 1.3317 -9.63130 1156.10240 50.69770 -7.36410 -0.56160
13 Comb17-3 23.9319 12.32300 1288.61780 -16.51630 67.42530 0.50480
13 Comb18-1 -25.2622 7.48550 760.31700 -11.99250 -95.35520 0.13840
13 Comb18-2 -0.7486 -21.92450 593.25000 80.45450 -7.77410 -1.05890
13 Comb18-3 29.3851 7.34790 769.93720 -9.16420 91.94510 0.36300
13 Comb19-1 Max 3.7763 13.39930 1378.72970 -18.94550 -2.86060 0.45670
13 Comb19-1 Min 3.6518 13.32560 1378.27830 -19.17180 -3.28330 0.44680
13 Comb19-2 Max 3.7763 13.39930 1378.72970 -18.94550 -2.86060 0.45670
13 Comb19-2 Min 3.6518 13.32560 1378.27830 -19.17180 -3.28330 0.44680
13 Comb19-3 Max 3.7763 13.39930 1378.72970 -18.94550 -2.86060 0.45670
13 Comb19-3 Min 3.6518 13.32560 1378.27830 -19.17180 -3.28330 0.44680
13 Comb19-4 Max 3.7763 13.39930 1378.72970 -18.94550 -2.86060 0.45670
13 Comb19-4 Min 3.6518 13.32560 1378.27830 -19.17180 -3.28330 0.44680
13 Comb20-1 Max 3.7494 13.42650 1378.89220 -18.86190 -2.95300 0.45930
13 Comb20-1 Min 3.6787 13.29850 1378.11570 -19.25540 -3.19100 0.44420
13 Comb20-2 Max 3.7494 13.42650 1378.89220 -18.86190 -2.95300 0.45930
13 Comb20-2 Min 3.6787 13.29850 1378.11570 -19.25540 -3.19100 0.44420
13 Comb20-3 Max 3.7494 13.42650 1378.89220 -18.86190 -2.95300 0.45930
13 Comb20-3 Min 3.6787 13.29850 1378.11570 -19.25540 -3.19100 0.44420
13 Comb20-4 Max 3.7494 13.42650 1378.89220 -18.86190 -2.95300 0.45930
13 Comb20-4 Min 3.6787 13.29850 1378.11570 -19.25540 -3.19100 0.44420
13 Comb21-1 Max 6.3456 16.07630 1509.45570 -22.37000 -4.78290 0.37850
13 Comb21-1 Min 6.2523 16.02100 1509.11710 -22.53970 -5.09990 0.37110
13 Comb21-2 Max 6.3456 16.07630 1509.45570 -22.37000 -4.78290 0.37850
13 Comb21-2 Min 6.2523 16.02100 1509.11710 -22.53970 -5.09990 0.37110
13 Comb21-3 Max 6.3456 16.07630 1509.45570 -22.37000 -4.78290 0.37850
13 Comb21-3 Min 6.2523 16.02100 1509.11710 -22.53970 -5.09990 0.37110
13 Comb21-4 Max 6.3456 16.07630 1509.45570 -22.37000 -4.78290 0.37850
13 Comb21-4 Min 6.2523 16.02100 1509.11710 -22.53970 -5.09990 0.37110
13 Comb22-1 Max 6.3255 16.09670 1509.57760 -22.30730 -4.85220 0.38040
13 Comb22-1 Min 6.2724 16.00070 1508.99520 -22.60240 -5.03070 0.36910
13 Comb22-2 Max 6.3255 16.09670 1509.57760 -22.30730 -4.85220 0.38040
13 Comb22-2 Min 6.2724 16.00070 1508.99520 -22.60240 -5.03070 0.36910
13 Comb22-3 Max 6.3255 16.09670 1509.57760 -22.30730 -4.85220 0.38040
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat

SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
13 Comb22-3 Min 6.2724 16.00070 1508.99520 -22.60240 -5.03070 0.36910
13 Comb22-4 Max 6.3255 16.09670 1509.57760 -22.30730 -4.85220 0.38040
13 Comb22-4 Min 6.2724 16.00070 1508.99520 -22.60240 -5.03070 0.36910
13 Comb23-1 Max 6.3456 16.07630 1509.45570 -22.37000 -4.78290 0.37850
13 Comb23-1 Min 6.2523 16.02100 1509.11710 -22.53970 -5.09990 0.37110
13 Comb23-2 Max 6.3456 16.07630 1509.45570 -22.37000 -4.78290 0.37850
13 Comb23-2 Min 6.2523 16.02100 1509.11710 -22.53970 -5.09990 0.37110
13 Comb23-3 Max 6.3456 16.07630 1509.45570 -22.37000 -4.78290 0.37850
13 Comb23-3 Min 6.2523 16.02100 1509.11710 -22.53970 -5.09990 0.37110
13 Comb23-4 Max 6.3456 16.07630 1509.45570 -22.37000 -4.78290 0.37850
13 Comb23-4 Min 6.2523 16.02100 1509.11710 -22.53970 -5.09990 0.37110
13 Comb24-1 Max 6.3255 16.09670 1509.57760 -22.30730 -4.85220 0.38040
13 Comb24-1 Min 6.2724 16.00070 1508.99520 -22.60240 -5.03070 0.36910
13 Comb24-2 Max 6.3255 16.09670 1509.57760 -22.30730 -4.85220 0.38040
13 Comb24-2 Min 6.2724 16.00070 1508.99520 -22.60240 -5.03070 0.36910
13 Comb24-3 Max 6.3255 16.09670 1509.57760 -22.30730 -4.85220 0.38040
13 Comb24-3 Min 6.2724 16.00070 1508.99520 -22.60240 -5.03070 0.36910
13 Comb24-4 Max 6.3255 16.09670 1509.57760 -22.30730 -4.85220 0.38040
13 Comb24-4 Min 6.2724 16.00070 1508.99520 -22.60240 -5.03070 0.36910
13 Comb25-1 Max 1.8454 6.45230 662.06060 -9.03710 -1.26350 0.22180
13 Comb25-1 Min 1.7209 6.37860 661.60920 -9.26340 -1.68630 0.21190
13 Comb25-2 Max 1.8454 6.45230 662.06060 -9.03710 -1.26350 0.22180
13 Comb25-2 Min 1.7209 6.37860 661.60920 -9.26340 -1.68630 0.21190
13 Comb25-3 Max 1.8454 6.45230 662.06060 -9.03710 -1.26350 0.22180
13 Comb25-3 Min 1.7209 6.37860 661.60920 -9.26340 -1.68630 0.21190
13 Comb25-4 Max 1.8454 6.45230 662.06060 -9.03710 -1.26350 0.22180
13 Comb25-4 Min 1.7209 6.37860 661.60920 -9.26340 -1.68630 0.21190
13 Comb26-1 Max 1.8185 6.47950 662.22320 -8.95350 -1.35590 0.22440
13 Comb26-1 Min 1.7478 6.35150 661.44670 -9.34700 -1.59390 0.20940
13 Comb26-2 Max 1.8185 6.47950 662.22320 -8.95350 -1.35590 0.22440
13 Comb26-2 Min 1.7478 6.35150 661.44670 -9.34700 -1.59390 0.20940
13 Comb26-3 Max 1.8185 6.47950 662.22320 -8.95350 -1.35590 0.22440
13 Comb26-3 Min 1.7478 6.35150 661.44670 -9.34700 -1.59390 0.20940
13 Comb26-4 Max 1.8185 6.47950 662.22320 -8.95350 -1.35590 0.22440
13 Comb26-4 Min 1.7478 6.35150 661.44670 -9.34700 -1.59390 0.20940
STATICAL CALCULATION
RSKP JATISARI - KARAWANG
JAWA BARAT
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
LIST OF CONTENT Karawang - Jawa Barat

LIST OF CONTENT :

1. MATERIAL CHARACTERISTIC
2. LOADS ON FOUNDATION
3. DIMENSION FOUNDATION
4. CAP BEARING CAPACITY
5. INDIVIDUAL PILE'S UPLIFT - CAPACITY
6. INDIVIDUAL PILE'S COMPRESSION - CAPACITY
7. GROUP PILE'S CAPACITY
8. LOADS DISTRIBUTION
9. PILE REINFORCEMENT
10. SHEAR REINFORCEMENT IN PILE
11. CAP REINFORCEMENT
11.1. Upper Reinforcement
11.2. Lower Reinforcement
12. PUNCHING SHEAR CHECK
13. HORIZONTAL LOAD ANALYSIS
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

1. MATERIAL CHARACTERISTIC
Soil density (gs ) : 1600 kg/m3
Concrete density (gc ) : 2400 kg/m3
Soil density - submerge (gs1) : 800 kg/m3
Concrete density - submerge (gc1) : 1400 kg/m3
2
Concrete compression strength (fc) : 249 kg/cm 24.42 Mpa (K-300)
Steel yield strength, main bar (fy) : 3900 kg/cm2 382 Mpa (BJTD39)
Steel yield strength, shear bar (fy2) : 2400 kg/cm2 235 Mpa (BJTP24)
Depth of Pile (Df ) : 38.0 m
Diameter of Pile (dp) : 0.5 m
Effective Diameter of Pile (Def) : 0.5 m

Statical average value of SPT for pile's friction resistance (N), is taken from
depth at : 0.8 m
to depth at : 38.0 m
N-SPT : 18

Value of SPT for pile's end bearing (Nb), at depth 38 m


Nb-SPT : 32

Statical average value of cone resistance for bearing capacity at cap (N-SPT),is taken
N-SPT : 2
Convertion SPT to CPT => for sand N = qc/4 ...(4-18) Joseph. E Bowls, Analysis dan Desain Pondasi
=> for clay N = qc/2 or Ir. Sunggono kh, Manual Book Teknik Sipil

qc3 : 3.33 kg/cm2 (Clay)


σallcap : qc3 / 15 : 0.17 kg/cm 2

Concrete cover,
cover : 75 mm ( For design )
cover1 : 60 mm ( For Implementation )

2. LOADS ON FOUNDATION
FVc = 3195.681 kN = 325,857 kg
Fvu = 0.000 kN = 0 kg
Hxc = 47.312 kN = 4,824 kg
Hxu = 0.000 kN = 0 kg
Hyc = 35.839 kN = 3,654 kg
Hyu = 0.000 kN = 0 kg

3. DIMENSION FOUNDATION
Size of pile : dp = 0.50 m
Effective pile diameter : Def = 0.50 m
Minimum pile's spacing : S = 2.5 * dP = 1.25 m

Size of cap :

Bc = 2.50 m
hcap = 0.80 m
b = 0.70 m
h1 = 0.00 m
h2 = 0.00 m
h = h1 + h2 = 0.00 m
Wcap = (Bc^2 x hcap + b^2x h)x yc1 = 68.649 kN
Wsoil = (Bc^2 - b^2)x h2 x ys1 = 0.000 kN
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

4. CAP BEARING CAPACITY


Wcap /Bc2 = 0.112 kg/cm2 < s allcap = 0.17 kg/cm2
ok !

5. INDIVIDUAL PILE'S UPLIFT-CAPACITY


Q friction = a x Cu x p x Li …(Meyerhof, 1976)
α = 0.55 …(Reese & Wright, 1977)
Cu = KxN kN/m2 …K : 3.5 - 6.5 (Stroud , 1974)
77.48 kN/m2
p = 1.57 m
Li = 37.20 m
Safety factor :
SF1 = 3.0 ; safety factor for weight of foundation's cap
Q friction = 2490.0 kN
Wp = 100.3 kN

So, pile's uplift-capacity :


Qumax = 2523.4 kN

6. INDIVIDUAL PILE'S COMPRESSION-CAPACITY

Q endbearing = 9 x Cu x Ap …(Meyerhof, 1976)

So, pile's compression-capacity :


Qc max = 2526.6 kN

7. GROUP PILE'S CAPACITY


EFFICIENCY OF PILE GROUPS

= 0.80

atan d/s (Ø) = 18.4


number of row (m) = 2
number of piles in rows (n) = 2
diameter of pile (d) = 0.50 m
center to center of pile (s) = 1.50 m
Qu-pgroup = Eff * n * Qu = 8026.25 kN
Qc-pgroup = Eff * n * Qc = 8036.43 kN

8. LOADS DISTRIBUTIONS
maximum load :
Fvu = 0.000 kN
Hxu = 0.00 kN
Hyu = 0.000 kN
Fvc = 3195.681 kN
Hxc = 47.312 kN
Hyc = 35.839 kN
The horizontal load is transformed to proper coordinate:

= 0.000

= 8.113

= 0.000

= 58.797
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

Nc = Fvc

n : number of pile
Qu : Pile loading in uplift
Qc : Pile loading in compression
Fu : Maximum uplift of vertical load from tower
Fc : Maximum compression of vertical load from tower
h : Distance between ground level with point of working horizontal load.
Wcap : Weight of pile cap
Mux, Muy : x and y component of overtuning-moment in uplift condition
Mcx, Mxy : x and y component of overtuning-moment in compression condition

Uplift load :

= 0.000 kN

hext = 0 m + h = 0 m
Mux = Hxu1x hext = 0.000 kNm
Muy = Hyu1x hext = 0.000 kNm

Compression Load :
Nc = Fvc = 3195.681 kN
Mcy = Hyc1 x hext = 0.000 kNm
Mcx = Hxc1 x hext = 0.000 kNm

VerticalComp
Pile no. x y x2 y2 Spacing S > Smin
Q uv Q cv
1 0.70 -0.70 0.49 0.49 S12 1.40 OK ! 0.00 802.29
2 0.70 0.70 0.49 0.49 S24 1.40 OK ! 0.00 879.10
3 -0.70 0.70 0.49 0.49 S13 1.98 OK ! 0.00 795.55
4 -0.70 0.70 0.49 0.49 S14 1.98 OK ! 0.00 795.55

Number of Pile nPile = 4


Maximum Q uv = 0.00 kN (based on table)
Maximum Q cv = 879.10 kN (based on table)

Maximum loads compared with individual pile's uplift & compression capacity.
Q uv = 0.00 kN < Qu max = 2523.446 kN ok !
Q cv = 879.10 kN < Qc max = 2526.647 kN ok !

Maximum loads compared with group pile's uplift & compression capacity.
Fvu = 0.00 kN < Qu-pgroup = 8026.25 kN ok !
Fvc = 3195.68 kN < Qc-pgroup = 8036.43 kN ok !
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

9. BOREPILE REINFORCEMENT

dp = 0.5 m
Fp = 1.25 x Qumax = 0.00 kN
= 0.00 mm2

Asmin = 0.01x (π/ 4)xdp2 = 1962.5 mm2

Ast = max(Asreq,Asmin) = 1962.500 mm2

As(19) = 283.53 mm2


n = Ast = 6.922 take n1 = 8
As(19)

Using 8 D19
n1x As(19) = 2268.23 mm2 > Ast = 1962.5 mm2

spase = 141.372 mm

10. SHEAR REINFORCEMENT IN PILE

dc = dp - cover = 0.425 m
f = 0.75

= 7565.259 kg

= 10087.012 kg

fc1 = fc x (Mpa ke kg) = 24.418

Shear strength provided by concrete :

= 17850.954 kg

Due to Vn < Vc , use minimum steel shear reinforcement :

Av = 2 x As(10) = 157.080 mm2

= 221.482 mm

Maximum spacing :

Smax = min[dc/2,24x in] = 212.5 mm

use : D 10 -100 (untuk tumpuan 1/4 L dari Footplate)


: D 10 -150 (untuk lapangan)
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

11. CAP REINFORCEMENT


MAXIMUM PILE'S LOAD
Uplift , Fpu = Quv = 0.00 kN
Compression , FPc = Qcv = 879.10 kN
Maximum , FP = max(( Fpu FPc ))
= 879.10 kN
dp1 = hcap - cover = 0.725 m

11.1. Upper reinforcement,


Wcap = 68.649 kN
Wsoil = 0.000 kN

distance = 1.5 m

Uplift Condition :

= 21.453 kNm

AsReq ( Mup) = 77.394545 mm2

AsMin = 0.002 x Bc x dp1 = 3625 mm2

AstReq = max ( AsMin,AsReq(Mup)) = 3625 mm2

Using D19 round bar , number of bars


n = AstReq = 12.7853 take n1= 16
As(19)

= 150 mm

So, use 16D19-150

11.2. Lower reinforcement,


Compression condition : = 1318.65 kNm

AsReq ( Mco) = 4876.0931 mm2

AsMin = 0.002 x Bc x dp1 = 3625 mm2

AstReq = max ( AsMin,AsReq(Mco)) = 4876.093137 mm2


Using D22round bar , number of bars
n = AstReq = 12.827344 take n2= 16
As(22)

= 150 mm

So, use 16D22-150


FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

12. PUNCHING SHEAR CHECK


Concrete punching capacity is calculated based on SKSNI section 3.4.11 (ACI section 11.12.2.) as follows:

Maximum pile's load

Uplift , Fpu = 0.00

Compression , FPc = 879.10

Maximum , FP = max(Fpu,FPc)
= 879.10 kN

Distance of reinforcing bar centre to concrete side:

fv = 0.75 [ SKSNI 3.2.3.2 (3) ]

= 24.418

dp2 = hcap - cover = 0.725 m

Perimeter :
radius of perimeter : r = (0.5 x dp)+(0.5 x dp2) = 0.613 m

Due to intersection of each radius perimeters, perimeter of punching shear is taken :

bo = ( 0.5 x Bc ) + ( 0.5 x space + b ) = 2700 mm

Two way shear ,


Tu = 2FP = 1758.1992 kN

[ SKSNI 3.4.11.2 (1) ]

Vu = 2418.218 kN > Tu ok !

13. HORIZONTAL LOAD ANALYSIS


Horizontal load capacity of pile is analyzed using Brom's theory, with soil variable Cu that obtained
from previous step. If the horizontal capacity is less than acting horizontal load, Cu should be
increased, so that it will increase fs consequently.

Fmax = Largest of Fvu or Fvc = 3195.681 kN

Hxnormal = max ( Hxu Hxc ) = 47.312 kN

Hynormal = max ( Hyu Hyc ) = 35.839 kN

59.354 kN

x =(131x mm)xcos(45 x deg) = 92.631 mm

y=x = 92.631 mm
Es = 210000 Mpa
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

d = dp - cover = 425 mm

= 0.001819

= 264.575 mm

ab = 0.85 x xb = 224.889 mm

= 0.002150

fs1 = Es x es1 = 451.412 Mpa

= 0.002349

fs2 = Es x es2 = 493.394 Mpa

= 0.000100209

fs3 = Es x es3 = 21.044 Mpa

= 0.000885

fs4 = Es x es4 = 185.865 Mpa

es5 = ey = 0.001819

fs5 = Es x es5 = 382.000 Mpa

As(19) = 283.53 mm2

Cs1 = 2 x As (19) x (fs1 - 0.85 x fc) = 244.207 kN

Cs2 = 2 x As (19) x (fs2 - 0.85 x fc) = 268.014 kN

Ts3 = 2 x As (19) x (fs3 - 0.85 x fc) = 0.164 kN

Ts4 = 2 x As (19) x fs4 = 105.396 kN

Ts5 = 2 x As (19) x fs5 = 216.616 kN

Using fig.13.13.2 from Reinforce Concrete Design , Chu-Kia Wang and Charles G. Salmon,
page 411 :

= 0.450

area of segment : A = 0.3 x dp2


= 0.075 m2
first moment of segment : Qo = 0.0775 x dp3
= 0.0096875 m2
moment inertia of circular segment : Io = 0.0242 x dp4
= 0.0015125 m2
xc = Qo = 0.129 m Cc = 0.85 x fc x A = 1556.637 kN
A
Mb = (Cc x xc) + [Cs1 x (0.5 x dp - cover)] + (Cs2 x x) + (Ts3 x 0 x m) + (Ts4 x x) + [Ts5 x (0.5 x dp - cover)]
= 316.299 kNm
Pb = Cc + Cs1 + Cs2 - Ts3 - Ts4 -Ts5
= 1746.682 kN
M yield = Mb = 316.299 kNm
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

SOLUTION FOR HORIZONTAL LOAD CAPACITY USING BROM'S THEORY :


(1) First Mechanism : Shallow Pile

For 4 piles arrangement, with 38 m length :

Cu = 57.562 kPa
1pile = Df
= 38 m
Effective pile diameter :
Def = 0.5 m
Hu =9 x Cu x Def x (1pile - 1.5 x Def)
= 9648.903 kN
Mmax = Hu x (0.5 x 1pile - 0.75 x Def)
= 179710.818 kNm > Myield = 316.30 kNm

So, this mechanism is not possible.

(2) Second Mechanism : Middle Length Pile

With known L, Def, Myield, and Cu we can find f by Newton-Rampson Method.

Initial value: f = 1 m
g = (1pile - 1.5 x Def) - f
= 36.25 m
k1 = 1pile - 1.5 x Def
= 37.25 m
My = (2.25 x Cu x Def) x g2 - (9 x Cu x Def) x f x (1.5 x Def + 0.5 x f)
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

k2 = 2.25 x Cu x Def
= 64.758 kN/m
k3 = 9 x Cu x Def
= 259.031 kN/m
My = k2 x (k1 - f)2 - k3 x f x(1.5 x Def) - 0.5 x k3 x f 2
= k2 x (k12 -2 x k1 x f + f 2) - (k3 x 1.5 x Def)x f - (0.5 x k3) x f 2
= k2 x k12 - (2 x k1 x k2) x f + (k2) x f 2 -(1.5 x Def x k3)x f - (0.5 x k3)x f 2

0 = (-0.5 x k3+k2)x f 2 - (2 x k1 x k2 +1.5 x Def x k3) x f +(k2 x k12 - My)

Coefficient A, B, and C are determined as follow :

A = (-0.5 x k3 + k2)
= -64.758 kNm
B = (2 x k1 x k2 +1.5 x Def x k3)
= 5018.725 kNm
C = (k2 x k12 - Myield)
= 89539.110 kNm

So, the equation that had to be solved :

f(f)=A x f2-B x f+C = 0

Using Newton-Rampson Methods :

f ( f ) = f - f ( f ) / f' ( f ) = f' ( f ) = 2 x A x f - B

f ( f ) = f - ( A x (f 2) - B x f + C ) / (2 x A x f - B )

Iteration 1 : f = 25 m fnew = 15.746 m

Iteration 2 : f = 15.746 m fnew = 14.961 m

Iteration 3 : f = 14.961 m fnew = 14.955 m

Iteration 4 : f = 14.955 m fnew = 14.955 m

Iteration 5 : f = 14.955 m fnew = 14.955 m

Iteration 6 : f = 14.955 m fnew = 14.955 m

So, solution for f is:

f = 14.955 m

g = (1pile - 1.5 x Def) - f = 22.295 m


Hu = 9 x Cu x Def x f = 3873.841 kN

= 32188.570 > Myield = 316.299 kNm

So, this mechanism is not possible.


FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

(3) Third Mechanism : Long Pile

Coefficient A, B, and C are determined as follow :

A = ( 27 x Cu x Def 2 ) = 388.546 kN
B = (36 x Myield x Cu x Def) = 327724.862 kN

So, the equation that had to be solved is:

f ( f ) = Hu 2 - A x Hu + B = 0

Using Newton-Rampson Methods :

f ( f ) = f - f ( f ) / f' ( f )
f' ( f ) = 2 x Hu - A
f ( f ) = f - ( ( Hu 2 - A x Hu + B)/( 2 x Hu - A ) )
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat

Iteration 1 : Hu = 50 kN

= 675.933 kN

Iteration 2 : Hu = 675.933 kN

= 450.819 kN

Iteration 3 : Hu = 450.819 kN

= 411.540 kN

Iteration 4 : Hu = 411.540 kN

= 410.267 kN

Iteration 5 : Hu = 410.267 kN

= 410.265 kN

Final solution :

Hu = 410.265 kN

Considering safety factor ,

Number of pile : npile = 4

Hu / 2 = 205.133 > HmaxNormal / npile = 14.838 kN ok !


BEARING CAPACITY (N-SPT)
RSKP JATISARI - KARAWANG
JAWA BARAT
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
BEARING CAPACITY Karawang - Jawa Barat

PROCEDURE FOR BEARING CAPACITY CALCULATION

PURPOSE
To determine bearing capacity (q allowable) at a certain location
from Cone Penetration Test Data

REFERENCES
1. Joseph E.Bowles, 1984, "Foundation Analysis and Design",
Third Edition, McGraw-Hill International Book Company.

FOUNDATION TYPE CLASSIFICATION


Based on SPT Data, Location : JATISARI, KARAWANG

DB-1 DB-2 DB-3


Depth N-SPT N Nb N-SPT N Nb N-SPT N Nb
(Friction) (Bearing) (Friction) (Bearing) (Friction) (Bearing)
0.0 1 1.00 3 3.00 1 1.00
1.0 1 1.00 5 3 3.00 8 1 1.00 5
2.0 5 2.33 6 8 4.67 8 3 1.67 5
3.0 5 3.00 6 8 5.50 8 3 2.00 6
4.0 6 3.60 7 9 6.20 9 5 2.60 6
5.0 6 4.00 7 9 6.67 9 5 3.00 7
6.0 9 4.71 7 10 7.14 10 9 3.86 7
7.0 9 5.25 8 10 7.50 10 9 4.50 8
8.0 10 5.78 8 11 7.89 11 10 5.11 8
9.0 10 6.20 8 11 8.20 13 10 5.60 9
10.0 11 6.64 9 12 8.55 14 12 6.18 9
11.0 11 7.00 9 12 8.83 14 12 6.67 10
12.0 12 7.38 9 20 9.69 14 13 7.15 12
13.0 12 7.71 10 20 10.43 14 13 7.57 12
14.0 13 8.07 10 20 11.07 14 17 8.20 12
15.0 13 8.38 11 34 12.50 15 17 8.75 12
16.0 14 8.71 11 34 13.76 15 13 9.00 12
17.0 15 9.06 11 13 13.72 16 35 10.44 13
18.0 15 9.37 12 13 13.68 17 35 11.74 14
19.0 17 9.75 12 19 13.95 18 14 11.85 14
20.0 18 10.14 13 19 14.19 19 14 11.95 15
21.0 18 10.50 14 22 14.55 20 14 12.05 16
22.0 19 10.87 14 23 14.91 21 16 12.22 17
23.0 13 10.96 15 24 15.29 23 17 12.42 18
24.0 13 11.04 16 27 15.76 24 19 12.68 19
25.0 18 11.31 16 32 16.38 25 20 12.96 20
26.0 18 11.56 17 34 17.04 26 22 13.30 21
27.0 22 11.93 17 36 17.71 28 23 13.64 21
28.0 22 12.28 18 36 18.34 29 30 14.21 22
29.0 23 12.63 19 38 19.00 30 31 14.77 22
30.0 23 12.97 19 38 19.61 32 32 15.32 23
31.0 24 13.31 20 40 20.25 33 34 15.91 24
32.0 24 13.64 21 42 20.91 35 23 16.12 26
33.0 25 13.97 23 44 21.59 36 24 16.35 28
34.0 25 14.29 25 46 22.29 38 25 16.60 29
35.0 26 14.61 27 47 22.97 40 26 16.86 30
36.0 27 14.95 28 47 23.62 42 34 17.32 32
37.0 28 15.29 30 60 24.58 43 34 17.76 34
38.0 28 15.62 32 60 25.49 45 60 18.85 36
39.0 60 16.73 60 26.35 60 19.88
FOUNDATION P1
STATICAL CALCULATION
RSKP JATISARI
BEARING CAPACITY Karawang - Jawa Barat

40.0 60 17.78 60 27.17 60 20.85


41.0 60 18.79 60 27.95 60 21.79
42.0 60 19.74 60 28.70 60 22.67
43.0 60 20.66 60 29.41 60 23.52
44.0 60 21.53 60 30.09 60 24.33
45.0 60 22.37 60 30.74 60 25.11
46.0 60 23.17 60 31.36 60 25.85
47.0 60 23.94 60 31.96 60 26.56

-2
- The worst qc value until 38 m depth = 6.00 kgf.cm
-2
- So, qallowable = 6/15 = 0.4 < 1.00 kgf.cm

So, use Borepile Foundation


with, N = 15.62 N
Nb = 32.09 N

Note :
Data SPT diambil dari Laporan Soil Test Rumah Sakit Paru Karawang, Jawa Barat