Professional Documents
Culture Documents
5 Price Schedule BMC 2021-23 Tender Id 449263
5 Price Schedule BMC 2021-23 Tender Id 449263
1
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
Scaffolding Erection
2
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
3
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
Erection of scaffolding in FBHE Shift scaffolding material from store to site. Erect
Bundle chamber/Empty chamber/Seal scaffolding. Make proper plateform at diiferent
pot / for Miscelleneous work elevations as per instruction of EIC. Scaffolding erected
70 A 7 BD No. 35 793 27755
Size of scaffolding - 2mx2mx3m may be require to adjust for refractory works as per
.Scaffolding materials in the scope of instruction of EIC. Finally dismantle and shift the
contractor. scaffolding material to store after work completion.
4
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
5
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
6
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
7
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
8
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
9
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
Unit Biennial
C Sr. No
Welding in windboxes of combustor / Clean the place to be welded, Cut & edge prepare the
FBHE / Seal pot. material. Then weld by MMAW on both sides (Hot side
310 A 31 BD No 300 278 83400
Size - 300 mm welding length is & cold side). Carry out the LPI on the weld joint and
consideres as 1 No ensure the leak proofness.
Opening and closing of Drum Manhole
Ensure proper cooling. Open both manhole doors.
doors
320 A 32 Inspect drum internally. Replace the gaskets and close BD No 4 1665 6660
Both side Manhole door is considered
the man hole doors.
as 1 No.
Ensure proper cooling. Open both manhole doors.
Install exhaust fan at one end for forced cooling. Inspect
all drum internals namely, cyclone separators, driers,
pipings etc,
etc Take necessary precaution to prevent
Inspection and cleaning of drum
330 A 33 foreign material falling inside drum/drum opening. BD NO. 4 14203 56812
internal
Remove all drum internals (turboseprator assy. 60 nos.
and screen type drier-30 nos.) Replace/repair damage
bolts, nuts etc. Clean all internals and refix. Box up the
manhole door. Above work is consoder as one no.
Shift material from store to site. Clean the coils.
Repair / replacement of cassette Remove the old cassette baffles with new ones. Clamp
340 A 34 BD No. 50 630 31500
baffle in Backpass Material: SS and weld. Repair the damaged ones if required and re-
position the fallen ones.
Remove the damage nozzle cap by grinding the welded
Replacement/Repair of cap of nozzle
portion. Weld new nozzle cap by welding a bolt plate on
350 A 35 in Combustors,FBHE,Seal pot and BD No. 700 280 196000
it. Do LPI. Rectify the defect found in LPI. Weld the
Ash coolers.( SS material)
nozzle cap damage portion if required
Remove the damage nozzle cap by grinding the welded
360 A 36 Combustor guide pipe dummy. portion. Welding a bolt plate on it for dummy of guide BD NO 400 138 55200
pipe.
Remove the nozzle assly. from position by grinding or
Replacement/Repair of nozzle
gauging. Edge prepare the surface.Assemble the guide
assembly (i.e guide pipe and cap with
370 A 37 pipe, cap and bolt. Put the new nozzle assly. Make BD No. 700 441 308700
bolt ) in Combustors,FBHE,Seal pot
alignment
a g e to of nozzle.
o e Ca Carry
y out welding.
e d g Doo LPI. Rectify
ect y
and
d Ash
A h coolers.(
l ( SS material)
t i l) 11
the the defect found in LPI.
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
12
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
Remove old damage sheeting. Apply new sheeting and Per Sq.
480 A 48 Only Aluminum sheeting BD 100 140 14000
screw finishing as per E-I-C. Mtr.
A Opening
p g and closing
g of manhole doors. 0
13
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
14
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : A PRESSURE PARTS
Unit Biennial
C Sr. No
Unit Biennial
C Sr. No
16
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
Unit
Unit of Bienni
Rate
Sr. No
SR. (Rs.)
Name of the Activity Scope of Work of remen Quanti Price
NO Per
CS
Work t t
ty (AXB)
UoM
(UoM) (A)
(B)
GIPCL E-I-C intimate to mobilize additional gange
consists of 1 IBR approved welder, 01 pressure part
Mobilization of
tte , 0
fitter, 01 g
grinders,
de s, 01
0 gas cutter
cutte and
a d 04
0 helpers,
e pe s,
additional manpower
contractor shall mobilize additional gang seperately
for presure part work
#### A 1 within 24 Hrs. BD No. 10 23849 238490
for forced shutdown of
unit as per instruction
Activity to be consider only if, complete mentioned
of GIPCL EIC
gang mobilized.Partial mobilization not to be
consider.
Pressure part area inspection for bed material
Bed material Leakage
#### A 2 leakage (i.e area include Combustor ww, FBHE ww, PM No. 120 280 33600
inspection
sealpot etc.)
Sox point dechoking Sox point to be clean and dechoked at ID fan
BD No. 96 206 19776
work discharge
discharge.
Fabrication of Bend tube up to Dia 57 mm. To
fabricate the Bend tube preparation of Spool length
Fabrication of pressure with filling the sand inside the tube and tube to be
part bends up to OD temporery dummied by welding. Cold or Hot bending BD No. 200 630 126000
57mm to be carried out as per EIC instruction. After
bending, tube to be normalised (i.e removal of
temporery dummied and cleaning of tubes.
17
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
18
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : A PRESSURE PARTS
Unit of
Biennial Unit Rate
Nature of Measure
S.No Name of the Activity Scope of Work Quantity (Rs.) Per
Mntc. ment
(A) UoM (B)
(UoM)
19
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : B SA Fan / PA fan
Bienni
Unit Unit
C Sr. No
Nature al Total
PART
Bienni
Unit Unit
C Sr. No
Nature al Total
PART
IGV link assy./IGV flap /guide ring / Open the manhole doors. Check for any damage link assy. /
640 B 3 Link shaft bearing/ gland removal flap/bearing/gland packing.Replace with new one.if required. BD Per Mtr. 15 1041 15615
or repair. (Any-1) Check IGV for full operation. Box up.
Bienni
Unit Unit
C Sr. No
Nature al Total
PART
22
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Unit Unit
C Sr. No
Internal checkings of fan and Open manhole doors,Check for Plates/blades. Clean the Each
770 C 1 PM 7 1382 9674
internal cleaning of impeller impeller. Box up fan
23
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Unit Unit
C Sr. No
IGV link assy./IGV flap /guide Open the manhole doors. Check for any damage link assy. /
820 C 6 ring / Link shaft bearing/ gland flap/bearing/gland packing.Replace with new one.if required. BD No. 2 1382 2764
removal or repair. (any-1) Check IGV for full operation. Box up.
I) For delinking:-Delink the HC scoop or IGV from the
pneumatic actuator. Position the scoop/IGV as per
Delinking / Linking of Hydraulic
830 C 7 instruction of E-I-C. Lock the scoop/IGV by welding if BD No. 4 140 560
coupling (HC)scoop or IGV.
required.II) For Linking:- Remove the lock. Link the scoop/
IGV to power cylinder.
Decouple the fan with hydraulic coupling. Check alignment.
Alignment of hydraulic Do alignment if required. Check coupling bolts. Replace if
840 C 8 BD No. 4 7345 29380
coupling with Fan. required. Grease the coupling .Box-up the coupling. Assist
trial run.
Alignment of hydraulic
850 C 9 -- do -- BD No. 4 7345 29380
coupling with motor.
Dismantle bearing housing after removing all oil and water
Replacement of DE/NDE connections.Dismantle the bearing and place the new Each
860 C 10 BD 2 10103 20206
bearing bearing, carry out blue matching if required. Box up the brg
bearing. Note bearing clearances.
24
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Unit Unit
C Sr. No
Open the top cover /top half of the bearing. Inspect bearings
Each
870 C 11 DE/NDE bearing inspection. for clearances/damage etc. Note bearing clearance. Box BD 2 1382 2764
bearing
up.If required replace as per sr. no.10
De couple the both halves of coupling as per the
880 C 12 De-coupling and coupling requirement for facilitating other work and couple after BD No. 2 973 1946
completion of work.
De couple the both halves of coupling.Check
Checking of Coupling or alignment.Correct the alignment if required.Check the
890 C 13 BD 0 0 1444 0
Greasing of coupling condition of coupling bolts (Repair/replace if required).
Grease the coupling .Tighten the coupling bolts..
Decouple the HC from Fan & motor side.Remove both half
900 C 14 Coupling repair / replacement of coupling. Change with new coupling. Align properly, BD No. 2 6198 12396
Grease the coupling.Box up. Assist trial run.
Providing manpower for assisting balancing of fan/motor.
Assistant for Balancing of Each
910 C 15 This includes welding of trial/final weight. Correctness of BD 2 2225 4450
Impellar/Fan Fan
alignment. Inspection of bearings etc.
Manhole door opening and Open the Manhole door, inspect the volute casing and Box-
920 C 16 BD No. 2 520 1040
closing for Inspection up Manhole door.
Open the side cover of bearing housing.Identify the
Replacement of bearing damaged nipple with new one.Internal cleaning of Each
930 C 17 BD 2 520 1040
cooling water nipple bearing.Oil top up after boxup of bearing and external brg
cleaning.
Manhole door leakage Arrest the air leakage through manhole door by sodium
940 C 18 BD No. 4 520 2080
arresting. silicate application on line.
25
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Unit Unit
C Sr. No
Decouple the HC from Fan & Motor side. Open the top half
of the HC. Remove lub oil / water connecting pipe line from
HC. Shift the internals of HC to work shop. Dismantle the
Hydraulic coupling Overhauling
entire HC as per insruction of EIC. Check for any damage
950 C 19 as per the direction of expert BD No. 2 44501 89002
internals. Replace the damage parts. Replace bearings.
engr.
Check lub oil pump, replace if require. Check oil condition ,
replace entire oil if require. Box up and align with fan &
motor. Assist trial run.
ID fan alignment with Motor.Align and correct coupling
960 C 20 Alignment of id fan phase-2 BD Per 0 7345 0
between motor and fan.
Ensure the Elec/Mech isoaltion.Decouple the
ID Fans alignment checking fan/motor.Check the alignment of fan/motor and take
970 C 21 BD Per. 3 1106 3318
work reading alignment and coupling gap.Couple the fan/motor or
do alignment as per sr.no-20 and direction of EIC.
Ensure the Elec/Mech isolation,Decouple the fan from motor
and remove the motor foundation bolt and coupling half and
Coupling Removal/Re
Re-install the coupling half in motor and re install the
980 C 22 installation work for motor BD No. 2 5815 11630
foundation bolt.Align the fan and motor. Assist the trail run
replacement work
of fan couple/ decouple condition .Clean the surrounding
area.
Ensure the Elec/Mech isolation, Remove the all foundation
Motor foundation bolt
990 C 23 bolts to facilitate the work and Re- install the foundation BD No. 2 3844 7688
Removal/Re-installation work
bolts as per the direction of EIC.
PHASE # 2 Part : C TOTAL 408952
26
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Unit Unit
C Sr. No
Unit Unit
C Sr. No
Drain complete oil from tank. Clean the tank & view glass
New oil Filling/Replacement
1110 D 13 after oil draining. Fill the tank with new oil up to normal BD No. 6 1659 9954
upto 350 litres
level. Box up. Clean the area.
New oil Filling/Replacement
1120 D 14 ….DO … BD Once 2 2211 4422
more than 350 litres
Pump not developing Adjust the releif valve.Attend leakage of oil if any and
1130 D 15 BD Each 2 416 832
pressure restore.
Decouple the pump. Remove all connecting piping and
1140 D 16 Replacement of lub oil pump. fittings.Replaced with new one. Align and couple it. BD No. 6 829 4974
Assist trial run.
Replacements of relief valve Isolate the system. Replaced with new relief valve.Assist
1150 D 17 BD No. 2 829 1658
of lub oil pump / lub oil system trial run. Adjust relief valve if required.
Unit Unit
C Sr. No
Replcements of
Remove the belt guard. Replaced the set of belts. Adjust
1210 D 23 belts/alignment of scanner air BD Set 2 416 832
the tension , align properly. Fix the belts guard.
fan.
Replacements of suction Remove the strainer by opening of bolts. Replace the
1220 D 24 BD No. 2 416 832
strainer of scanner air fan. strainer with new one. Fix new gasket & box up.
ID fan bearings oil leakage
1230 D 25 Check for any leakage.attend leak as per E-I-C BD No. 6 829 4974
attending.
Bearing NDE & DE leakage
1240 D 26 Check for leakages from the bearings. Attend the same. BD No. 8 829 6632
arresting - water & oil side.
PHASE # 1 Part : D TOTAL 163748
29
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -A Unit rates are excluding GST
Unit
Unit
C Sr. No
Open the man hole doors, Clean the duct with scapping /
cleaning tools & tackles.collect all material at ground floor.
1250 E 1 Suction duct cleaning. BD No. 2 15399 30798
Joint inspection carried out By GIPCL Engineer Incharge.
Scrap the same Box up man holed door
Unlock the strainer casing. Remove the fabric strainer. ,
Suction Stainers cleaning
1260 E 2 replace it or Clean the fabric as well as internals of strainer PM No. 80 484 38720
of LT Blower
with compressed air. Box up.
Suction Stainers cleaning
1270 E 3 _-Do_ PM No. 225 553 124425
of HT blower
Clean the suction stainers.
stainers Check oil level/condition.
level/condition Top up
the oil or replace as per instruction of EIC. Attend leakages
if any.Check belt tension, adjust/replace belts set if
require.Check the lobe condition varify clearances.rotate
1280 E 4 PM of LT blower blower manually and identify any abnormalities if any.Check PM No. 40 1244 49760
and varify condition of pulley by belt guage Clean the blower
unit. Check speed sensing disc, replace if require. Check
the foundation bolt for tightness.Clean the oil view glass and
replace if found damage.
Unit
Unit
C Sr. No
Decouple/ coupling of LT
blower with motor. (belt
1310 E 7 -do- BD No. 8 553 4424
drive) or Belt replacement
of LT blower
Suction strainer filter Remove the strainer from the position. Repair/replace if any
1330 E 9 element repair/ internals found damage I.e filter element, sponge element BD No. 6 862 5172
replacements etc. Box up the strainer.
Oil top up /replacements in Check the oil condition/colour visually. Refill/Top up /replace
1340 E 10 BD No 550 208 114400
the gear box of blower oil as per E-I-C.
Oil level indicator sight Drain the oil from the gear box to oil pot. Remove sight
1350 E 11 glass cleaning/repair / glass. Clean it, refix it properly. Fill removed oil again still BD No 32 312 9984
replacements normal oil level
Remove the MEJ from the position. Inspect for any damage.
Repair/replacements of
1360 E 12 Repair if possible by welding. Or replaced with new one. BD No 2 1732 3464
MEJ at discharge of blower
Place in position. Check for leackage.
31
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -A Unit rates are excluding GST
Unit
Unit
C Sr. No
Speed sensor flap Inspect the speed sensing disc.Reair/replace the same if
1400 E 16 BD No. 6 556 3336
repair/Replacement necessary. Fabricate the sensor plate if require.
Servicing of safety valves Dismantle the safety valve and service the same as per
1410 E 17 BD No. 3 2211 6633
in blower discharge line. instructions of EIC.Replace any damage internals. Box up.
Replacement of Oil seal at Remove the drive pulley and open the end cover of drive
1420 E 18 BD No. 20 1379 27580
DE drive shaft. side. Install new Oil seal and Box-up
32
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -A Unit rates are excluding GST
Unit
Unit
C Sr. No
Servicing of NRV in Blower Dismantle the NRV and service the NRV. Fabricate the flap
1430 E 19 BD No. 5 1112 5560
discharge line. of NRV. Replace the flap of the NRV if required.Box up.
Oil leakage arresting from Identify the leakage. Clean area of leakage. Attend the
1440 E 20 BD No. 20 691 13820
blower leakage as per EIC.
33
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -A Unit rates are excluding GST
Unit
Unit
C Sr. No
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Open the top cover plates. Check chain flight , pin, circlip
etc. Check the damage/worn out plates. as per instruction
of EIC, Replace or Straightened the bent links by heating
PM of bed ash and hammering . Clean the drive mechanisam. Check for
1560 F 1 PM No. 55 1659 91245
conveyor. wear of driving mechanisam. Check oil level in gear box.
Lubricate the drive chain, bearings. Inspect bearings,
sprockets, . Take trial run. Adjust chain tension if required
And submit Pm report immediately to Engineer in-charge
Lubrication of bed ash Bed ash conveyor all bearing greasing, Gear box oil level
1570 F 2 PM No. 180 416 74880
conveyer checking and top-up if required etc…..
Greasing of driving Remove the chain guard. Clean the chain & Apply
1580 F 3 PM No. 10 210 2100
chain grease.Place the chain guard.
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Idler replacements of
bed ash conveyor Open the top cover plate. Delink chain from idler. Remove
1610 F 6 NDE side. Size: OD- the bearings. Replace the idler. Box up bearings. Normalise BD No. 2 1935 3870
400mm & 60mm the conveyors.
width
width.
Driving double roller Open the chain guard. Remove the double roller chain.
1620 F 7 chain repair / Replace if found damaged. Adjust the chain tension and BD No. 3 1382 4146
replacements. align it. Normalise the conveyor
Shear pin Open the chain guard. Remove the damaged shear pin.
1630 F 8 BD No. 25 260 6500
replacements. Replaced with new one. Fix the chain guard.
36
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Bearings inspection
Open the top half of the bearing. Inspect the bearing.
1640 F 9 DE & NDE side (Any- BD No. 8 553 4424
Lubricate and box up.
1)
Bearings
g
Open the bearing plummer block.
block Replace the bearing with
1650 F 10 replacements DE & BD No. 2 1659 3318
new one & lubricate. Box up.
NDE side (Any-1)
Shaft seal Remove the bearings with plummer block. Replace shaft
1670 F 12 BD No. 2 1382 2764
replacements seal and labyrinth seal with new one.
37
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Conveyor chain flight Open the cover plate. Remove the circlip and pin of chain
1700 F 15 BD No. 750 260 195000
replacements flight. Replace with new one. Normalise the conveyor
38
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Filling of refractory
between wear plate
As per instruction of E-I-C, prepare refractory mix and fill in
1720 F 17 and casing (gap BD Meter 5 1382 6910
the gap & cure it.
50mm,, Height
g -
150mm).
Chain tension Loosen the tail end. Adjust the chain tension as per E-I-C.
1730 F 18 BD No. 4 208 832
adjustment Tighten the tail end.
Lubrication of gear Remove the old oil from the gear box. Fill the new oil. Clean
1740 F 19 BD No. 4 208 832
box. the gear box.
39
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Speed sensing disc Remove the cover of disc. Repair / replace the with new
1750 F 20 BD No. 4 416 1664
repair / replacements one. Place the cover.
Guide rail
Open the top & bottom cover plate. Remove the chain.
replacements. Size:
1760 F 21 Inspect for guide rail. Replaced with new one.length of guide BD No. 5 6259 31295
50mm width,16mm
rail @2meter in 4 location.
thick,8m length
Replacement of motor
Open the Drive chain guard.Remove the drive
1770 F 22 end small sprocket of BD No. 2 2008 4016
chain.Remove the worn-out sprocket and replace with new.
duplex roller chain.
40
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Replacement of
Conveyor end bigger Open the Drive chain guard.Remove the drive
1780 F 23 BD No. 4 4500 18000
sprocket of duplex chain.Remove the worn-out sprocket and replace with new.
roller chain.
Dismantling and Drain the oil from Gear box. Dismantle the drive motor and
1790 F 24 refixing of Drive Motor install new motor .Fill Oil in gear box. Ensure no oil leakages BD No. 4 1386 5544
(Geared) from the Gear box.
41
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Drain the oil. Remove the motor. Remove the gear box from
Replacement of drive the position. Replace the gear box woth new one.. Place it
1810 F 26 BD No. 2 7633 15266
end gear box. position. TOP up the oil. Fix its drive sprocket and drive
chain in position. Box up.
Drain the oil. Remove the motor. Dismantle the gear box.
Inspection internal and Identify damaged spares.
1820 F 27 Servicing of gear box. Repair/service the gear box as per instruction of E-I-C. BD No. 2 4423 8846
Place it p
position. TOP up p the oil. Fix its drive sprocket
p and
drive chain in position. Box up.
F 2. Rotary air lock feeder 10 TPH / 32 TPH 0 0 0 0
Lubrication of bed ash bed ash rotary air lock feeder all bearing greasing, Gear box
1840 F 29 PM No. 25 208 5200
rotary air lock feeder oil level checking and top-up if required etc…..
42
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Replacement of bed
1850 F 30 material / ash cooler Isolate the feeder, remove the feeder, replace new, restore. BD No. 2 2781 5562
feeders.
Shaft seals Open the seal cover on both side. Replace new seal. Box
1870 F 32 BD No. 6 416 2496
replacements of RALF up.
Drain the oil from the gear box. Remove the motor. Replace
Oil seal replacement
1880 F 33 the oil seal from the gear box. Place the motor and fill the oil BD No. 4 1041 4164
of RALF
in gear box.
43
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Drain the oil from the gear box. Remove the motor.
Servicing of Rotary air
1890 F 34 Removed the gear box. Service the rotor assy and gear BD No. 6 4146 24876
lock feeder..
box. Normalise.
Lubrication of gear Check for oil level in gear box. Fill oil or totally replace the oil
1910 F 36 BD No. 4 520 2080
box. as per E-I_C.
Repair replacements
1920 F 37 Replace the disc with new one if required. BD No. 4 525 2100
of speed sensing disc.
F 3. Ash cooler 0 0 0 0
44
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Choking removal of
Remove the ash cooler drain valve/spiese valve sight glass.
ash cooler spiese
Carried out pocking through valve /sight glass opening.
1930 F 38 valve to ash cooler BD No. 400 829 331600
Carry out hammering of the line if required. Clear chockage.
line/spiese valve
Normalise.
mouth.
Repair / replacemetns
Remove the valve from position.Dismentle the valve. Clean
of grate drain valve /
1940 F 39 it.Freeness checking. Assemble the valve. Replace BD No. 42 1041 43722
wind box drain
gasket/bolts/nut with new one & box up.
valve.(Up to 150NB)
45
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Choking removal of
ash cooler bundle
Open grate drain valve,check flow of bed material. De chock
1960 F 41 chamber / empty BD No. 1200 624 748800
the line if required till evacuation of chamber.close the valve
chamber grate drain
(Any-1)
46
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Choking removal of
conveying line from I/A
1970 F 42 Clear the chock by applying air. Normalise it. BD No. 14 520 7280
bin to bed material
silo.
Open the cover of bag filter. Remove the bag filter. Remove
Servicing of Bag filter
bags from the filter. Clean the bags with service air or
1980 F 43 /Replacement of all PM No 4 2764 11056
replace bag if require. Clean the perging lines and check for
bags in bag filter
air coming from all perging line .Box up.
47
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Replacements of air
2000 F 45 hose of filter cleaning Isolate the air supply. Replace the hose with new one. BD No. 2 520 1040
system.
Repair / replacements
Remove / dismantle the damaged NMEJ. Repair / replace
2010 F 46 of NMEJ of dust BD No. 2 1382 2764
as per instruction of E-I-C.
extraction fan.
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Bed material Draining Open the grate drain valve. Drain the combuster as per
2070 F 52 BD No. 75 870 65250
from Combustor. requirement and Remove chocking if any . Close the valve.
49
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
50
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Chocking clearing of
Bed material filling line
Check the line for chock up.Hammer the line & pocking.If
from bed ash silo to
chock up not cleaned, cut the pocket or open the flange , do
2090 F 54 combustor/Chocking BD No. 420 520 218400
pocking and welding the cut pocket or refix the flange. After
clearing of PA
removal of chock up normalise the system.
windbox conveying
line
51
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Combustor spiess
valve to ash cooler
Identify the leakage,apply sodium silicate or do welding as
2100 F 55 line/PA windbox BD No. 300 556 166800
per
p E-I-C.
conveying
i line
li leakage
l k
attending
52
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
Mixing nozzle
Replace the damage nozzle and put new nozzle by welding
2120 F 57 replacement in PA BD No 4 1321 5284
and bolting
coveying line
Bed ash
Open the man hole door. Check the level of ash in
2140 F 59 silo.Intermediate ash BD No. 25 107 2675
bunker/silo.
bin level checking.
53
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
54
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : F Bed Ash Conveying System
Unit
Unit of
C Sr. No
Biennial Rate
PART
55
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
1. Lignite Conveyor
Decouple the drive. Open the top plates.Decouple the chain
Conveyor link Sprockets (Both side)
2180 G 1 link . Replace sprocket.Couple the link .Normalise the OM No. 4 8877 35508
replacement. Phase-2
conveyor.Assist trial run.
Check chain looseness. Loosen the tail end bracket. Adjust
2190 G 2 Chain tension adjustments. the chain by tightening the bolts as per E-I-C.Tighten the tail OM No. 5 346 1730
end bracket.
Greasing of DE / NDE bearings of
conveyors, chain compensation Clean the bearings. Apply the grese with pressure. Remove per
2200 G 3 PM 310 260 80600
bearings, flow indicator bearings.Total the additional graese from bearings from outside. conveyor
no of bearings - 8 per conveyor
Remove the chain guard. Apply grease with oil
2210 G 4 Greasing of driving chain PM No. 40 210 8400
mixture.Place the chain guard.
Ensure Isolation of the conveyor from bunker. Open the
cover plates of lignite conveyor. Remove the complete
lignite from conveyor length. Remove the entire chain from
conveyor & Clean the groove. Check for any damage of
guide rail/brackets. Adjust if required or repair/replace the
rail/bracket.check the conveyor casing for leakages and
replace the casing plate/top cover plate. Inspect all the
Servising/Overhauling of Lignite bearings, replace if required. Check sprocket condition and
2220 G 5 PM No. 6 61957 371742
conveyors. change if required. Check the idler at tail end. Fix in position
if found dislodged or replace if required. Lubricate the
conveyor drive chain and bearings. Inspect the bassalt
liners & repair/replace as per instructions of Engr I/C.
Inspect the lingnite chain link & repair/replace as per
instructions of E-I/C. Check the drive chain &
repair/replace, if required. Align the gear box with conveyor.
Normalise the system. Assist trial run.
56
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
Open the drive end covers. Remove the lignite. Inspect the
2230 G 6 Lignite conveyor chain link inspection link pin/flighted link for damage.Replace the damage PM No. 500 312 156000
link.Adjust the chain tension if required. Box up.
Adjust the hole of sprocket,replace the shear pin.Fit circlip
2240 G 7 Shear Pin replacement BD Nos. 100 156 15600
on both sides of shear pin.Restore to normal.
Ensure Isolation of the conveyor from bunker. Open the
cover plate and remove lignite from conveyor. Remove the
Replacement of entire chain link of entire chain from position. Clean the groove of the
2250 G 8 BD Nos. 7 19642 137494
conveyor. conveyor. Place the entire chain link assy. Normalise the
bunker gates.Box up and assist trial run.Adjust the chain
tension during trial run.
Isolate the lignite feeder from lignite bunker. Open feeder
Removal of one link of drag link chain cover. Remove the lignite from drive end of the conveyor.
2260 G 9 BD per link 120 695 83400
by drive end inspection Remove/Replace one link of conveyor chain.Adjust chain
tension.Restore.
Ensure Isolation of the lignite feeder from lignite bunker.
Open feeder cover plates at 3-4 places from drive to tail end
of conveyor.Remove the lignite conveyor from drive to tail
Inspection of lignite conveyor
2270 G 10 end. Clean the grooves.Check the complete conveyor links. BD No 15 3858 57870
assembly for conveyor breakdown
Note the damages.Check the circlip & replace the damaged
one. check & replace the shear pin.Adjust chain tension .
Restore.Assist the trial run.
Replacement of chain link of conveyor
Shift the new link from store to site.Remove the damaged
2280 G 11 as per noted defect in S No 1.10 as BD per link 300 1239 371700
chain links & replace it with new one.
above .
Decouple the motor assembly of driving gear box.
Main drive -Gear box mechanism
2290 G 12 Repair/replace assembly. Align the gear box with motor. BD No. 2 2413 4826
Repacement
Restore to normal.
57
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
Open the top cover plate. Decouple the chain link . Remove
Idler/shaft replacements of lignite the shaft end seals.Remove the bearings.Remove the shaft
conveyor NDE side.Size of shaft :- & idler. Replace or repair the idler / shaft / beraing, shaft
2300 G 13 BD No. 4 8877 35508
OD 120 mm & length @ 2 meter, Size end seals; if required.Put the shaft & idler in position. Fit the
of idler:-436 mm OD & width 60 mm bearings & do greasing. Normalise the conveyors.Assist
trial run.
Open the top cover plate. Remove the chain
links.Repair/Build up the sprocket by welding with
2310 G 14 Sprocket repair /build up work BD No. 4 1740 6960
hardfacing electrod Flush grind the weld area. Join the
chain link and normalize the conveyor.
Open the chain guard. Remove the tripple roller chain.
Driving chain tripple rollar repair /
2320 G 15 Replaced if damage. Adjust the chain tension and aligned it. BD No. 4 1723 6892
replacements.
Normalise the conveyor
Bearing replacements of lignite Open the bearing plummer block. Replace the bearing with
2330 G 16 BD No. 4 1723 6892
conveyors, DE / NDE side.(any-1) new one.
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
Lig. Conveyor link cleaner Lig. Conveyor link cleaner repairing/replacement as per
2480 G 31 BD No 4 1732 6928
repair/replacement work instruction of E-I-C.
Lig. Conveyor gear box coupling Lig. Conveyor gear box coupling repair/replacement as per
2490 G 32 BD No 0 520 0
repair/replacement instruction of E-I-C.
G 2. Lignite rotary air lock feeder.
Isolate the system. Remove geared motor, gear box, clutch
assy., Open inspection cover and dismatle the entire feeder.
Inspect for any damage parts viz. bearings, shaft sleeve,
2500 G 33 Overhauling/Servising of Lignite RALF sealing strip, casing sleeve, bucket, rotor of feeder as well PM No. 8 45181 361448
as scraper etc. Replace any damaged internals if required.
Check for clearences. Carry out lubrication of gear box as
well as bearings. Assemble as per E-I-C. Assist trial run.
Greasing of DE / NDE bearings of Clean the bearings. Apply the grease with pressure. Clean
2510 G 34 PM No. 320 520 166400
rotor, scrapper assy. Of lignite RALF. the excess grease from outside.
Tighten the SINGLE shaft seals of scraper and rotor shaft
2520 G 35 Shaft stuffing box leakage arresting. BD No. 150 624 93600
as per instruction of EIC. Clean the area.
Remove the gland follower of any one shaft seals. Remove
Lig. RALF Shaft stuffing box
2530 G 36 the all old galnd packing. Placed the new gland packing. BD No. 60 276 16560
seal/gland replacements.(Single side)
Tighten the gland follower. Clean the all area.
Open the gear box. Drain the old oil/grease. Refill / replaced
2540 G 37 Lubrication of gear box. BD No. 110 520 57200
the new oil / grease.
Rotate rotary air lock feeder manually through coupling,
Open the top cover plate. Inspect feeder from inside for any
2550 G 38 Clearing RALF jamm. foreign material, remove if any, Put mixture of bed material BD No. 120 1379 165480
with water from top, hand rotate for 2 to 3 revolution and
make free. Box up.
Speed sensing disc repair / Remove the cover of disc. Repair / replace the with new
2560 G 39 BD No. 4 278 1112
replacements one. Place the cover.
Repair of NMEJ betn feeder and pull the top of the lignite conveyor. Remove the expansion
2570 G 40 BD No. 2 1212 2424
conveyors. Size 1mx2m joint, replaced with new one. Box up
60
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
Clean the area properly. Check for any leakage of flue gas
On line leackage arresting of of bed material. Apply sodium silicate with refractory,
2580 G 41 BD No. 30 1212 36360
NMEJ/MEJ betn feeder and seal pot. ceramic wool mixture. Make necessary arrangements to
hold mixture using plates etc. Arrest leakage.
Drain the oil from Gear box. Decouple the drive motor and
Dismantling and refixing of RALF
2590 G 42 install new motor .Couple the drive motor & align it.Fill Oil in BD No. 2 1206 2412
Drive Motor (Geared)
gear box. Ensure no oil leakages from the Gear box.
Isolate the RALF. Open the manhole door remove all
damaged sealing strips by cutting / grinding. Replace with
Replacement of Sealing strips for
2600 G 43 new sealing strips as per EIC. Check the clearance BD Set 2 2082 4164
Rotor / Scrapeer
between casing and rotor. Box up and check for free
rotation of the feeder
Isolate the feeder. Dismantle the feeder by removing gear
box, motor, clutch assy, remove the bearings, shaft
Replacement of shaft sleeve and
2610 G 44 protection sleeves and replace with new one, check the BD No. 4 8836 35344
bearing replacement work
clearances, check the condition of bearing and replace if
required box up and check for free rotation as per EIC
Isolate the feeder, drain the oil dismantle the gear box
2620 G 45 Replacement of Oil seal replace the damaged oil seal, box up the gear box check for BD No. 2 1106 2212
leakages as per EIC.
Lignite RALF gear box Leakage Identify the leakage. Replace flange gasket or oil plug if
2630 G 46 BD No. 2 350 700
attending required.
Drain the oil from drain plug. Remove the motor & gear box
from position.Repair/replace the GB mounting flange bolt.
2640 G 47 Lignite RALF gear box replacements Issue new gear box from store and place in position. BD No. 4 2425 9700
Lubricate the gear box. Fit the motor,replace coupling if
required. Align gear box with motor. Assist trial.
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
2670 G 50 Lig. RALF Clutch torque setting Lig. RALF Clutch torque setting as per instruction of E-I-C. BD No 85 312 26520
Lig. RALF Inspection for abnormal sound. Inspection door
2680 G 51 Lig. RALF Inspection to be opened & work to be carried out /Cleaning of Srapper BD No 45 1723 77535
& Bucket as per instruction of E-I-C.
2690 G 52 Lig RALF Scraper shaft replacement 0 BD No 4 24525 98100
G 3. Master Fuel trip valve.
Decouple the master fuel trip from electrical actuator &
remove the spindle nut. Remove the cover plate. Remove
the MFT plate along with spindle. Decouple the plate from
spindle. Dismantle the entire gate. Check for damage
Overhauling/Servising of motorise internals viz. sealing rope, accenders, bearings, spindle nut,
2700 G 53 PM No 10 14649 146490
MFT etc. Replace/repair any damaged internals. Replace the
MFT plate, spindle if required. Ensure purge/service air
pressure & flow. Box up. Ensure the free manual operation
of MFT for full open/full close position. Assist for the limit
switch setting with electrical dept. Assist trial run.
Open the cover. Clean the spindle, Lubricate the spindle
2710 G 54 Spindle gate lubrication. PM No. 4 520 2080
with grease. Box up.
Once
2720 G 55 Manual operation of the MFT. Open /close the MFT manually as per instruction of EIC. BD Operatio 30 517 15510
n
Open the top flange of MFT cover plates. Remove the bed
2730 G 56 Internal cleaning of MFT material by applying air. Clean the entire empty chamber BD No. 5 691 3455
area. Ensure purge/service air pressure & flow. Box up.
62
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
Once
2740 G 57 Opening/closing of lignite bunker gate. Open/close the lignite bunker gates as per requirements. BD Operatio 80 431 34480
n
Remove the spindles of gate. Clean the gear pairs, nut &
2750 G 58 Lignite bunker gate servicing. BD No. 20 1382 27640
bearings. Check freeness of gate. Box up.
Open the cover of MFT. Remove the spindle. Remove nut &
2760 G 59 MFT spindle nut replacements BD No. 10 862 8620
box up after replacing nut.
Ensure that bunker is completely empty. Ensure electrical
isolation of lignite conveyor. Open all bunker outlet gates.
Bunker inspection & its liner plate(
Make proper approach for inspection. Inspect the liners on
2770 G 60 Polymer or SS 310) repairing/ BD No. 5 29370 146850
all sides of bunker plate. Repair/replace as per E -I/C. Liner
replacement
size is @ 1x2 meter. Remove the scrap. Normalise the
system.
G 4. Limestone air lock feeder. 10 TPH.
Isolate the Airlock feeder. Clean the annular space between
casing and rotor. Grease the bearings. Check the oil level
2780 G 61 PM of Lime stone RALF and top-up if necessary. Check the condition of oil seal and PM No. 35 689 24115
replace if necessary. Tighten the gland or replace the gland,
if required.
Isolate the feeder. Remove the motor & Gear box. Remove
Replacement of limestone air lock
2790 G 62 the feeder & replace it with new feeder. Fit the gear box & BD No. 2 2413 4826
feeders.
motor. Normalise & assist trial run.
Rotary air lock feeder DE/NDE Remove the motor. Replace the bearing using proper tools
2800 G 63 BD No. 2 689 1378
bearing replacements (any-1) and tackles. Install new bearing. Normalise & assist trial run
Open the seal cover on both side. Replace new seal. Box
2810 G 64 Shaft seals replacements of RALF BD No. 25 553 13825
up.
Drain the oil from the gear box. Remove the motor.
2820 G 65 Oil seal replacement of RALF Replaced the oil seal from the gear box. Place the motor BD No. 2 553 1106
and fill the oil in gear box.
Drain the oil from the gear box. Remove the motor. Remove
2830 G 66 Servising/ Overhauling of RALF. the gear box. Remove the rotar assy. Place the new rotar BD No. 2 2758 5516
assy. Normalise.
63
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
Delink the chain and remove bottom portion link from the
per
lignite conveyor and carry out groove cleaning work as per
Lig. Conveyor Bottom portion link bottom
2970 G 80 instruction of EIC. After complition of the grrove cleaning BD 6 13235 79410
removal work. portion
insert the bottom part of the coveyor, box up the conveyor
links
and take trial.
Lignite conveyor Gear Box Servicing Dismantle the gear box assembly, thoroughly inspect for the
2980 G 81 BD NO 2 7381 14762
work. problem and replace the damaged parts and box up.
Lignite RALF Gear Box Servicing Dismantle the gear box assembly, thoroughly inspect for the
2990 G 82 BD NO 5 2771 13855
work. problem and replace the damaged parts and box up.
Lignite conveyor gear box to motor Decouple the gear box and motor , carry out alignment work
3000 G 83 BD NO 4 1112 4448
alignment work. and coupled the gear box and motor.
Decouple the drive. Open the side plates.Decouple the
Conveyor link Sprockets replacement.
3010 G 84 chain link . Replace sprocket.Couple the link .Normalise the BD NO 8 1039 8312
Phase-1-(Single/one side)
conveyor.Assist trial run.
Replacements of NMEJ betn feeder Replacement of NMEJ between feeder and conveyor as per
3020 G 85 BD NO 2 6007 12014
and conveyors. Size 1mx2m EIC
3030 G 86 Lig RALF Scraper shaft repair. Repair of scraper shaft as per EIC BD NO 4 1112 4448
Remove the gland follower of any one shaft seals. Remove
Single side Gland replacement of
3040 G 87 the all old galnd packing. Placed the new gland packing. BD NO 6 553 3318
Lime RALF
Tighten the gland follower. Clean the all area.
3050 G 88 Flight bar repair/replacement work Repair/replace flight bar as per direction of EIC. BD No 10 278 2780
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per UoM (AXB)
(UoM)
(B)
Remove the cover plate. Remove the MFT plate along with
spindle. Decouple the plate from spindle. Dismantle the
entire gate. Check for damage internals viz. sealing rope,
accenders, bearings, spindle nut, etc. Replace/repair any
3080 G 91 Overhauling/Servicing of Manual MFT BD No. 4 4076 16304
damaged internals. Replace the MFT plate, spindle if
required. Ensure purge/service air pressure & flow. Box up.
Ensure the free manual operation of MFT for full open/full
close position.
Ensure the Elec/Mech isolation.Dismental the RALF and
inspect the rotor bucket. Blank the rotor bucket by plate
3090 G 92 Limstone RALF flow adjustment BD No. 2 2225 4450
welding as per EIC. Box up the RALF and normalise for
trail.
PHASE # 1 Part : G TOTAL 3752935
66
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Nature al Total
PART
3100 H 1 CRM /ERM/GDRM oil top up. Check for oil level/condition, Oil top up/replace if reqd. BD No. 20 140 2800
clean the ERM/CRM/GDRM (Any one) gear box externally
PM of CRM /ERM/ GDRM open the Motor/Gear box flange, inspect the internals.Check
3110 H 2 PM No. 150 624 93600
gear box. for any leakage from oil seal, view glass and if required
attend the same.
Remove the wire snapped electrode. Inspect for tension /
Replacement of emitting worn out emmitting electrode. Replace new electrode using
3120 H 3 BD No. 150 104 15600
electrode. ONE ELE-1 QTY stretching tool divice only to ensure required tension. Box
up.
Replacement of shaft
Decouple the motor gear box assembly. Remove the cover
3130 H 4 insulators for emmitting BD No. 4 1106 4424
plate.. Replace the insulator .
rapping mechanism
Alignment of collecting / Align the collecting / emmitting gear box assembly with the
3140 H 5 BD No. 4 829 3316
emmitting gear box. rapping mechanism shaft.
Un load damaged gear box from site and shift it to
maintenance area/ work shop. Dismantle whole gear box as
per standard maintenance practice or instruction of E-
Servicing of collecting / I/C.Identify the damaged,wear & tear parts and hand over
3150 H 6 BD No. 4 2211 8844
emmitting rapping gear box. list to E-I/C. Issue required spare from ware house. install
new parts/spare in existing gear box assemble gear box for
ready for install/replace and tagged the same and shift it to
site/warehouse/spare assembly area.
67
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Nature al Total
PART
68
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Nature al Total
PART
Nature al Total
PART
70
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Nature al Total
PART
71
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : I Bed Ash Conveying System
First
Year
Unit Bi-
C Sr. No
72
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : I Bed Ash Conveying System
First
Year
Unit Bi-
C Sr. No
73
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : I Bed Ash Conveying System
First
Year
Unit Bi-
C Sr. No
74
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : I Bed Ash Conveying System
First
Year
Unit Bi-
C Sr. No
75
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : I Bed Ash Conveying System
First
Year
Unit Bi-
C Sr. No
76
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : I Bed Ash Conveying System
First
Year
Unit Bi-
C Sr. No
Carry out the damper servicing work, check it's open and
close movement , coorect if any gap observed in between
3620 I 26 PA/SA damper servicing work. plates. Check all the link elements repair/replaced if PM NO 29 4076 118204
required. Greasing of all the link assembly. Decoupled and
coupled with actuator if required. Take trail run.
77
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : I Bed Ash Conveying System
First
Year
Unit Bi-
C Sr. No
78
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : I Bed Ash Conveying System
First
Year
Unit Bi-
C Sr. No
79
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : I Bed Ash Conveying System
First
Year
Unit Bi-
C Sr. No
Shift material from store to site. Inspect the duct wall for
Replacement of casing and duct wear.Remove damage/oxodized plate and Prepare new
3700 I 34 plate up to 16 mm thick at plate as per required size (except bending), Replace with BD MT 15 38249 573735
COD/cyclone/ Cto C etc…… MS plate of up to 16.0 mm thickness as per E-I-C. Remove
scrap from site to scrap yard as per EIC
Seal box removing at Hot spot Seal box plate and refractory / Bed material / ceramic wool
area and all jack removing from shell plate by cutting set, chissel -
3710 I 35 BD No. 120 3877 465240
Size: 900 X 500 X 250 mm of hammer or breaker machine, All metalic and refractory
6/8mm IS 2062 M.S plate debris / scrap removing from site to scrap yard as per EIC
NMEJ patch up work. (during
Clean the area around NMEJ. Identify leakages/ hot spot.
forced outage/AOH of boiler)
Attending by patch up work by ceramic wool or high
Locations : C to C,Backpass
3720 I 36 temperature cloth as per EIC. Normalise. Check for flue gas BD No. 6 1379 8274
inlet, COD inlet NMEJ, Seal pot ,
leakage. (all leakages in one NMEJ to be considered as
Air duct NMEJ., Flue gas duct
one no.)
NMEJ.
80
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : I Bed Ash Conveying System
First
Year
Unit Bi-
C Sr. No
81
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : J Fuel Firing System.
Unit
Unit of Rate
C Sr. No
Replacements of hoses of Isolate the fuel, steam, air, gas supply. Replace the hose
3810 J 4 BD No. 30 691 20730
SUB / BL. with new one. Assist trail run ,Check for any leakage.
82
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : J Fuel Firing System.
Unit
Unit of Rate
C Sr. No
Repair / replacements of
steam, air, fuel oil atomising Remove the valve from skid. ( Flange joint) Open the
3850 J 8 and trip valve of SUB / BL valve, Check for any damage to seat, disc etc. Replace if BD No. 8 1112 8896
control station. reqd. or replace the valve with new one.
Size:- Upto 1.5".
Strainer (Oil, steam, air)
Open the strainer, clean the element with diesel , air. Box
3860 J 9 cleaning from SUB / BL BD No. 38 829 31502
up.
control station.
Strainer (Oil , Steam , air )
3870 J 10 replacements from SUB / BL Replace the strainer with new one. BD No. 4 416 1664
control station.
Steam, oil leakage arresting
Identify the leakage, remove insulation if reqd. Tighten the
3880 J 11 from the SUB / BL control BD No. 65 829 53885
flange, replace gasket if reqd.
station skid.
Adjust the pressure of steam/oil/air.Open the cover of the
3890 J 12 Pressure adjustment of valve BD No. 3 72 216
valve. Adjust bolt asper E-I-C.
Bed Lance guide pipe Remove the bed lance from position. Clear the chocking of
3900 J 13 BD No. 32 208 6656
cleaning. guide pipe. Fixed the Bed lance.
83
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : J Fuel Firing System.
Unit
Unit of Rate
C Sr. No
84
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : J Fuel Firing System.
Unit
Unit of Rate
C Sr. No
85
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
Replacement of LP valves Remove the damaged valve from position make neccssary
4010 K 3 above 2" upto 8" size ( 800 edge preparation and weld the new valve in position. Check BD No. 8 2088 16704
Class and below ) for no leakage.
Gland tightening of valves up to Clean the bolts and gland follower, apply cleaner,Tighten the
3" size of various class for gland follower tightening bolts to the maximum possible
4030 K 5 BD No. 100 140 14000
water, steam, oil and air extend to arrest the gland leakage. Tighten both the bolts
applications uniformly, apply dry moly spray.
86
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
Gland tightening of valves Clean the bolts and gland follower, apply cleaner,Tighten the
above 3" size of various class gland follower tightening bolts to the maximum possible
4040 K 6 BD No. 15 210 3150
for water, steam, oil and air extend to arrest the gland leakage. Tighten both the bolts
applications uniformly, apply dry moly spray on the bolts.
87
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
88
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
Replacement of HP valves Remove the damaged valve from position make neccssary
4130 K 15 more than 3" to 8" size ( 1500# edge preparation and weld the new valve in position. Check BD No. 4 2985 11940
and above ) for no leakage.
89
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
90
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
91
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
Isolate the valve from sealing air side, Remove the gland
Gland replacement of Spiess follower and remove the entire gland packing set. Clean the
4260 K 28 BD No. 4 630 2520
valves sprindle and gland follower and replace with new gland
packing set and box up. Check for no leakage
92
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
Once
Manual operation of spiese
4290 K 31 Open/close the spiese valve manually as per EIC
EIC. BD operatio 80 278 22240
valve.
n
Replacement of valves handle Remove the valve handle from position. Replace with new
4300 K 32 BD No. 22 420 9240
upto 4'' one.
93
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
Isolate the valve from cooling water and seal air side, remove
the cooling water, seal air hoses. Remove complete assly of
spiess valve from position. Dismentle spiess valve shaft from
Servicing/Overhauling of body. Check the condition, ovality of shaft, condition cone.
combustor Spiess valve Remove the damaged shaft and replace with the new one if
4310 K 33 BD No. 8 7417 59336
assembly. Size: OD- 80mm, require. Cleaning of shaft sleeve & replaced gland packing.
Legth: 2.5 meter. Build up cone with special electrode as per instruction of EIC.
Box up & align the valve as per EIC .Connect the cooling
water,
water seal air hoses.
hoses Check for no leakage,
leakage passing and
normal operation
94
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
Isolate the valve from cooling water and seal air side, remove
the cooling water, seal air hoses. Remove complete assly of
spiess valve from position. Dismentle spiess valve shaft from
Servicing/Overhauling of body. Check the condition, ovality of shaft, condition cone.
FBHE/Seal pot Spiess valve Remove the damaged shaft and replace with the new one if
4320 K 34 BD No. 8 10201 81608
assembly. Size:OD- 135mm, require. Cleaning of shaft sleeve & replaced gland packing.
Legth: 3.5 meter. Build up cone with special electrode as per instruction of EIC.
Box up & align the valve as per EIC .Connect the cooling
water,
water seal air hoses.
hoses Check for no leakage,
leakage passing and
normal operation
Freeness checking of various Check the valve for jamming. Made free if required. Lubricate
4330 K 35 size of gate and globe valves: the spindle of valve. Assist trial run of valve by opening and BD No. 300 140 42000
Size- upto 3" closing of valve.
Freeness checking of various Check the valve for jamming. Made free if required. Lubricate
4340 K 36 size of gate and globe valves: the spindle of valve. Assist trial run of valve by opening and BD No. 15 556 8340
Size- above 3" upto 16" closing of valve.
95
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
Cleaning of valves above 3" External cleaning of valves by manually and with spray.It
4380 K 40 BD No. 18 210 3780
size should be cleaned properly without any dust
Remove the damaged valve from position and install the new
Replacement/Installation of
4400 K 42 valve on position. Check for no leakage as per direction of BD No. 4 1669 6676
KGV up to 300 NB pipe size
EIC. Remove the scrape from surrounding.
Replacement/installation of air Remove the damaged valve from position and install the new
4410 K 43 line valve up to 50 NB pipe valve on position. Check for no leakage as per direction of BD No. 3 948 2844
size EIC.
96
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : K Valves
Unit of Unit
C Sr. No
Nature Biennial
PART
Pipe removal / replacement / Make necessary approch for work and Remove/replace/erect
per
4430 K 45 erection above size 100 NB up the MS/SS/GI pipe as per the direction of EIC. Check for no BD 18 1391 25038
meter
to 300 NB leakage.
Clamp fabrication for online
4440 K 46 leakage attending of steam Fabricate the clamp as per required size of pipe. BD No. 4 1112 4448
leakage
PHASE # 1 Part : K TOTAL 923387
97
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : L Soot Blower
Unit
Unit of Rate
C Sr. No
Chain tension adjustments of Check for chain tension. Adjust the chain tension with the
4470 L 3 BD No. 6 104 624
rotary and traverse motor. help of gear box adjustments.Clear the area.
98
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : L Soot Blower
Unit
Unit of Rate
C Sr. No
Lubrication of rotary /
transeverse gear box, chain of Fill the oil / change the oil from gear box. Grease the
4520 L 8 BD No. 12 277 3324
jack shaft, drive chain, chain, travelling carraige assy. As per E-I-C.
travelling carraige assy. Etc.
Decoupling / Coupling of rotary Declutch the both gear box. Decouple the gear box from
4530 L 9 BD No. 70 173 12110
/ transverse motor motor. Box up.
Jack shaft chain replacements/ Declutch the both drive. Remove the chain from jack
4540 L 10 BD No. 2 518 1036
repair. shaft. Repair / replaced as per E-IC
Travelling carraige assy. Gland Remove the worn out gland. Replaced the gland. Tighten
4570 L 13 BD No. 45 415 18675
packing replacements the gland as per E-I-C.
Steam blowing bar ( strip) Remove the damaged strip (blowing bar) Check during
4620 L 18 BD No. 40 277 11080
replacements. operation.
Remove the lance from position. Fix new lance in
4630 L 19 Lance tube replacement position. Align lance in carraige assy. Box up. Assist trial BD No. 12 5056 60672
run.
Puppet valve plug Check puppet valve plug thread. If found damage tap
4640 L 20 BD No. 3 69 207
replacement. new thread. Fix new plug. Box up.
Isolate the system from steam side remove the damaged
gasket replacement of Poppet
4650 L 21 gasket and replace with new one charge the line and BD No. 20 1035 20700
valve
check for any leakage.
100
ANNEXURE -A
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 1 Part : L Soot Blower
Unit
Unit of Rate
C Sr. No
Jack shaft end bearing Remove old bearing of jack shaft assembly and replace it
4670 L 23 PM No. 12 553 6636
replacement 1 No. bearing with new one
Drive end bearing replacement Remove old bearing of drive shaft assembly and replace
4680 L 24 PM No. 18 484 8712
1 No. bearing it with new one
Opening & closing of soot
Opening & closing of soot blower manual valve during
4690 L 25 blower manual valve during PM No. 1500 68 102000
sootblowing as per instruction of GIPCL EIC
sootblowing
4700 L 26 external cleaning of sootblower External cleaning of soot blower assembly PM No. 80 137 10960
101
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : M Fuel Oil Handling
Unit
Unit of Rate
C Sr. No
102
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : M Fuel Oil Handling
Unit
Unit of Rate
C Sr. No
Decouple the pump from motor. Take the motor out for
pump dismentaling. Remove the bearing, mechanical seals.
Dismentle the pump & check all internals. Replace/repair the
damaged internals. Check the both DE & NDE bearing,
Servicing of pump / mech seal ,its washer, etc & replace if required. Box up the
4810 M 8 BD No. 5 8249 41245
replacement of pump pump, bearing,mech seals. Lubricate the bearing. Ensure
the freeness of pump by manual operation. Replace the
coupling, if required. Fit the motor & align with pump. assist
trial run.and replace if required. Align and couple. Clean the
area & remove the scrap. p
Pressure adjustments of
4820 M 9 Adjust the pressure relief valve as per E-I-C. BD No. 2 263 526
pump.
Arrest the leackage from the flange, strainer flange. Tighten
Steam leakage arresting from
4830 M 10 it or replaced the gasket as per E-I-C. Clean the drain oil / BD No. 12 1308 15696
heater skid.
water from the skid.
Fuel oil leakage arresting Clean the area.Arrest the leakages from the flange, strainer
4840 M 11 from pump skid and heater flanges. Tighten it or replace the gasket as per E-I-C. Clean BD No. 3 1308 3924
skid. the drain oil / water from the skid.
Steam strainer cleaning from Isolate the strainer. Remove the filter elements. Clean with
4850 M 12 BD No. 4 592 2368
Pump skid and Heater skid. diesel / air. Box up.Clean the area.
Fuel oil strainer cleaning from Isolate the strainer. Remove the filter elements. Clean with
4860 M 13 BD No. 16 1045 16720
Pump skid and Heater skid. diesel / air. Box up.Clean the area.
Replacement of oil valve upto Isolate the system. Cut the damage valve. Replace the
4870 M 14 BD No. 2 1308 2616
3" size. valve with new one.
Attending gland leakages of
4880 M 15 Tighten the glands. Replace if necessary BD No. 4 523 2092
valves upto NB 3"
103
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : M Fuel Oil Handling
Unit
Unit of Rate
C Sr. No
104
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Isolate cooler from water and oil side. Drain oil in the empty
4930 N 4 PM of Working oil / lub oil cooler BD No. 2 2211 4422
barrel. Clean the water box
Topping of Diesel in EBFP Fuel Shift the diesel barrel from stores and top the oil in fuel oil
4970 N 8 BD No. 8 1041 8328
tank tank to the level as per EIC
Topping of Lub oil in Lub oil Shift the Lub oil barrel from stores and top the oil in fuel oil
4980 N 9 BD No. 2 208 416
tank tank to the level as per EIC
Remove the old oil from lub oil tank completely. Clean the
4990 N 10 Lub oil replacement. tank from inside. Clean the view glass. Fill the tank as per BD No. 2 1665 3330
instruction of EIC.
Isolate the lub oil filter from oil side and clean the filter
5010 N 12 Lub oil filter cleaning which is choked. After cleaning charge the lub oil filter and BD No. 2 416 832
check for any leakage attend if any
107
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 1 Part : O Hoist
Unit
Unit of Rate
C Sr. No
108
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
109
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
Inspection and external This activity is to be carried out in running unit, so utmost
cleaning of Drain Header care to be taken while doing the work and dont disturb any
1&2 Station. valves or cable etc. Clean all valves ,apply dry molyspray on
5110 P 4 PM No 10 789 7890
It consists of around 40 - its stem. Clean the Drain header area .remove all dirt, dust,
nos valves upto 2" size is oil, grease, insulationn scrap, metallic scrap, etc. Note the
considered as one no. defects and inform it to E-I/C. Shift the scrap to scrap yard.
Inspection and external This activity is to be carried out in running unit, so utmost
cleaning of valves station care to be taken while doing the work and dont disturb any
at drum level and 33 mtr valves or cable etc. Clean all valves ,apply dry molyspray on
5120 P 5 elevation. its stem. Clean the Drum area & 33 meter valve station area PM No 10 789 7890
It consists of 15 nos valves .Remove all dirt, dust, oil, grease, insulationn scrap, metallic
upto 2" size is considered scrap, etc. Note the defects and inform it to E-I/C. Shift the
as one no. scrap to scrap yard.
Inspection/ Cleaning of RH
attemperator, SH This activity is to be carried out in running unit, so utmost
attemperator & Soot care to be taken while doing the work and dont disturb any
blower Control valves valves or cable etc. Clean all valves ,apply dry molyspray on
5130 P 6 PM No 10 789 7890
station its stem. Clean the valve station area .Remove all dirt, dust,
It consists of 30 -nos oil, grease, insulationn scrap, metallic scrap, etc. Note the
valves upto 2.5" size is defects and inform it to E-I/C. Shift the scrap to scrap yard.
considered as one no.
This activity is to be carried out in running unit, so utmost
Inspection/ Cleaning of care to be taken while doing the work and dont disturb any
Combustor species valve / valves or cable etc. Clean all valves ,apply dry molyspray on Per
5140 P 7 PM 15 197 2955
FBHE to ash cooler its stem. Clean the valve station area .Remove all dirt, dust, Valve
Speciss valve station oil, grease, insulationn scrap, metallic scrap, etc. Note the
defects and inform it to E-I/C. Shift the scrap to scrap yard.
110
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
111
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
112
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
114
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
115
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
116
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
117
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
118
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
119
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
120
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
121
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
123
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
124
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
Annexure B3 Unit rates are excluding GST
Phase-1 & 2 unforeseen work Execution of unforeseen work
Unit of
Biannual
Nature Measur Rate (Rs.) Per Total Price
Sr. No. Name of activity Scope of Work Quantity
Of Work ement UOM (B) (AXB)
(A)
(UOM)
A B C D E F G H
Mill Right fitter , IBR Welder- Execution of
Unforesee
1 During Normal Duty unforeseen work Per Day 255 1100 280500
n work
Piping fitter, Structural fitter, Execution of
Unforesee
2 Mechanical fitter-During unforeseen work Per Day 255 880 224400
n work
Normal Duty
Welder, cutter, Rigger, Execution of
grinder, Refractory breaker unforeseen work Unforesee
3 operator, Painter, Per Day 255 836 213180
n work
Electrician-During Normal
Duty
Helper-During Normal Duty Execution of Unforesee
4 Per Day 550 770 423500
unforeseen work n work
Mill Right fitter , IBR Welder- Execution of Unforesee
5 Per HR 760 275 209000
Additional duty unforeseen work n work
Piping fitter, Structural fitter, Execution of
Unforesee
6 Mechanical fitterAdditional unforeseen work Per HR 760 220 167200
n work
duty
Welder, cutter, Rigger, Execution of
grinder, Refractory breaker unforeseen work Unforesee
7 Per HR 760 209 158840
operator, Painter, n work
Electrician-Additional duty
Helper-Additional duty Execution of Unforesee
8 Per HR 1684 192 323328
unforeseen work n work
TOTAL 2000000
For Final Cost consideration say 20,00,000 (20 Lakhs)
Note 1:Rates as given above shall include cost of all manpower,Vehicle, equipment consumables (except free issue materials by
GIPCL) labor, supervision, tools and tackles, transport,Safety and statutory compliance, mobilization, Contingency expenditure
and supervision charges etc. and such other cost are not specifically mentioned herein but will be incurred by the contractor for
the satisfactory and timely completion of the work.
Note 2: The quantities specified are estimated and for tendering purpose only. Payment will be made, based on actual work done as certified by
Engineer-in-charge of GIPCL and inline with "INSTRUCTIONS TO BIDDERS & CONDITIONS OF CONTRACT"
SUB TOTAL -1 FOR PHASE -1 1000000
SUB TOTAL -2 FOR PHASE -2 1000000
125
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
126
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 2 Part : A PRESSURE PARTS
Unit
C Sr. No
Scaffolding Erection
127
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 2 Part : A PRESSURE PARTS
Unit
C Sr. No
128
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 2 Part : A PRESSURE PARTS
Unit
C Sr. No
Erection of scaffolding in
economiser hopper Shift necessary scaffolding material. Make proper
80 A 8 Size of scaffolding - 2mx2mx3m.
2mx2mx3m scaffolding & platform as per instruction of EIC
EIC. Remove BD No.
No 2 793 1586
Scaffolding materials in the the scaffolding.
scope of contractor.
Unit
C Sr. No
Unit
C Sr. No
Unit
C Sr. No
132
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 2 Part : A PRESSURE PARTS
Unit
C Sr. No
133
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 2 Part : A PRESSURE PARTS
Unit
C Sr. No
134
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 2 Part : A PRESSURE PARTS
Unit
C Sr. No
Unit
C Sr. No
Welding in windboxes of Clean the place to be welded, Cut & edge prepare the
combustor / FBHE / Seal pot. material. Then weld by MMAW on both sides (Hot side &
310 A 31 BD No 550 278 152900
Size - 300 mm welding length is cold side). Carry out the LPI on the weld joint and ensure
consideres as 1 No the leak proofness.
Opening and closing of Drum
Ensure proper cooling. Open both manhole doors. Inspect
Manhole doors
320 A 32 drum internally. Replace the gaskets and close the man BD No 4 1665 6660
Both side Manhole door is
hole doors.
considered as 1 No.
Ensure proper cooling. Open both manhole doors. Install
exhaust fan at one end for forced cooling. Inspect all drum
internals namely, cyclone separators, driers, pipings etc,
Take necessary precaution to prevent foreign material
Inspection and cleaning of drum
330 A 33 falling inside drum/drum opening. Remove all drum BD NO. 2 14203 28406
internal
internals (turboseprator assy. 60 nos. and screen type drier-
30 nos.) Replace/repair damage bolts, nuts etc. Clean all
internals and refix. Box up the manhole door. Above work
is consoder as one no.
Shift material from store to site. Clean the coils. Remove
Repair / replacement of cassette the old cassette baffles with new ones. Clamp and weld.
340 A 34 BD No. 10 630 6300
baffle in Backpass Material: SS Repair the damaged ones if required and re-position the
fallen ones.
Replacement/Repair of cap of Remove the damage nozzle cap by grinding the welded
nozzle in portion. Weld new nozzle cap by welding a bolt plate on it.
350 A 35 BD No. 1200 280 336000
Combustors,FBHE,Seal pot and Do LPI. Rectify the defect found in LPI. Weld the nozzle
Ash coolers.( SS material) cap damage portion if required
Unit
C Sr. No
Impulse pipe repair / Remove the damaged portion by cutting. Replace new
380 A 38 replacement up to 16 mm dia of pipeline by TIG/SMAW welding as per E-I-C. Check for BD Per Mtr. 5 699 3495
SS material. any leakage by charging. Repair the joint if required.
Erection / Replacement of Remove the damged portion of pipe. Erect new pipe line
pipeline in drain and vent piping by TIG/SMAW welding as per instruction of EIC. MOC:
390 A 39 BD Per Mtr. 12 1679 20148
(Pre.160Kg/sq.cm) Max. 3" dia. CS / alloy steel. Support to be provided along with clamp if
MOC: CS. required.
Erection / Replacement of
400 A 40 pipeline in drain and vent piping -DO- BD Per Mtr. 70 1679 117530
(Pre.40 kg/sq.cm) Max. 2" dia.
Unit
C Sr. No
Unit
C Sr. No
510 A 51 Bolted type. Open manhole door.replaced rope with new one. Box up. BD No. 500 210 105000
Erection and welding of anchors Erection and welding of anchors as per the instruction of E-
520 A 52 BD No. 4000 42 168000
of all sizes and type(SS). I-C.
139
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 2 Part : A PRESSURE PARTS
Unit
C Sr. No
Unit
C Sr. No
141
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
Unit
Bienni
Unit of Rate
Sr. No
Nature al Total
PART
W k
Work tty (AXB)
(UoM) UoM
(A)
(B)
GIPCL E-I-C intimate to mobilize additional gange
consists of 1 IBR approved welder, 01 pressure
Mobilization of additional part fitter, 01 grinders, 01 gas cutter and 04 helpers,
manpower for presure contractor shall mobilize additional gang seperately
#### E 1 part work for forced within 24 Hrs. BD No. 10 23849 238490
shutdown of unit as per
instruction of GIPCL EIC Activity to be consider only if, complete mentioned
gang mobilized.Partial mobilization not to be
consider.
Pressure part area inspection for bed material
Bed material Leakage
#### E 2 leakage (i.e area include Combustor ww, FBHE ww, PM No. 100 280 28000
inspection
sealpot etc.)
Sox point dechoking Sox point to be clean and dechoked at ID fan
#### E 3 BD No. 96 206 19776
workk di
discharge.
h
Fabrication of Bend tube up to Dia 57 mm. To
fabricate the Bend tube preparation of Spool length
Fabrication of pressure with filling the sand inside the tube and tube to be
#### E 4 p
part bends up p to OD temporery
p y dummied byy welding. g Cold or Hot BD No. 200 630 126000
57mm bending to be carried out as per EIC instruction.
After bending, tube to be normalised (i.e removal of
temporery dummied and cleaning of tubes.
142
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
143
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -A
PHASE # 2 Part : A PRESSURE PARTS
Unit of
Biennial Unit Rate
Nature of Measure
S.No Name of the Activity Scope of Work Quantity (Rs.) Per
Mntc. ment
(A) UoM (B)
(UoM)
144
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : B SA Fan / PA fan
Bienni
Unit Unit
C Sr. No
Nature al Total
PART
Bienni
Unit Unit
C Sr. No
Nature al Total
PART
IGV link assy./IGV flap /guide ring / Open the manhole doors. Check for any damage link assy. /
640 B 3 Link shaft bearing/ gland removal flap/bearing/gland packing.Replace with new one.if required. BD Per Mtr. 15 1041 15615
or repair. (Any-1) Check IGV for full operation. Box up.
146
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : B SA Fan / PA fan
Bienni
Unit Unit
C Sr. No
Nature al Total
PART
147
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
Unit Unit
C Sr. No
Biennial Total
PART
Unit Unit
C Sr. No
Biennial Total
PART
Unit Unit
C Sr. No
Biennial Total
PART
Open the top cover /top half of the bearing. Inspect bearings
DE/NDE bearing Each
870 C 11 for clearances/damage etc. Note bearing clearance. Box BD 2 1382 2764
inspection. bearing
up.If required replace as per sr. no.10
De couple the both halves of coupling as per the requirement
880 C 12 De-coupling and coupling for facilitating other work and couple after completion of BD No. 2 973 1946
work.
De couple the both halves of coupling.Check
Checking of Coupling or alignment.Correct the alignment if required.Check the
890 C 13 BD 0 2 1444 2888
Greasing of coupling condition of coupling bolts (Repair/replace if required).
Grease the coupling .Tighten the coupling bolts..
Decouple the HC from Fan & motor side.Remove both half of
Coupling repair /
900 C 14 coupling. Change with new coupling. Align properly, Grease BD No. 2 6198 12396
replacement
the coupling.Box up. Assist trial run.
Providing manpower for assisting balancing of fan/motor.
Assistant for Balancing of
910 C 15 This includes welding of trial/final weight. Correctness of BD Each Fan 4 2225 8900
Impellar/Fan
alignment. Inspection of bearings etc.
Manhole door opening and Open the Manhole door, inspect the volute casing and Box-
920 C 16 BD No. 4 520 2080
closing for Inspection up Manhole door.
150
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
Unit Unit
C Sr. No
Biennial Total
PART
Decouple the HC from Fan & Motor side. Open the top half
of the HC. Remove lub oil / water connecting pipe line from
HC. Shift the internals of HC to work shop. Dismantle the
Hydraulic coupling
entire HC as per insruction of EIC. Check for any damage
950 C 19 Overhauling as per the BD No. 0 44501 0
internals. Replace the damage parts. Replace bearings.
direction of expert engr.
Check lub oil pump, replace if require. Check oil condition ,
replace entire oil if require. Box up and align with fan &
motor. Assist trial run.
Alignment of id fan phase- ID fan alignment with Motor.Align and correct coupling
960 C 20 BD Per 4 7345 29380
2 between motor and fan.
Ensure the Elec/Mech isoaltion.Decouple the
ID Fans alignment fan/motor.Check the alignment of fan/motor and take reading
970 C 21 BD Per. 4 1106 4424
checking work alignment and coupling gap.Couple the fan/motor or do
alignment as per sr.no-20 and direction of EIC.
151
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
Unit Unit
C Sr. No
Unit Unit
C Sr. No
New oil Drain complete oil from tank. Clean the tank & view glass
1110 D 13 Filling/Replacement upto after oil draining. Fill the tank with new oil up to normal level. BD No. 4 1659 6636
350 litres Box up. Clean the area.
New oil
1120 D 14 Filling/Replacement more ….DO … BD Once 2 2211 4422
than 350 litres
Pump not developing Adjust the releif valve.Attend leakage of oil if any and
1130 D 15 BD Each 2 416 832
pressure restore.
Decouple the pump. Remove all connecting piping and
Replacement of lub oil
1140 D 16 fittings.Replaced with new one. Align and couple it. Assist BD No. 5 829 4145
pump.
trial run.
Replacements of relief
Isolate the system. Replaced with new relief valve.Assist
1150 D 17 valve of lub oil pump / lub BD No. 2 829 1658
trial run. Adjust relief valve if required.
oil system
Valve repair / relacements
of lub oil system. Water Check for leakage /passing of valve. Attend the
1160 D 18 BD No. 4 624 2496
and oil side. Max up to 1 leakage/passing problem. Replace the valve if required.
inch size.
Remove the filter element from the casing. Replace with
1170 D 19 Lub oil Filter replacements. BD No. 4 416 1664
new one.
Sight glass / flow indicator
Replace/ repair the sight glass / flow indicator with new
1180 D 20 cleaning/replacements. BD No. 60 624 37440
one.Ensure leakproofness of valve.
Water and oil side.
Flexible hose
1190 D 21 replacements. Water / oil Replace hose with new one. Check for no-leackage. BD No. 12 416 4992
side.
Replacement of DE/NDE Decouple. Dismantle the damaged bearing.Replace new
1200 D 22 BD Each 2 833 1666
Bearing of Scanner Air Fan ones.Lubricate. Align with motor and install V-Belts.
153
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
Unit Unit
C Sr. No
Replcements of
Remove the belt guard. Replaced the set of belts. Adjust
1210 D 23 belts/alignment of scanner BD Set 2 416 832
the tension , align properly. Fix the belts guard.
air fan.
Replacements of suction Remove the strainer by opening of bolts. Replace the
1220 D 24 BD No. 2 416 832
strainer of scanner air fan. strainer with new one. Fix new gasket & box up.
ID fan bearings oil leakage
1230 D 25 Check for any leakage.attend leak as per E-I-C BD No. 8 829 6632
attending.
Bearing NDE & DE
1240 D 26 leakage arresting - water & Check for leakages from the bearings. Attend the same. BD No. 20 829 16580
oil side.
PHASE # 2 Part : D TOTAL 222275
154
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -B Unit rates are excluding GST
Unit Unit
C Sr. No
Biennial Total
PART
Open the man hole doors, Clean the duct with scapping /
cleaning tools & tackles.collect all material at ground floor.
1250 E 1 Suction duct cleaning. BD No. 2 15399 30798
Joint inspection carried out By GIPCL Engineer Incharge.
Scrap the same Box up man holed door
Unlock the strainer casing. Remove the fabric strainer. ,
Suction Stainers
1260 E 2 replace it or Clean the fabric as well as internals of strainer PM No. 60 484 29040
cleaning of LT Blower
with compressed air. Box up.
Suction Stainers
1270 E 3 _-Do_ PM No. 310 553 171430
cleaning of HT blower
Clean the suction stainers.
stainers Check oil level/condition.
level/condition Top up
the oil or replace as per instruction of EIC. Attend leakages
if any.Check belt tension, adjust/replace belts set if
require.Check the lobe condition varify clearances.rotate
1280 E 4 PM of LT blower blower manually and identify any abnormalities if any.Check PM No. 35 1244 43540
and varify condition of pulley by belt guage Clean the blower
unit. Check speed sensing disc, replace if require. Check
the foundation bolt for tightness.Clean the oil view glass and
replace if found damage.
Decouple/ coupling of Remove the belt guard.Loosen the belt by lifting mechanism
HT blower with motor. of motor using screw jack/hydraulic jack. Remove belt from
1300 E 6 (belt drive) or Belt pulley. Check alignment of motor and blower pulley. Correct BD No. 4 691 2764
replacement of HT alignment if required. Refix/replace the belt & adjust belt
blower tension. Refix belt guard. Assist trial run.
155
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -B Unit rates are excluding GST
Unit Unit
C Sr. No
Biennial Total
PART
Decouple/ coupling of LT
blower with motor. (belt
1310 E 7 drive) or Belt -do- BD No. 4 553 2212
replacement of LT
blower
Suction strainer filter Remove the strainer from the position. Repair/replace if any
1330 E 9 element repair/ internals found damage I.e filter element, sponge element BD No. 5 862 4310
replacements etc. Box up the strainer.
Oil top up /replacements Check the oil condition/colour visually. Refill/Top up /replace
1340 E 10 BD No 100 208 20800
in the gear box of blower oil as per E-I-C.
Oil level indicator sight Drain the oil from the gear box to oil pot. Remove sight
1350 E 11 glass cleaning/repair / glass. Clean it, refix it properly. Fill removed oil again still BD No 14 312 4368
replacements normal oil level
Repair/replacements of Remove the MEJ from the position. Inspect for any damage.
1360 E 12 MEJ at discharge of Repair if possible by welding. Or replaced with new one. BD No 2 1732 3464
blower Place in position. Check for leackage.
156
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -B Unit rates are excluding GST
Unit Unit
C Sr. No
Biennial Total
PART
Speed sensor flap Inspect the speed sensing disc.Reair/replace the same if
1400 E 16 BD No. 8 556 4448
repair/Replacement necessary. Fabricate the sensor plate if require.
Servicing of safety
Dismantle the safety valve and service the same as per
1410 E 17 valves in blower BD No. 6 2211 13266
instructions of EIC.Replace any damage internals. Box up.
discharge line.
Replacement of Oil seal Remove the drive pulley and open the end cover of drive
1420 E 18 BD No. 6 1379 8274
at DE drive shaft. side. Install new Oil seal and Box-up
157
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -B Unit rates are excluding GST
Unit Unit
C Sr. No
Biennial Total
PART
Servicing of NRV in Dismantle the NRV and service the NRV. Fabricate the flap
1430 E 19 BD No. 6 1112 6672
Blower discharge line. of NRV. Replace the flap of the NRV if required.Box up.
Oil leakage arresting Identify the leakage. Clean area of leakage. Attend the
1440 E 20 BD No. 30 691 20730
from blower leakage as per EIC.
Suction Filter Removal of Existing Suction Filter from Blower Assembly &
1450 E 21 BD No. 11 416 4576
Replacement install new suction filter (Bed Ash , Sealpot blowers)
158
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
ANNEXURE -B Unit rates are excluding GST
Unit Unit
C Sr. No
Biennial Total
PART
IInspectt blower
bl b lt gurad
belt d assemblybl on intimation
i ti ti b
by
engineer-in charge, verification of failure of belt.Receipt MIV
from EIC ,collect belt from ware house,open belt
guard,remove old belt (send them to scrap yard) , install
Belt replacement- LT
1520 E 26 new belt , check freeness of both pulley before and after BD No. 5 695 3475
(K35 / GM 35 / GM 25)
instllation of belt.check tightness of belt ,verify belt
alignment do alteration if alignment is not ok ,verify sensing
of zero speed switch, box up belt guards, iremove all tools
tackles / manpower from site and inform to EIC
discharge damper Inspect Discharge damper assembly on intimation by
1530 E 27 inspection & minor repair engineer-in charge, verification of defect ,inform to EIC , BD No. 6 484 2904
for any defect Work to be carried out as per EIC`s instruction
discharge damper Inspect Discharge damper assembly on intimation by
replacement work / engineer-in charge for Major Repair / OH ,submit assesment
1540 E 28 BD No. 3 3058 9174
Major Repair for work inform to EIC , Work to be carried out as per EIC`s
Overhauling instruction
Inspect Safety valve assembly on intimation by engineer-in
Servicing of safety
charge for Verify defect , asses the defect and plan work to
1550 E 29 valves in blower BD No. 4 1112 4448
repair the sameWork to be carried out as per EIC`s
discharge line.
instruction
159
PHASE # 2 P t:E
Part TOTAL 758058
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Open the top cover plates. Check chain flight , pin, circlip
etc. Check the damage/worn out plates. as per instruction
of EIC, Replace or Straightened the bent links by heating
PM of bed ash and hammering . Clean the drive mechanisam. Check for
1560 F 1 PM No. 65 1659 107835
conveyor. wear of driving mechanisam. Check oil level in gear box.
Lubricate the drive chain, bearings. Inspect bearings,
sprockets, . Take trial run. Adjust chain tension if required
And submit Pm report immediately to Engineer in-charge
Lubrication of bed ash Bed ash conveyor all bearing greasing, Gear box oil level
1570 F 2 PM No. 215 416 89440
conveyer checking and top-up if required etc…..
Greasing of driving Remove the chain guard. Clean the chain & Apply
1580 F 3 PM No. 20 210 4200
chain grease.Place the chain guard.
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Idler replacements of
Open the top cover plate. Delink chain from idler. Remove
bed ash conveyor NDE
1610 F 6 the bearings. Replace the idler. Box up bearings. Normalise BD No. 2 1935 3870
side. Size: OD-400mm
the conveyors.
& 60mm width.
Driving double roller Open the chain guard. Remove the double roller chain.
1620 F 7 chain repair / Replace if found damaged. Adjust the chain tension and BD No. 4 1382 5528
replacements. align it. Normalise the conveyor
Shear pin Open the chain guard. Remove the damaged shear pin.
1630 F 8 BD No. 120 260 31200
replacements. Replaced with new one. Fix the chain guard.
161
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Bearings inspection DE Open the top half of the bearing. Inspect the bearing.
1640 F 9 BD No. 5 553 2765
& NDE side (Any-1) Lubricate and box up.
Shaft seal Remove the bearings with plummer block. Replace shaft
1670 F 12 BD No. 2 1382 2764
replacements seal and labyrinth seal with new one.
162
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Conveyor chain flight Open the cover plate. Remove the circlip and pin of chain
1700 F 15 BD No. 750 260 195000
replacements flight. Replace with new one. Normalise the conveyor
163
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Filling of refractory
between wear plate and As per instruction of E-I-C, prepare refractory mix and fill in
1720 F 17 BD Meter 10 1382 13820
casing (gap 50mm, the gap & cure it.
Height - 150mm).
150mm)
Chain tension Loosen the tail end. Adjust the chain tension as per E-I-C.
1730 F 18 BD No. 5 208 1040
adjustment Tighten the tail end.
Remove the old oil from the gear box. Fill the new oil. Clean
1740 F 19 Lubrication of gear box. BD No. 7 208 1456
the gear box.
164
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Speed sensing disc Remove the cover of disc. Repair / replace the with new
1750 F 20 BD No. 2 416 832
repair / replacements one. Place the cover.
Guide rail
Open the top & bottom cover plate. Remove the chain.
replacements. Size:
1760 F 21 Inspect for guide rail. Replaced with new one.length of guide BD No. 2 6259 12518
50mm width,16mm
rail @2meter in 4 location.
thick,8m length
Replacement of motor
Open the Drive chain guard.Remove the drive
1770 F 22 end small sprocket of BD No. 2 2008 4016
chain.Remove the worn-out sprocket and replace with new.
duplex roller chain.
165
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Replacement of
Conveyor end bigger Open the Drive chain guard.Remove the drive
1780 F 23 BD No. 2 4500 9000
sprocket of duplex roller chain.Remove the worn-out sprocket and replace with new.
chain.
Drain the oil from Gear box. Dismantle the drive motor and
Dismantling and refixing
1790 F 24 install new motor .Fill Oil in gear box. Ensure no oil leakages BD No. 2 1386 2772
of Drive Motor (Geared)
from the Gear box.
166
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Drain the oil. Remove the motor. Remove the gear box from
Replacement of drive the position. Replace the gear box woth new one.. Place it
1810 F 26 BD No. 2 7633 15266
end gear box. position. TOP up the oil. Fix its drive sprocket and drive
chain in position. Box up.
Drain the oil. Remove the motor. Dismantle the gear box.
Inspection internal and Identify damaged spares.
1820 F 27 Servicing of gear box. Repair/service the gear box as per instruction of E-I-C. BD No. 2 4423 8846
Place it position. TOP up the oil. Fix its drive sprocket and
drive chain in position. Box up.
F 2. Rotary air lock feeder 10 TPH / 32 TPH
Lubrication of bed ash bed ash rotary air lock feeder all bearing greasing, Gear box
1840 F 29 PM No. 150 208 31200
rotary air lock feeder oil level checking and top-up if required etc…..
167
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Replacement of bed
1850 F 30 material / ash cooler Isolate the feeder, remove the feeder, replace new, restore. BD No. 2 2781 5562
feeders.
Shaft seals Open the seal cover on both side. Replace new seal. Box
1870 F 32 BD No. 5 416 2080
replacements of RALF up.
Drain the oil from the gear box. Remove the motor. Replace
Oil seal replacement of
1880 F 33 the oil seal from the gear box. Place the motor and fill the oil BD No. 2 1041 2082
RALF
in gear box.
168
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Drain the oil from the gear box. Remove the motor.
Servicing of Rotary air
1890 F 34 Removed the gear box. Service the rotor assy and gear BD No. 2 4146 8292
lock feeder..
box. Normalise.
Check for oil level in gear box. Fill oil or totally replace the oil
1910 F 36 Lubrication of gear box. BD No. 2 520 1040
as per E-I_C.
Repair replacements of
1920 F 37 Replace the disc with new one if required. BD No. 2 525 1050
speed sensing disc.
F 3. Ash cooler
169
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Choking removal of ash Remove the ash cooler drain valve/spiese valve sight glass.
cooler spiese valve to Carried out pocking through valve /sight glass opening.
1930 F 38 BD No. 200 829 165800
ash cooler line/spiese Carry out hammering of the line if required. Clear chockage.
valve mouth. Normalise.
Repair / replacemetns
Remove the valve from position.Dismentle the valve. Clean
of grate drain valve /
1940 F 39 it.Freeness checking. Assemble the valve. Replace BD No. 12 1041 12492
wind box drain
gasket/bolts/nut with new one & box up.
valve.(Up to 150NB)
170
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
171
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Choking removal of
1970 F 42 conveying line from I/A Clear the chock by applying air. Normalise it. BD No. 14 520 7280
bin to bed material silo.
Open the cover of bag filter. Remove the bag filter. Remove
Servicing of Bag filter
bags from the filter. Clean the bags with service air or
1980 F 43 /Replacement of all PM No 8 2764 22112
replace bag if require. Clean the perging lines and check for
bags in bag filter
air coming from all perging line .Box up.
172
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Replacements of air
2000 F 45 hose of filter cleaning Isolate the air supply. Replace the hose with new one. BD No. 1 520 520
system.
Repair / replacements
Remove / dismantle the damaged NMEJ. Repair / replace
2010 F 46 of NMEJ of dust BD No. 0 1382 0
as per instruction of E-I-C.
extraction fan.
Dust extraction fan Open the cover. Decouple fan. Replace coupling with new
2020 F 47 BD No. 0 691 0
coupling replacements. one. Align the fan & box up.
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Bed material Draining Open the grate drain valve. Drain the chamber as per
2060 F 51 BD N
No. 700 276 193200
from FBHE BC/EC requirement and Remove chocking if any . Close the valve.
Bed material Draining Open the grate drain valve. Drain the combuster as per
2070 F 52 BD No. 40 870 34800
from Combustor. requirement and Remove chocking if any . Close the valve.
174
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
175
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Chocking clearing of
Bed material filling line Check the line for chock up.Hammer the line & pocking.If
from bed ash silo to chock up not cleaned, cut the pocket or open the flange , do
2090 F 54 BD No. 620 520 322400
combustor/Chocking pocking and welding the cut pocket or refix the flange. After
clearing of PA windbox removal of chock up normalise the system.
conveying line
176
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
177
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Mixing nozzle
Replace the damage nozzle and put new nozzle by welding
2120 F 57 replacement in PA BD No 4 1321 5284
and bolting
coveying line
Bed ash
Open the man hole door. Check the level of ash in
2140 F 59 silo.Intermediate ash BD No. 25 107 2675
bunker/silo.
bin level checking.
178
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
Bed Ash Conveyors Open the Door & Remove the foreign materials from the
2150 F 60 BD NO 12 350 4200
discharge line Inpection disharge line grill. Door box up.
179
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : F Bed Ash Conveying System
Unit of Unit
C Sr. No
Biennial
PART
180
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit of Unit
C Sr. No
Biennial
PART
1. Lignite Conveyor
Decouple the drive. Open the top plates.Decouple the chain
Conveyor link Sprockets (Both
2180 G 1 link . Replace sprocket.Couple the link .Normalise the OM No. 2 8877 17754
side) replacement. Phase-2
conveyor.Assist trial run.
Check chain looseness. Loosen the tail end bracket. Adjust
2190 G 2 Chain tension adjustments. the chain by tightening the bolts as per E-I-C.Tighten the tail OM No. 180 346 62280
end bracket.
Greasing of DE / NDE bearings
of conveyors, chain
Clean the bearings. Apply the grese with pressure. Remove per
2200 G 3 compensation bearings, flow PM 340 260 88400
the additional graese from bearings from outside. conveyor
indicator bearings.Total no of
bearings - 8 per conveyor
Remove the chain guard. Apply grease with oil
2210 G 4 Greasing of driving chain PM No. 24 210 5040
mixture.Place the chain guard.
Ensure Isolation of the conveyor from bunker. Open the
cover plates of lignite conveyor. Remove the complete
lignite from conveyor length. Remove the entire chain from
conveyor & Clean the groove. Check for any damage of
guide rail/brackets. Adjust if required or repair/replace the
rail/bracket.check the conveyor casing for leakages and
replace the casing plate/top cover plate. Inspect all the
Servising/Overhauling of Lignite bearings, replace if required. Check sprocket condition and
2220 G 5 PM No. 8 61957 495656
conveyors. change if required. Check the idler at tail end. Fix in position
if found dislodged or replace if required. Lubricate the
conveyor drive chain and bearings. Inspect the bassalt
liners & repair/replace as per instructions of Engr I/C.
Inspect the lingnite chain link & repair/replace as per
instructions of E-I/C. Check the drive chain &
repair/replace, if required. Align the gear box with conveyor.
Normalise the system. Assist trial run.
181
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit of Unit
C Sr. No
Biennial
PART
Open the drive end covers. Remove the lignite. Inspect the
Lignite conveyor chain link
2230 G 6 link pin/flighted link for damage.Replace the damage PM No. 565 312 176280
inspection
link.Adjust the chain tension if required. Box up.
Adjust the hole of sprocket,replace the shear pin.Fit circlip
2240 G 7 Shear Pin replacement BD Nos. 200 156 31200
on both sides of shear pin.Restore to normal.
Ensure Isolation of the conveyor from bunker. Open the
cover plate and remove lignite from conveyor. Remove the
Replacement of entire chain link entire chain from position. Clean the groove of the
2250 G 8 BD Nos. 2 19642 39284
of conveyor. conveyor. Place the entire chain link assy. Normalise the
bunker gates.Box up and assist trial run.Adjust the chain
tension during trial run.
Isolate the lignite feeder from lignite bunker. Open feeder
Removal of one link of drag link cover. Remove the lignite from drive end of the conveyor.
2260 G 9 BD per link 140 695 97300
chain by drive end inspection Remove/Replace one link of conveyor chain.Adjust chain
tension.Restore.
Ensure Isolation of the lignite feeder from lignite bunker.
Open feeder cover plates at 3-4 places from drive to tail end
Inspection of lignite conveyor of conveyor.Remove the lignite conveyor from drive to tail
2270 G 10 assembly for conveyor end. Clean the grooves.Check the complete conveyor links. BD No 22 3858 84876
breakdown Note the damages.Check the circlip & replace the damaged
one. check & replace the shear pin.Adjust chain tension .
Restore.Assist the trial run.
Replacement of chain link of
Shift the new link from store to site.Remove the damaged
2280 G 11 conveyor as per noted defect in BD per link 550 1239 681450
chain links & replace it with new one.
S No 1.10 as above .
Decouple the motor assembly of driving gear box.
Main drive -Gear box
2290 G 12 Repair/replace assembly. Align the gear box with motor. BD No. 2 2413 4826
mechanism Repacement
Restore to normal.
182
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit of Unit
C Sr. No
Biennial
PART
Open the top cover plate. Decouple the chain link . Remove
Idler/shaft replacements of
the shaft end seals.Remove the bearings.Remove the shaft
lignite conveyor NDE side.Size
& idler. Replace or repair the idler / shaft / beraing, shaft
2300 G 13 of shaft :- OD 120 mm & length BD No. 3 8877 26631
end seals; if required.Put the shaft & idler in position. Fit the
@ 2 meter, Size of idler:-436
bearings & do greasing. Normalise the conveyors.Assist
mm OD & width 60 mm
trial run.
Open the top cover plate. Remove the chain
links.Repair/Build up the sprocket by welding with
2310 G 14 Sprocket repair /build up work BD No. 4 1740 6960
hardfacing electrod Flush grind the weld area. Join the
chain link and normalize the conveyor.
Open the chain guard. Remove the tripple roller chain.
Driving chain tripple rollar repair
2320 G 15 Replaced if damage. Adjust the chain tension and aligned it. BD No. 22 1723 37906
/ replacements.
Normalise the conveyor
Bearing replacements of lignite
Open the bearing plummer block. Replace the bearing with
2330 G 16 conveyors, DE / NDE side.(any- BD No. 4 1723 6892
new one.
1)
Open the bearing plummer block. Inspect the bearing in
Bearing Inspection of Lignite
2340 G 17 detail and inform condition to Engineer in charge.After BD No. 4 829 3316
conveyor DE/NDE.(any-1)
instruction of engineer in charge box up the bearing.
Basalt lining / refractory Open the cover plate of conveyors. Identified the damaged
Sq.
2350 G 18 application in the lignite liner portion. Remove the chain flights. Apply refractory / BD 2 2902 5804
meter
conveyors. basalt lining as per E-I-C
Remove the old oil from the gear box. Fill the new oil. Clean
2360 G 19 Lubrication of gear box. BD No. 35 416 14560
the gear box.
Speed sensing disc repair / Remove the cover of disc. Repair / replace the with new
2370 G 20 BD No. 4 208 832
replacements one. Place tne cover.
Lignite flow indicator Open the cover plate of conveyor. Adjust the flap of flow
2380 G 21 BD No. 4 520 2080
adjustments. indicator. Box up
Open the cover plate. Remove the shaft from
Repair / replacements of flow
2390 G 22 position.Check the bearings & replace if required. BD No. 4 1382 5528
indicator shaft & its bearings
Repair/replace the shaft . Box up
183
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit of Unit
C Sr. No
Biennial
PART
Unit of Unit
C Sr. No
Biennial
PART
Lig. Conveyor link cleaner Lig. Conveyor link cleaner repairing/replacement as per
2480 G 31 BD No 4 1732 6928
repair/replacement work instruction of E-I-C.
Lig. Conveyor gear box coupling Lig. Conveyor gear box coupling repair/replacement as per
2490 G 32 BD No 2 520 1040
repair/replacement instruction of E-I-C.
G 2. Lignite rotary air lock feeder.
Isolate the system. Remove geared motor, gear box, clutch
assy., Open inspection cover and dismatle the entire feeder.
Inspect for any damage parts viz. bearings, shaft sleeve,
Overhauling/Servising of Lignite
2500 G 33 sealing strip, casing sleeve, bucket, rotor of feeder as well PM No. 8 45181 361448
RALF
as scraper etc. Replace any damaged internals if required.
Check for clearences. Carry out lubrication of gear box as
well as bearings. Assemble as per E-I-C. Assist trial run.
Greasing of DE / NDE bearings
Clean the bearings. Apply the grease with pressure. Clean
2510 G 34 of rotor, scrapper assy. Of lignite PM No. 360 520 187200
the excess grease from outside.
RALF.
Shaft stuffing box leakage Tighten the SINGLE shaft seals of scraper and rotor shaft
2520 G 35 BD No. 140 624 87360
arresting. as per instruction of EIC. Clean the area.
Lig. RALF Shaft stuffing box Remove the gland follower of any one shaft seals. Remove
2530 G 36 seal/gland replacements.(Single the all old galnd packing. Placed the new gland packing. BD No. 70 276 19320
side) Tighten the gland follower. Clean the all area.
Open the gear box. Drain the old oil/grease. Refill / replaced
2540 G 37 Lubrication of gear box. BD No. 152 520 79040
the new oil / grease.
Rotate rotary air lock feeder manually through coupling,
Open the top cover plate. Inspect feeder from inside for any
2550 G 38 Clearing RALF jamm. foreign material, remove if any, Put mixture of bed material BD No. 150 1379 206850
with water from top, hand rotate for 2 to 3 revolution and
make free. Box up.
Speed sensing disc repair / Remove the cover of disc. Repair / replace the with new
2560 G 39 BD No. 4 278 1112
replacements one. Place the cover.
Repair of NMEJ betn feeder and pull the top of the lignite conveyor. Remove the expansion
2570 G 40 BD No. 2 1212 2424
conveyors. Size 1mx2m joint, replaced with new one. Box up
185
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit of Unit
C Sr. No
Biennial
PART
Clean the area properly. Check for any leakage of flue gas
On line leackage arresting of
of bed material. Apply sodium silicate with refractory,
2580 G 41 NMEJ/MEJ betn feeder and seal BD No. 12 1212 14544
ceramic wool mixture. Make necessary arrangements to
pot.
hold mixture using plates etc. Arrest leakage.
Drain the oil from Gear box. Decouple the drive motor and
Dismantling and refixing of
2590 G 42 install new motor .Couple the drive motor & align it.Fill Oil in BD No. 4 1206 4824
RALF Drive Motor (Geared)
gear box. Ensure no oil leakages from the Gear box.
Isolate the RALF. Open the manhole door remove all
damaged sealing strips by cutting / grinding. Replace with
Replacement of Sealing strips
2600 G 43 new sealing strips as per EIC. Check the clearance BD Set 6 2082 12492
for Rotor / Scrapeer
between casing and rotor. Box up and check for free
rotation of the feeder
Isolate the feeder. Dismantle the feeder by removing gear
box, motor, clutch assy, remove the bearings, shaft
Replacement of shaft sleeve and
2610 G 44 protection sleeves and replace with new one, check the BD No. 5 8836 44180
bearing replacement work
clearances, check the condition of bearing and replace if
required box up and check for free rotation as per EIC
Isolate the feeder, drain the oil dismantle the gear box
2620 G 45 Replacement of Oil seal replace the damaged oil seal, box up the gear box check for BD No. 5 1106 5530
leakages as per EIC.
Lignite RALF gear box Leakage Identify the leakage. Replace flange gasket or oil plug if
2630 G 46 BD No. 2 350 700
attending required.
Drain the oil from drain plug. Remove the motor & gear box
from position.Repair/replace the GB mounting flange bolt.
Lignite RALF gear box
2640 G 47 Issue new gear box from store and place in position. BD No. 8 2425 19400
replacements
Lubricate the gear box. Fit the motor,replace coupling if
required. Align gear box with motor. Assist trial.
Unit of Unit
C Sr. No
Biennial
PART
2670 G 50 Lig. RALF Clutch torque setting Lig. RALF Clutch torque setting as per instruction of E-I-C. BD No 120 312 37440
Lig. RALF Inspection for abnormal sound. Inspection door
2680 G 51 Lig. RALF Inspection to be opened & work to be carried out /Cleaning of Srapper BD No 40 1723 68920
& Bucket as per instruction of E-I-C.
Lig RALF Scraper shaft
2690 G 52 0 BD No 3 24525 73575
replacement
G 3. Master Fuel trip valve.
Decouple the master fuel trip from electrical actuator &
remove the spindle nut. Remove the cover plate. Remove
the MFT plate along with spindle. Decouple the plate from
spindle. Dismantle the entire gate. Check for damage
Overhauling/Servising of internals viz. sealing rope, accenders, bearings, spindle nut,
2700 G 53 PM No 10 14649 146490
motorise MFT etc. Replace/repair any damaged internals. Replace the
MFT plate, spindle if required. Ensure purge/service air
pressure & flow. Box up. Ensure the free manual operation
of MFT for full open/full close position. Assist for the limit
switch setting with electrical dept. Assist trial run.
Open the cover. Clean the spindle, Lubricate the spindle
2710 G 54 Spindle gate lubrication. PM No. 80 520 41600
with grease. Box up.
Once
2720 G 55 Manual operation of the MFT. Open /close the MFT manually as per instruction of EIC. BD Operatio 20 517 10340
n
Open the top flange of MFT cover plates. Remove the bed
2730 G 56 Internal cleaning of MFT material by applying air. Clean the entire empty chamber BD No. 12 691 8292
area. Ensure purge/service air pressure & flow. Box up.
187
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit of Unit
C Sr. No
Biennial
PART
Once
Opening/closing of lignite bunker
2740 G 57 Open/close the lignite bunker gates as per requirements. BD Operatio 50 431 21550
gate.
n
Remove the spindles of gate. Clean the gear pairs, nut &
2750 G 58 Lignite bunker gate servicing. BD No. 56 1382 77392
bearings. Check freeness of gate. Box up.
Open the cover of MFT. Remove the spindle. Remove nut &
2760 G 59 MFT spindle nut replacements BD No. 8 862 6896
box up after replacing nut.
Ensure that bunker is completely empty. Ensure electrical
isolation of lignite conveyor. Open all bunker outlet gates.
Bunker inspection & its liner
Make proper approach for inspection. Inspect the liners on
2770 G 60 plate( Polymer or SS 310) BD No. 2 29370 58740
all sides of bunker plate. Repair/replace as per E -I/C. Liner
repairing/ replacement
size is @ 1x2 meter. Remove the scrap. Normalise the
system.
G 4. Limestone air lock feeder. 10 TPH.
Isolate the Airlock feeder. Clean the annular space between
casing and rotor. Grease the bearings. Check the oil level
2780 G 61 PM of Lime stone RALF and top-up if necessary. Check the condition of oil seal and PM No. 22 689 15158
replace if necessary. Tighten the gland or replace the gland,
if required.
Isolate the feeder. Remove the motor & Gear box. Remove
Replacement of limestone air
2790 G 62 the feeder & replace it with new feeder. Fit the gear box & BD No. 2 2413 4826
lock feeders.
motor. Normalise & assist trial run.
Rotary air lock feeder DE/NDE Remove the motor. Replace the bearing using proper tools
2800 G 63 BD No. 2 689 1378
bearing replacements (any-1) and tackles. Install new bearing. Normalise & assist trial run
Shaft seals replacements of Open the seal cover on both side. Replace new seal. Box
2810 G 64 BD No. 25 553 13825
RALF up.
Drain the oil from the gear box. Remove the motor.
2820 G 65 Oil seal replacement of RALF Replaced the oil seal from the gear box. Place the motor BD No. 4 553 2212
and fill the oil in gear box.
Drain the oil from the gear box. Remove the motor. Remove
2830 G 66 Servising/ Overhauling of RALF. the gear box. Remove the rotar assy. Place the new rotar BD No. 4 2758 11032
assy. Normalise.
188
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit of Unit
C Sr. No
Biennial
PART
Unit of Unit
C Sr. No
Biennial
PART
Delink the chain and remove bottom portion link from the
per
lignite conveyor and carry out groove cleaning work as per
Lig. Conveyor Bottom portion bottom
2970 G 80 instruction of EIC. After complition of the grrove cleaning BD 4 13235 52940
link removal work. portion
insert the bottom part of the coveyor, box up the conveyor
links
and take trial.
Lignite conveyor Gear Box Dismantle the gear box assembly, thoroughly inspect for the
2980 G 81 BD NO 2 7381 14762
Servicing work. problem and replace the damaged parts and box up.
Lignite RALF Gear Box Dismantle the gear box assembly, thoroughly inspect for the
2990 G 82 BD NO 6 2771 16626
Servicing work. problem and replace the damaged parts and box up.
Lignite conveyor gear box to Decouple the gear box and motor , carry out alignment work
3000 G 83 BD NO 2 1112 2224
motor alignment work. and coupled the gear box and motor.
Conveyor link Sprockets Decouple the drive. Open the side plates.Decouple the
3010 G 84 replacement. Phase-1- chain link . Replace sprocket.Couple the link .Normalise the BD NO 0 1039 0
(Single/one side) conveyor.Assist trial run.
Replacements of NMEJ betn
Replacement of NMEJ between feeder and conveyor as per
3020 G 85 feeder and conveyors. Size BD NO 2 6007 12014
EIC
1mx2m
3030 G 86 Lig RALF Scraper shaft repair. Repair of scraper shaft as per EIC BD NO 2 1112 2224
Remove the gland follower of any one shaft seals. Remove
Single side Gland replacement
3040 G 87 the all old galnd packing. Placed the new gland packing. BD NO 8 553 4424
of Lime RALF
Tighten the gland follower. Clean the all area.
Flight bar repair/replacement
3050 G 88 Repair/replace flight bar as per direction of EIC. BD No 20 278 5560
work
Lignite RALF inspection for Inspect the Lignite RALF in running condition for frquent per
3060 G 89 BD 230 143 32890
tripping tripping or any abnormalities. Inform to EIC. Lig.RALF
Ensure Elec/Mech isolation of conveyor. Isolate the bunker
Lignite Bunker liner removal
3070 G 90 gate if required. Remove the liner from bunker as per BD No. 2 1112 2224
work
direction of EIC.
190
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
Unit of Unit
C Sr. No
Biennial
PART
Remove the cover plate. Remove the MFT plate along with
spindle. Decouple the plate from spindle. Dismantle the
entire gate. Check for damage internals viz. sealing rope,
Overhauling/Servicing of accenders, bearings, spindle nut, etc. Replace/repair any
3080 G 91 BD No. 6 4076 24456
Manual MFT damaged internals. Replace the MFT plate, spindle if
required. Ensure purge/service air pressure & flow. Box up.
Ensure the free manual operation of MFT for full open/full
close position.
Ensure the Elec/Mech isolation.Dismental the RALF and
inspect the rotor bucket. Blank the rotor bucket by plate
3090 G 92 Limstone RALF flow adjustment BD No. 2 2225 4450
welding as per EIC. Box up the RALF and normalise for
trail.
PHASE # 2 Part : G TOTAL 4018999
191
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
Unit of Unit
C Sr. No
Nature Biennial
PART
3100 H 1 CRM /ERM/GDRM oil top up. Check for oil level/condition, Oil top up/replace if reqd. BD No. 10 140 1400
clean the ERM/CRM/GDRM (Any one) gear box externally
PM of CRM /ERM/ GDRM open the Motor/Gear box flange, inspect the internals.Check
3110 H 2 PM No. 180 624 112320
gear box. for any leakage from oil seal, view glass and if required
attend the same.
Remove the wire snapped electrode. Inspect for tension /
Replacement of emitting worn out emmitting electrode. Replace new electrode using
3120 H 3 BD No. 25 104 2600
electrode. ONE ELE-1 QTY stretching tool divice only to ensure required tension. Box
up.
Replacement of shaft
Decouple the motor gear box assembly. Remove the cover
3130 H 4 insulators for emmitting BD No. 8 1106 8848
plate..
l t Replace
R l the iinsulator
th l t .
rapping mechanism
Alignment of collecting / Align the collecting / emmitting gear box assembly with the
3140 H 5 BD No. 5 829 4145
emmitting gear box. rapping mechanism shaft.
Un load damaged gear box from site and shift it to
maintenance area/ work shop. Dismantle whole gear box as
per standard maintenance practice or instruction of E-
Servicing of collecting / I/C.Identify the damaged,wear & tear parts and hand over
3150 H 6 BD No. 3 2211 6633
emmitting rapping gear box. list to E-I/C. Issue required spare from ware house. install
new parts/spare in existing gear box assemble gear box for
ready for install/replace and tagged the same and shift it to
site/warehouse/spare assembly area.
192
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
Unit of Unit
C Sr. No
Nature Biennial
PART
193
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
Unit of Unit
C Sr. No
Nature Biennial
PART
Unit of Unit
C Sr. No
Nature Biennial
PART
195
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
Unit of Unit
C Sr. No
Nature Biennial
PART
196
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : I Bed Ash Conveying System
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per (AXB)
(UoM)
UoM (B)
Clean & Grease the driving chain. Operate the gate & check
for full open/ full close. Overhauling of gear box. Check the
condition of all the sealing strips fand replace if required.
Servicing of ESP / IDGates Replace the bearings, chain, sprockets if required. Trail
3370 I 1 PM No. 32 10201 326432
(Inlet / outlet). operation with limit switch setting in-co-ordination with
electrical / C & I people. Scraping and painting of gate.
Apply of lubricant dry molycote. (Supply of Molycote on
GIPCL scope )
Remove the electrical actuator. Clean the old grease from
Servicing of ESP gates gear gear box. Check for damage of bearings, internals etc.
3380 I 2 PM No. 2 7417 14834
boxes. Replace the damage internals if required. Apply new grease
& box upup.
Identify the damage NMEJ faric cloth. Remove bolts of
damage cloth area. Patch up the fabric cloth as per
3390 I 3 Repair of NMEJ in PA/SA duct BD Each 4 2784 11136
instruction of E-I-C. Check for any leakage of air. Hot tighten
the bolts.
Replacement of NMEJ
Remove the fabric cloth by removing bolts. Fix the new
assembly in PA/SA duct.Size:
3400 I 4 NMEJ clothes as per instruction of E-I-C.. Check for air BD Each 6 10201 61206
Circumferential length of
leakage. Hot tighten the bolts.
NMEJ up to 6 meter
Replacement of NMEJ
assembly in PA/SA duct.Size:
3410 I 5 Circumferential length of -- do -- BD Each 6 14834 89004
NMEJ more than 06 Meter and
up to 10 meter
Shift material from store to site. Inspect the duct wall for
Replacement of casing and wear. Patch with MS plate of 3.15 mm / 6.0 mm /8.00mm
3420 I 6 BD MT 20 25946 518920
duct plate up to 6 mm thick /10mm thickness as per E-I-C. for baffles the plate shoud be
as per actual profile only.
197
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : I Bed Ash Conveying System
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per (AXB)
(UoM)
UoM (B)
Repair / replacements of Lock the blower air pipe. Loosen the flange joints of Mettalic
Metallic Expansion Joints expansion joints. Remove the MEJ. Fixed new one by fixing
3430 I 7 BD No. 4 4076 16304
(MEJ) in blower air line. Max. rope at flanges. Normalise the air pipe. Check for any air
dia 405 mm (Flanged) leakage. Hot tighten the bolts.
Internal cleaning of combustor Inspect the expansion joints. Dismantle the bottom portion of
to cyclone Non Metallic the expansion joint Check for ingress of bed material. Clean
3440 I 8 Expansion Joints (NMEJ) at the material if any. Repair for damage if any. Fill the missing BD No 16 1665 26640
bottom portion. Length-@ 4.5 insulation material properly including anchor welding and
meter boxup.
Internal cleaning of cyclone to
3450 I 9 back pass NMEJ at bottom -do- BD No. 16 1665 26640
portion. Length - @5 meter
198
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : I Bed Ash Conveying System
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per (AXB)
(UoM)
UoM (B)
199
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : I Bed Ash Conveying System
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per (AXB)
(UoM)
UoM (B)
200
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : I Bed Ash Conveying System
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per (AXB)
(UoM)
UoM (B)
201
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : I Bed Ash Conveying System
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per (AXB)
(UoM)
UoM (B)
Carry out the damper servicing work, check it's open and
close movement , coorect if any gap observed in between
3620 I 26 PA/SA damper servicing work. plates. Check all the link elements repair/replaced if PM NO 60 4076 244560
required. Greasing of all the link assembly. Decoupled and
coupled with actuator if required. Take trail run.
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per (AXB)
(UoM)
UoM (B)
203
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : I Bed Ash Conveying System
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per (AXB)
(UoM)
UoM (B)
Shift material from store to site. Inspect the duct wall for
Replacement of casing and wear.Remove damage/oxodized plate and Prepare new
3700 I 34 duct plate up to 16 mm thick at plate as per required size (except bending), Replace with BD MT 20 38249 764980
COD/cyclone/ Cto C etc…… MS plate of up to 16.0 mm thickness as per E-I-C. Remove
scrap from site to scrap yard as per EIC
204
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : I Bed Ash Conveying System
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per (AXB)
(UoM)
UoM (B)
Seal box removing at Hot spot Seal box plate and refractory / Bed material / ceramic wool
area and all jack removing from shell plate by cutting set, chissel -
3710 I 35 BD No. 200 3877 775400
Size: 900 X 500 X 250 mm of hammer or breaker machine, All metalic and refractory
6/8mm IS 2062 M.S plate debris / scrap removing from site to scrap yard as per EIC
Erection of retainer plate (as Shifting of material from store. Ensure surface preparation
per requirement drawing / E-I- of base plate by cleaning, grinding etc. Erection and welding
3740 I 38 BD No. 30 696 20880
C) Size: 600x200x10 mm of of the retainer plate in Cyclone & COD NMEJ area, Bullnose
SS plate area, any other area (as per requirement, drawing / E-I-C)
Cutting and welding of SS clit for fabrication of anchors/
Fabrication of anchors of all
3750 I 39 preparation from old anchors for reuse as per requirement, BD No. 500 62 31000
size of SS material
E-I-C.
Assist for opening & closing of measuring port. (One boiler
Assistance for Oxygen level
3760 I 40 oxygen level level measurement at various points shall be BD NO 6 268 1608
measurement work
considered as 01 NO)
205
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : I Bed Ash Conveying System
Unit
Unit of
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quantity (Rs.) Price
NO ment
Work (A) Per (AXB)
(UoM)
UoM (B)
206
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : J Fuel Firing System.
Unit
Unit of Rate
C Sr. No
Replacements of hoses of Isolate the fuel, steam, air, gas supply. Replace the hose
3810 J 4 BD No. 30 691 20730
SUB / BL. with new one. Assist trail run ,Check for any leakage.
207
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : J Fuel Firing System.
Unit
Unit of Rate
C Sr. No
Repair / replacements of
steam, air, fuel oil atomising Remove the valve from skid. ( Flange joint) Open the
3850 J 8 and trip valve of SUB / BL valve, Check for any damage to seat, disc etc. Replace if BD No. 8 1112 8896
control station. reqd. or replace the valve with new one.
Size:- Upto 1.5".
Strainer (Oil, steam, air)
Open the strainer, clean the element with diesel , air. Box
3860 J 9 cleaning from SUB / BL BD No. 38 829 31502
up.
control station.
Strainer (Oil , Steam , air )
3870 J 10 replacements from SUB / BL Replace the strainer with new one. BD No. 4 416 1664
control station.
Steam, oil leakage arresting
Identify the leakage, remove insulation if reqd. Tighten the
3880 J 11 from the SUB / BL control BD No. 65 829 53885
flange, replace gasket if reqd.
station skid.
Adjust the pressure of steam/oil/air.Open the cover of the
3890 J 12 Pressure adjustment of valve BD No. 3 72 216
valve. Adjust bolt asper E-I-C.
Bed Lance guide pipe Remove the bed lance from position. Clear the chocking of
3900 J 13 BD No. 32 208 6656
cleaning. guide pipe. Fixed the Bed lance.
208
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : J Fuel Firing System.
Unit
Unit of Rate
C Sr. No
209
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -A Unit rates are excluding GST
PHASE # 1 Part : J Fuel Firing System.
Unit
Unit of Rate
C Sr. No
210
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
Replacement of LP valves above Remove the damaged valve from position make neccssary
4010 K 3 p 8" size ( 800 Class and edge
2" upto g p p
preparation and weld the new valve in p
position. Check BD No. 4 2088 8352
below ) for no leakage.
211
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
212
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
213
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
Replacement of HP valves more Remove the damaged valve from position make neccssary
4130 K 15 than 3" to 8" size ( 1500# and edge preparation and weld the new valve in position. Check BD No. 4 2985 11940
above ) for no leakage.
214
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
215
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
Choking/Jamming clearout of Isolate the valve, loosen the Gland bolts and free the valve
4230 K 25 BD No. 72 420 30240
Knife edge valves by slight hammering as per EIC
216
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
Isolate
I l t the
th valve
l ffrom sealing
li air
i side,
id Remove
R the
th gland
l d
Gland replacement of Spiess follower and remove the entire gland packing set. Clean the
4260 K 28 BD No. 4 630 2520
valves sprindle and gland follower and replace with new gland
packing set and box up. Check for no leakage
217
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
Once
4290 K 31 Manual operation of spiese valve. Open/close the spiese valve manually as per EIC. BD 90 278 25020
operation
Replacement of valves handle Remove the valve handle from position. Replace with new
4300 K 32 BD No. 22 420 9240
upto 4'' one.
Isolate the valve from cooling water and seal air side,
remove the cooling water, seal air hoses. Remove complete
assly of spiess valve from position. Dismentle spiess valve
Servicing/Overhauling of shaft from body. Check the condition, ovality of shaft,
combustor Spiess valve condition cone. Remove the damaged shaft and replace
4310 K 33 BD No. 6 7417 44502
assembly. Size: OD- 80mm, with the new one if require. Cleaning of shaft sleeve &
Legth: 2.5 meter. replaced gland packing. Build up cone with special electrode
as per instruction of EIC. Box up & align the valve as per
EIC .Connect the cooling water, seal air hoses. Check for no
leakage, passing and normal operation
218
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
Isolate the valve from cooling water and seal air side,
remove the cooling water, seal air hoses. Remove complete
assly of spiess valve from position. Dismentle spiess valve
Servicing/Overhauling of shaft from body. Check the condition, ovality of shaft,
FBHE/Seal pot Spiess valve condition cone. Remove the damaged shaft and replace
4320 K 34 BD No. 9 10201 91809
assembly. Size:OD- 135mm, with the new one if require. Cleaning of shaft sleeve &
Legth: 3.5 meter. replaced gland packing. Build up cone with special electrode
as per instruction of EIC. Box up & align the valve as per
EIC .Connect the cooling water, seal air hoses. Check for no
leakage, passing and normal operation
Freeness checking of various size Check the valve for jamming. Made free if required.
4330 K 35 of gate and globe valves: Size- Lubricate the spindle of valve. Assist trial run of valve by BD No. 630 140 88200
upto 3" opening and closing of valve.
Freeness checking of various size Check the valve for jamming. Made free if required.
4340 K 36 of gate and globe valves: Size- Lubricate the spindle of valve. Assist trial run of valve by BD No. 20 556 11120
above 3" upto 16" opening and closing of valve.
219
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
220
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : K Valves
Unit of Unit
C Sr. No
221
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 2 Part : L Soot Blower
Unit of Unit
C Sr. No
Chain tension
Check for chain tension. Adjust the chain tension with the
4470 L 3 adjustments of rotary and BD No. 4 104 416
help of gear box adjustments.Clear the area.
traverse motor.
Drive chain repair /
Remove the chain. Add additional link or replace with new
4480 L 4 replacements of rotary BD No. 22 553 12166
one.Clear the area.
and transverse motor.
222
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 2 Part : L Soot Blower
Unit of Unit
C Sr. No
De clutch/couple the gear box. Drain the oil from the gear
box.Remove the motor. Dismantle the gear box. Inspect the
Gear box servicing of
4490 L 5 internals and handover list of spare required . Replace the BD No. 2 2213 4426
rotary / transverse motor.
damaged parts . Service the gear box.Lubricate gear box..
Box up.
Replacements of rotary / Declutch the gear box. Remove the damaged gear box.
4500 L 6 transverse gear box Place new one. Align it, adjust the chain tension. Fill the oil BD No. 2 690 1380
assy. in gear box.
Oil seal replacements of
oil Remove the motor.
Drain the oil. motor Replaced the damaged oil
4510 L 7 rotary / transverse gear BD No. 2 345 690
seal. Box up.
box
Lubrication of rotary /
transeverse gear box,
Fill the oil / change the oil from gear box. Grease the chain,
4520 L 8 chain of jack shaft, drive BD No. 12 277 3324
travelling carraige assy. As per E-I-C.
chain, travelling carraige
assy. Etc.
Decoupling / Coupling of Declutch the both gear box. Decouple the gear box from
4530 L 9 BD No. 2 173 346
rotary / transverse motor motor. Box up.
Jack shaft chain Declutch the both drive. Remove the chain from jack shaft.
4540 L 10 BD No. 2 518 1036
replacements/ repair. Repair / replaced as per E-IC
Unit of Unit
C Sr. No
Puppet valve Replace the puppet valve with new one. Adjust the pressure
4610 L 17 BD No. 11 557 6127
replacements. as per E-I-C. replace gaskets if required
Steam blowing bar ( Remove the damaged strip (blowing bar) Check during
4620 L 18 BD No. 38 277 10526
strip) replacements. operation.
Puppet valve plug Check puppet valve plug thread. If found damage tap new
4640 L 20 BD No. 4 69 276
replacement. thread. Fix new plug. Box up.
Isolate the system from steam side remove the damaged
gasket replacement of
4650 L 21 gasket and replace with new one charge the line and check BD No. 25 1035 25875
Poppet valve
for any leakage.
224
ANNEXURE -B
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
PHASE # 2 Part : L Soot Blower
Unit of Unit
C Sr. No
4730 L 29 home position checking On intimation verified home postion of individual soot blower PM No. 150 68 10200
225
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : M Fuel Oil Handling
Unit of Unit
C Sr. No
Replacement of coupling
Decouple the coupling and replace if required. Align and
4800 M 7 & Alignment (Transfer / BD No. 2 2616 5232
couple.
unloading pump)
226
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : M Fuel Oil Handling
Unit of Unit
C Sr. No
Decouple the pump from motor. Take the motor out for
pump dismentaling. Remove the bearing, mechanical seals.
Dismentle the pump & check all internals. Replace/repair the
damaged internals. Check the both DE & NDE bearing,
Servicing of pump / mech seal ,its washer, etc & replace if required. Box up the
4810 M 8 BD No. 6 8249 49494
replacement of pump pump, bearing,mech seals. Lubricate the bearing. Ensure
the freeness of pump by manual operation. Replace the
coupling, if required. Fit the motor & align with pump. assist
trial run.and replace if required. Align and couple. Clean the
area & remove the scrap. p
Pressure adjustments of
4820 M 9 Adjust the pressure relief valve as per E-I-C. BD No. 2 263 526
pump.
Arrest the leackage from the flange, strainer flange. Tighten
Steam leakage arresting
4830 M 10 it or replaced the gasket as per E-I-C. Clean the drain oil / BD No. 8 1308 10464
from heater skid.
water from the skid.
Fuel oil leakage arresting Clean the area.Arrest the leakages from the flange, strainer
4840 M 11 from pump skid and flanges. Tighten it or replace the gasket as per E-I-C. Clean BD No. 4 1308 5232
heater skid. the drain oil / water from the skid.
Steam strainer cleaning
Isolate the strainer. Remove the filter elements. Clean with
4850 M 12 from Pump skid and BD No. 4 592 2368
diesel / air. Box up.Clean the area.
Heater skid.
Fuel oil strainer cleaning
Isolate the strainer. Remove the filter elements. Clean with
4860 M 13 from Pump skid and BD No. 16 1045 16720
diesel / air. Box up.Clean the area.
Heater skid.
Replacement of oil valve Isolate the system. Cut the damage valve. Replace the
4870 M 14 BD No. 2 1308 2616
upto 3" size. valve with new one.
Attending gland leakages
4880 M 15 Tighten the glands. Replace if necessary BD No. 4 523 2092
of valves upto NB 3"
227
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : M Fuel Oil Handling
Unit of Unit
C Sr. No
228
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
Unit of Unit
C Sr. No
PM of Working oil / lub oil Isolate cooler from water and oil side. Drain oil in the empty
4930 N 4 BD No. 2 2211 4422
cooler barrel. Clean the water box
Unit of Unit
C Sr. No
Topping of Diesel in EBFP Shift the diesel barrel from stores and top the oil in fuel oil
4970 N 8 BD No. 12 1041 12492
Fuel tank tank to the level as per EIC
Topping of Lub oil in Lub oil Shift the Lub oil barrel from stores and top the oil in fuel oil
4980 N 9 BD No. 4 208 832
tank tank to the level as per EIC
Remove the old oil from lub oil tank completely. Clean the
4990 N 10 Lub oil replacement. tank from inside. Clean the view glass. Fill the tank as per BD No. 2 1665 3330
instruction of EIC.
Isolate the lub oil filter from oil side and clean the filter
5010 N 12 Lub oil filter cleaning which is choked. After cleaning charge the lub oil filter and BD No. 14 416 5824
check for any leakage attend if any
Unit of Unit
C Sr. No
231
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 2 Part : O Hoist
Unit of Unit
o
C Sr. No
232
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
233
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
Inspection/ Cleaning of RH
This activity is to be carried out in running unit, so utmost
attemperator, SH
care to be taken while doing the work and dont disturb any
attemperator & Soot blower
valves or cable etc. Clean all valves ,apply dry molyspray on
5130 P Control valves station PM No 18 789 14202
its stem. Clean the valve station area .Remove all dirt, dust,
It consists of 30 -nos
oil, grease, insulationn scrap, metallic scrap, etc. Note the
valves upto 2.5" size is
defects and inform it to E-I/C. Shift the scrap to scrap yard.
considered as one no.
234
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
235
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
I ti
Inspection andd external
t l
cleaning of Bed Ash Clean the entire system with air pressure & cooton cloths,
Conveying system, remove all the dirt, oil, grease, ash, foreign material. Clean
intermediate ash bin. the platform between two ash cooler & top cover plate of
5180 P It consists of two nos bed intermediate ash bin and its area & its surrounding area, PM Per Unit 16 789 12624
ash conveyor, two nos check for any abnormality or bed ash leakages & inform to E-
ashcooler, two nos of I-C. Box up all inspection doors with applying rope if found
rotary air lock feeder, open. Shift the scrap to scrap yard.
intermediate ash bin
P D) NMEJ, Boiler
This activity is to be carried out in hot condition, so utmost
Inspection and external
care to be taken while doing the work. Clean the entire
cleaning of Combustor to
5190 P perpheral area and surrounding are by air. Check for any PM No. 30 789 23670
Cyclone NMEJ & its
damages/leakages & if found immidiately inform to E-I-
cyclone roof
C.Shift the scrap to scrap yard.
236
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
237
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
238
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 ANNEXURE -B Unit rates are excluding GST
239
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
240
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
241
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
242
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
243
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
244
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
245
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
247
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
ANNEXURE -B
PHASE # 1 & 2 Part : Q Vortex Finder
Bienn
Unit
C Sr. No
SR. Measure
Name of the Activity Scope of Work of Quant (Rs.) Per Price
NO ment
Work ity UoM (B) (AXB)
(UoM)
(A)
248
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263
Annexure B3 Unit rates are excluding GST
Phase-1 & 2 unforeseen work Execution of unforeseen work
Unit of
Biannual
Nature Measur Rate (Rs.) Per Total Price
Sr. No. Name of activity Scope of Work Quantity
Of Work ement UOM (B) (AXB)
(A)
(UOM)
A B C D E F G H
Mill Right fitter , IBR Welder- Execution of
Unforesee
1 During Normal Duty unforeseen work Per Day 255 1100 280500
n work
Piping fitter, Structural fitter, Execution of
Unforesee
2 Mechanical fitter-During unforeseen work Per Day 255 880 224400
n work
Normal Duty
Welder, cutter, Rigger, Execution of
grinder, Refractory breaker unforeseen work Unforesee
3 operator, Painter, Per Day 255 836 213180
n work
Electrician-During Normal
Duty
Helper-During Normal Duty Execution of Unforesee
4 Per Day 550 770 423500
unforeseen work n work
Mill Right fitter , IBR Welder- Execution of Unforesee
5 Per HR 760 275 209000
Additional duty unforeseen work n work
Piping fitter, Structural fitter, Execution of
Unforesee
6 Mechanical fitterAdditional unforeseen work Per HR 760 220 167200
n work
duty
Welder, cutter, Rigger, Execution of
grinder, Refractory breaker unforeseen work Unforesee
7 Per HR 760 209 158840
operator, Painter, n work
Electrician-Additional duty
Helper-Additional duty Execution of Unforesee
8 Per HR 1684 192 323328
unforeseen work n work
TOTAL 2000000
For Final Cost consideration say 20,00,000 (20 Lakhs)
Note 1:Rates as given above shall include cost of all manpower,Vehicle, equipment consumables (except free issue materials by
GIPCL) labor, supervision, tools and tackles, transport,Safety and statutory compliance, mobilization, Contingency expenditure
and supervision charges etc. and such other cost are not specifically mentioned herein but will be incurred by the contractor for
the satisfactory and timely completion of the work.
Note 2: The quantities specified are estimated and for tendering purpose only. Payment will be made, based on actual work done as certified by
Engineer-in-charge of GIPCL and inline with "INSTRUCTIONS TO BIDDERS & CONDITIONS OF CONTRACT"
SUB TOTAL -1 FOR PHASE -1 1000000
SUB TOTAL -2 FOR PHASE -2 1000000
249
PRICE SCHEDULE BMC 2021-23 TENDER ID 449263 Unit rates are excluding GST
250