Agenda Konsinyering Tanggal tentative)

No Disiplin Hari ke Tanggal


1 Civil 1
2
3
4
5
6
7
8

2 Electrical

10

11

12
13
14
15
16
17

3 Piping 1
2
3
4
5
6
7
8


Pembahasan Jumlah Dokumen
Drainage For Cushion Pond General Layout 2

Power & Control Wiring Layout for Electrical Control


room.Power & Control Wiring Layout for Bulk Product
Storage (TT-401, M-402, M-409, D-402, D-401, M-404, TT-403) 2

Power & Control Wiring Layout for Electrical Control


room.Power & Control Wiring Layout for Bulk Product
Storage (TT-401, M-402, M-409, D-402, D-401, M-404, TT-403) 2
Power & Control Wiring Layout for Electrical Control
room.Section and Detail Cable Route Layout 2
Power & Control Wiring Layout for Electrical Control
room.Power & Control Wiring Layout for General Area 2
Single Line Diagram for Low Voltage System 1
Single Line Diagram for Low Voltage System,Schematic
Diagram for Electrical System 2
Schematic Diagram for Electrical System,Protection Relay
Coordination Study 2
Protection Relay Coordination Study,Connection Diagram for
Electrical System 2

Power and Control Cable Schedule,Grounding Wiring Layout


for Process Building (M-203, M-204, TT-202, M-401)
`
Power and Control Cable Schedule,Cable Drum Schedule 2
Material Take Off for Distribution & Lighting Panel/ bulk
material Lighting 2
Diskusi MTO diluar doc.diatas
Diskusi MTO diluar doc.diatas
Diskusi MTO diluar doc.diatas
Diskusi MTO diluar doc.diatas