Professional Documents
Culture Documents
ERP (Group Week 2)
ERP (Group Week 2)
Quantity
Location Total
1 2 3 4 5
Machine Machines
1 0 0 0 1 0 1 =
2 0 0 1 0 0 1 =
3 1 0 0 0 0 1 =
Total Locations 1 0 1 1 0
<= <= <= <= <=
Needed 1 1 1 1 1
Total Cost
1
1
1
$31
THE BETTER PRODUCTS COMAPANY
Unit Cost
Product
Plant 1 2 3 4
Quantity (Units/day)
Product
Plant 1 2 3 4
1 0 30 30 0
2 0 0 0 15
3 20 0 0 25
Total Units of Product 20 30 30 40
= = = =
Required Production 20 30 30 40
Total Cost
ts/day)
Total Units produced Capacity
in Plant Available
60 <= 75
15 <= 75
45 <= 45
$3,260
THE BETTER PRODUCTS COMAPANY
Cost ($/day)
Product
1 2 3 4
Plant
1 820 810 840 960
2 800 870 - 920
3 740 900 810 840
Total Assigned 1 1 1 1
Quantity
Product
1 2 3 4
Plant
1 0 1 1 0
2 1 0 0 0
3 0 0 0 1
Total Units of Product 1 1 1 1
= = = =
Total Assigned 1 1 1 1
Total Cost ($/day)
3,290