Risk Assessment For Refurbishment of Civil Assets in Pump Station Rev 00
Risk Assessment For Refurbishment of Civil Assets in Pump Station Rev 00
TTL/ADAC/RA/045
(TORNADO GROUP) No.:
RISK ASSESSMENT FOR REFUBRISHMENT
Rev.
WORKS FOR CIVIL ASSETS IN EXISTING 00
No:
PUMP STATION (PARK 1.7)
Project Details: INTEGRATED REPAIR WORKS FOR WATANI PROJECT, ABU DHABI, UAE
8 to 12 High Risk Activity or industry should be modified to include remedial planning and action and be subject to detailed OSH Assessment
4 to 6 Moderate Risk Activity or industry can operate subject to management and / or modification
Prepared by: Reviewed & Approved by: Approved by:
Name: Neeraj Kumar K J Name: Abdallah Alladwan Name:
Position: HSE Engineer Position: Project Manager Position:
Signature: Signature: Signature:
Date: 21/10/2020 Date: 21/10/2020 Date:
sConsequence
Probability
Probability
OSHAD-SF
Hazards / Impact Risk
S.L. # Activity Control Measures
PxC
PxC
Identified
TORNADO TOTAL LANDSCAPE Ref.
TTL/ADAC/RA/045
(TORNADO GROUP) No.:
RISK ASSESSMENT FOR REFUBRISHMENT
Rev.
WORKS FOR CIVIL ASSETS IN EXISTING 00
No:
PUMP STATION (PARK 1.7)
Project Details: INTEGRATED REPAIR WORKS FOR WATANI PROJECT, ABU DHABI, UAE
2 Site Survey Slip, Trips and Fall 3 5 15 Ensure proper access and egress 1 5 5 Project Manager/
Manual Handling available. Construction
Physical Injuries Ensure proper manual handling Manager/Sr. Project
Road accidents techniques while shifting of Engineer
Fatality carrying materials.
Ensure sufficient training and Project Engineer,
supervision at all times. Foremen, Surveyor,
If in contact with any biological Surveyor helpers
hazards such as snakes, vermin
etc. immediately coordinate with HSE Team
5 Storage of Can delay the progress of 3 3 9 All the material shall be stored as 1 3 3 Project Manager/
Materials/Assets the work per manufacture storage Construction
Material may fall on the recommendations Manager/Sr. Project
same level that may cause Materials to be properly stacked Engineer
physical injuries to and stored in safe, covered and
personnel secured manner Project Engineer,
Can obstruct means of All the materials shall be covered Foremen
access during emergency using polythene sheets to avoid Store in charge
water ingress, dust or site debris
Materials to be kept in a cool and Project HSE Team
dry place.
Storage areas to be properly
illuminated or with adequate
lighting & ventilation
Fire Extinguisher to keep at
storage areas
Good housekeeping
arrangements has to be done
Keep the area clean and free from
any obstructions
Ensure escape routes are not
obstructed and marked with safety
signs and barriers.
Emergency contact numbers to be
displayed.
All employees to be made aware
of Emergency evacuation
procedures
TORNADO TOTAL LANDSCAPE Ref.
TTL/ADAC/RA/045
(TORNADO GROUP) No.:
RISK ASSESSMENT FOR REFUBRISHMENT
Rev.
WORKS FOR CIVIL ASSETS IN EXISTING 00
No:
PUMP STATION (PARK 1.7)
Project Details: INTEGRATED REPAIR WORKS FOR WATANI PROJECT, ABU DHABI, UAE
6 Maneuvering of Uncertified and 4 4 16 Proper access and egress must be 1 4 4 Project Manager/
vehicle and incompetent driver/ provided. Construction
mobile operator. Inspection of Tools prior to use Manager/Sr. Project
equipment Blind spots Rotation of work among labors Engineer
Damage to property. Supervisor should onsite
Materials and equipment Damage or fabricated tools Project Engineer,
Physical injury. should not be used Foremen
Damage tools should be returned
to store Project HSE Team
Proper barricade shall be in
8 Hot Work Activity Electrocution 4 4 16 Hot work permit shall be ensured 1 4 4 Project Manager/
(Use of Flame Explosion and recorded prior to the Construction
Torch) Physical injuries commencement of work Manager/Sr. Project
OS OSHAD SF COP
10 Sand blasting Impact injuries from debris 4 5 20 Inspect
shallhoses prior to each
be conducted prioruse
to 1 5 5 Project Manager/
Activity Injection of high-pressured commencement of work Construction
air Work permit shall be ensured Manager/Sr. Project
Explosion Inspect all hoses and connections Engineer
Physical injuries frequently and replace any that
Ergonomics are worn or damaged before Project Engineer,
HA2.0
- OSHAD SF - CoP
12 Use of Hand and Use of inappropriate / 4 5 20 1 5 5 Project Manager/
Power tools damaged hand tools obtained. Construction
(use of paddle Contact with Sharp Edges, Ensure tools are in good Manager/Sr. Project
mixer, Drilling and Electrocution condition without any defects. Engineer
grinding machines Slip and Trip Homemade tools are not to be
etc.) Project Engineer,
CoP2.0
Entanglement used.
13 Working at Height Fall of material. 4 5 20 Ensure permit to work obtained. 1 5 5 Project Manager/
35.0,
(Erection, Fall of personnel. Ensure proper training and Construction
22, 23,OSHAD
Dismantling and Slips and Trips. supervision provided for all work Manager/Sr. Project
Use of Mobile Property Damage. force. Engineer
Scaffold/Ladder) Fatality. Ensure proper access/egress at all
times. Project Engineer,
- 2.0,
14 Transferring or Electrocution 4 5 20 Electrical Permit shall be ensured 1 5 5 Project Manager/
CoP21,
terminating Burns and injuries prior to start work Construction
existing cable Sparks/fire Where practicable only 110v Manager/Sr. Project
15OSHAD2.0,
connection from Shock electrical tools will be used Engineer
GI trunk Necessary protective devices such
(Working in breakers shall be provided in the Project Engineer,
energized circuit to avoid risk of shock, fire Foremen
15 Chemical Hazards Respiratory illnesses 4 4 16 PTW shall be ensured if required 1 4 4 Project Manager/
(Spray Painting Lung cancer TBT/JSA shall be conducted prior Construction
works/Handling of Skin Dermatitis to the commencement of work Manager/Sr. Project
chemicals, paints, Eye irritation Area should be barricaded and Engineer
2.0,OSHAD
activities without NOC/ADM). work activities. Construction
Slip trip and falls Arrangements shall be done for Manager/Sr. Project
Site Emergencies like fire, proper lighting, general and task Engineer
Workers should dispose empty
54.0
18 Disposal of waste Slip, trip and fall 4 4 16 1 4 4 Project Manager/
OSHAD SF COPCoP
materials from Pollution drums/Skips to the designated Construction
work area/ Spillage area from where the same shall Manager/Sr. Project
Housekeeping Slippery surface be cleared on weekly basis. Engineer
(Waste Environmental hazards Wastages should be disposed as
Management) per Municipality rules and Project Engineer,
regulation to avoid any Foremen
Waste Management
Environmental Impact.
Ensure that the workforce is well Project HSE
1.
19 Environmental Spillage, pollution 3 3 9 Chemicals or hazardous materials 1 3 3 Project
OSHAD-SF-CoP
Fire shall comply with inventory or Manager/
Hazardous waste record keeping. Construction
All effort shall be dedicated Manager/Sr.
towards minimizing the waste Project
generation. Engineer
Ensure all wastes are stored on
Hazardous4.materials
site correctly to minimize adverse Project
impact to the environment and Engineer,
20 Emergency! Fire 3 3 9 Communication means to be 1 3 3 Project
First
Chemical Spill available at all times, i.e.: Mobile Manager/
Medical emergency phones. Site Office Emergency Construction
OSHAD-SF-CoP