Professional Documents
Culture Documents
ELECTRICAL
ELECTRICAL
SWITCH BOARD AT
3'-0" LVL.
2'-0"
2'-0"
2'-121"
SWITCH BOARD AT
3'-0" LVL.
1'-421"
1'-421"
SWITCH BOARD AT SWITCH BOARD AT
3'-0" LVL. 3'-0" LVL.
3'-421"
3'-9"
3'-9"
4'-6"
4'-6"
SWITCH BOARD AT SWITCH BOARD AT
3'-0" LVL. 3'-0" LVL.
3'-9"
+ LAN POINT AT 2'-0" LVL. + LAN POINT AT 2'-0" LVL.
1'-3"
1'-3"
3'-0" LVL. 3'-0" LVL.
2'-121" 2'-7" 2'-7" 2'-121"
3'-0"
2 POINT 5 / 6 AMP
SOCKET AT 2'-6" LVL. SWITCH BOARD AT
4'-121"
3'-0" LVL.
3'-9"
3'-9"
S.BORD AT
4'-3" LVL
1'-721"
2 POINT 5 / 6 AMP SOCKET
+ LAN POINT AT 2'-0" LVL.
DATE
1'-6"
26-09-2020
DRAWING
2'-621"
4'-3" LVL
+ LAN POINT AT 3'-0" LVL.
PROPOSED OFFICE FOR
D.B.
AT 7'-0" LVL. MR.BRIJENDRA SINGH,
MR. HIMANSHU SINGH
ARCHITECT
1'-6"
ENTRY ENTRY
EXH.POINT
2 POINT 5 / 6 AMP SOCKET AT 7'-6'
+ LAN POINT AT 2'-6" LVL.