A

1200

2000 50mm chamfer

R.C Concrete slab

200

200
B B
Reinforcement sits on 50mm Layer of ballast

2000
ELEVATION A

A
BASE PLAN

1200
Reinforcement:
Y10 @ 200mm spacing both ways
200

9 pcs 1100mm = 9900mm


Reinforcement sits on 50mm Layer of ballast
5 pcs 1900mm = 9500mm

ELEVATION B

NOTES
SIGN:
1. NOT TO SCALE DRAWING TITLE: BATTERY SLAB LAYOUT
2. All dimensions are in mm unless
otherwise specified.
3. All details of existing construction to be SITE NAME GENERAL
confirmed on site. Any discrepancies are
to be reported to the designer SITE CODE JOHN
immediately.
4. This drawing to be in conjuction with all
relevant drawings. SITE COORDINATES