National Builtech Trading & Contracting Co.

SURFACE PREPARATION AND PAINTING INSPECTION REPORT NBTC-FO/QC-03/Rev.00


PROJECT : JOB NO : 2648 REPORT NO : NBTC-PIR- 2648 001
CONTRACTOR : TBK PAINTING SYSTEM : Project specification DATE : 18/09/2021
SUB CONTRACTOR : SUBSYSTEM : NA LOCATION : NBTC Workshop
Wheather conditions SURFACE PREPARATION AND PRIMER COAT INTERMEDIATE COAT TOP COAT SURFACE PREPARATION

Date and Time AM PM AM 5.00PM 2:00 PM 2:00 AM Inspection time & Date : 14/09/2021
Substrate Temperature inoC 28 28 32 Surface Preparation Required : BLASTING
Ambient Temperature inoC 31 33 30 Abrasive Used & Batch No : Garnet 30/60
Relative Humidity in % 48% 54% 55% Surface profile Roughness : SA 2.5
Dew Point inoC 19 21 20 Attach Press 'O' Film
Paint Details P.C. Batch No. I.C. Batch No. T.C. Batch No.

Base 820080070 820080070 45889570200015

C.A. : 820061389 820061389 820010064 Signature


Thinner 820021766 820021766 820030126 DATE 14/09/2021
PROCEDURE NO: Project specification SPECIFICATION NO : NA REF DRAWING NO: NA NBTC Contractor Client
PRIMER COAT START DATE & TIME : 14/09/2021 INTERMEDIATE COAT START DATE & TIME : 15/09/2021 FINAL COAT START DATE & TIME : 16/09/2021

S. NO LINE NO/DRAWING NO/ISOMETRIC NO VISUAL REQ. DFT IN µ PRIMER COAT DFT IN µ INTERMEDIATE COAT DFT IN µ TOP COAT DFT IN µ REMARKS

1 1F -03 OK 180 82 87 90 150 155 162 215 242 255

2 4F -02 OK 180 84 89 92 152 157 164 217 244 257

3 5F -01 OK 180 80 85 88 148 153 160 213 240 253

4 5F -02 OK 180 77 82 85 145 150 157 210 237 250

5 7F -01 OK 180 75 80 83 143 148 155 208 235 248

6 7F -02 OK 180 77 82 85 145 150 157 210 237 250

7 9F -02 OK 180 74 79 82 142 147 154 207 234 247

8 10F -01 OK 180 77 134 134 194 199 206 259 286 299

9 10F -02 OK 180 72 77 80 140 145 152 205 232 297

10 B1 -01 OK 180 70 75 78 138 143 150 210 230 298

11 B1 -02 OK 180 80 85 88 148 153 160 220 240 253

12 B1 -03 OK 180 80 85 88 148 153 160 220 240 253

13 B2 -02 OK 180 79 134 134 194 199 206 266 286 299

14 GF -02 OK 180 86 91 94 154 159 166 226 246 248

15 GF -03 OK 180 86 91 94 154 159 166 226 246 249

Final Coat Colour Code / RAL No: RAL 7030 NBTC CONTRACTOR / TPI CLIENT

DFT Gauge Serial No : SC05897 Signature

Calibration Due Date : 23/Dec/2021 Date 18/09/2021

REMARKS : Adhesion Test: NA Dust level : NA


Holiday Test: NA Holiday Voltage: NA
Chloride
Chloride Test: NA : NA
Level
NBTC CONTRACTOR CLIENT
Signature

Name AMAL

Date: 18/09/2021