The document outlines 22 maintenance activities to be performed during an upcoming shutdown of Sirajganj 225 MW CCPP (Unit-3). The activities include performing functionality tests, replacing filters, cleaning strainers, rectifying issues like leaks and inaccurate sensors, and calibrating transmitters. The activities are assigned to various responsibility centers like Operations, Maintenance, Instrumentation and Controls for completion during the shutdown.
The document outlines 22 maintenance activities to be performed during an upcoming shutdown of Sirajganj 225 MW CCPP (Unit-3). The activities include performing functionality tests, replacing filters, cleaning strainers, rectifying issues like leaks and inaccurate sensors, and calibrating transmitters. The activities are assigned to various responsibility centers like Operations, Maintenance, Instrumentation and Controls for completion during the shutdown.
The document outlines 22 maintenance activities to be performed during an upcoming shutdown of Sirajganj 225 MW CCPP (Unit-3). The activities include performing functionality tests, replacing filters, cleaning strainers, rectifying issues like leaks and inaccurate sensors, and calibrating transmitters. The activities are assigned to various responsibility centers like Operations, Maintenance, Instrumentation and Controls for completion during the shutdown.
S/N Activities Responsibility 1 Performing functionality test of GT HCO System just before shut Operation down. 2 Checking the GT operation mode, Transfer from premix to diffusion CMC issue. 3 Performing Low Vacuum Protection Trip during ST shutdown. All 4 Performing EPB (at GT Hall) Protection Trip during GT shutdown. All 5 GT Air Intake system Pre-Filter and Fine Filter replacement. MMD 6 Rectification of the movement of seal water flow indicator and water MMD leakage of Condensate Pump- B (CEP-B) 7 Cleaning the strainer of CCCW heat Exchanger-B MMD 8 GT UPS-01 to be taken into service. EMD, CMC 9 Calibration of Air intake Pressure Transmitter I&C 10 Rectification of GT hydraulic oil leakage from the outlet Pressure MMD, I&C Transmitter. 11 Testing the communication system between HMI & PLC of diverter EMD, I&C, CMC damper. 12 Replacement of limit switches of Guillotine damper. EMD, I&C 13 Replacement of Filter of Diverter Damper seal air fan. MMD, EMD 14 Replacement of Fan of GT Application server. I&C 15 Checking of Gas Detector near and surroundings of GT. I&C 16 Checking the flow transmitter of Auxiliary Cooling water. I&C 17 Installation of reduction gear of Boiler HP super heater de- CMC superheating water MOV. 18 Cooling Tower Fan #3, Lube oil replacement; chamber and filter CMC cleaning. 19 Rectification of inaccurate feedback of CWP-B outlet valve. CMC 20 Checking the Bearing spare temperature sensor of CEP-B CMC 21 Rectification of fault alarm of ST speed controller. CMC 22 Cleaning of ST UPB Box de-superheating water nozzle. CMC