Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Part Index

High Rise Elevator Ctrl. No. ELCOM-IM-04-0

FOD Page 1/3


Overseas Support Team
Installation Manual Date SEP. 2004

Index
Titles Pages

Part 1. General
1.1. Safety ---------------------------------------------------------------------------- 1

1.2. Installation tool --------------------------------------------------------------- 2

1.3. Hoistway survey ------------------------------------------------------------- 6

1.4. Application of scaffold ---------------------------------------------------- 9

1.5. Verifying scaffolds & fittings -------------------------------------------- 9

1.6. Construction of scaffold -------------------------------------------------- 9

1.7. Overhead protection ------------------------------------------------------- 15

1.8. Unloading & inventory ----------------------------------------------------- 16

Part 2. Template
1.1. Template layout -------------------------------------------------------------- 1

1.2. Building construction preview ------------------------------------------ 2

1.3. Template works -------------------------------------------------------------- 6

1.4. Measuring rail brackets --------------------------------------------------- 13

Part 3. Hoistway
1.1. Buffer installation ----------------------------------------------------------- 1

1.2. Rail brackets assembly ---------------------------------------------------- 4

1.3. Guide rail installation ------------------------------------------------------ 8

1.4. Assembly of over speed governor tension pulley --------------- 16

1.5. Installation of compensating sheave------------------------------------ 16

1.6. Assembly of terminal limit switch ------------------------------------- 19

1.7. Hoistway traveling cable installation --------------------------------- 21


Part Index
High Rise Elevator Ctrl. No. ELCOM-IM-04-0

FOD Page 2/3


Overseas Support Team
Installation Manual Date SEP. 2004

Titles Pages

Part 4. Machine room


2.1. Layout of STD 41-15B Traction machine ---------------------------- 2

2.2. Layout of TD 76-34 BD Traction machine ----------------------------- 3

2.3. Machine beam installation ----------------------------------------------- 4

2.4. Traction machine assembly ------------------------------------------------ 7

2.5. Traction machine centering ---------------------------------------------- 10

2.6. Fixing traction machine --------------------------------------------------- 12

2.7. Traction machine brake setting ----------------------------------------- 12

2.8. Control panel installation ------------------------------------------------- 13

2.9. Over speed governor installation -------------------------------------- 14

2.10 Machine room duct --------------------------------------------------------- 16

Part 5. Car assembly


1.1. Car layout ---------------------------------------------------------------------- 1

1.2. Supporting beam installation ------------------------------------------- 2

1.3. Car platform assembly ---------------------------------------------------- 2

1.4. Supporting jig assembly -------------------------------------------------- 3

1.5. Safety gear assembly ------------------------------------------------------ 3

1.6. Car sling assembly --------------------------------------------------------- 4

1.7. Cross head assembly ------------------------------------------------------ 5

1.8. Fitting plate,tie rod,platform pole and pole support assembly 6

1.9. Hitching rod assembly ---------------------------------------------------- 8

1.10. Terminal switch cam and railing assembly ------------------------- 9


Part Index
High Rise Elevator Ctrl. No. ELCOM-IM-04-0

FOD Page 3/3


Overseas Support Team
Installation Manual Date SEP. 2004

Titles Pages

1.11. Guide roller assembly ----------------------------------------------------- 10

1.12. Car centering ----------------------------------------------------------------- 12

2.1. Selecting the position of counter weight frame ------------------- 13

2.2. Counterweight guide roller assembly -------------------------------- 13

3.1. Car roping ---------------------------------------------------------------------- 15

3.2. Roping method --------------------------------------------------------------- 19

4.1. Compensating sheave bracket assembly --------------------------- 30

4.2. Assembly of compensating sheave ----------------------------------- 31

4.3. Compensating roping ------------------------------------------------------ 32

4.4. Counterweight rope socketing ------------------------------------------ 33

4.5. Counterweight compensating roping -------------------------------- 34

4.6. Car socketing ----------------------------------------------------------------- 35

4.7. Assembly of compensating sheave switch ------------------------- 36

Part 6. Entrance
1. HAV Door type layout ------------------------------------------------------ 1

2. Landing sill installation --------------------------------------------------- 7

3. Jamb installation ------------------------------------------------------------ 19

4. Landing door operator assembly -------------------------------------- 24

Part 7. Hall button


1. Hall buttons and hall fixtures installation --------------------------- 1

2. Hall button & indicator work --------------------------------------------- 5


Part Index
High Rise Elevator Ctrl. No. ELCOM-IM-04-0

FOD Page 4/3


Overseas Support Team
Installation Manual Date SEP. 2004

Titles Pages

Part 8. Car enclosure


1.1. Car structure ------------------------------------------------------------------ 1

1.2. Car wall & door work ----------------------------------------------------- 2

Part 9. Adjustment
1.1. Preparing the work --------------------------------------------------------- 1

1.2. Car balance ------------------------------------------------------------------ 1

1.3. Adjustment of positecter and shelter plate ------------------------- 4

1.4. Adjustment of car and counterweight balance -------------------- 5

1.5. Adjustment potentiometer device ------------------------------------- 6

1.6. Finishing work ---------------------------------------------------------------- 8

You might also like