Professional Documents
Culture Documents
Precision Junction Boxes: Download Installation Guide
Precision Junction Boxes: Download Installation Guide
EN
DE
ES
FR
IT
NL
PT
SE
DK
NO
Download Installation Guide:
EU W: English, Deutsch, Español,
PL
Français, Italiano, Nederlands,
Português
CZ
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
HU
Русский, Türkçe
www.mt.com/ind-ajb-downloads
RU
TK
Download Installation Guide:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Precision Junction Box » Installation Guide EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Plan Mounting Location PCBA Functions Install Cables and Plugs in Glands
1» 2» 3»
EN
INPUT
Home Run Cable – 6 wires plus shield Cord Grip Cap
Rubber Grommet
Nut
LC1-LCn
Load Cell connection
AUX
wires plus shield
Optional Use
Home Run or Spherical Washer Junction Box Enclosure
Shift adjustment switches: Load Cell Cable
Default values: 80 Body Insert
SW
Coarse (16x): 00 lowest signal
Fine (1x): FF highest signal
LC4 LC6
LC8
LC2
AUX Cable
Plug
Terminal
LC3 LC5
LC7
LC1
Download Installation Guide:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Precision Junction Box » Installation Guide EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Optional Procedure Only for Shift Adjustment: Range Setting Attach Cover
6» 7»
EN
Set the junction box range according to load cell nominal resistance:
• Load cells <1kΩ – default; no setting required.
• Load cells ≥1kΩ and <2kΩ – cut all 1000R wires in all boxes.
• Load cells ≥2kΩ – cut both the 1000R wires and 2000R resistors only for AJB541M and
AJB540L.
1.8 Nm / 16 in-lb
Resistors
Wires
Installation Notes:
For CalFREE and Shift Adjust Contact authorized Mettler-Toledo service
• Never cut or extend the load cell cable
8» •
•
Inspect gaskets monthly
Avoid heating
technician to activate the weigh modules for
startup and calibration.
• Ensure voltage stability – use a regulated power supply
•
•
Weighing systerm terminal should be grounded
For hazardous area installations in Europe, refer to enclosed instructions
Contact Information:
Download Installation Guide:
EU W: English, Deutsch, Español,
www.mt.com/contact
Note:
Français, Italiano, Nederlands,
May be covered by one or more patent(s): visit www.mt.com/patentmarking
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
DE
Montageanleitung herunterladen:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Montageanleitung herunterladen:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Präzisionsanschlusskasten » Montageanleitung EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Ebener Aufstellort PCBA-Funktionen Montage von Kabeln und Steckern
1» 2» 3»
in Kabelverschraubungen
EINGANG
„Home Run“-Kabel – Sechs Drähte
DE
plus Abschirmung
Gummitülle
Mutter
Zugentlastungskappe
LC1-LCn
Wägezellenanschluss
Optionale Verwendung
Anschluss für zweiten Anschlusskasten –
AUX
Sechs Drähte plus Abschirmung
SW
Grob (16x): 00 schwächstes
Signal
Fein (1x): FF stärkstes Signal
LC4 LC6
LC8
LC2
AUX-Kabel
Stecker
Terminal
LC3 LC5
LC7
LC1
Montageanleitung herunterladen:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Präzisionsanschlusskasten » Montageanleitung EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Betriebsverfahren nur für Wechseljustierung: Bereichseinstellung Abdeckung anbringen
6» Stellen Sie den Anschlusskastenbereich gemäss den Nennwiderstand der Wägezelle ein:
7»
DE
• Wägezellen <1 kΩ – Standard; keine Einstellung erforderlich.
• Wägezellen ≥1 kΩ und <2kΩ – Durchtrennen aller 1000R-Drähte in allen Anschlusskästen.
• Wägezellen ≥2kΩ – Durchtrennen der 1000R-Drähte und 2000R-Widerstände nur für
AJB541M und AJB540L.
1,8 Nm
Widerstände
Drähte
Montagehinweise:
Für CalFREE und Wechseljustierung Kontaktieren Sie einen autorisierten
• Wägezellenkabel niemals durchtrennen oder verlängern
8»
Mettler-Toledo Servicetechniker, um
• Dichtungen monatlich inspizieren
• Erhitzung vermeiden
die Wägemodule für Start und Kalibrierung
• Spannungsstabilität sicherstellen – geregelte Stromversorgung verwenden zu aktivieren.
• Wägesystemterminal muss geerdet sein
Montageanleitung herunterladen:
• Für Installationen in Ex-Bereichen in Europa, siehe beiliegende Anleitung Kontaktdaten:
EU W: English, Deutsch, Español, Hinweis: www.mt.com/contact
Français, Italiano, Nederlands,
Ist möglicherweise durch ein oder mehrere Patente abgedeckt:
Português
siehe www.mt.com/patentmarking
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
ES
Descargue la guía de instalación:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Descargue la guía de instalación:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Caja de conexiones de precisión » Guía de instalación EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Planifique el lugar para su colocación Funciones de PCBA Instale los cables y los conectores
1» 2» 3»
en los pasacables
ENTRADA
Cable de pasaje – 6 cables más
blindaje
Arandela
Casquillo de la de goma
ES
Tuerca
empuñadura del cable
LC1-LCn
Conexión de la celda de carga
AUX
conexiones – 6 cables más blindaje
Uso opcional
Cable de pasaje Arandela esférica Carcasa de la caja
Interruptores de ajuste de cambio o de celda de carga de conexiones
Valores predeterminados: 80 Inserto
del cuerpo
SW
Aproximado (16x): 00 señal más baja
Preciso (1x): FF señal más alta
Ajuste los pasacables en torno a los cables y conectores Extensión con AUX
4» 5» • NOTA: Al conectar varias cajas de conexiones, consulte el manual de instalación para conocer
los requisitos de los cables y el procedimiento de ajuste de cambio
• NOTA: Mantenga el cable AUX lo más corto posible
LC4 LC6
LC8
LC2
Cable AUX
Conector
Terminal
LC3 LC5
LC7
LC1
Descargue la guía de instalación:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Caja de conexiones de precisión » Guía de instalación EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Procedimiento opcional para ajuste de cambio solamente: ajuste de rango Atornillar la tapa
ES
• Celdas de carga ≥2kΩ – corte los cables 1000R y las resistencias 2000R solo para
AJB541M y AJB540L.
1,8 Nm / 16 pulgadas-libras
Resistencias
Cables
FR
Télécharger le Guide d'installation :
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Télécharger le Guide d'installation :
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Boîte de jonction de précision » Guide d'installation EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Planifier l'emplacement de montage Fonctions de l'ensemble carte à circuit imprimé Installer les câbles et la connec-
1» 2» tique dans les presse-étoupes
3»
ENTRÉE
Câble de connexion – 6 fils, blindé
Joint en
Capuchon de caoutchouc
Écrou
serre-câbles
LC1-LCn
FR
Connexion de la cellule de pesage
AUX
Utilisation facultative
de jonction – 6 fils, blindée
Commutateurs SW
Valeurs par défaut : 80 Câble de connexion Rondelle Enceinte de la boîte
ou câble de la de jonction
Approximatif 00 signal le cellule de pesage Insert du corps
(16x) : plus bas
Fin (1x) : FF signal le
plus haut
Serrer les presse-étoupes autour des câbles Extension à l'aide des AUX
et de la connectique
4» 5» • REMARQUE : en cas de connexion de plusieurs boîtes de jonction, consulter le manuel d'installation
pour connaître les exigences en matière de câble et la procédure de réglage du décalage
• REMARQUE : le câble AUX doit être aussi court que possible
LC4 LC6
LC8
LC2
Câble AUX
Connecteur
Terminal
LC3 LC5
LC7
LC1
Télécharger le Guide d'installation :
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Boîte de jonction de précision » Guide d'installation EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Procédure en option uniquement pour le réglage du décalage : Fixer le cache
paramètres de la plage
6» Régler la plage de la boîte de jonction en fonction de la résistance nominale de la cellule 7»
de pesage :
• Cellules de pesage < 1kΩ – par défaut ; aucun réglage nécessaire.
• Cellules de pesage ≥ 1kΩ et < 2kΩ – couper tous les fils 1000R dans toutes les boîtes.
• Cellules de pesage ≥ 2kΩ – couper les fils 1000R et les résistances 2000R uniquement
pour AJB541M et AJB540L.
FR
1,8 Nm / 16 in-lb
Résistances
Fils
Remarques d'installation :
Pour CalFREE et le réglage du décalage
• Ne jamais prolonger ou raccourcir le câble de la cellule de pesage Contactez un technicien de maintenance agréé
8» •
•
Contrôler les joints tous les mois
Éviter toute exposition à la chaleur
Mettler-Toledo pour l'activation et l'étalonnage
des modules de pesage.
• Veiller à la stabilité de la tension – utiliser une alimentation électrique
régulée
• Le terminal du système de pesage doit être raccordé à la terre
Coordonnées :
Télécharger le Guide d'installation :
EU W: English, Deutsch, Español,
• Pour les installations en zone dangereuse en Europe, se reporter aux www.mt.com/contact
instructions jointes
Français, Italiano, Nederlands,
Português Remarque :
EU N: Svenska, Dansk, Norsk
Cette installation peut être couverte par un ou plusieurs brevet(s) :
EU E: Polski, Čeština, Magyar, consulter www.mt.com/patentmarking
Русский, Türkçe
www.mt.com/ind-ajb-downloads
IT
Scaricate la guida sull'installazione:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Scaricate la guida sull'installazione:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Scatola di derivazione di precisione » Guida sull'installazione EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Pianificare la sede di installazione Funzioni PCBA Installare cavi e connettori
1» 2» 3»
nei pressacavi
INGRESSO
Cavo di collegamento diretto:
6 fili più schermatura
Cappuccio Passacavo
Dado
del serracavo
LC1-LCn
Collegamento cella di carico
IT
Collegamento per una seconda scatola
AUX
di derivazione: 6 fili più schermatura
Uso facoltativo
Switch di regolazione della deriva:
Cavo di Rosetta a Alloggiamento della
Valori predefiniti: 80 collegamento sede sferica scatola di derivazione
Inserto
SW
diretto o della cella
Modalità Segnale più di carico del corpo
grossolana (16x): basso 00
Modalità fine (1x): Segnale più alto FF
4» 5» • NOTA: per collegare più scatole di derivazione, consultare il manuale di installazione per conoscere
i requisiti del cavo e la procedura di regolazione della deriva
• NOTA: tenere il cavo AUX quanto più corto possibile
LC4 LC6
LC8
LC2
Cavo AUX
Connettore
Terminale
LC3 LC5
LC7
LC1
Scaricate la guida sull'installazione:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Scatola di derivazione di precisione » Guida sull'installazione EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Procedura opzionale solo per la regolazione della deriva: impostazione
Collegare la copertura
del range
6» Impostare il range della scatola di derivazione in base alla resistenza nominale della 7»
cella di carico:
• Celle di carico <1kΩ: valore predefinito; nessuna impostazione necessaria.
• Celle di carico ≥1kΩ e <2kΩ: tagliare tutti i fili 1000R di tutte le scatole.
• Celle di carico ≥2kΩ: tagliare sia i fili 1000R sia i resistori 2000R solo in AJB541M
e AJB540L.
1,8 Nm
IT
Resistori
Fili
8» •
•
Verificare ogni mese le guarnizioni
Evitare il riscaldamento
contattare il tecnico dell'assistenza
autorizzato Mettler-Toledo.
• Garantire la stabilità della tensione: utilizzare alimentazione
regolamentata
• Il terminale nel sistema di pesatura deve essere dotato di collegamento
Informazioni di contatto:
Scaricate la guida sull'installazione:
EU W: English, Deutsch, Español,
di messa a terra www.mt.com/contact
• Per l'installazione in aree a rischio di esplosione in Europa, fare
Français, Italiano, Nederlands, riferimento alle istruzioni allegate
Português
EU N: Svenska, Dansk, Norsk Nota:
EU E: Polski, Čeština, Magyar, Può essere coperta da uno o più brevetti; visitare il sito
Русский, Türkçe www.MT.com/patentmarking
www.mt.com/ind-ajb-downloads
NL
Download de installatiehandleiding:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Download de installatiehandleiding:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Precision Junction Box » Installatiehandleiding EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Selecteer de bevestigingslocatie PCBA-functies Steek de kabels en de stekkers
1» 2» 3»
in de pakkingen
INPUT
afscherming
Rubberen
doorvoertule
Moer
Snoerklemdop
LC1-LCn
Aansluiting load cell
NL
Aansluiting voor tweede junction box –
Optioneel gebruik
AUX
6 draden plus afscherming
SW
Grof (16x): 00 laagste signaal
Fijn (1x): FF hoogste signaal
LC4 LC6
LC8
LC2
AUX-kabel
Plug
Aanslui-
tklem
LC3 LC5
LC7
LC1
Download de installatiehandleiding:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Precision Junction Box » Installatiehandleiding EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Optionele procedure alleen voor shift-correctie: bereik instellen Bevestig de dekplaat
6» Stel het bereik van de junction box in conform de nominale weerstand van de load cell:
7»
• Load cells <1kΩ – standaard; geen instelling vereist.
• Load cells ≥1kΩ en <2kΩ – knip alle 1000R draden in alle junction boxes op lengte.
• Load cells ≥2kΩ – knip zowel de 1000R draden als de 2000R weerstanden alleen
voor AJB541M en AJB540L op lengte.
1,8 Nm
Weerstanden
NL
Draden
8»
technicus van METTLER TOLEDO om de
• Inspecteer de pakkingen elke maand
weegmodules voorafgaand aan de opstart
• Vermijd verwarming
• Zorg ervoor dat de spanning stabiel is – gebruik een gereguleerde te activeren en te kalibreren.
stroomvoorziening
Download de installatiehandleiding:
• De terminal van het weegsysteem moet geaard zijn Contactgegevens:
• Voor installaties in explosiegevaarlijke omgevingen in Europa raadpleegt
EU W: English, Deutsch, Español, u de meegeleverde aanwijzingen www.mt.com/contact
Français, Italiano, Nederlands,
Português Opmerking:
EU N: Svenska, Dansk, Norsk
Er kunnen één of meer octrooien gelden: ga naar www.mt.com/patentmarking
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
PT
Faça o Download do Guia de Instalação:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Faça o Download do Guia de Instalação:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Caixa de Junção de Precisão » Guia de Instalação EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Planeje o Local de Montagem Funções "PCBA" Instale Cabos e Tomadas
1» 2» 3»
nos Prensa-Cabos
ENTRADA
Cabo Dedicado – 6 fios mais blindagem
Anilha de
Borracha
Porca
Tampa da rosca
LC1-LCn
Conexão de célula de carga
AUX
PT
Uso Opcional
de junção – 6 fios mais blindagem
SW
Grosso (16x): 00 menor sinal
Fino (1x): FF maior sinal
4» 5» • AVISO: ao conectar várias caixas de junção, consulte o manual de instalação para saber os requisitos
de cabos e o procedimento de ajuste de deslocamento
• AVISO: mantenha o cabo AUX o mais curto possível
LC4 LC6
LC8
LC2
Cabo AUX
Plugue
Terminal
LC3 LC5
LC7
LC1
Faça o download do Guia de Instalação:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Caixa de Junção de Precisão » Guia de Instalação EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Procedimento Opcional Apenas para Ajuste de Deslocamento:
Conecte a Tampa
Configuração de Intervalo
6» Configure o intervalo da caixa de junção conforme a resistência nominal da célula 7»
de carga:
• Células de carga <1 kΩ – padrão; nenhuma configuração exigida.
• Células de carga ≥1 kΩ e <2 kΩ – corte todos os fios 1000R em todas as caixas.
• Células de carga ≥2 kΩ – corte os resistores de ambos os fios 1000 R e 2000 R apenas
para os AJB541M e AJB540L.
1,8 Nm/16 pol.-lb
Resistores
PT
Fiação
Avisos de Instalação:
Para CalFREE e Ajuste de Deslocamento
• Nunca corte ou estenda o cabo da célula de carga Entre em contato com um técnico de serviço
8» •
•
Inspecione as gaxetas mensalmente
Evite aquecimento
autorizado Mettler-Toledo para ativar os
módulos de pesagem para start-up e calibração.
• Garanta a estabilidade da tensão – use uma fonte de energia regulada
•
•
O terminal do sistema de pesagem deve ser aterrado
Para instalações em áreas de risco na Europa, consulte as instruções
Informações de Contato:
Faça o download do Guia de Instalação:
EU W: English, Deutsch, Español,
anexas www.mt.com/contact
Français, Italiano, Nederlands, Aviso:
Português
Pode estar coberta por uma ou mais patentes: visite www.mt.com/patentmarking
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
SE
Ladda ned installationsguide:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Ladda ned installationsguide:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Precisionskopplingsdosa » Installationsguide EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Planera monteringsplats PCBA-funktioner Installera kablar och stickproppar
1» 2» 3»
i kabelförskruvningar
INMATNING
Home run-kabel – 6 ledningar samt
skärmad ledning
Gummigenomföring
Mutter
Fästhylsa för ledning
LC1-LCn
Lastcellanslutning
Valfri användning
AUX
kopplingsdosa – 6 ledningar
samt skärmad ledning
SE
Home Run eller Sfärisk packning Hölje för kopplingsdosa
Förskjutningsjusteringsbrytare: lastcellskabel
Standardvärden: 80 Insats
SW
Grov (16x): 00 lägsta signal
Fin (1x): FF högsta signal
Dra åt kabelsförskruvningar runt kablar och stickproppar Förlängning som använder AUX
LC4 LC6
LC8
LC2
AUX-kabel Stickk-
ontakt
Terminal
LC3 LC5
LC7
LC1
Ladda ned installationsguide:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Precisionskopplingsdosa » Installationsguide EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Valfri procedur endast för förskjutningsjustering: intervallinställning Fäst lock
SE
Ledningar
Installationsanteckningar:
För CalFREE och skiftjustering
• Klipp eller förläng aldrig lastcellskabeln Kontakta den auktoriserade serviceteknikern
8» •
•
Inspektera packningar varje månad
Undvika upphettning
för Mettler-Toledo för att aktivera
viktmodulerna för start och kalibrering.
• Säkerställ spänningsstabilitet – använd en reglerad strömförsörjning
•
•
Vägningssystemets terminal bör vara jordad
För installation i farliga områden i Europa, se bifogade instruktioner
Kontaktuppgifter:
Ladda ned installationsguide:
EU W: English, Deutsch, Español,
www.mt.com/contact
OBS:
Français, Italiano, Nederlands,
Kan omfattas av ett eller flera patent: se www.mt.com/patentmarking
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
DK
Download installationsvejledning:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Download installationsvejledning:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Præcisionssamledåse » Installationsvejledning EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Planlæg placeringen for montering PCBA-funktioner Installer kabler og stik i remmene
1» 2» 3»
Hovedkabel – 6 ledninger plus
INPUT
afskærmning
Gummistrop
Møtrik
Dæksel til kabelholder
LC1-LCn
Belastningscelleforbindelse
AUX
6 ledninger plus afskærmning
Valgfri brug
Hovedkabel Kugleskive Samledåsens indkapsling
Skiftjusteringskontakter: eller kabel til
Standardværdier: 80
DK
belastningscelle Indsats til legeme
SW
Grov (16x): 00 – laveste signal
Fin (1x): FF – højeste signal
LC4 LC6
LC8
LC2
AUX-kabel
Stik
Terminal
LC3 LC5
LC7
LC1
Download installationsvejledning:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Præcisionssamledåse » Installationsvejledning EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Valgfri procedure kun til skiftjustering: Indstilling af rækkevidde Påsæt dæksel
Ledninger
DK
Installationsnoter:
For CalFREE og skiftjustering Kontakt en autoriseret Mettler-Toledo-
• Tilskær eller forlæng aldrig belastningscellekablet
8» •
•
Inspicér pakningerne månedligt
Undgå opvarmning
servicetekniker for at aktivere vejemodulerne
for opstart og kalibrering.
• Sørg for spændingsstabilitet – brug en reguleret strømforsyning
•
•
Vægtens systemterminal skal være jordforbundet
For installationer i farlige områder i Europa henvises til de vedlagte
Kontaktoplysninger:
Download installationsvejledning:
EU W: English, Deutsch, Español,
instruktioner www.mt.com/contact
Français, Italiano, Nederlands, Bemærk:
Português
Kan være dækket af et eller flere patenter: besøg www.mt.com/patentmarking
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
NO
Last ned installasjonsveiledning:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Last ned installasjonsveiledning:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Presisjonskoblingsboks » Installasjonsveiledning EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Planlegg monteringssted PCBA funksjoner Installer kabler og plugger
1» 2» 3»
i kabelmuffer
INNGANG
Home Run kabel – 6 ledere
pluss skjerm
Gummimalje
Mutter
Ledningshette
LC1-LCn
Tilkobling for lastcelle
AUX
6 ledere pluss skjerm
Valgfri bruk
Home Run eller Rund skive Kapsling til koblingsboks
Brytere for forskyvningsjustering lastcellekabel
Standardverdier: 80 Innsats
SW
Grov (16x): 00 laveste signal
NO
Fin (1x): FF høyeste signal
4» 5» • MERK: Hvis flere koblingsbokser kobles sammen, må du se installasjonshåndboken for krav til kabler
og prosedyre for forskyvning.
• MERK: Hold AUX-kabelen så kort som mulig.
LC4 LC6
LC8
LC2
AUX-kabel
Plugg
Terminal
LC3 LC5
LC7
LC1
Last ned installasjonsveiledning:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Presisjonskoblingsboks » Installasjonsveiledning EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Valgfri prosedyre kun for skiftjustering: innstilling av område Fest deksel
Ledninger
NO
Installasjonsmerknader:
For justering av CalFREE og skift
• Du må aldri kutte eller øke lastecellens kabellengde. Kontakt en autorisert Mettler-Toledo-
8» •
•
Inspiser pakninger månedlig.
Unngå oppvarming.
servicetekniker for å aktivere veiemoduler
før oppstart og kalibrering.
• Sikre stabil spenning – bruk en regulert strømforsyning.
•
•
Veiiesystermterminalen skal være jordet.
For installasjoner i farlige omgivelser i Europa, se de vedlagte
Kontaktinformasjon:
Last ned installasjonsveiledning:
EU W: English, Deutsch, Español,
instruksjonene. www.mt.com/contact
Français, Italiano, Nederlands, Obs!
Português
Kan dekkes av ett eller flere patent(er): se www.mt.com/patentmarking
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
PL
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Ściągnij poradnik instalacji:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Precyzyjna skrzynka połączeniowa » poradnik instalacji EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Planowanie miejsca instalacji Funkcje zespołu płytki drukowanej Zainstaluj kable i zaślepki
1» 2» 3»
w dławnicach
WEJŚCIE
Kabel przyłączeniowy – 6 przewodów
i ekran
Gumowy
pierścień
Nasadka uchwytu Nakrętka
przewodu
LC1-LCn
Podłączenie do czujnika wagowego
Zastosowanie opcjonalne
Podłączenie do drugiej skrzynki
AUX
połączeniowej – 6 przewodów i ekran
SW
wagowego Element
sygnał wkładany
Dokładna (1x): FF najwyższy do korpusu
sygnał
PL
Dokręć dławnice kabli i zaślepek Przedłużenie za pomocą kabla AUX
4» 5» • UWAGA: w przypadku podłączania wielu skrzynek należy zapoznać się z procedurą adiustacji przesunięcia
oraz wymaganiami dotyczącymi kabli; informacje te można znaleźć w podręczniku instalacji
• UWAGA: Kabel AUX powinien być jak najkrótszy
LC4 LC6
LC8
LC2
Kabel AUX
Wtyk
Terminal
LC3 LC5
LC7
LC1
Ściągnij poradnik instalacji:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Precyzyjna skrzynka połączeniowa » poradnik instalacji EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Procedura opcjonalna tylko na potrzeby adiustacji przesunięcia: Zamocuj pokrywę
ustawianie zakresu
6» Ustaw zakres skrzynki połączeniowej stosownie do wartości nominalnej rezystancji
czujnika wagowego:
7»
• Czujniki wagowe o rezystancji <1kΩ – ustawienie domyślne; zmiana niewymagana.
• Czujniki wagowe o rezystancji ≥1kΩ i <2kΩ – odetnij wszystkie przewody 1000R we
wszystkich skrzynkach.
• Czujniki wagowe ≥2kΩ – odetnij przewody 1000R i rezystory 2000R tylko w przypadku
modeli AJB541M i AJB540L.
1,8 Nm / 16 in-lb
Rezystory
Przewody
PL
Uwagi dotyczące instalacji:
Funkcje CalFREE i Shift Adjust W sprawie przygotowania modułów
• Nigdy nie przedłużaj ani nie skracaj przewodu czujnika wagowego
8»
wagowych do uruchomienia i wzorcowania
• Raz w miesiącu dokonuj przeglądu uszczelek
należy skontaktować się z autoryzowanym
• Unikaj przegrzewania
• Zapewnij stabilność napięcia – użyj zasilacza regulowanego technikiem serwisowym Mettler-Toledo.
• Terminal systemu wagowego powinien być uziemiony
CZ
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Montážní návod ke stažení:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Slučovací skříňka Precision » Montážní návod EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Vyberte vhodné umístění Funkce PCBA Zaveďte kabely a konektory
1» 2» 3»
do průchodek
VSTUP
plus odstínění
Pryžová
průchodka
Tahově Matice
odlehčovací víčko
LC1-LCn
Zapojení snímače
Volitelné použití
AUX
6 vodičů plus odstínění
SW
Nahrubo (16×): 00 nejnižší signál
Přesněji (1×): FF nejvyšší signál
CZ
4» 5» • POZNÁMKA: Před propojením vícero slučovacích skříněk nahlédněte do návodu k instalaci, kde naleznete
informace o požadavcích na kabeláž a o postupu při nastavování posunu.
• POZNÁMKA: Kabel AUX by měl být co nejkratší.
LC4 LC6
LC8
LC2
Kabel AUX
Konektor
Terminál
LC3 LC5
LC7
LC1
Montážní návod ke stažení:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Slučovací skříňka Precision » Montážní návod EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Volitelný postup pouze pro nastavení posunu: nastavení rozsahu Připevněte kryt
Kabeláž
Poznámky k montáži:
Služba CalFREE a nastavení posunu
CZ
• Kabel snímače nezkracujte ani neprodlužujte Spuštění a kalibraci váhových modulů
8» •
•
Jednou měsíčně kontrolujte těsnění
Chraňte před teplem
zajišťuje autorizovaný servisní technik
společnosti Mettler-Toledo.
• Zajistěte přívod stabilního napětí – používejte regulovaný napájecí zdroj
•
•
Terminál vážicího systému musí být uzemněn
Montáž v prostředí s nebezpečím výbuchu v Evropě vyžaduje dodržení
Kontaktní informace:
Montážní návod ke stažení:
EU W: English, Deutsch, Español,
přiložených pokynů www.mt.com/contact
Français, Italiano, Nederlands, Poznámka:
Português
Může být součástí jednoho nebo více patentů: navštivte webové stránky
EU N: Svenska, Dansk, Norsk
www.mt.com/patentmarking
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
HU
Русский, Türkçe
www.mt.com/ind-ajb-downloads
A szerelési útmutató letöltése:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Precíziós közösítődoboz » Szerelési útmutató EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
A felszerelési hely megtervezése PCBA-funkciók Kábelek és dugaszok beszerelése
1» 2» 3»
a tömszelencékbe
INPUT
árnyékolás
Átvezető gumi
Anya
Tömszelencesapka
LC1-LCn
Mérőcella-csatlakozó
AUX
bekötéséhez – 6 vezeték plusz
Opcionális használat
árnyékolás
Beszabályzó kapcsolók:
Alapértelmezett értékek: 80 Bekötőkábel vagy Gömbölyű Közösítődoboz-ház
mérőcellakábel alátét
SW
Durva (16x): 00 a legalacso- Házbetét
nyabb szintű jel
Finom (1x): FF a legmagasabb
szintű jel
4» 5»
HU
• MEGJEGYZÉS: Több közösítődoboz összekötése esetén olvassa el a kábelekkel kapcsolatos előírások
és a beszabályozási eljárások témakörét a szerelési útmutatóban
• MEGJEGYZÉS: A pótkábel (AUX) legyen a lehető legrövidebb
LC4 LC6
LC8
LC2
Pótkábel
(AUX) Dugasz
Kivezetés
LC3 LC5
LC7
LC1
A szerelési útmutató letöltése:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Precíziós közösítődoboz » Szerelési útmutató EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Nem kötelező eljárás, csak beszabályozáshoz: tartomány beállítása A burkolólap rögzítése
Huzalok
HU
• Kerülje a hevítést METTLER TOLEDO szerviztechnikussal.
• Gondoskodjon stabil feszültségről – használjon szabályozott tápegységet
•
•
A tömegmérő rendszer terminálját földelni kell
Európában a robbanásveszélyes környezetbe történő beszereléssel
Elérhetőségi adatok:
A szerelési útmutató letöltése:
EU W: English, Deutsch, Español,
kapcsolatban olvassa el mellékelt utasításokat www.mt.com/contact
Français, Italiano, Nederlands, Megjegyzés:
Português
A termék egy vagy több szabadalom hatálya alatt állhat – keresse fel
EU N: Svenska, Dansk, Norsk
a következő weboldalt: www.mt.com/patentmarking
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
www.mt.com/ind-ajb-downloads
RU
Скачать руководство по установке:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Прецизионный соединительный короб » Руководство по установке EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Определите место размещения Функции печатной платы Установите кабели и заглушки
1» 2» 3»
в кабельные уплотнения
ВХОД
Возвратный кабель —
шестипроводной с экраном
Резиновая
втулка
Колпачок Гайка
LC1-LCn
кабельного ввода
Подключение датчика веса
ДОП. ПОРТ
Подключение второго соединительного
короба — шестипроводной кабель
с экраном
Дополнительно
Переключатели регулировки сдвига:
Значение по умолчанию: 80 Возвратный Сферическая Корпус соединительного
кабель или кабель шайба короба
SW
Грубая 00 самый слабый датчика веса Вставка
регулировка (16x): сигнал
Точная FF самый мощный
регулировка (1x): сигнал
RU
• ПРИМЕЧАНИЕ: Кабель AUX должен быть как можно короче.
LC4 LC6
LC8
LC2
Кабель AUX
Штекер
Терминал
LC3 LC5
LC7
LC1
Скачать руководство по установке:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Прецизионный соединительный короб » Руководство по установке EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Дополнительная процедура — только для регулировки погрешности:
Установите крышку
настройка диапазона
6» Установите диапазон соединительного короба в соответствии с номинальным 7»
сопротивлением датчика веса:
• Датчики веса <1 кОм — значение по умолчанию; настройка не требуется.
• Датчики веса ≥1 кОм и <2 кОм — отсоединитевсе провода 1000R во всех коробах.
• Датчики веса ≥2 кОм — отсоедините провода 1000R и резисторы 2000R только для
AJB541M и AJB540L.
1,8 Н·м / 16 дюйм-фунтов
Резисторы
Провода
Указания по монтажу:
Для CalFREE и регулировки сдвига Обратитесь к сервисному представителю
• Запрещается укорачивать и удлинять кабель датчика веса
8»
МЕТТЛЕР ТОЛЕДО за помощью по
• Ежемесячно проверяйте прокладки
• Избегайте перегрева
активации весовых модулей для запуска
• Обеспечьте стабильное напряжение — используйте регулируемое и калибровки.
RU
электропитание
www.mt.com/ind-ajb-downloads
TK
Kurulum Kılavuzunu İndirin:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Hassas Bağlantı Kutusu » Kurulum Kılavuzu EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Montaj Yerini Planlayın PCBA İşlevleri Kabloları ve Fişleri
1» 2» 3»
Bileziklere Takma
INPUT
6 telli ve blendajlı
Lastik Halka
Somun
Kordon Tutma Başlığı
LC1-LCn
Yük Hücresi bağlantısı
Opsiyonel Kullanım
İkinci bağlantı kutusu için bağlantı –
AUX
6 telli ve blendajlı
SW
İri Ayar (16 kat): 00 en düşük sinyal
İnce Ayar (1 kat): FF en yüksek sinyal
4» 5» • NOT: Birden fazla bağlantı kutusu bağlarken kablo gereksinimleri ve kayma ayarı ile ilgili prosedür
için kurulum kılavuzuna bakın.
• NOT: AUX kablosunu olabildiğince kısa tutun.
TK
LC4 LC6
LC8
LC2
AUX Kablosu
Fiş
Terminal
LC3 LC5
LC7
LC1
Kurulum Kılavuzunu İndirin:
EU W: English, Deutsch, Español,
Français, Italiano, Nederlands,
Português
EU N: Svenska, Dansk, Norsk
Hassas Bağlantı Kutusu » Kurulum Kılavuzu EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Yalnızca Kayma Ayarı İçin Opsiyonel Prosedür: Aralık Ayarı Kapağı Takma
Teller
Kurulum Notları:
CalFREE ve Kayma Ayarı İçin Tartım modüllerini ilk açılış ve kalibrasyon
• Yük hücresi kablosunu asla kesmeyin veya uzatmayın
8»
için çalıştırmak amacıyla yetkili bir
• Contaları ayda bir kontrol edin
METTLER TOLEDO servis teknisyeniyle
• Isınmalarını önleyin
• Voltajın stabil olduğuna emin olun – bir regülatör kullanın iletişime geçin.
•
•
Tartım sistemi terminali topraklanmalıdır
Avrupa’da tehlikeli bölge kurulumları için ilişikteki talimatlara bakın
İletişim Bilgileri:
Kurulum Kılavuzunu İndirin:
TK
EU W: English, Deutsch, Español,
www.mt.com/contact
Not:
Français, Italiano, Nederlands,
Bir veya daha fazla patent kapsamında olabilir. Şu adresi ziyaret edin:
Português
www.mt.com/patentmarking
EU N: Svenska, Dansk, Norsk
EU E: Polski, Čeština, Magyar,
Русский, Türkçe
www.mt.com/ind-ajb-downloads
Mettler-Toledo, LLC
1900 Polaris Parkway
Columbus, OH 43240