1 Description
Notice that in this study case only one feeder has been defined. A characteristic has been
predefined (PV-Daily characteristic) in the LV Characteristic subfolder and has been
applied to the ‘pgini’ parameter of the static generator elements in the feeder. A
characteristic has also been set for the scaling factor parameter of the fixed component
of the Low voltage load (variable “scale0”).
Use the “TimeSweep” script to examine the effects of the characteristics.

2 PowerFactory Project Information


Name of Project: LV_Distribution_Example
Name of Study Case: 3 – Time Sweep Analysis

LV Distribution Example - Time Sweep Analysis 1


DIgSILENT GmbH
Heinrich-Hertz-Strasse 9
D-72810 Gomaringen
Tel.: +49 7072 9168 - 0
Fax: +49 7072 9168 - 88
http://www.digsilent.de
e-mail: mail@digsilent.de

LV Distribution Example - Time


Sweep Analysis

Published by
DIgSILENT GmbH, Germany

Copyright 2013. All rights


reserved. Unauthorised copying
or publishing of this or any part
of this document is prohibited.
Doc. Rev. No. 1,
06 Februar 2013

LV Distribution Example - Time Sweep Analysis 2

You might also like