S&OP Grid - FOR STUDENTS
S&OP Grid - FOR STUDENTS
S&OP Grid - FOR STUDENTS
Past Periods
PRODUCTION
Planned Production 0 0 0 0
Actual Production 1950 2000 2000 2150
Diff. Mo.
Diff. Cum.
Diff. %
0 0 0 0 0 0 0 0
Machines required
S&OP Grid for a Make-to-Orde
Past Periods
PRODUCTION/SHIPMENT
Planned Production 45 45 50 50
Actual Production 43 42 51 53
Diff. Mo.
Diff. Cum.
Diff. %
ORDER BACKLOG
Planned Backlog 20
Actual Backlog 25
Diff. Mo.
Diff. Cum.
Diff. %
Backlog (Weeks)
rid for a Make-to-Order Production Environment (Using Chase Strategy)
50 55 55 60 65 65 60 60