Professional Documents
Culture Documents
Foundation P3 RSKP
Foundation P3 RSKP
I. FOUNDATION CRITERIA
1. Soil Density : 1600 kg/m3
2. Soil Density Submerge : 800 kg/m3
3. Concrete Density : 2400 kg/m3
4. Concrete Density Submerge : 1400 kg/m3
CAPACITY OF FOUNDATION
No Checking point Allowable Actual Note Unit
1 Bearing Capacity 0.17 0.07 ok ! kg/cm2
2 Borepile :
Uplift cap. individual pile's 793.36 -3.71 Ok ! kN
Compress cap. individual pile's 804.65 490.53 Ok ! kN
Uplift cap. group pile's 1586.71 0.00 Ok ! kN
Compress cap. group pile's 1609.29 906.85 Ok ! kN
3 Punching Shear :
Two way shear 892.55 490.53 Ok ! kN
4 Horizontal Load Analysis 170.37 9.02 Ok ! kN
REINFORCEMENT OF FOUNDATION
No Checking point Allowable Actual Note Unit
1 Pad Foundation
Upper Reinforcement D16 - 200 D16 - 180 Ok ! mm
Lower Reinforcement D16 - 200 D16 - 180 Ok ! mm
2 Borepile :
Longitudinal Rebar 4 D16 6 D16 Ok ! mm
Shear Reinforcement Ø10 - 150 Ø10 - 150 Ok ! mm
CONCLUSION
Note :
Foundation structure is still strong enought to support loading on building structure
SUPPORT REACTION DATA
RSKP JATISARI - KARAWANG
JAWA BARAT
FOUNDATION P3
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat
SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
17 Comb11 -1.4974 -9.88150 748.79600 12.80670 -1.70620 -0.00730
17 Comb12 -1.9218 -11.39830 891.65330 16.81970 -2.18860 -0.01330
17 Comb13-1 -1.4984 -9.88440 758.73210 12.82220 -1.70520 -0.00720
17 Comb13-2 -1.4984 -9.88440 758.73210 12.82220 -1.70520 -0.00720
17 Comb14-1 -1.8164 -11.02120 863.39110 15.82810 -2.06730 -0.01170
17 Comb14-2 -1.8164 -11.02120 863.39110 15.82810 -2.06730 -0.01170
17 Comb15-1 -11.9534 -9.82290 747.20430 12.65600 -15.77590 -0.01320
17 Comb15-2 -0.7535 -13.52350 764.41890 24.06290 -0.66890 -0.06950
17 Comb15-3 8.9586 -9.94000 750.38770 12.95730 12.36360 -0.00130
17 Comb16-1 -9.3402 -9.83980 755.05430 12.70540 -12.25770 -0.01170
17 Comb16-2 -0.9402 -12.61520 767.96530 21.26050 -0.92750 -0.05390
17 Comb16-3 6.3438 -9.92760 757.44190 12.93130 8.84690 -0.00280
17 Comb17-1 -9.3402 -9.83980 755.05430 12.70540 -12.25770 -0.01170
17 Comb17-2 -0.9402 -12.61520 767.96530 21.26050 -0.92750 -0.05390
17 Comb17-3 6.3438 -9.92760 757.44190 12.93130 8.84690 -0.00280
17 Comb18-1 -11.3544 -5.87030 447.68590 7.53340 -15.09340 -0.01030
17 Comb18-2 -0.1545 -9.57090 464.90050 18.94020 0.01350 -0.06660
17 Comb18-3 9.5575 -5.98740 450.86930 7.83460 13.04600 0.00160
17 Comb19-1 Max -1.5955 -10.67660 809.46990 13.85900 -1.81310 -0.00750
17 Comb19-1 Min -1.642 -10.68720 809.42710 13.82900 -1.87560 -0.00820
17 Comb19-2 Max -1.5955 -10.67660 809.46990 13.85900 -1.81310 -0.00750
17 Comb19-2 Min -1.642 -10.68720 809.42710 13.82900 -1.87560 -0.00820
17 Comb19-3 Max -1.5955 -10.67660 809.46990 13.85900 -1.81310 -0.00750
17 Comb19-3 Min -1.642 -10.68720 809.42710 13.82900 -1.87560 -0.00820
17 Comb19-4 Max -1.5955 -10.67660 809.46990 13.85900 -1.81310 -0.00750
17 Comb19-4 Min -1.642 -10.68720 809.42710 13.82900 -1.87560 -0.00820
17 Comb20-1 Max -1.6042 -10.67270 809.48600 13.87010 -1.82480 -0.00740
17 Comb20-1 Min -1.6333 -10.69110 809.41100 13.81790 -1.86400 -0.00830
17 Comb20-2 Max -1.6042 -10.67270 809.48600 13.87010 -1.82480 -0.00740
17 Comb20-2 Min -1.6333 -10.69110 809.41100 13.81790 -1.86400 -0.00830
17 Comb20-3 Max -1.6042 -10.67270 809.48600 13.87010 -1.82480 -0.00740
17 Comb20-3 Min -1.6333 -10.69110 809.41100 13.81790 -1.86400 -0.00830
17 Comb20-4 Max -1.6042 -10.67270 809.48600 13.87010 -1.82480 -0.00740
17 Comb20-4 Min -1.6333 -10.69110 809.41100 13.81790 -1.86400 -0.00830
17 Comb21-1 Max -1.8858 -11.59040 906.83730 16.58210 -2.14280 -0.01190
17 Comb21-1 Min -1.9207 -11.59830 906.80520 16.55970 -2.18970 -0.01240
17 Comb21-2 Max -1.8858 -11.59040 906.83730 16.58210 -2.14280 -0.01190
17 Comb21-2 Min -1.9207 -11.59830 906.80520 16.55970 -2.18970 -0.01240
17 Comb21-3 Max -1.8858 -11.59040 906.83730 16.58210 -2.14280 -0.01190
17 Comb21-3 Min -1.9207 -11.59830 906.80520 16.55970 -2.18970 -0.01240
17 Comb21-4 Max -1.8858 -11.59040 906.83730 16.58210 -2.14280 -0.01190
17 Comb21-4 Min -1.9207 -11.59830 906.80520 16.55970 -2.18970 -0.01240
17 Comb22-1 Max -1.8924 -11.58740 906.84940 16.59050 -2.15150 -0.01180
17 Comb22-1 Min -1.9142 -11.60130 906.79310 16.55130 -2.18090 -0.01250
17 Comb22-2 Max -1.8924 -11.58740 906.84940 16.59050 -2.15150 -0.01180
17 Comb22-2 Min -1.9142 -11.60130 906.79310 16.55130 -2.18090 -0.01250
17 Comb22-3 Max -1.8924 -11.58740 906.84940 16.59050 -2.15150 -0.01180
17 Comb22-3 Min -1.9142 -11.60130 906.79310 16.55130 -2.18090 -0.01250
17 Comb22-4 Max -1.8924 -11.58740 906.84940 16.59050 -2.15150 -0.01180
17 Comb22-4 Min -1.9142 -11.60130 906.79310 16.55130 -2.18090 -0.01250
FOUNDATION P3
STATICAL CALCULATION
RSKP JATISARI
SUPPORT REACTION Karawang - Jawa Barat
SUPPORT REACTION
Fx Fy Fz Mx My Mz
Joint Load Case
kN kN kN kN-m kN-m kN-m
17 Comb23-1 Max -1.8858 -11.59040 906.83730 16.58210 -2.14280 -0.01190
17 Comb23-1 Min -1.9207 -11.59830 906.80520 16.55970 -2.18970 -0.01240
17 Comb23-2 Max -1.8858 -11.59040 906.83730 16.58210 -2.14280 -0.01190
BW
17 D=
Comb23-2 Min -1.9207 -11.59830 906.80520 16.55970 -2.18970 -0.01240
50
LIST OF CONTENT :
1. MATERIAL CHARACTERISTIC
2. LOADS ON FOUNDATION
3. DIMENSION FOUNDATION
4. CAP BEARING CAPACITY
5. INDIVIDUAL PILE'S UPLIFT - CAPACITY
6. INDIVIDUAL PILE'S COMPRESSION - CAPACITY
7. GROUP PILE'S CAPACITY
8. LOADS DISTRIBUTION
9. PILE REINFORCEMENT
10. SHEAR REINFORCEMENT IN PILE
11. CAP REINFORCEMENT
11.1. Upper Reinforcement
11.2. Lower Reinforcement
12. PUNCHING SHEAR CHECK
13. HORIZONTAL LOAD ANALYSIS
FOUNDATION P3
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat
1. MATERIAL CHARACTERISTIC
Soil density (gs ) : 1600 kg/m3
Concrete density (gc ) : 2400 kg/m3
Soil density - submerge (gs1) : 800 kg/m3
Concrete density - submerge (gc1) : 1400 kg/m3
2
Concrete compression strength (fc) : 249 kg/cm 24.42 Mpa (K-300)
Steel yield strength, main bar (fy) : 3900 kg/cm2 382 Mpa (BJTD39)
Steel yield strength, shear bar (fy2) : 2400 kg/cm2 235 Mpa (BJTP24)
Depth of Pile (Df ) : 20.0 m
Diameter of Pile (dp) : 0.5 m
Effective Diameter of Pile (Def) : 0.5 m
Statical average value of SPT for pile's friction resistance (N), is taken from
depth at : 0.5 m
to depth at : 20.0 m
N-SPT : 10
Statical average value of cone resistance for bearing capacity at cap (N-SPT),is taken
N-SPT : 2
Convertion SPT to CPT => for sand N = qc/4 ...(4-18) Joseph. E Bowls, Analysis dan Desain Pondasi
=> for clay N = qc/2 or Ir. Sunggono kh, Manual Book Teknik Sipil
Concrete cover,
cover : 75 mm ( For design )
cover1 : 60 mm ( For Implementation )
2. LOADS ON FOUNDATION
FVc = 906.849 kN = 92,470 kg
Fvu = 0.000 kN = 0 kg
Hxc = 11.953 kN = 1,219 kg
Hxu = 0.000 kN = 0 kg
Hyc = 13.524 kN = 1,379 kg
Hyu = 0.000 kN = 0 kg
3. DIMENSION FOUNDATION
Size of pile : dp = 0.50 m
Effective pile diameter : Def = 0.50 m
Minimum pile's spacing : S = 2.5 * dP = 1.25 m
Size of cap :
Bc = 1.80 m
hcap = 0.50 m
b = 0.40 m
h1 = 0.00 m
h2 = 0.00 m
h = h1 + h2 = 0.00 m
Wcap = (Bc^2 x hcap + b^2x h)x yc1 = 22.242 kN
Wsoil = (Bc^2 - b^2)x h2 x ys1 = 0.000 kN
FOUNDATION P3
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat
= 1.00
8. LOADS DISTRIBUTIONS
maximum load :
Fvu = 0.000 kN
Hxu = 0.00 kN
Hyu = 0.000 kN
Fvc = 906.849 kN
Hxc = 11.953 kN
Hyc = 13.524 kN
The horizontal load is transformed to proper coordinate:
= 0.000
= -1.110
= 0.000
= 18.015
FOUNDATION P3
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat
Nc = Fvc
n : number of pile
Qu : Pile loading in uplift
Qc : Pile loading in compression
Fu : Maximum uplift of vertical load from tower
Fc : Maximum compression of vertical load from tower
h : Distance between ground level with point of working horizontal load.
Wcap : Weight of pile cap
Mux, Muy : x and y component of overtuning-moment in uplift condition
Mcx, Mxy : x and y component of overtuning-moment in compression condition
Uplift load :
= 0.000 kN
hext = 0 m + h = 0 m
Mux = Hxu1x hext = 0.000 kNm
Muy = Hyu1x hext = 0.000 kNm
Compression Load :
Nc = Fvc = 906.849 kN
Mcy = Hyc1 x hext = 0.000 kNm
Mcx = Hxc1 x hext = 0.000 kNm
VerticalComp
Pile no. x y x2 y2 Spacing S > Smin
Q uv Q cv
1 0.50 0.50 0.25 0.25 S12 1.41 OK ! -3.71 490.53
2 -0.50 -0.50 0.25 0.25 S21 1.41 OK ! -3.71 416.32
Maximum loads compared with individual pile's uplift & compression capacity.
Q uv = -3.71 kN < Qu max = 793.357 kN ok !
Q cv = 490.53 kN < Qc max = 804.646 kN ok !
Maximum loads compared with group pile's uplift & compression capacity.
Fvu = 0.00 kN < Qu-pgroup = 1586.71 kN ok !
Fvc = 906.85 kN < Qc-pgroup = 1609.29 kN ok !
FOUNDATION P3
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat
9. BOREPILE REINFORCEMENT
dp = 0.5 m
Fp = 1.25 x Qumax = -4.63 kN
= -12.13 mm2
Using 8 D19
n1x As(19) = 2268.23 mm2 > Ast = 1962.5 mm2
spase = 141.372 mm
dc = dp - cover = 0.425 m
f = 0.75
= 2300.534 kg
= 3067.378 kg
= 17850.954 kg
= 221.482 mm
Maximum spacing :
distance = 0.8 m
Uplift Condition :
= 2.039 kNm
= 150 mm
= 150 mm
Maximum , FP = max(Fpu,FPc)
= 490.53 kN
= 24.418
Perimeter :
radius of perimeter : r = (0.5 x dp)+(0.5 x dp2) = 0.463 m
Vu = 892.548 kN > Tu ok !
18.049 kN
y=x = 92.631 mm
Es = 210000 Mpa
FOUNDATION P3
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat
d = dp - cover = 425 mm
= 0.001819
= 264.575 mm
ab = 0.85 x xb = 224.889 mm
= 0.002150
= 0.002349
= 0.000100209
= 0.000885
es5 = ey = 0.001819
Using fig.13.13.2 from Reinforce Concrete Design , Chu-Kia Wang and Charles G. Salmon,
page 411 :
= 0.450
Cu = 34.215 kPa
1pile = Df
= 20 m
Effective pile diameter :
Def = 0.5 m
Hu =9 x Cu x Def x (1pile - 1.5 x Def)
= 2963.856 kN
Mmax = Hu x (0.5 x 1pile - 0.75 x Def)
= 28527.114 kNm > Myield = 316.30 kNm
Initial value: f = 1 m
g = (1pile - 1.5 x Def) - f
= 18.25 m
k1 = 1pile - 1.5 x Def
= 19.25 m
My = (2.25 x Cu x Def) x g2 - (9 x Cu x Def) x f x (1.5 x Def + 0.5 x f)
FOUNDATION P3
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat
k2 = 2.25 x Cu x Def
= 38.492 kN/m
k3 = 9 x Cu x Def
= 153.967 kN/m
My = k2 x (k1 - f)2 - k3 x f x(1.5 x Def) - 0.5 x k3 x f 2
= k2 x (k12 -2 x k1 x f + f 2) - (k3 x 1.5 x Def)x f - (0.5 x k3) x f 2
= k2 x k12 - (2 x k1 x k2) x f + (k2) x f 2 -(1.5 x Def x k3)x f - (0.5 x k3)x f 2
A = (-0.5 x k3 + k2)
= -38.492 kNm
B = (2 x k1 x k2 +1.5 x Def x k3)
= 1597.403 kNm
C = (k2 x k12 - Myield)
= 13947.258 kNm
f ( f ) = f - f ( f ) / f' ( f ) = f' ( f ) = 2 x A x f - B
f ( f ) = f - ( A x (f 2) - B x f + C ) / (2 x A x f - B )
f = 7.409 m
A = ( 27 x Cu x Def 2 ) = 230.950 kN
B = (36 x Myield x Cu x Def) = 194797.821 kN
f ( f ) = Hu 2 - A x Hu + B = 0
f ( f ) = f - f ( f ) / f' ( f )
f' ( f ) = 2 x Hu - A
f ( f ) = f - ( ( Hu 2 - A x Hu + B)/( 2 x Hu - A ) )
FOUNDATION P3
STATICAL CALCULATION
RSKP JATISARI
PILECAP AND BOREPILE Karawang - Jawa Barat
Iteration 1 : Hu = 50 kN
= 596.156 kN
Iteration 2 : Hu = 596.156 kN
= 386.577 kN
Iteration 3 : Hu = 386.577 kN
= 342.833 kN
Iteration 4 : Hu = 342.833 kN
= 340.745 kN
Iteration 5 : Hu = 340.745 kN
= 340.740 kN
Final solution :
Hu = 340.740 kN
PURPOSE
To determine bearing capacity (q allowable) at a certain location
from Cone Penetration Test Data
REFERENCES
1. Joseph E.Bowles, 1984, "Foundation Analysis and Design",
Third Edition, McGraw-Hill International Book Company.
-2
- The worst qc value until 20 m depth = 6.00 kgf.cm
-2
- So, qallowable = 6/15 = 0.4 < 1.00 kgf.cm
Note :
Data SPT diambil dari Laporan Soil Test Rumah Sakit Paru Karawang, Jawa Barat