Chlorine Building PH I

Picture no. 1 Picture no. 2

1. The fluorescent light has been uprooted as a picture no 1.


2. 4 nos. from 16 nos. of fluorescent lights was not light up or malfunction as a picture no.2.
3. Ventilation fan no.2 is not functioning.
4. ABC fire extinguisher was expired.

Booster Pump House

Picture no. 3 Picture no. 4

Picture no. 5 Picture no. 6

1. 2 nos. from 4 nos. of ceiling suspended fluorescent lights was not light up.
2. Bulk lights too rusty and did not light up and need to repair or replace.
3. Peel off the paint at the pump base and need to be repainted.
4. Impeller volute too rusty and need to service.

Treated Water Pump House

Picture no. 7 Picture no. 8

Picture no. 9 Picture no. 10

Picture no. 11 Picture no. 12

There is lack of maintenance at Treated Water House phase 1. It shall be repaired and maintain
properly.

1. 5 nos. from 16 nos. of fluorescent lights was not light up or malfunction.


2. Almost of cable tray is not aligned, rust and rot. It is advice to replace the cable tray.
3. Leaking on treated water pump (elbow flange) at treated water pump no. 1, 2, & 3.
4. Plate based for treated water and wash water pump too rusty and need to repaint.
5. Battery compartment shall be covered properly to prevent insert entry.
11kV Starter Panel Treated Water Pump House

Picture no. 13 Picture no. 14

Picture no. 15 Picture no. 16

1. All electrical panel are well maintain and in good working condition (picture no. 13 & 14).
2. 5 nos. from 6 nos. of ceiling lights was not light up or malfunction (picture no. 15) and only 2
nos. wall mounted florescent light are lit.
3. Leaking point / water mark was observed on ceiling of 11kV Starter Panel Treated Water Pump
House (picture no. 16).
Generator and Transformer Room

Picture No. 17 Picture no. 18

Picture No. 19 Picture No. 20

1. 2 nos. of 1500kVA generator is under standby mode in case failure of main supplies (picture no.
17 & 18).
2. Individual function (without EMF board) is working properly but cannot synchronize with each
other because of control card and SEPAM panel was broken.
3. EMF board cannot read for voltage, current & power.
4. 2 nos. of ceiling lights was not light up or malfunction.
5. 1 no. of 3000kVA step up transformer and 1 no. of 11kV switch gear are working properly and
under standby mode in case failure of main supplies.
Filter Gallery

Picture No. 21 Picture no. 22

Picture No. 23 Picture No. 24

1. 5 nos. of ceiling fluorescent light were not light up and need to repair (picture no. 21).
2. Perforated of cable tray and need to be replaced (picture no 22).
3. The hole shall be covered properly to avoid unwanted portions something happened (picture
no. 23).
4. Peel off the paint at pipe line and advice to repaint (picture no. 24).
Picture No. 25 Picture no. 26

Picture No. 27 Picture No. 28

5. 8 nos. of ceiling fluorescent light were not light up (picture no. 25).
6. Missing of 1 no. wall mounted flood light and another 2 nos. of flood light were not light up
(picture 26).
7. Inlet waste water actuator no. 1, 2 and 3 not working properly in order to fully open and close
(picture 27).
8. Outlet waste water actuator no. 2, 5 and 7 not working properly due to mechanical problem
(picture 28).
Control Room

Picture No. 29 Picture no. 30

Picture No. 31 Picture No. 32

1. SCADA system in control room is working properly. This SACADA is system is only monitor the
plant phase 1 and phase 2 but cannot monitor the activity at Pulau Eone, Labuan.
2. It is because of problem with transferring wireless signal communication. It is happened since 4
years ago.
3. All activity at Pulau Eone was reported manually via telephone with operator and control room.
4. The system can be controlled via SACADA only on Alum Sulphine Plant.
5. All printers are working properly during inspection.
6. UPS is not work properly and don’t have a backup since 2 years ago and need to repair as
soonest possible.
7. Radio communication between control room and raw water intake phase 2 is working properly
but the channel is not tally with each others.
8. Radio communication at raw water intake phase 1 is not working properly.
9. 1 no. 42 inch LED TV is not function.
Chemical House

Picture no. 33 Picture no. 34

1. Almost of wall mounted fluorescent light in chemical room is working properly.


2. There is only 1 no. from 16 nos. hibay was light up.
3. 3nos from 6nos light at 415V chemical house were not functioning.

415V MSB Room TWPS

Picture no. 33 Picture no. 34

1. 415V MSB panel is working properly.


2. 2 nos. from 4 nos. ceiling fluorescent light are not light up.
3. All relay setting was calibrated as per schedule.
11kV Swicthgear Room TWPS

Picture no. 33 Picture no. 34

1. 11kV Switchgear and 110V DC supply is working properly.


2. All relay setting was calibrated as per schedule.
3. 16 nos. from 24 nos. ceiling fluorescent light were not functioning.
4. 2 nos. 800kVA outdoor transformers are working properly.
Auxiliary Generator and Compressor Room

Picture no. 33 Picture no. 34

1. Auxiliary generator and compressor are maintain and working properly.


2. All ceiling florescent lights are not light up.
PHASE 2

33kV Switchgear Room

Picture no. 33 Picture no. 34

1. 2 nos. of 10MVA 33kV transformer are working properly and in good condition.
2. Single incoming 33kV feeder comes from SESB.
3. Only 1 no. 33kV transformer duty in one time while another 1 no. is in standby mode.
4. Switch gear room neat and clean. Switch gear is working properly
5. All relay setting for every single panel in 33kV need to recalibrate by third party tester in order
to comply with Suruhanjaya Tenaga.
11kV Switchgear Room

Picture no. 33 Picture no. 34

1. All 11kV panel and equipment in 11kV switch gear room are working properly and good
condition.
2. 11kV Switch gear room neat and clean.
3. All relay setting for every single panel in 33kV need to recalibrate by third party tester in order
to comply with Suruhanjaya Tenaga.

Generator Room

Picture no. 33 Picture no. 34

1. Generator room neat and clean.


2. 3 nos. of 1900kVA standby generator were installed.
3. Only generator no.3 is working properly.
4. Generator no. 1 having a problem with hardly to start up.
5. Generator no. 2 having a problem with cranking and hunting condition during operation.
Treated Water Pumping House

Picture no. 33 Picture no. 34

1. Treated water pump room neat and clean.


2. 2 nos. of 750kVA transformer are working properly.
3. All equipment and pump sets in treated water pump room are working properly.
4. All relay setting for every single panel in shall to recalibrate by third party tester in order to
comply with Suruhanjaya Tenaga.

Storage Tank at Pulau Eone Labuan


picture no. 33 Picture no. 34

1. Transmitter for tank level no.2 was not functioning and cannot read / monitor for water level
storage tank due power cable power supply was being damage.
2. The red cover is too rusty and need to replace.
3. Wire inside the panel is too massy.
4. The pipes line Phase 1 were corroded and detached from its original condition.
5. The pipes support need to be repainted and maintain as well.
picture no. 33 Picture no. 34

6. Riser guide phase 1 and phase 2 main pipe lines too rusty and recommend repainting.
7. There is no access gate between storage boundary to outside pipe line and recommend to
provide access gate for easier operator to monitor outside the boundary.