Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PT HASNUR RIUNG SINERGI

DAILY BROKEN INVENTORY JOB SITE PT BRE


PRODUCTION DEPARTEMENT
( DRILL & BLAST )
Hari / Tanggal Release : Monday, September 20, 2021

Range Code Number Layar 1


Layar 2 NOTE: HARAP TINGGI FRONT DISESUAIKAN DENGAN KEDALAMAN INVENTORY BLASTING
Progres loading layer terakhir AGAR RECOVERY DAPAT TERLOADING MAKSIMAL

BLASTING GEOMETRI EVALUATION


Blasting Blasting Blasting
No. Of No. Of Dept Depth Actual Volume Elevasi REMAKS
Date Location Burden Spacing Area survey Inventory Recovery Removal
Blast Block Holes Actual Sub Drill 0.3 By Survey Awal BOB Act Cut
meter meter Hole Meter Meter sq meter BCM M M M M BCM % BCM
482 27-Sep-20 Seam OL 16-17 8.00 9.00 16 7.3 6.950 1,162.87 8,081.95 -93.012 -99.96 -97.00 2.96 3444.06 57% 4638 air
541 25-Oct-20 Seam OL 7.00 8.00 35 7.5 7.174 1,930.27 13,906.85 -110.726 -117.90 -114.43 3.47 6726.68 52% 7180 air
553 28-Oct-20 Seam OL 8.00 9.00 30 6.7 6.430 2,219.51 14,419.50 -95.050 -101.48 -98.00 3.48 7804.25 46% 6615 air
555 29-Oct-20 Seam OL 8.00 9.00 34 6.7 6.444 2,531.23 16,424.35 -101.178 -107.62 -104.19 3.43 8748.39 47% 7676 air
0.00
322 17-May-21 Seam O 23 7.00 7.00 27 5.7 5.356 1,130.06 6,140.27 -3.140 -8.50 -5.80 2.70 3090.22 50% 3050 diluar design
341 25-May-21 Seam V1 24-25 7.00 7.00 40 4.0 3.698 1,892.35 6,989.36 35.730 32.03 34.22 2.18 4125.56 41% 2864 diluar design
372 8-Jun-21 Seam UuU 18-19 7.00 7.00 22 5.3 5.009 1,056.27 5,290.95 -1.582 -6.59 -4.45 2.14 2261.38 57% 3030
391 16-Jun-21 Seam F 18-19 8.00 9.00 10 6.8 6.530 744.58 4,862.11 -47.254 -53.78 -52.00 1.78 1328.48 73% 3534
-0.300
446 10-Jul-21 Seam Ru 26 7.00 7.00 29 6.5 6.152 1,416.14 8,324.67 28.624 22.47 24.63 2.16 2924.16 65% 5401 diluar design
447 11-Jul-21 Seam R 25-26 7.00 7.00 42 6.7 6.412 1,796.88 11,520.93 29.358 22.95 26.00 3.05 5486.48 52% 6034 diluar design
478 28-Jul-21 Seam P 17-19 7.00 7.00 88 6.2 5.919 4,224.57 25,151.67 -40.877 -46.80 -43.60 3.20 13581.51 46% 11570 jalan
479 29-Jul-21 Seam L 16 8.00 9.00 43 7.3 7.016 3,093.59 20,848.74 -96.304 -103.32 -101.00 2.32 6894.73 67% 13954 air
482 31-Jul-21 Seam F 17 5.00 9.00 10 5.0 4.660 519.70 2,430.82 -41.197 -45.86 -41.20 4.66 2430.82 0% 0
486 1-Aug-21 Seam UL 20 5.00 7.00 41 4.4 4.107 1,391.16 5,726.37 3.820 -0.29 1.52 1.81 2516.63 56% 3210 diluar design
489 2-Aug-21 Seam UL 19 5.00 7.00 21 4.8 4.519 703.10 3,189.47 4.197 -0.32 2.00 2.32 1638.66 49% 1551 diluar design
497 7-Aug-21 Seam P 16-18 6.00 7.00 57 7.3 6.954 2,150.28 14,953.88 -51.354 -58.31 -55.49 2.82 6059.87 59% 8894
505 10-Aug-21 Seam E2 16-17 8.00 9.00 71 6.4 6.145 5,024.33 31,063.99 -37.800 -43.95 -39.15 4.80 24239.81 22% 6824 jalan
527 19-Aug-21 Floor P 23 7.00 7.00 24 8.5 8.188 1,119.16 9,163.12 18.942 10.75 13.21 2.45 2744.69 70% 6418 jalan
530 21-Aug-21 Seam P 17 7.00 7.00 50 4.9 4.550 2,401.17 10,797.24 -58.506 -63.06 -61.13 1.93 4582.54 58% 6215
531 22-Aug-21 Seam G 18 8.00 9.00 20 7.3 7.005 1,457.54 10,193.63 -66.093 -73.10 -70.21 2.89 4207.84 59% 5986
532 22-Aug-21 Seam P 17 7.00 7.00 35 4.9 4.603 1,640.88 7,561.19 -56.515 -61.12 -57.99 3.13 5138.68 32% 2423
534 23-Aug-21 Floor F 19 7.00 9.00 19 7.4 7.079 1,146.13 8,121.11 -66.015 -73.09 -70.00 3.09 3547.08 56% 4574
537 24-Aug-21 O Lower 16-17 8.00 9.00 46 7.2 6.904 3,168.93 21,728.54 -76.538 -83.44 -79.79 3.65 11493.82 47% 10235
543 26-Aug-21 Seam V 19 7.00 7.00 14 3.5 3.193 652.74 2,071.77 35.159 31.97 35.16 3.19 2071.77 0% 0
545 26-Aug-21 Seam E 18 9.00 8.00 30 7.6 7.260 2,182.40 15,841.38 -29.319 -36.58 -34.50 2.08 4536.68 71% 11305 jalan
546 26-Aug-21 Seam OL 17 6.00 8.00 15 5.6 5.260 693.23 3,656.68 -76.824 -82.08 -79.91 2.17 1510.29 59% 2146
550 29-Aug-21 Seam F 19 8.00 9.00 27 6.2 5.912 2,184.37 12,912.99 -49.163 -55.07 -52.00 3.07 6715.85 48% 6197

559 2-Sep-21 Seam E 8.00 9.00 21 6.6 6.348 1,805.86 12,004.67 -39.104 -45.45 -39.10 6.35 12004.67 0% 0 jalan
560 2-Sep-21 Seam U 22 7.00 7.00 29 6.4 6.069 1,518.71 9,217.00 2.538 -3.53 -1.58 1.95 2967.44 68% 6250
561 4-Sep-21 Floor F 19 8.00 9.00 19 7.7 7.353 1,315.20 9,668.21 -64.257 -71.61 -66.70 4.91 6456.45 33% 3212
573 7-Sep-21 Seam R 20-21 7.00 7.00 88 6.1 5.792 1,394.63 24,317.76 -6.493 -12.29 -8.40 3.89 16313.03 33% 8005
575 8-Sep-21 Seam P 18 7.00 7.00 50 7.3 6.968 2,371.99 16,528.03 -58.892 -65.86 -64.20 1.66 3937.65 76% 12590
576 9-Sep-21 Seam E 18-19 8.00 9.00 49 7.6 7.296 3,144.57 23,185.14 -25.858 -33.15 -30.00 3.15 10021.82 57% 13163 diluar design
577 9-Sep-21 Seam F 17 8.00 9.00 31 7.0 6.745 2,084.91 14,209.41 -55.637 -62.38 -60.27 2.12 4455.77 69% 9754
579 9-Sep-21 Seam U 23 7.00 7.00 22 7.1 6.777 1,073.04 7,272.28 10.492 3.71 6.75 3.04 3256.73 55% 4016 jalan
580 11-Sep-21 Seam E 15 8.00 9.00 46 5.9 5.639 3,041.14 17,398.82 -34.632 -40.27 -37.60 2.67 8240.36 53% 9158
581 11-Sep-21 Seam F 15 8.00 9.00 31 7.3 6.977 2,107.90 14,709.21 -48.113 -55.09 -51.89 3.20 6753.09 54% 7956
583 12-Sep-21 Seam R 21-22 7.00 7.00 47 6.9 6.626 2,330.34 15,446.02 4.454 -2.17 0.55 2.72 6343.63 59% 9102
584 12-Sep-21 Floor R 21-22 6.00 7.00 27 7.9 7.637 1,243.92 9,513.67 7.786 0.15 3.80 3.65 4548.66 52% 4965
585 13-Sep-21 Seam G 15 8.00 9.00 16 7.2 6.893 986.91 6,803.10 -47.196 -54.09 -49.98 4.11 4057.32 40% 2746
586 13-Sep-21 Floor F 16 8.00 9.00 47 7.3 7.038 3,118.57 21,920.87 -55.528 -62.57 -58.45 4.12 12820.92 42% 9100
587 13-Sep-21 Seam R 21 7.00 7.00 56 6.6 6.277 2,805.36 17,565.87 2.031 -4.25 -1.65 2.60 7265.37 59% 10300
589 14-Sep-21 Seam U 22-23 7.00 7.00 78 6.2 5.947 3,755.47 22,372.01 7.059 1.11 4.40 3.29 12369.66 45% 10002
590 14-Sep-21 Floor R 20-21 5.00 7.00 16 3.9 3.638 764.16 2,768.15 -2.729 -6.37 -5.00 1.37 1039.72 62% 1728
591 14-Sep-21 Seam R 20-21 7.00 7.00 13 3.5 3.154 634.09 2,005.46 -11.425 -14.58 -11.43 3.15 2005.46 0% 0
601 15-Sep-21 Floor P 20 5.00 7.00 19 5.2 4.889 664.00 3,256.37 -8.521 -13.41 -8.52 4.89 3256.37 0% 0
602 16-Sep-21 Seam P 21 7.00 8.00 50 5.1 4.820 2,572.13 12,340.10 -6.506 -11.33 -6.51 4.82 12340.10 0% 0
603 16-Sep-21 Seam U 23 7.00 7.00 18 5.1 4.778 902.97 4,320.37 9.547 4.77 7.74 2.97 2682.25 38% 1638
604 16-Sep-21 Seam V 21-22 7.00 7.00 75 4.4 4.111 3,468.10 13,911.93 42.445 38.33 41.72 3.39 11466.49 18% 2445
605 16-Sep-21 Seam V 23 7.00 7.00 22 6.9 6.614 1,060.36 7,019.74 42.008 35.39 39.15 3.76 3986.39 43% 3033
606 18-Sep-21 Seam E 15-16 8.00 9.00 40 5.3 5.043 2,648.64 13,416.09 -40.374 -45.42 -40.37 5.04 13416.09 0% 0
607 18-Sep-21 Seam E 15-16 8.00 9.00 16 4.3 3.975 1,154.77 4,600.01 -39.656 -43.63 -39.66 3.98 4600.01 0% 0
608 18-Sep-21 Floor F 15-16 8.00 9.00 30 8.0 7.660 2,017.21 15,417.45 -44.415 -52.08 -44.42 7.66 15417.45 0% 0
609 18-Sep-21 Floor E 15-16 8.00 9.00 46 7.0 6.722 2,856.63 19,217.02 -37.927 -44.65 -42.10 2.55 7287.30 62% 11930
611 19-Sep-21 Seam F 16 8.00 9.00 14 7.0 6.721 947.41 6,372.18 -49.101 -55.82 -52.30 3.52 3339.67 48% 3033
612 19-Sep-21 Floor F 16 8.00 9.00 22 6.2 5.936 1,441.81 8,566.72 -44.434 -50.37 -44.43 5.94 8566.72 0% 0
614 19-Sep-21 Seam R 22 7.00 7.00 35 4.4 4.109 1,729.75 6,965.59 3.722 -0.39 3.72 4.11 6965.59 0% 0
616 20-Sep-21 Floor E 17 5.00 7.00 11 8.8 8.527 497.56 4,230.86 -42.233 -50.76 -42.23 8.53 4230.86 0% 0
617 20-Sep-21 Seam F 16 8.00 9.00 43 6.6 6.326 2,915.99 18,388.02 -45.015 -51.34 -45.02 6.33 18388.02 0% 0
618 20-Sep-21 Seam R 22 7.00 7.00 47 5.7 5.357 2,013.92 10,628.86 4.135 -1.22 4.13 5.36 10628.86 0% 0
TOTAL 7 8 2,070 6.21 5.87 112,021 696,930 401,281 42.42% 295,650

Dibuat oleh, Di Ketahui oleh, Disetujui oleh, Inventory Broken Material


Material terendam air 33618.1 BCM
Material di Bench 0.0 BCM
Material di buat jalan 60364.1 BCM
Material diluar design 29803.5 BCM
Material Close 295649.6 BCM
Not Aviable 123785.7 BCM
Available 277,495.13 BCM
GL Drill & Blast Sec. Drill & Blast Mine Plan Engineering Total Broken material 401,281 BCM
Total Recovery 42%

You might also like