Dust net, P =95 m
t =12 m
LEGENDA Dust net, P =145 m PLN
t =12 m
1. JEMBATAN TIMBANG
2. SETTLING POND
3. MCC-01
4. POWER HOUSE & KUBIKAL ( 10.50 X 18.00 )
15
5. WORKSHOP FPM & Elc (11.50 x 11.00)
6. WTP
7. MCC-02
5
8. SHIPPING OFFICE ROM
9. SETTLING POND
10. HOPPER DUMPING (CRUSHER) 1
2
11. HOPPER LOADING
S.POND
12. FUEL TANK CAP 14 KL (4.20 X 7.50) 4
12
KL
14
TANK
FUEL
13. FUEL TANK CAP 30 KL (6.00 X 7.00)
PAD
DING &
G
LOADIN
UNLOA
Crusher
Pos
14. OFFICE ( 10.5 X 11.50 ) 16
15. POS SECURITY (4.00 x 4.00)
16. POS JAGA (1.50 x 2.00)
17. RUMAH POMPA BUNKER ( 2.00 X 2.00 ) 3
STOCKPILE 14
5
13
6
7
8
17 Dust net, P =60 m
Pos
16 t= 6m
JETTY
LAYOUT PLAN
PROJECT KM.02
Black Steel Ø 4" Black Steel Ø 2" Black Steel Ø 3" Black Steel Ø 4" Black Steel Ø 2" Black Steel Ø 3" Black Steel Ø 4"
tebal 4,5mm tebal 3,6mm tebal 4mm tebal 4,5mm tebal 3,6mm tebal 4mm tebal 4,5mm
1.500 1.500
6.000 6.000
1.500
Black Steel Ø 4" tebal 4,5mm 1.500
0.200
OWNER KONTRAKTOR DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH JUDUL GAMBAR SKALA GAMBAR NO. LEMBAR
NAMA PEKERJAAN
DETAIL DUST NET 1:75
PEKERJAAN DUST NET AREA OFFICE PORT
TANGGAL
ENERGI DIGAMBAR OLEH ANGGA D DARMAWAN
26/08/2020
TAHUN PEKERJAAN
PT. MAHAKAM SUMBER JAYAPT.JL.ENERGI PERKASA ABADI
Nahkoda Blok 2 No.2 - Samarinda - Kaltim - Indonesia
JL. Batubara No.08 - Samarinda - Kaltim - Indonesia
DESIGN KODE GAMBAR
2021 ERWIN YUNIARTO
PROJECT DEVELOPMENT
HARWIDA S
ADMIN PROJECT DEVELOPMENT
RIZKI OKTAVIAN S
SITE MANAGER
DRAWING MSJ//EPA/DUSTNET
BLACK STEEL Ø 2" T= 3.6MM BLACK STEEL Ø 2" T= 3.6MM
1.500
1.500
BLACK STEEL Ø 4" T= 4.5MM BLACK STEEL Ø 4" T= 4.5MM
0.300
1.500
1.500
1.500
1.500
BLACK STEEL Ø 3" T= 4MM
1.500
1.500
12.000
12.000
1.500
1.500
MONOFILAMENT DUST NET
BLACK STEEL Ø 3" T= 4MM R12-C225HM3-25%
1.500
1.500
BLACK STEEL Ø 2" T= 3.6MM
1.500
1.500
MONOFILAMENT DUST NET
R12-C225HM3-25%
1.500
0.200
0.200
1.500
3.000 3.000 3.000 3.000
OWNER KONTRAKTOR DISETUJUI OLEH DIPERIKSA OLEH DIAJUKAN OLEH JUDUL GAMBAR SKALA GAMBAR NO. LEMBAR
NAMA PEKERJAAN
DETAIL DUST NET 1:75
PEKERJAAN DUST NET AREA OFFICE PORT
TANGGAL
ENERGI DIGAMBAR OLEH ANDRIANTO
3/04/2021
TAHUN PEKERJAAN
PT. MAHAKAM SUMBER JAYAPT.JL.ENERGI PERKASA ABADI
Nahkoda Blok 2 No.2 - Samarinda - Kaltim - Indonesia
JL. Batubara No.08 - Samarinda - Kaltim - Indonesia
DESIGN KODE GAMBAR
2021 ERWIN YUNIARTO
PROJECT DEVELOPMENT
HARWIDA S
ADMIN PROJECT DEVELOPMENT
RIZKI OKTAVIAN S
SITE MANAGER
DRAWING MSJ//EPA/DUSTNET