Indicative Cable Routing

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Door Frame Door Leaf

2 mm Vinyl Floor Central line Floor Tile or as specified


+ 1 mm of Door Leaf floor finish
Tolerance
Mortar
STAIR A-04 STAIR B-01
77 mm
TECHNICAL ROOM
BS-01b TECHNICAL ROOM
BS-01c
TECHNICAL ROOM
BS-01d
TECHNICAL ROOM
BS-01d Screed
F.F.L.+8500
F.F.L.+8500
F.F.L.+8500 F.F.L.+8500 T.O.C.+8500
T.O.C.+8500
T.O.C.+8500 T.O.C.+8500

STORAGE
BS-01k STORAGE
Concrete Slab
BS-01n

F.F.L.+11000
T.O.C.+10920 F.F.L.+11000
F.F.L.+10500
T.O.C.+10920
T.O.C.+10500

TECHNICAL ROOM
BS-01b EXPANSION JOINTS 10mm
BS-56 IN SLAB ON GRADE

F.F.L.+10500
T.O.C.+10500

F.F.L.+10700

SERVICE WAY EXPANSION JOINTS 10mm


BS-01e TX ROOM IN SLAB ON GRADE

BS-01h

TX
-4
F.F.L.+10500
T.O.C.+10450 F.F.L.+10900
T.O.C.+10900

TECHNICAL GALLERY
BS-117
Detail of

TX
-5
F.F.L.+10700 F.F.L.+10500

EXPANSION JOINTS 10mm


IN SLAB ON GRADE
CONTROL JOINTS 5x5mm
IN SLAB ON GRADE
T.O.C.+10500 CONTROL JOINTS 5x5mm
IN SLAB ON GRADE

1 Vinyl Floor / Floor Tile


L-5
NE STAIR B-02
PA

TX
OZONE GENERATOR
MV

-6
BS-117a

Construction

MV PANEL-44
F.F.L.+10500
T.O.C.+10500
L -E
NE
PA
MV
MV ROOM
BS-01g
Joint Cover
EXPANSION JOINTS 10mm
IN SLAB ON GRADE
F.F.L.+10900
T.O.C.+10900 TECHNICAL ROOM
BS-01b 2 mm thick
F.F.L.+10500
T.O.C.+10500
EXPANSION JOINTS 10mm
IN SLAB ON GRADE
vinyl floor
DRIVE WAY
BS-01a
EXPANSION JOINTS 10mm
1mm Tolerance
IN SLAB ON GRADE
F.F.L.+10500
T.O.C.+10450
F.F.L.+10500

77 mm
T.O.C.+10500

PARKING SPACE
RAMP
Concrete Slab
Screed
STAIR A-03 BS-01i ---

F.F.L.+10500 STAIR B-03


T.O.C.+10450
RAMP
F.F.L.+10800 --- F.F.L.+11000
T.O.C.+10800 T.O.C.+11000

F.F.L.+11000
EXPANSION JOINTS 10mm
IN SLAB ON GRADE
CONTROL JOINTS 5x5mm
IN SLAB ON GRADE

TECHNICAL GALLERY
BS-117
F.F.L.+10500
EXPANSION JOINTS 10mm T.O.C.+10500
IN SLAB ON GRADE

F.F.L.+10500
T.O.C.+10450

CONTROL JOINTS 5x5mm


DRIVE WAY IN SLAB ON GRADE

BS-01a

F.F.L.+10500
EXPANSION JOINTS 10mm T.O.C.+10450
IN SLAB ON GRADE F.F.L.+10500
EXPANSION JOINTS 10mm T.O.C.+10500
IN SLAB ON GRADE

EXPANSION JOINTS 10mm


IN SLAB ON GRADE

DRIVE WAY
BS-01a
PARKING SPACE
BS-01i
Vinyl Floor
F.F.L.+10500
T.O.C.+10450 F.F.L.+10500
T.O.C.+10450
2 Construction Joint Detail
EXPANSION JOINTS 10mm
IN SLAB ON GRADE

CONTROL JOINTS 5x5mm


IN SLAB ON GRADE

C.J. C.J. C.J. C.J.

STAIR A-01 STAIR A-02


CONTROL JOINTS
LOCKERS STORAGE 5x5mm IN SLAB
STORAGE
BS-02 BS-07a ON GRADE
BS-04a

LOBBY TOILETS
BS-01j BS-09

HD HD HD HD HD HD

SHOWER & CHANGING ROOMS


BS-08

HS CHANGING\ROOM
SHOWER & CHANGING ROOMS
BS-03 HD BS-05 REFEREES CHANGING ROOM HD
BS-10 BS-07
REFEREES HS
HD
EXPANSION JOINTS 10mm
BS-06 TD
TD HD IN SLAB ON GRADE

HS HS TECHNICAL GALLERY
BS-01f

HS HS EXPANSION JOINTS
STORAGE
10mm IN SLAB
STORAGE BS-16 ON GRADE
HS BS-26 HS

TOILETS
BS-04
LOBBY
BS-11 F.F.L.+10500
T.O.C.+10500
HD SAUNA
TECHNICAL ROOM
BS-18 BS-118
BY SPECIALIST
MASSAGE & AS DETAILED TECHNICAL ROOM
BS-17
HD HD
SHOWERS
BS-01m
SHOWERS
BS-14 F.F.L.+10500
BS-25 JACUZZI
BS-57 F.F.L.+10500
EXPANSION JOINTS 10mm
BS-19
T.O.C.+10500
T.O.C.+10500 ELECTRICAL ROOM
IN SLAB ON GRADE F.F.L.+10500 BS-121b
CONTROL JOINTS 5x5mm
T.O.C.+10500 IN SLAB ON GRADE F.F.L.+10500
EXPANSION JOINTS 10mm
IN SLAB ON GRADE BY SPECIALIST
& AS DETAILS
T.O.C.+10500
F.F.L.+10500
T.O.C.+10500
P-05
HS HS

HD HD
TOILETS TOILETS
TD BS-13 TD
BS-24
HALLWAY CONTROL JOINTS 5x5mm
DECK CHAIR
BS-15 IN SLAB ON GRADE
HS HS BS-19a
FITNESS HALL
BS-27 CHANGING ROOM
BS-23 HD
EXPANSION JOINTS 10mm
IN SLAB ON GRADE HS HS AC PLENUM
CHANGING ROOM AC PLENUM
HD BS-12 BS-57a BS-58a AC PLENUM
TD TD PANTRY BS-58a
BS-30
HD HD
F.F.L.+10500 TRAINER F.F.L.+10500
F.F.L.+10500 TRAINER TOILETS TOILETS TRAINER AC PLENUM BS-63a TRAINER TRAINER TOILETS TOILETS TRAINER F.F.L.+10500 EXPANSION JOINTS 10mm
BS-40 BS-40a BS-42a BS-46a BS-57a
T.O.C.+10500 T.O.C.+10500 BS-64a BS-65 BS-65a BS-71a BS-71
T.O.C.+10420 1 1 T.O.C.+10500 IN SLAB ON GRADE
BY SPECIALIST
C.J. C.J. 2 2 C.J.
C.J. C.J. C.J.
& AS DETAILS 3 3
C.J. C.J.

JACUZZI
HS HS ENT. LOBBY
BS-54
1 HS HS LOBBY
BS-121
BS-19 REST ROOM
TRAINER REST ROOM
MASSAGE BS-36a BS-74
BS-46b REST ROOM ENT. LOBBY REST ROOM
BS-21 MASSAGE MASSAGE MASSAGE MASSAGE
BS-47 BS-54 BS-63
BS-36 BS-46 BS-64 BS-72

F.F.L.+10500
STEAM ROOM
BS-20
CONTROL JOINTS 5x5mm
IN SLAB ON GRADE
T.O.C.+10420

BY SPECIALIST
& AS DETAILED
HD
HD
HD HD HD
CAFETERIA SAUNA STORAGE SAUNA
STAIR B-07
BS-31 STORAGE STORAGE
BS-34 BS-43 TD TD STORAGE BS-70 BS-75
TD BS-39 SAUNA
SAUNA
BS-66
OFFICE OFFICE BS-61 CHANGING
CAFETERIA ANTE. ROOM BS-48 CHANGING ANTE. ROOM
BS-28 CHANGING ANTE. ROOM BS-62 TECHNICAL AREA
BS-22 BS-31 ANTE. ROOM BS-49a BS-73 BS-75a BY SPECIALIST
BS-35 BS-61a & AS DETAILED BS-118a
LOBBY BY SPECIALIST BS-34a CHANGING BY SPECIALIST DRYING DRYING
BS-11 & AS DETAILED DRYING DRYING BS-45 BY SPECIALIST & AS DETAILED
BS-66a BS-66b
BS-38
BY SPECIALIST
BS-38a & AS DETAILED

BY SPECIALIST
CONTROL JOINTS 5x5mm
IN SLAB ON GRADE
A/C PLENUM
& AS DETAILED
TD TD BY SPECIALIST
& AS DETAILED
TD TD Stair A-13a Stair A-13a TD TD & AS DETAILED BY SPECIALIST
& AS DETAILED
TD TD
BS-121c

HD HD HD HD
HD HD HD HD
ATHLETE'S HALLWAY
ENTRY BS-29
SHOWERS
BS-49
SHOWERS
BS-60
F.F.L.+10500
BS-01 SHOWERS HS HS SHOWERS
BS-33 BS-76 T.O.C.+10500
TOILETS
TOILETS HS TOILETS HS TOILETS
BS-67
BS-37 HS BS-44 HS BS-69
C.J. C.J.
HS HS TECHNICAL ROOM CONTROL JOINTS 5x5mm
HS HALLWAY HS HALLWAY BS-115 IN SLAB ON GRADE HALLWAY HALLWAY
BS-41 BS-68 BS-116 BS-116 OFFICE
HS C.J. HS BS-116a

EXPANSION JOINTS 10mm EXPANSION JOINTS 10mm EXPANSION JOINTS 10mm


C.J. C.J. C.J. C.J. C.J. C.J. C.J. CONTROL JOINTS 5x5mm CONTROL JOINTS 5x5mm CONTROL JOINTS 5x5mm MACHINE ROOM
IN SLAB ON GRADE
IN SLAB ON GRADE IN SLAB ON GRADE IN SLAB ON GRADE
RAMP A-1 RAMP A-2
IN SLAB ON GRADE IN SLAB ON GRADE BS-121a
MALE/FEMALE TOILETS
BS-51 BS-53 BS-112

C.J. C.J. C.J.


C.J.
F.F.L.+10500
T.O.C.+10500
STAFF REST ROOM
BS-111d COLD KITCHEN CHEF'S OFFICE
ELEVATOR LOBBY BS-111e BS-111f
BS-52 FEMALE LOCKER
TRAINING ROOM TRAINING ROOM BS-111b MALE LOCKER STAIR B-04
BS-32 TRAINING ROOM BS-77 BS-111c
TRAINING ROOM
BS-59
BS-50
ATHLETE'S HALLWAY ATHLETE'S HALLWAY BOTTLE STORAGE
BS-29 BS-29 ATHLETE'S HALLWAY BS-107
EXPANSION JOINTS 10mm CONTROL JOINTS 5x5mm EXPANSION JOINTS 10mm EXPANSION JOINTS 10mm BS-29
IN SLAB ON GRADE IN SLAB ON GRADE IN SLAB ON GRADE IN SLAB ON GRADE

2 KITCHEN
COMPRESSOR ROOM
BS-106 OFFICE
BS-109
BS-122a
C.J. C.J.

CONTROL JOINTS 5x5mm 1,2,3,4 HS


CONTROL JOINTS 5x5mm
IN SLAB ON GRADE IN SLAB ON GRADE HALLWAY
BS-41a
HALLWAY
BS-87
P-02
3 4 P-03
HALLWAY
BS-68a
TOILET & SHOWER
BS-79a
KITCHEN
BS-109
P-04 F.F.L.+10500 LOBBY
LOBBY
BS-119a
T.O.C.+10420 BS-121
C.J. C.J. STORAGE STORAGE
BS-114 BS-114
TD
HD HS
HS HD
TD C.J.

STAIR A-06 Rise to 3rd Floor C.J.


HS REFEREES
BS-79
HD
MISC. STORE OFFICE
REFEREES REFEREES
via Ele Shaft REFEREES
TD
CONFERENCE ROOM
BS-111k
TOILETS BS-122c F.F.L.+10500
BS-91 BS-88 BS-78
BS-81 BS-142a
LOBBY T.O.C.+10420
ELECTRICAL ROOM
O,B.EQUIPMENT AREA
BS-92a
LOBBY LOBBY
BS-52
INTERVIEW
BS-142b BS-122
BS-52 BS-82
F.F.L.+10500
BSD57A ATHLETE'S HALLWAY
DW-01
STAFF DINING ROOM
BS-113
CHINA WARE
BS-111
DISH WASHING
BS-111a C.A.R. RISING FLOOR
O,B.EQUIPMENT AREA T.O.C.+10420
EXPANSION JOINTS 10mm
IN SLAB ON GRADE
SMB-B2 BS-29
C.J.
INTERVIEW
BS-85 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 HD
C.J.
DW-02 DW-03
TOILETS
BS-143
BS-141
BS-142

F.F.L.+10500
1,2,3,4 C.J. C.J.
TOILET AND SHOWER
MACHINE
BS-114a JANITOR'S ROOM
F.F.L.+10500 T.O.C.+10420 LOBBY
BS-80
STORE
BS-111g
BIG POTS WASH AREA RECIEVING AREA
T.O.C.+10420 BS-123
ATHLETE'S HALLWAY
BS-92
BS-86 INTERVIEW
BS-83 16 17
STAIR A-07 BS-111h BS-109a LOBBY
POTS/PANS WASH AREA
BS-122b
HD
BS-111i

18 19 20 21 22 23 24 25
HS
UTILTY ROOM
GARBAGE ROOM
BS-108 LOBBY F.F.L.+10500
BS-122b
C.J. C.J. C.J. C.J. BS-111j
LOBBY
T.O.C.+10420
BS-119
LOBBY STAIR A-05 HS
Store
STAIR B-05 3 OFFICE
BS-68b 2 1
BS-93 1 2 3
STAIR B-06
BS-120a
C.J. TECHNICAL GALLERY
BS-105 C.J.
TECHNICAL GALLERY C.J. C.J.

TECHNICAL ROOM ATHLETE'S HALLWAY BS-138a BS-105


BS-93a BS-92 ATHLETE'S HALLWAY Hallway
F.F.L.+10500 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 BS-92
F.F.L.+10500
T.O.C.+10450 Hallway
BS-120
BS-120 T.O.C.+10420

MACHINE TECHNICAL GALLERY F.F.L.+10500

P-01
PRESS
BS-98a
BS-100 BS-105
ELECTRICAL ROOM
BS-119b
2 C.J. C.J.
T.O.C.+10420

C.J.
F.F.L.+10500
T.O.C.+10500 F.F.L.+10500 CHANGING ROOM SHOWERS HD

T.O.C.+10450 BS-145b
TRAINING TRACK TRAINING TRACK
MACHINE ROOM
BS-110a BS-104 BS-104
ECONOMA STORAGE REST ROOM TD
EXPANSION JOINTS 10mm BS-147
IN SLAB ON GRADE F.F.L.+10500 F.F.L.+10500 BS-146
T.O.C.+10420 T.O.C.+10420 HD

F.F.L.+10500 HS HS
LOBBY T.O.C.+10420 F.F.L.+10500
BS-119 T.O.C.+10420
LOBBY
F.F.L.+10500
BS-145c
F.F.L.+10500 HS HS
T.O.C.+10420
PRESS PARKING SPACE T.O.C.+10450
F.F.L.+10500
BS-95 T.O.C.+10420
HS HS

STAIR C-01
C.J.

EXPANSION JOINTS 10mm REST ROOM


IN SLAB ON GRADE
LOBBY BS-145
F.F.L.+10500 BS-144 HS HS
EXPANSION JOINTS 10mm
T.O.C.+10450 IN SLAB ON GRADE

F.F.L.+10500
T.O.C.+10420
F.F.L.+10500 F.F.L.+10500 HD

T.O.C.+10500 TECHNICAL GALLERY F.F.L.+10500 T.O.C.+10420


TECHNICAL ROOM BS-105 T.O.C.+10420 TD

BS-140
CHANGING ROOM SHOWERS F.F.L.+10500
EXPANSION JOINTS 10mm
IN SLAB ON GRADE F.F.L.+10500 BS-145a T.O.C.+10420
F.F.L.+10500 T.O.C.+10450
T.O.C.+10500 HD

DRIVEWAY
BS-94

F.F.L.+10500
EXPANSION JOINTS 10mm T.O.C.+10450
IN SLAB ON GRADE
MULTI PURPOSE USE
BS-124

F.F.L.+10500
EXPANSION JOINTS 10mm T.O.C.+10420
IN SLAB ON GRADE
EXPANSION JOINTS 10mm
EXPANSION JOINTS 10mm
IN SLAB ON GRADE
IN SLAB ON GRADE

RAMP D-1
BS-97 EXPANSION JOINTS 10mm
IN SLAB ON GRADE
SERV. AREA
BS-150

F.F.L.+10500
F.F.L.+10500
T.O.C.+10420
T.O.C.+10500
EXPANSION JOINTS 10mm TECHNICAL ROOM
IN SLAB ON GRADE BS-148

EXPANSION JOINTS 10mm


F.F.L.+10500
IN SLAB ON GRADE
T.O.C.+10500

PRESS PARKING SPACE


C.J. C.J.
BS-95
TECHNICAL ROOM
BS-148
F.F.L.+10500 TECHNICAL GALLERY
T.O.C.+10450 BS-105
F.F.L.+10500
T.O.C.+10500
EXPANSION JOINTS 10mm F.F.L.+10500
IN SLAB ON GRADE T.O.C.+10450
EXPANSION JOINTS 10mm
IN SLAB ON GRADE STAIR C-03
EXPANSION JOINTS 10mm
IN SLAB ON GRADE EXPANSION JOINTS 10mm
IN SLAB ON GRADE

STAIR C-02
EXPANSION JOINTS
10mm IN SLAB
ON GRADE

DRIVEWAY
BS-94
SERV. AREA
BS-151
F.F.L.+10500
T.O.C.+10450
F.F.L.+10500
T.O.C.+10500

SERV. AREA
BS-151
STAIR C-02
STAIR D-02 EXPANSION JOINTS 10mm EXPANSION JOINTS 10mm
IN SLAB ON GRADE IN SLAB ON GRADE
MAINTENANCE PARKING SPACE F.F.L.+10500
EXPANSION JOINTS 10mm EXPANSION JOINTS 10mm T.O.C.+10500
IN SLAB ON GRADE IN SLAB ON GRADE BS-96

F.F.L.+10500
T.O.C.+10500
HALLWAY
BS-102
STORE
F.F.L.+10500 BS-116b
T.O.C.+10450

DRIVEWAY C.J.
EXPANSION JOINTS 10mm
IN SLAB ON GRADE
BS-94 TECHNICAL AREA
BS-138
F.F.L.+10500
T.O.C.+10450

EXPANSION JOINTS 10mm F.F.L.+10500


IN SLAB ON GRADE T.O.C.+10500 SERV. AREA
BS-152
EXPANSION JOINTS 10mm
IN SLAB ON GRADE

EXPANSION JOINTS 10mm EXPANSION JOINTS 10mm


IN SLAB ON GRADE IN SLAB ON GRADE

F.F.L.+10500
T.O.C.+10500
LOBBY
BS-137a B.M.S. ROOM
GENERAL SECURITY
BS-149 BS-125c
C.J. C.J.
F.F.L.+10500
F.F.L.+10500 F.F.L.+10500 T.O.C.+10420
TRAINING TRACK TRAINING TRACK
T.O.C.+10420 T.O.C.+10500 C.J.
BS-104 BS-104

F.F.L.+10500 F.F.L.+10500 GARBAGE


PLUMBING TECHNICAL AREA T.O.C.+10420 T.O.C.+10420 EXPANSION BS-125
BS-139 BS-137 JOINTS 10mm TECHNICAL ROOM
IN SLAB ON GRADE
BMS,CCTV,FIRE ALARM DW-04 BS-148
MACHINE ROOM
BS-139b BS-125b F.F.L.+10500
F.F.L.+10500 TECHNICAL GALLERY
SERVICE WAY T.O.C.+10500
T.O.C.+10420 F.F.L.+10500
BS-133 BS-105 T.O.C.+10500
F.F.L.+10500 EXPANSION JOINTS 10mm F.F.L.+10500
F.F.L.+10500
C.J. T.O.C.+10420 IN SLAB ON GRADE TECHNICAL GALLERY T.O.C.+10500
C.J. T.O.C.+10500
F.F.L.+10500 F.F.L.+10500 BS-105
EXPANSION JOINTS 10mm T.O.C.+10450 STORE TECHNICAL SHAFT WORKSHOP
T.O.C.+10450 IN SLAB ON GRADE EXPANSION JOINTS 10mm EXPANSION JOINTS 10mm
BS-127 BS-126 BS-125a
IN SLAB ON GRADE IN SLAB ON GRADE
F.F.L.+10500 C.J.
T.O.C.+10450
C.J. F.F.L.+10500 C.J.
C.J.
T.O.C.+10500
C.J. C.J.
TECHNICAL SHAFT TECHNICAL SHAFT TECHNICAL SHAFT
EXPANSION JOINTS 10mm BS-136 BS-136 BS-126
IN SLAB ON GRADE
F.F.L.+10500
T.O.C.+10500 F.F.L.+10500
EXPANSION JOINTS 10mm
T.O.C.+10500
F.F.L.+10500 F.F.L.+10500 IN SLAB ON GRADE
C.J.
T.O.C.+10500 T.O.C.+10500
EXPANSION JOINTS 10mm
IN SLAB ON GRADE

C.J. PABX
BS-139a C.J.

C.J. F.F.L.+10500 EXPANSION JOINTS 10mm


IN SLAB ON GRADE
T.O.C.+10420 TECHNICA GALLERY EXPANSION JOINTS 10mm
BS-128 IN SLAB ON GRADE
EXPANSION JOINTS 10mm
IN SLAB ON GRADE

F.F.L.+10500
T.O.C.+10500

C.J. C.J.

C.J.
C.J.

EXPANSION JOINTS 10mm TECHNICAL AREA TECHNICAL ROOM


EXPANSION JOINTS 10mm
IN SLAB ON GRADE
IN SLAB ON GRADE BS-134 BS-128a EXPANSION JOINTS 10mm
STAIR C-07 IN SLAB ON GRADE
F.F.L.+10900 L-2
F.F.L.+10500 STAIR C-06 F.F.L.+10500 T.O.C.+10900 NE
PA
T.O.C.+10500 T.O.C.+10500 C.J. MV

MV ROOM
BS-133b C.J.

TECHNICAL ROOM
SERVICE WAY EXPANSION JOINTS 10mm -2
BS-132 EL

TX
IN SLAB ON GRADE AN
BS-133 TX ROOM SERVICE WAY

-1
VP
CORRIDOR M
BS-133c
EXPANSION JOINTS 10mm BS-133
IN SLAB ON GRADE BS-130
F.F.L.+9500 C.J.
F.F.L.+10500 T.O.C.+9500 EXPANSION JOINTS 10mm
T.O.C.+10450 TECHNICAL ROOM IN SLAB ON GRADE N EL
-3
F.F.L.+9500 BS-129 PA F.F.L.+10500
MV

TX
T.O.C.+9500 T.O.C.+10450

-2
EXPANSION JOINTS 10mm F.F.L.+9500 F.F.L.+10900
EXPANSION JOINTS 10mm IN SLAB ON GRADE
IN SLAB ON GRADE T.O.C.+9500 T.O.C.+10900

TX
EXPANSION JOINTS 10mm RAMP

-3
IN SLAB ON GRADE
----
STAIR C-08

800x1200MM DEEP F.F.L.+10500


TRENCH COVERED BY T.O.C.+10450
STAIR C-05 CHEQUERED PLATE F.F.L.+10500
T.O.C.+10450
P-06

EXPANSION JOINTS 10mm


IN SLAB ON GRADE

P-07

LOBBY
STAIR D-01 BS-131
S-01 STAIR C-04

F.F.L.+10500
EXPANSION JOINTS 10mm T.O.C.+10420
IN SLAB ON GRADE

STAIR C-09 F.F.L.+10500 F.F.L.+9500


T.O.C.+10500 T.O.C.+9500

EXPANSION JOINTS 10mm


IN SLAB ON GRADE
SERVICE WAY ELECTRICAL ROOM MECHANICAL ROOM
BS-133 BS-132a BS-131a

F.F.L.+10500
T.O.C.+10450

SERVICE WAY
BS-133

F.F.L.+10500
T.O.C.+10450

HV ROOM
BS-133a

F.F.L.+10500
T.O.C.+10500
LOBBY
LOBBY GF-08
GF-08
2

N/W UPPER SEATING GALLERY


GF-9
N/W UPPER SEATING GALLERY
GF-9

FEMALE TOILET
GF-08f

STAIR A-10a
LOBBY
GF-08

MALE TOILET
GF-08e

1
2
3
4

6 5
8 7
LOBBY

9 10
GF-08

11 12
13 14
15 16
17 18
19
POOL DECK
GF-56
HALLWAY
GF-06

POOL DECK
HALLWAY
GF-56
GF-07

MALE TOILET
GF-08b

POOL DECK
GF-56
STORE
GF-08d

FEMALE TOILET
GF-08c

HALLWAY
GF-07
TABLE TENNIS
GF-05 POOL DECK
GF-56

POOL DECK
GF-56

POOL DECK
GF-56

DIVING POOL
GF-59
TABLE TENNIS TEACHING POOL
HALLWAY
GF-05 GF-06 GF-58

JACUZZI
GF-57

POOL DECK
GF-56

JUDGE
GF-55

TOILETS
GF-54

POOL ENTRY
POOL DECK GF-49
GF-56

HALLWAY
GF-07
TABLE TENNIS
GF-05
CHANGING ROOM
GF-50 LOBBY
GF-41

SWIMMING POOL
GF-60

POOL DECK
GF-56

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
GFD-80 ELECTRICAL ROOM
GF-53a

LOBBY
GF-03
34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
6
SHOWERS
GF-51

WOMEN MASSAGE
GF-53b

TOILETS
GF-52

MASSAGE
GF-53
FOOT TO 5 POOL DECK
GF-04 GF-56

SHOWERS
GF-51
LOBBY
GF-41

ELEC ROOM
GF-40C LOUNGE
GF-61

CHANGING ROOM
GF-50

LOBBY
LOBBY GF-31
GF-01 OFFICES
GF-46

MEN
ENTRANCE
GF-64
PLAYERS' ENTRANCE LOBBY
LOBBY
V.I.P ENTRANCE LOBBY GF-40a
GF-40
OFFICES
GF-45 GF-40a LOBBY
GF-63

POOL DECK
GF-56

LOBBY
GF-03 POOL ENTRY LOBBY
RECEPTION COUNTER
GF-49 GF-41 GF-62
LOBBY POOL DECK SWIMMING POOL
GF-56 GF-60
FOOT TO 5
GF-04
GF-31
V.I.P ENTRANCE LOBBY
S/E UPPER SEATING GALLERY
GF-40a
GF-10

LOBBY LOBBY
GF-01 GF-40
SWIMMING TEACHER ANTI-DOPE ROOM LOBBY
GF-48 GF-43 GF-41 R1
02
76
2

R5
54
6
STAIR A-09
DOCTOR

5,6 TOILET GF-44


INFIRMARY GF-42 PLAYERS' ENTRANCE LOBBY
LOBBY GF-47 GF-40a

STAIR A-09a
GF-01
LOBBY
GF-01
GFD-15 ELEC. ROOM
GF-18
PANTRY
GF-15
HALLWAY
GF-26
POOL DECK
GF-56
ABLUTION

7
GF-69

SMB-GN3 LOBBY
GF-41a
PRAYER ROOM
2

SERVERY GF-70
GF-19
100x105h

CAFETERIA

N
LOBBY GF-25
GF-13 ELEC ROOM

GFD-96
D 00 D 01 D 02 D 03 D 04 D 05 D 06 D 07 D 08 D 09 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 20 D 21 D 22 D 23 D 24
LOBBY
FEMALE TOILET ELEC. ROOM GF-70a

37
38

39

40
41

42

43

44
45

46

26

27
GF-17 GF-27
GF-30a

A
CENTRAL LOBBY CONFERENCE ROOM
STORAGE

7
GF-21 GF-22 PASSAGE
HALLWAY GF-68
GF-03a GF-01a

LOBBY
LOBBY
GF-01
SERVERY
GF-11 FEMALE TOILET
GF-12 MALE TOILET
GF-14
CAFETERIA
GF-20

SERVERY
PANTRY
GF-23 HANDICAP TOILET
GF-27a
FEMALE-TOILET
GF-28
MALE TOILET
GF-29
SMB-GN4 MEETING ROOM
GF-33

LOBBY
MALE TOILET
GF-67

B
GF-24 MEETING ROOM MEETING ROOM MEETING ROOM MEETING ROOM
GF-01 STORE GF-37
STAIR B-04
GF-40
GF-34 GF-35 GF-36

30
36

35
34
33

32

31

29
28
MALE TOILET GF-30 MALE TOILET
GF-16 GF-39

HANDICAP TOILET
GF-27b LOBBY
LOBBY GF-38b LOBBY C 00 C 00

GF-31 GF-40

LOBBY
GF-38a
PANTRY
GF-11a LOBBY
DRY STORE
GF--- GF-40
STAIR A-06 FEMALE TOILET
STAIR A-08
GF-38 LOBBY

6
CENTRAL LOBBY GF-40
GF-21 CENTRAL LOBBY
GF-21

22 23 24 25 26 27 28 29 30
HALLWAY
PRESS LOBBY STAIR A-07 GF-138 HALLWAY
--- HALLWAY
---
GF-197 GF-32 GF-32 LOBBY C 01 C 01

GF-65
12 13 14 15 16 17 18 19 20 21

FHC FHC 1 2 3 4 5 6 7 8 9 10 11

LOCKERS & CHANGING


GF-134 TOILETS
TOILETS TOILETS GF-79 HALLWAY
ANTI-DOPE GF-32 C 02 C 02
GF-145 GF-137
GF-196 INTERVIEW HALLWAY LOBBY CAFETERIA

5
TOILETS
STAIR A-05 GF-195 GF-138
GF-86 GF-40 GF-71
TOILETS
RAMP D-1 PRESS LOUNGE LOCKERS/CHANGING LOCKERS/CHANGING GF-89
TOILETS GF-197a GF-77 GF-84
BS-97 GF-196a
C 03 C 03
A.C.PLENUM
LOBBY
GF-190 GF-31
TRAINER ENTRANCE
A.C.PLENUM TRAINER TRAINER TRAINER
GF-82
GF-83 GF-66
INTERVIEW GF-140 GF-81 C 04 Slab on level +16.00
C 04
PRESS LOBBY GF-190 GF-194 DUCT
TRAINER MASSAGE SHOWER MASSAGE DUCT
GF-197 AC RETURN AC RETURN
GF-139 GF-136 GF-135 SHOWERS GF-80 C 05 C 05
SHOWERS
GF-78 GF-85
MASSAGE SHOWER
GF-143 MASSAGE
MASSAGE GF-144
GF-88 LOCKERS/CHANGING
GF-147 MASSAGE
GF-91
GF-87 C 06 C 06

C 07 C 07
PANTRY
C 08 C 08
INTERVIEW LOCKERS & CHANGING FHC FHC GF-72
GF-193 GF-149 SHOWER SHOWERS
GF-148 GF-90
HALLWAY HALLWAY
GF-133 GF-100 DUCT
AC SUPPLY AC SUPPLY
DUCT
MEDICAL CENTER
GF-192

JUDO SEATING GALLERY B 00


B 20
GF-189 TRAINER
HALLWAY GF-150
GF-138
HALLWAY
GF-133 TRAINER C 09 C 09 C 09
GF-92

TRAINER B 01
B 19
GF-151

TRAINER
GF-152
TRAINER
GF-93
FHC FHC
B 18
HALLWAY
GF-133
C 10 C 10
MULI-PURPOSE HALL
DUCT
GF-74
TRAINER AC RETURN
AC RETURN
DUCT GF-94 C 11 C 11

B 17
LOCKERS/CHANGING
LOCKERS & CHANGING ATHLETIC TRACKS GF-95
FHC FHC
GF-153 GF-132

HALLWAY HALLWAY C 12 B 16 C 12
GF-191 GF-32 LOBBY
GF-40
ATHLETIC TRACKS C 13 C 13

GF-132 B 15

JUDO,VOLLEYBALL SHOWERS LOBBY


STORE GF-188
GF-154
TOILETS
GF-40b C 14
B 14
C 14

TOILETS

C
GF-202 GF-156 GF-98

D
A.C.PLENUM
GF-190 SHOWERS
GF-96
D 00 D 01 D 02 D 03 D 04 D 05 D 06 D 07 D 08 D 09 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 20 D 21 D 22 D 23 D 24

ATHLETIC TRACKS MASSAGE


MASSAGE GF-97
GF-155 GF-132

HALLWAY
GF-100
A.C. PLENUM A.C. PLENUM
HALLWAY
GF-73 GF-73
GF-133
MULI-PURPOSE HALL
REFEREES
GF-99 GF-74
DUCT
AC SUPPLY AC SUPPLY
DUCT

HALLWAY
GF-138

REGISTER ROOM
GF-157

REFEREES
GF-100a

LOBBY
GF-40

LOBBY
GF-201

LOBBY
GF-201
SMO
OTH
CONC FINISH
PROT RETE FAIR
LOBBY ECTI STEP FACE
VE STEE S WITH D
GF-201 LOBBY EPOX L NOIS
Y PAINT STAI
GF-40 FACE ON FAIR
ING
∅ 60
NLES
S
CONC mm STEEL
RETE
HAN SATIN HANDRAIL
DRAI FINI
L TYPE SH 220
SH1

T
SMOO
TH
CONC FINISH
PROT RETE STEPFAIR FACE
ECTIV
E STEE S WITH D
FHC FHC
L NOSI
NG

GFD-25
L
EPOX 14
Y PAINT 13
ON FAIR
12
CONC 11
JUDGES RETE FACE

I
BG
GF-160 18 18
19 19
POLICE EPOX
Y PAIN

20
17
STAIR D-02 STAIR C-02
17
16 20
GF-102 LOBBY 10
9
8
T
CON ON FAIR
CRET FACE
16 7 E
21
15 15 21 GF-40 6
5
4
3

5
22 2
14 14 22 1
23 EPOX

U
24
13
12
13 23
LOBBY EPOX
Y
ON FAIRPAINT
Y PAINT
ON BLOC ON PLAST
12 24 K WORK ER
25
11 11 25
GF-40 FACE
ON 80mm
CONC
RETE
SCRE
ED DOUB
LE STEE
ELECTRICAL ROOM 26

27
10 10 26 L DOOR
(OB-0
1)
GF-198A 28
9 9 27 EPOX
Y PAINT

B
8 8 28 CONC ON FAIR
29 RETE FACE
7 7 29
30
6 6 30
HALLWAY 31
5
GF-162 31
32
32
33
33

S/C LOBBY

S
GF-75
FIRE MEN
GF-198

TOILET
GF-199
JUDGES
GF-161 AC SUPPLY
DUCT

MASSAGE
GF-164
HALLWAY
GF-159

HALLWAY
MASSAGE
GF-107
AC SUPPLY
DUCT
REFEREES
GF-105

HALLWAY
GF-103
ELEC. ROOM
GF-76e
SEATING GALLERY
GF-75a
A
GF-101
ATHLETIC TRACKS
GF-132 STORAGE
SHOWER
GF-108
GF-76b
TOILET
GF-163 TOILETS
SHOWERS GF-106
GF-165

ATHLETIC TRACKS
GF-132
ATHLETIC TRACKS
STORAGE GF-132
GF-200

LOCKERS/CHANGING
GF-166 LOCKERS/CHANGING
GF-109

FHC FHC TRAINER


AC RETURN GF-110 AC RETURN
DUCT DUCT
TRAINER
GF-167 GARBAGE
GF-76d
S/COURT-1
KARATE S/COURT-2
GF-76
GF-187 GF-76a
FHC FHC

LOBBY
TRAINER
GF-201 GF-168
TRAINER
GF-111
2

TRAINER
GF-112
TRAINER
GF-169

HALLWAY
LOCKERS/CHANGING GF-101 LOCKERS/CHANGING
GF-170 HALLWAY HALLWAY
SHOWERS GF-115
GF-159 GF-101 SHOWER
GF-171
GF-116

FHC FHC

MASSAGE
GF-118 HALLWAY
MASSAGE
GF-103
GF-172 MASSAGE MASSAGE
GF-175 GF-119
SHOWER SHOWER
GF-176 GF-121
SHOWERS LOCKERS/CHANGING LOCKERS/CHANGING SHOWER MASSAGE TRAINER TRAINER
GF-182 GF-183 GF-129 GF-128 GF-126 GF-125 GF-123
MASSAGE LOCKERS/CHANGING
TRAINER TRAINER GF-181 TRAINER GF-122
GF-178 GF-179 TRAINER GF-124
LOCKERS/CHANGING GF-180 TECHNICAL ROOM
GF-177
GF-76c

TOILETS
GF-173
TOILETS
MULTIPURPOSE HALL & FENCING LOBBY GF-117

GF-74 GF-130
TOILETS
GF-174 TOILETS
GF-120
TOILETS TOILETS
GF-184 GF-127

FHC FHC

HALLWAY
GF-162 HALLWAY
GF-103

LOBBY
GF-130

GYMNASIUM
GF-113

GYMNASIUM
GF-113 Main Contractor
STORAGE

CONSOLIDATED CONTRACTO
GF-184a
STORAGE
GF-184a
MULTIPURPOSE HALL
GF-186

HANDRAIL

INTERNATIONAL COMPANY S
TYPE H2
HANDRAIL
TYPE H1

STORAGE
GF-184a

STAIR C-12

FOR DETAILS REFER


TO DWG NO.
CCSCGGBAS4599

P.O.BOX: 22056, DOHA, QATAR.


Sub Contractor
EMULSION PAINT
ON FAIR FACE CONC.

LOBBY
GF-130a

STORAGE
GF-185a

HANDRAIL
TYPE H2

HANDRAIL
TYPE H1
HANDRAIL A
TYPE H2

Client
THE SPORT CITY PROJECT
STAIR C-13
FOR DETAILS REFER
TO DWG NO.
CCSCGGBAS4599
I

Project
SPORTS HALL
I

Title
GROUND FLOOR
MASTER KEY PLAN
LEVEL
DO NOT SCALE
Designed
Drafting Design
Check : MUS Check
APPROVED : M.S.

This Drawing must not be used for Construction unless signed as Approved

Drawing No. Original Size

A0
CC-SHG-GF-AN-410201 01
AS BUILT
PLATFORM 5

PLATFORM 2

PLATFORM 1

PLATFORM 4

PLATFORM 6

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

STAIR B-13

E
STAIR B-14

STAIR B-15

void of level
+20000

D 00 D 01 D 02 D 03 D 04 D 05 D 06 D 07 D 08 D 09 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 20 D 21 D 22 D 23 D 24

N
A
STAIR A-09

LOBBY
2F-01b

B
ELEC. ROOM VOID OVER

2F-20a 7 LEVEL +10500


V.I.P.
Entrance

C 00 C 00

UPPER SEATING GALLERY TOILET LOUNGE OFFICE ABLUTION AREA


2F-02 MAJLIS LIFT LOBBY 2F-11 2F-20
2F-08 2F-22 VOID OVER

LOBBY LOUNGE PANTRY


2F-06a PRAYER ROOM LEVEL +10500

2F-01 2F-03 MAJLIS-1 2F-21


2F-05 2F-06
TOILE Cable from GF via ILET
2F-04 T TOILET TO LOBBY LOBBY
2F-10 ELEC. ROOM

TOILET
Electrical Shaft

2F-22a
2F-08a HS
2F-01 2F-25 2F-01b 22 23 24 25 26 27 28 29

ANTE ROOM
30

2F-23 HS
C 01 C 01

MAJLIS-2
HS HS
12 13 14 15 16 17 18 19 20 21
HS HS
HS
ELEC. ROOM 2F-07 HS
HS

2F-05a HS HS HS 1 2 3 4 5 6 7 8 9 10 11

7 7 MAJLIS-3
2F-16 PANTRY
C 02 C 02

MAJLIS JACUZZI 2F-18 DATA ROOM


2F-09 2F-25a
UPPER SEATING GALLERY LOBBY C 03 C 03

2F-17 2F-24
ELEC. ROOM PRAYER ROOM SERVERY
2F-01c 2F-12 2F-19 C 04 Slab on level +16.00
C 04

C 05 C 05

LOBBY C 06 C 06

2F-01a C 07 C 07

C 08 C 08

B 00
B 20

C 09 C 09 C 09

B 01
B 19

B 18

C 10 C 10

C 11 C 11

B 17

C 12 B 16 C 12

C 13 C 13
B 15

C 14 C 14
B 14

D D 00 D 01 D 02 D 03 D 04 D 05 D 06 D 07 D 08 D 09 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 20 D 21 D 22 D 23 D 24

C
A

I L T
B U
AS

STAIR C-17
STAIR D-06

STAIR C-16 STAIR C-16


LOBBY
FF-58
LOBBY STAIR C-16 STAIR C-16 STAIR C-16 STAIR C-16
STAIR C-16 STAIR C-16
FF-57 STAIR C-16 STAIR C-16 STAIR C-16 STAIR C-16

Main Contractor

CONSOLIDATED CONTRACTOR
INTERNATIONAL COMPANY S.A
P.O.BOX: 22056, DOHA, QATAR.
Sub Contractor

FOR DETAILS REFER


TO DWG NO.
CCSCGGBAS4584
STAIR C-12

Client
THE SPORT CITY PROJECT
Project
C

SPORTS HALL
STAIR C-13

Title
SECOND FLOOR
MASTER KEY PLAN
LEVEL +24.50m
DO NOT SCALE
Designed
Drafting Design
Check : MUS Check
APPROVED : M.S.

This Drawing must not be used for Construction unless signed as Approved

Drawing No. Original Size

A0
CC-SHG-02-AN-4104 01 01
AS BUILT
1 1
2 2
3 3
4 4

5
6

6
7

7
8

8
9 10

9 10
11 12

11 12
13 14

13 14
15

15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

D 00 D 01 D 02 D 03 D 04 D 05 D 06 D 07 D 08 D 09 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 20 D 21 D 22 D 23 D 24

N
Cables from
Basement via
3F-01 3F-02 3F-03 3F-04 3F-05

COMMENTATORS
3F-01 TO 3F-05
3F-06 3F-07 3F-08 3F-09 3F-10

COMMENTATORS
3F-06 TO 3F-10
TOILET
3F-18
TOILET
3F-19

4
STORE
3F-20a TOILET
3F-32
TOILET
3F-33
A
C 00 C 00

B
Ele. Shaft
4 LOBBY LOBBY STUDIO GALLERY STUDIO LOBBY LOBBY
3F-11
3
3F-14 3F-15 3F-17 3F-20 3F-31
4 P-08 3F-34
22 23 24 25 26 27 28 29 30

3 EQU. ROOM
3F-00 COMMENTATORS
3F-21 TO 3F-25 COMMENTATORS
C 01

12 13 14 15 16 17 18 19 20 21
C 01

3F-26 TO 3F-30 ES-09 1 2 3 4 5 6 7 8 9 10 11

TOILET TOILET STORE TOILET C 02 C 02

3F-12 3F-13 3F-15a 3F-16


3F-21 3F-22 3F-23 3F-24 3F-25 3F-26 3F-27 3F-28 3F-29 3F-30
C 03 C 03

Slab on level +16.00


C 04 C 04

C 05 C 05

C 06 C 06

C 07 C 07

C 08 C 08

B 00
B 20

C 09 C 09 C 09

B 01
B 19

B 18

C 10 C 10

C 11 C 11

B 17

C 12 B 16 C 12

C 13 C 13
B 15

C 14 C 14
B 14

D D 00 D 01 D 02 D 03 D 04 D 05 D 06 D 07 D 08 D 09 D 10 D 11 D 12 D 13 D 14 D 15 D 16 D 17 D 18 D 19 D 20 D 21 D 22 D 23 D 24

I LT
B U
A S

Main Contractor

CONSOLIDATED CONTRACTO
INTERNATIONAL COMPANY S
P.O.BOX: 22056, DOHA, QATAR.
Sub Contractor

FOR DETAILS REFER


TO DWG NO.
CCSCGGBAS4584
STAIR C-12

Client
THE SPORT CITY PROJECT
Project
SPORTS HALL

C
Title
THIRD FLOOR
STAIR C-13

MASTER KEY PLAN


LEVEL +29.75m
DO NOT SCALE
Designed
Drafting Design
Check : MUS Check
APPROVED : M.S.

This Drawing must not be used for Construction unless signed as Approved

Drawing No. Original Size

A0
CC-SHG-03-AN-4105 01 01
AS BUILT

You might also like