Activity 01 Contracts

Activity 02 Document Review and Revision


Activity 03 Grading and Building Permits
Activity 04 Site Work
Activity 05 Clear lot
Activity 06 Strip Topsoil & Stockpile
Activity 07 Stake Lot for Excavation
Activity 08 Rough grade lot
Activity 09 Excavate for foundation
Activity 10 Foundation
Activity 11 Layout footings
Activity 12 Dig footings & Install Reinforcing
Activity 13 Footing inspection
Activity 14 Pour Footings
Activity 15 Pin Footings
Activity 16 Stock block, mortar, sand
Activity 17 Build block foundation
Activity 18 Fill block Cores with concrete
Activity 19 Steel Delivery
Activity 20 Set Lintels, Bolts, Cap Block
Activity 21 Waterproofing and Drain Tile
Activity 22 Rough Carpentry
Activity 23 Set steel
Activity 24 1st floor deck framing
Activity 25 1st floor wall framing
Activity 26 2nd floor deck framing
Activity 27 Set roof trusses
Activity 28 Frame roof
Activity 29 Install roof plywood
Activity 30 Install windows and doors
Activity 31 Frame basement
Activity 32 Frame basement bulkheads
Activity 33 Concrete Slabs
Activity 34 Basement slab preparation
Activity 35 Termite treatment basement slab
Activity 36 Slab inspection
Activity 37 Pour basement slab
Activity 38 Prep garage slab
Activity 39 Termite treatment garage slab
Activity 40 Pour garage slab
Activity 41 H.V.A.C.
Activity 42 HVAC Layout Measure
Activity 44 HVAC Rough-in
Activity 45 HVAC Set Indoor Units
Activity 46 HVAC Temporary Heat
Activity 47 Plumbing Rough-In
Activity 48 Plumbing Sub-slab
Activity 49 Plumbing Layout
Activity 50 Country plumbing sub-slab inspection
Activity 50 Country plumbing rough-in inspection
Activity 51 Specialty rough-in
Activity 52 Central vacuum rough-in
Activity 53 Alarm system rough-in
Activity 54 Telephone system rough-in
Activity 55 Television system rough-in
Activity 56 Audio visual rough-in
Activity 57 Country electrical inspection
Activity 58 Country framing inspection
Activity 59 Install second floor wood girders
Activity 60 Install second floor wood joints
Activity 61 Install second floor wood joists
Activity 62 Install roof framing and roof rafters
Activity 63 Stock roof shingles
Activity 64 Install roof shingles
Activity 65 Install all steel windows
Activity 66 Install glass and screens
Activity 67 Exterior finishes
Activity 68 Exterior trim
Activity 69 Brick arch forms
Activity 70 Brick veneer
Activity 71 Insulation
Activity 72 Caulk and air seal
Activity 73 Draft and fire stop
Activity 74 Batt insulation
Activity 75 Country insulation inspection
Activity 76 Drywall
Activity 77 Stock drywall
Activity 78 Hang drywall
Activity 79 Remove scrap drywall
Activity 80 Tape and finish drywall
Activity 81 .Sand drywall
Activity 82 Drywall point-up
Activity 83 Layout all tiling works for toilets and kitchen
Activity 84 Install hardwood floor
Activity 85 Sand, stain, seal hardwood
Activity 86 Finishing all floorings, vinyl, wood tiles, granulithic,
washouts
Activity 87 Paint (optional)
Activity 88 Prepare drywall for prime coat
Activity 90 Prime paint drywall
Activity 91 Finish coat trim
Activity 92 Finish coat drywall
Activity 93 caulk exterior windows and doors
Activity 94 Finish coat exterior trim and siding
Activity 95 Install interior doors
Activity 96 Install interior trim
Activity 97 Fabricate all kitchen and bedroom closet and cabinets
Activity 98 Install appliances
Activity 99 Install grills and registers for paint
Activity 100 Set plumbing fixture
Activity 101 Remove all scaffoldings, debris, and clean-up premises