The document outlines the daily work plan for proposed construction of the Koforidua Regional Hospital in Ghana from August 14th to 21st. Activities include cutting the existing ground to ground zero, excavating to lay the foundation for a 315 KVA transformer plinth, and beginning excavation works using excavators, dump trucks, and a pay loader to reach formation level and mobilize over 4,200 cubic meters of earth.
The document outlines the daily work plan for proposed construction of the Koforidua Regional Hospital in Ghana from August 14th to 21st. Activities include cutting the existing ground to ground zero, excavating to lay the foundation for a 315 KVA transformer plinth, and beginning excavation works using excavators, dump trucks, and a pay loader to reach formation level and mobilize over 4,200 cubic meters of earth.
The document outlines the daily work plan for proposed construction of the Koforidua Regional Hospital in Ghana from August 14th to 21st. Activities include cutting the existing ground to ground zero, excavating to lay the foundation for a 315 KVA transformer plinth, and beginning excavation works using excavators, dump trucks, and a pay loader to reach formation level and mobilize over 4,200 cubic meters of earth.
PROPOSED CONSTRUCTION OF KOFORIDUA REGIONAL HOSPITAL, KOFORIDUA, GHANA
DAILY WORK PLAN
ACTIVITY ACTUAL PLAN FORECAST PLAN EQUIPMENTS QUANTUM
14/08/21 21/08/21 MOBILIZED OF WORK 1.Earthworks The existing ground level is Cuting to ground zero 1 No. Excavator 880 cubic being cut to ground zero. activity to be completed 2 No. Dump truck 2.Transformer Plinth Clearing of site to receive Excavation of trench to 315 KVA Transformer receive Plinth - - Plinth Casting of Plinth base 3. Excavation works Establishing excavation 2 Excavator 4200 cubic line prior excavation. 1 Pay loader Excavation to formation 3 No. Dump truck level to commence