MC Jembatan
MC Jembatan
MC Jembatan
TOTAL
NO PERHITUNGAN VOLUME Sat
VOLUME
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank 1.00 m'
= = 1.00 m'
2 Pasang Paving Blok Segi 6 t= 8 cm, K-175, abu-abu (lokal) 1,694.11 m'
Lebar Panjang
1. Area rumah dinas dan Gedung serbaguna = 3.88 x 6.14 = 23.82 m2
= 3.88 + 2.32 x 7.62 = 23.62 m2
2.00
= 9.03 x 6.14 = 55.44 m2
= 0.25 x 3.14 x 4.84 = (3.80) m2
= 7.62 x 6.33 = 48.23 m2
= 16.55 x 4.65 = 76.96 m2
= 5.00 x 0.68 x 0.90 = (3.06) m2
2. Plat deuker = 15.76 + 17.72 x 1.36 = 22.77 m2
2.00
3. Kantor camat dan Pendopo = 6.45 + 6.93 x 1.45 = 9.70 m2
2.00
= 4.85 + 1.24 x 11.59 = 35.29 m2
2.00
= 6.75 + 5.74 x 3.25 = 20.30 m2
2.00
= 0.25 x 3.14 x 10.56 = (8.29) m2
= 25.84 + 23.68 x 7.37 = 182.48 m2
2.00
= 6.50 x 6.40 = 41.60 m2
= 33.15 + 30.33 x 7.12 = 225.99 m2
2.00
= 18.20 + 11.20 x 16.66 = 244.90 m2
2.00
= 32.30 + 25.40 x 20.94 = 604.12 m2
2.00
4. Pengurang Pendopo = = (190.00) m2
5. Pengurang Lainnya = = (9.84) m2
6. Tambahan = 293.88 m2
1,694.11 m2
II PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 meter 70.50 m3
lbr tinggi pj.pagar
1. Pagar Belakang
Pas. batu kali
- Tipe A = 0.80 x 0.40 x 53.66 = 17.17 m3
- Tipe B.1 = 0.60 x - x 3.00 - plat deuker = - m3
- Tipe B.2 = 0.60 x 0.30 x 2.60 = 0.47 m3
- Tipe B.3 = 0.80 x 0.40 x 53.92 = 17.25 m3
- Tipe C = 0.60 x 0.50 x 42.25 = 12.68 m3
Jumlah Total = 155.43 m'
- Footplat tipe A = 0.70 x 0.70 x 0.25 x 10.00 = 1.23 m3
- Footplat tipe B = 0.70 x 0.70 x 0.25 x 11.00 = 1.35 m3
- Footplat tipe C = 0.70 x 0.70 x 0.25 x 7.00 = 0.86 m3
Jumlah Total = 28.00 bh
2. Pagar Depan
- Pas. batu kali = 0.55 x 0.45 x 49.43 = 12.23 m3
- Footplat = 0.60 x 0.60 x 0.15 x 18.00 = 1.35 m3
- Pot. bunga = 0.15 x 0.15 x 49.43 = 1.11 m3
3. Area Taman
- Pendopo = 0.15 x 0.20 x 31.40 = 0.94 m3
- Pagar Pendopo = 0.15 x 0.20 x 30.85 = 0.93 m3
- Kantor Pelayanan = 0.15 x 0.20 x 32.20 = 0.97 m3
= 0.15 x 0.20 x 10.21 = 0.31 m3
- Pagar Kantor Pelayanan = 0.15 x 0.20 x 49.80 = 1.49 m3
- Rumah Dinas = 0.15 x 0.20 x 5.70 = 0.17 m3
160.16 m' 70.50 m'
IV PEKERJAAN DINDING
1 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu
campuran 1SP : 3PP 116.37 m2
1. Pot bunga pagar depan
Arah horizontal = 49.43 x 0.55 = 27.19 m2
Arah vertikal = 0.50 x 0.55 x 4.00 = 1.10 m2
2. Taman = 160.16 x 0.55 = 88.09 m2
V PEKERJAAN PLESTERAN
1 Pekerjaan plesteran 1 PC : 6 PP, tebal 15 mm 329.03 m2
1. Pagar Belakang
a. Sloof = 0.20 x 1.00 x 155.43 = 31.09 m2
b. Kolom = 0.20 x 1.00 x 48.10 = 9.62 m2
c. Balok = 0.30 x 1.00 x 155.43 = 46.63 m2
d. Pondasi = 0.20 x 1.00 x 155.43 = 31.09 m2
2. Pagar Depan
a. Kolom
- Pintu gerbang sisi bawah = 2.00 x 0.16 x 2.96 = 0.95 m2
= 2.00 x 0.10 x 2.72 = 0.54 m2
= 2.00 x 0.03 x 2.20 = 0.13 m2
kolom utama = 2.00 x 1.97 x 2.00 = 7.88 m2
= 2.00 x 0.09 x 2.48 = 0.45 m2
Puncak segitiga = 8.00 x 0.20 x 0.62 = 0.99 m2
- Pagar sisi bawah = 16.00 x 0.06 x 2.60 = 2.50 m2
= 16.00 x 0.12 x 2.52 = 4.84 m2
= 16.00 x 0.03 x 1.84 = 0.88 m2
kolom utama = 16.00 x 1.45 x 1.60 = 37.12 m2
= 16.00 x 0.06 x 2.08 = 2.00 m2
Puncak segitiga = 64.00 x 0.15 x 0.52 = 4.99 m2
Pengurang Plesteran pada Kolom = - m2
- Sambungan dengan sloof = 4.00 x 1.00 x 0.02 = (0.09) m2
= 14.00 x 2.00 x 0.02 = 0.63 m2
- Pengurang pada kolom papan nama = 2.00 x 1.50 x 0.40 = (1.20) m2
- Plesteran Ciprat = = (6.93)
b. Papan Nama
sisi belakang = 2.73 m2
sisi atas 0.15 x 2.10 = 0.32 m2
c. Sloof dan pondasi = 2.00 x 1.06 x 49.43 = 52.40 m2
- Sloof tertutup kolom 1 = 2.00 x 1.06 x 0.60 = (0.64) m2
- Sloof tertutup kolom 2 = 16.00 x 1.06 x 0.50 = (0.53) m2
d. Pot bunga arah horizontal = 0.40 x 51.43 = 20.57 m2
3. Taman = 0.50 x 160.16 = 80.08 m2
Jumlah = 329.03 m2
VI PEKERJAAN BETON
1 Sloof 15/20
1. Pagar Belakang
a. Begisting = 0.20 x 2.00 x 155.43 = 62.17 x 0.50 = 31.09 m2
b. Pembesian
-Besi 4 Ø 12 = 4.00 x 0.89 x 155.43 = 551.94 kg
-Angkur Ø 8 - 500 = 155.00 x 0.39 x 0.50 = 30.58 kg
-Begel Ø 6 - 150 = 1,036.00 x 0.22 x 0.55 = 125.36 kg
707.87 kg
3 Kolom 20/20
1. Menggunakan footplat
Panjang Kolom Bawah
Tipe A = 10.00 x 2.60 = 26.00
Tipe B = 11.00 x 1.80 = 19.80
Tipe C = 7.00 x 0.90 = 6.30
52.10 m'
Panjang Kolom Atas
Pas.batako = 28.00 x 1.85 = 51.80 m'
103.90 m'
Panjang Sambungan = 4.00 x 28.00 x 0.75 = 84.00 m'
= 4.00 x 28.00 x 0.20 = 22.40 m'
106.40 m'
jml panjang
a. Begisting = 0.18 x 4.00 x 103.90 = 74.81 m2 x 0.50 37.40 m2
b. Pembesian
-Besi 4 Ø 12 = 103.90 x 1.00 x 0.89 = 92.24 kg
= 106.40 x 1.00 x 0.89 = 94.46 kg
-Begel Ø 6 - 150 = 695.00 x 0.22 x 0.65 = 100.26 kg
= 286.96 kg
c.
Volume
Beton bertulang = 1.00 x 2.10 x 1.90 = 3.99 m2
4 Gembok 1.00 bh
jumlah pasang pasang
Pintu 1.00 x 1.00 x 1.00 = 1.00 bh
IX PEKERJAAN PENGECATAN
1 Pengecatan tembok interior & plafond (ex. Catylac) 329.03 m2
2 Pengecatan permukaan baja (galbani) secara semprot dengan sistem 1 lapis cat mutakhir dengan tebal 200 um 58.33 m2
C. KANTOR PELAYANAN
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m 62.24 m3
Panjang total pondasi batu kali
arah H = 4.00 + 1.50 + 39.50 + 11.00 + 19.50 = 75.50 m'
3.00 + 33.00 + 5.50 + 3.50 = 45.00 m'
arah V = 12.00 + 3.00 + 12.00 + 4.00 + 5.00 = 36.00 m'
2.00 + 2.00 + 6.00 4.00 9.00 = 23.00 m'
3.00 + 6.00 + 3.00 3.00 = 15.00 m'
194.50 m'
Volume Galian
1. Pas. batu kali = 0.80 x 0.40 x 194.50 = 62.24 m3
2. Rollag = 0.20 x 0.20 x - = - m3
62.24 m3
1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP - m2
2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 81.20 m2
3 Pemasangan 1m2 dinding bata merah (5x11x22)cmtebal ½ batu campuran 1SP : 6PP 485.21 m2
V PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. 1,100.58 m2
VI PEKERJAAN BETON
1 Lantai Kerja, Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 18.20 m3
2 Rabat Beton, membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 6.30 m3
3 Sloof 15/25
4 Kolom 30/30
5 Kolom 20/20
7 Balok 15/40
9 Balok 15/20
a. Begisting Panjang Sloof
= 0.20 x 2.00 x 199.50 = 79.80 m2 x 0.50 39.90 m2
b. Pembesian
-Besi 5 D 13 = 5.00 x 1.04 x 199.50 = 1,037.40 kg
-Begel Ø 8 - 150 = 1,330.00 x 0.393 x 0.60 = 313.61 kg
1,351.01 kg 1,351.01 kg
11 Plat Atap
12 Shading
13 Plat Lisplang
8 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 463.00 m2
= 348.70 m2
= 15.34 m2
D. GEDUNG SERBAGUNA
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bauwplank 1.00 ls
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m 2.08 m3
Panjang total pondasi batu kali
arah H = 16.00 + 16.00 + 2.50 + 1.50 + 18.50 = 54.50 m'
arah V = 8.00 + 6.00 + 2.00 + 8.00 + 6.00 = 30.00 m'
84.50 m'
2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 51.43 m2
V PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. 564.25 m2
4 Sponengan 48.00 m1
VI PEKERJAAN BETON
1 Lantai Kerja 6.50 m3
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Lantai = 6.07 + 123.85 x 0.05 = 6.50 m3
3 Sloof 15/25
4 Kolom 20/20
5 Kolom 11/11
9 Balok 15/20
Sloof Balok 15/30 Balok miring Balok miring
Panjang Ringbalk = 84.50 - 16.00 - 6.00 + 10.00
= 72.50 m'
11 Plat Atap
12 Shading
5 Lisplang GRC Board tebal 9 mm, L = 30 cm (terpasang & pengecatan), motif kayu 61.00 m1
8 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 186.28 m2
= 6.00 x 16.00 = 96.00 m2
= 3.00 x 17.60 = 52.80 m2
= 35.60 x 0.80 = 28.48 m2
= 3.00 x 3.00 = 9.00 m2
Jumlah Total = 186.28 m2
2 Pengecatan 1 m2 plafon ( 1 lapis cat dasar, 2 lapis cat penutup) luas total 186.28 m2
60.00 m'
F. RUMAH DINAS
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bauwplank 1.00
II PEKERJAAN TANAH
IV PEKERJAAN DINDING
1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP 11.80
3 Pemasangan 1m2 dinding bata merah (5x11x22)c, tebal ½ batu campuran 1SP : 6PP 280.06
V PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. 629.00
VI PEKERJAAN BETON
1 Lantai Kerja 5.78
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Lantai = 2.50 + 113.03 x 0.05 = 5.78 m3
3 Sloof 15/25
4 Kolom 15/25
7 Balok 15/20
9 Plat Atap
10 Shading
11 Meja Dapur
2 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 14.70
3 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II 3.96
J1 = 0.35 x 2.00 = 0.70 m2
J2 = 0.41 x 8.00 = 3.26 m2
B1 = - x 6.00 = - m2
Jumlah Total 3.96 m2
7 Lisplang GRC Board tebal 9 mm, L = 30 cm (terpasang & pengecatan), motif kayu 55.20
10 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 150.31
TOTAL
VOLUME
ls
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m3
m3
m2
kg
m3
m2
kg
m3
m3
kg
m3
m2
kg
m3
m1
m2
kg
m3
m2
kg
m3
m2
kg
m3
m3
m2
m2
m3
m2
m1
m2
m1
m2
m2
m2
bh
bh
bh
bh
m2
m'
m2
m2
m1
m2
m2
m2
bh
ttk
bh
bh
bh
bh
bh
m'
C. KANTOR PELAYANAN
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bauwplank 1.00 ls
IV PEKERJAAN DINDING
1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP 5.70 m2
2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 28.82 m2
V PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. 314.35 m2
3 Sponengan 295.40 m1
VI PEKERJAAN BETON
1 Lantai Kerja 22.38 m3
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Foot plat = 1.00 x 1.00 x 0.10 x 14.00 = 1.40 m3
a. Begisting 4.48 m2
= 0.20 x 3.20 x 14.00 = 8.96 m2 x 0.5
b. Pembesian
-Begel Ø 12 - 150 = 5.00 x 0.89 x 2.30 x 14.00 = 142.81 kg
= 5.00 x 0.89 x 2.30 x 14.00 = 142.81 kg
285.61 kg 285.61 kg
4 Sloof 15/20
-
6 Kolom 20/20
7 Kolom 15/15
8 Balok 20/35
a. Begisting
= 0.45 x 2 x 144.00 = 129.60 m2 x 0.50 64.80 m2
b. Pembesian
-Besi 5 Ø 12 = 5.00 x 0.89 x 144.00 = 638.64 kg
-Besi 2 Ø 10 = 2.00 x 0.62 x 144.00 = 178.56 kg
-Begel Ø 86 - 125 = 1,152.00 x 0.22 x 1.00 = 253.44 kg
1,070.64 kg 1,070.64 kg
9 Balok 15/20
a. Begisting
= 0.2 x 2 x 57.00 = 22.80 m2 x 0.50 11.40 m2
b. Pembesian
-Besi 4 Ø 12 = 4.00 x 0.89 x 57.00 = 202.24 kg
-Begel Ø 6 - 150 = 380.00 x 0.22 x 0.60 = 50.16 kg
252.40 kg 252.40 kg
b. Pembesian
-Besi 4 Ø 12 = 4.00 x 0.89 x 82.50 = 292.71 kg
-Begel Ø 6 - 150 = 550.00 x 0.22 x 0.60 = 72.60 kg
365.31 kg 365.31 kg
12 Plat Shading
7 Lisplang GRC Board tebal 9 mm, L = 30 cm (terpasang & pengecatan), motif kayu 141.60 m1
10 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 22.50 m2
14 Pasang Papan pembungkus kolom beton (2 x 30 )cm, kayu Jati finising politur 28.32 m2
XI PEKERJAAN PENGECATAN
1 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 538.81 m2
3 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 658.24 m2
4 Pengecatan 1 m2 plafon ( 1 lapis cat dasar, 2 lapis cat penutup) luas total 433.00 m2
LAPORAN BULANAN
PEKERJAAN :
PEMELIHARAAN JEMBATAN GANTUNG WONOTIRTO
KECAMATAN KARANGGAYAM
TAHUN ANGGARAN 2019
PENYEDIA JASA :
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
LAPORAN BULANAN
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
PEKERJAAN :
PEMELIHARAAN JEMBATAN GANTUNG WONOTIRTO
KECAMATAN KARANGGAYAM
TAHUN ANGGARAN 2019
PENYEDIA JASA :
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN KARANGGAYAM
TAHUN ANGGARAN 2019
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : III ( Tiga )
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : IV ( Empat )
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : V ( Lima )
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
VI ( Enam )
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : ###
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
PEMERINTAH KABUPATEN KEBUMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jalan H.M. Sarbini No37 Telp ( 0287 ) 381128 Fax. (0287 ) 382821 Kebumen
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR
KECAMATAN SRUWENG
TAHUN ANGGARAN 2017
0 : VII ( Tujuh )
0 : ###
0 : #REF! %
0 : #REF! %
0 : #REF! %
0 : #REF! %
PENYEDIA JASA :
0
0
BACK UP PERHITUNGAN
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
F. RUMAH DINAS
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bauwplank 23.00 ls
= 23.00 X 1.00 = 23.00 ls
23.00 ls
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m
Panjang total pondasi batu kali 70.40 m3
arah H = 38.00 + 2.00 + 6.00 + + = 46.00 m'
46.00 m'
48.50 m'
2.36 m3
48.00 m3 48.00 m3
III PEKERJAAN PONDASI
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
Gedung
Pbk =( 0.30 + 0.80 ) x 2.05 x 94.50 m' = 106.55 m3
2
Jumlah total
= 106.55 = 106.55 m3 106.55 m3
Jumlah total
= 15.12 = 15.12 m3 15.12 m3
IV PEKERJAAN DINDING
1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
11.80 m2
2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
45.68 m2
Luas Perlubangan
P1 = 1.36 x 0.50 x (1.00) = (0.68) m2
P2 = 0.94 x 0.50 x (6.00) = (2.82) m2
P3 = 0.80 x 0.50 x (1.00) = (0.40) m2
Folding = 3.35 x 0.50 x (1.00) = (1.68) m2
(5.58) m2
Luas Netto = 45.68 + (5.58) = 40.11 m2
315.18 m2
= (39.69) m2
Perlubangan
Luas Netto = 315.18 + (39.69) = 275.49 m2 = 275.49 m2
= 275.49 m2
V PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.
= 2.00 x 315.60 = 631.20 m2
= 20.93 x (1.00) = (20.93) m2
2 Pemasangan 1 m2 acian.
= 610.28 x 1.00 = 610.28 m2
VI PEKERJAAN KAYU
1 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II ( kruing )
= 0.01 x 11.65 x 2.00 = 0.22 m3 1.52 m3
= 0.01 x 5.15 x 2.00 = 0.10 m3
= 0.01 x 10.80 x 2.00 = 0.21 m3
= 0.01 x 9.00 x 2.00 = 0.17 m3
= 0.01 x 22.00 x 2.00 = 0.32 m3
1.52 m3
2 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruing )
= 0.01 x 21.50 x 2.00 = 0.41 m3 1.84 m3
= 0.01 x 6.00 x 1.00 = 0.06 m3
= 0.01 x 16.90 x 2.00 = 0.32 m3
= 0.01 x 12.00 x 2.00 = 0.23 m3
= 0.01 x 7.90 x 2.00 = 0.15 m3
= 0.01 x 8.30 x 4.00 = 0.32 m3
= 0.01 x 3.00 x 4.00 = 0.12 m3
= 0.01 x 3.75 x 4.00 = 0.14 m3
= 0.01 x 4.00 x 1.00 = 0.04 m3
= 0.01 x 6.00 x 1.00 = 0.04 m3
1.84 m3
= 208.59 m2
4 Lisplang GRC Board tebal 9 mm, L = 30 cm (terpasang & pengecatan), motif kayu
= 11.80 x 2.00 = 23.60 m1 55.20 m1
= 15.80 x 2.00 = 31.60 m1
55.20
= 208.59 m2
52.20
7 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
= 9.50 x 12.00 = 114.00 m2 150.31 m2
= 2.00 x 3.00 = 6.00 m2
= 29.46 x 0.98 = 28.87 m2
= 3.00 x 0.48 = 1.44 m2
150.31
117.60
223.00
14.70
30.31
12 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
P1 = 0.04 x 1.00 = 0.04 m3 0.89 m3
P2 = 0.04 x 6.00 = 0.24 m3
P3 = 0.04 x 1.00 = 0.04 m3
J1 = 0.04 x 2.00 = 0.07 m3
J2 = 0.04 x 8.00 = 0.35 m3
B1 = 0.03 x 6.00 = 0.15 m3
0.89
13 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
J1 = 0.35 x 2.00 = 0.70 m2 3.96 m2
J2 = 0.41 x 8.00 = 3.26 m2
B1 = - x 6.00 = - m2
3.96
6.00 m3 6.00 m3
2 Rabat Beton
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Tritisan = 24.00 x 2.00 x 1.20 x 0.10 = 5.76 m3
= 3.50 x 2.00 x 1.00 x 0.10 = 0.70 m3
6.46 m3 6.46 m3
3 Sloof 15/25
a. Begisting = 0.25 x 2 x 97.50 = 48.75 m2 x 0.50 24.38 m2
b. Pembesian
-Besi 5 D 13 = 5.00 x 1.04 x 97.50 = 507.00 kg
-Begel Ø 8 - 150 = 650.00 x 0.393 x 0.70 = 178.82 kg
685.82 kg 685.82 kg
5 Kolom 11/11
= 4 x 15 x 1.00 = 60.00 m1 60.00 m3
60.00
6 Balok 15/30
a. Begisting
= 0.375 x 2 x 5.50 = 4.13 m2 x 0.50 2.06 m2
b. Pembesian
-Besi 6 D 13 = 6.00 x 1.04 x 5.50 = 34.32 kg
-Begel Ø 6 - 150 = 37.00 x 0.22 x 0.80 = 6.51 kg
40.83 kg 40.83 kg
9 Balok 15/20
a. Begisting
= 0.2 x 2 x 97.50 = 39.00 m2 x 0.50 19.50 m2
b. Pembesian
-Besi 5 D 13 = 5.00 x 1.04 x 97.50 = 507.00 kg
-Begel Ø 8 - 150 = 650.00 x 0.393 x 0.60 = 153.27 kg
660.27 kg 660.27 kg
11 Plat Atap
a. Begisting = 0.50 x 3.00 x 1.00 = 1.50 m2 x 0.50 0.75 m2
1.50 m2
b. Pembesian
-Besi Ø 10 - 150 = 0.60 x 0.62 x 40.00 = 14.88 kg
-Besi Ø 10 - 150 = 3.10 x 0.62 x 6.00 = 11.53 kg
26.41 kg 26.41 kg
0.18
12 Shading
a. Begisting = 0.60 x 13.00 x 1.00 = 7.80 m2 x 0.50 3.90 m2
7.80 m2
b. Pembesian
-Besi Ø 10 - 150 = 0.80 x 0.62 x 87.00 = 43.15 kg
-Besi Ø 10 - 150 = 13.00 x 0.62 x 4.00 = 32.24 kg
75.39 kg 75.39 kg
0.78
13 Meja Dapur
a. Begisting = 0.60 x 3.00 x 1.00 = 1.80 m2 x 0.50 0.90 m2
1.80 m2
b. Pembesian
-Besi Ø 10 - 150 = 0.80 x 0.62 x 20.00 = 9.92 kg
-Besi Ø 10 - 150 = 3.00 x 0.62 x 4.00 = 7.44 kg
17.36 kg 17.36 kg
0.18
= 117.00 m2 117.00 m2
2 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
= 2.00 x 1.50 x 1.00 = 3.00 m2
= 0.60 x 3.00 x 1.00 = 1.80 m2
= 4.80 m2 4.80 m2
= 9.90 m1 9.90 m1
= 14.85 m2 14.85 m2
5 Pemasangan 1 m2 dinding batu tempel susun sirih
= 2.70 x 0.35 x 4.00 = 3.78 m2
= 1.00 x 1.80 x 1.00 = 1.80 m2
= 5.58 m2 5.58 m2
XII PEKERJAAN KUNCI DAN KACA
1 Pemasangan 1 buah engsel pintu
P1 = 6.00 x 1.00 = 6.00 bh
P2 = 3.00 x 6.00 = 18.00 bh
P3 = 3.00 x 1.00 = 3.00 bh
27.00 bh 27.00 bh
36.00 bh 36.00 bh
36.00 bh 36.00 bh
15.00 bh 15.00 bh
13.33 m2 13.33 m2
2 Grendel pintu
J1 = 1.00 x 2.00 = 2.00 m'
J2 = 2.00 x 8.00 = 16.00 m'
P1 = 4.00 x 1.00 = 4.00 m'
P2 = 1.00 x 6.00 = 6.00 m'
P3 = 1.00 x 1.00 = 1.00 m'
8.44 m2 8.44 m2
610.28 m2 610.28 m2
2 Pengecatan 1 m2 plafon ( 1 lapis cat dasar, 2 lapis cat penutup) luas total
147.91 x 1.00 = 147.91 m2
= 147.91 m2 147.91 m2
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
D. GEDUNG SERBA GUNA
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bauwplank 28.00 ls
= 28.00 X 1.00 = 28.00 ls
28.00 ls
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m
Panjang total pondasi batu kali 58.60 m3
arah H = 6.00 + 17.00 + 32.00 + + = 55.00 m'
55.00 m'
23.50 m'
2.08 m3
54.80 m3 54.80 m3
III PEKERJAAN PONDASI
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
Gedung
Pbk =( 0.30 + 0.80 ) x 2.05 x 78.50 m' = 88.51 m3
2
Jumlah total
= 88.51 = 88.51 m3 88.51 m3
Jumlah total
= 12.56 = 12.56 m3 12.56 m3
IV PEKERJAAN DINDING
1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
16.40 m2
2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
42.85 m2
(2.55) m2
Luas Netto = 42.85 + (2.55) = 40.30 m2
270.25 m2
= (45.89) m2
Perlubangan
Luas Netto = 270.25 + (45.89) = 224.36 m2 = 224.36 m2
= 224.36 m2
V PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.
= 2.00 x 264.66 = 529.32 m2
= 0.80 x 2.40 x 5.00 = 9.60 m2
= 14.57 x (1.00) = (14.57) m2
3 Pemasangan 1 m2 acian.
= 524.35 x 1.00 = 524.35 m2
= 48.00 x 0.10 = 4.80 m2
4 Sponengan
= 0.80 x 12.00 x 5.00 = 48.00 m1
VI PEKERJAAN KAYU
1 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II ( kruing )
= 0.01 x 7.15 x 5.00 = 0.34 m3 1.45 m3
= 0.01 x 1.80 x 5.00 = 0.09 m3
= 0.01 x 6.80 x 5.00 = 0.33 m3
= 0.01 x 2.90 x 5.00 = 0.14 m3
= 0.01 x 8.00 x 5.00 = 0.29 m3
1.45 m3
2 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruing )
Hal. 89 dari 297
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
= 0.01 x 22.00 x 2.00 = 0.42 m3 1.47 m3
= 0.01 x 16.00 x 1.00 = 0.15 m3
1.47 m3
= 240.50 m2
4 Lisplang GRC Board tebal 9 mm, L = 30 cm (terpasang & pengecatan), motif kayu
= 18.50 x 2.00 = 37.00 m1 61.00 m1
= 12.00 x 2.00 = 24.00 m1
61.00
= 240.50 m2
34.00
7 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
= 6.00 x 16.00 = 96.00 m2 186.28 m2
= 3.00 x 17.60 = 52.80 m2
= 35.60 x 0.80 = 28.48 m2
= 3.00 x 3.00 = 9.00 m2
186.28
143.72
227.80
9.45
42.56
7.49 m3 7.49 m3
2 Rabat Beton
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Tritisan = 17.60 x 2.00 x 0.80 x 0.10 = 2.82 m3
= 8.00 x 2.00 x 0.80 x 0.10 = 1.28 m3
4.10 m3 4.10 m3
3 Sloof 15/25
a. Begisting = 0.25 x 2 x 78.50 = 39.25 m2 x 0.50 19.63 m2
b. Pembesian
-Besi 5 D 13 = 5.00 x 1.04 x 78.50 = 408.20 kg
-Begel Ø 8 - 150 = 523.00 x 0.393 x 0.70 = 143.88 kg
552.08 kg 552.08 kg
4 Kolom 20/20
a. Begisting = 0.2 x 4 x 3.00 = 2.40 m2 x 0.50 6.00 m2
= 2.40 x 5.00 = 12.00 m2
b. Pembesian
-Besi 4 Ø 10 = 4.00 x 3.00 + 0.30 = 13.20 m1
= 13.20 x 5.00 x 0.62 = 40.92 kg
-Begel Ø 6 - 150 = 100.00 x 0.22 x 0.70 = 15.40 kg
56.32 kg 56.32 kg
5 Kolom 11/11
= 4 x 22 x 1.00 = 88.00 m1 106.00 m3
= 3 x 6 x 1.00 = 18.00 m1
106.00
6 Balok 15/30
a. Begisting
= 0.375 x 2 x 16.00 = 12.00 m2 x 0.50 6.00 m2
b. Pembesian
-Besi 6 D 13 = 6.00 x 1.04 x 16.00 = 99.84 kg
-Begel Ø 6 - 150 = 107.00 x 0.22 x 0.80 = 18.83 kg
118.67 kg 118.67 kg
9 Balok 15/20
a. Begisting
= 0.2 x 2 x 66.50 = 26.60 m2 x 0.50 13.30 m2
b. Pembesian
-Besi 5 D 13 = 5.00 x 1.04 x 66.50 = 345.80 kg
-Begel Ø 8 - 150 = 443.00 x 0.393 x 0.60 = 104.46 kg
450.26 kg 450.26 kg
11 Plat Atap
a. Begisting = 4.00 x 3.50 x 1.00 = 14.00 m2 x 0.50 7.00 m2
14.00 m2
b. Pembesian
-Besi Ø 10 - 150 = 4.10 x 0.62 x 46.00 = 116.93 kg
Hal. 92 dari 297
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
-Besi Ø 10 - 150 = 3.60 x 0.62 x 54.00 = 120.53 kg
237.46 kg 237.46 kg
1.40
12 Shading
a. Begisting = 0.60 x 11.70 x 1.00 = 7.02 m2 x 0.50 3.51 m2
7.02 m2
b. Pembesian
-Besi Ø 10 - 150 = 0.80 x 0.62 x 78.00 = 38.69 kg
-Besi Ø 10 - 150 = 11.70 x 0.62 x 4.00 = 29.02 kg
67.70 kg 67.70 kg
0.84
= 140.80 m2 140.80 m2
2 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
= 3.00 x 3.00 x 1.00 = 9.00 m2
= 9.00 m2 9.00 m2
= 9.40 m1 9.40 m1
= 14.10 m2 14.10 m2
114.00 bh 114.00 bh
114.00 bh 114.00 bh
6.00 bh 6.00 bh
2 Grendel pintu
P1 = 2.00 x 3.00 = 6.00 m'
P2 = 2.00 x 3.00 = 6.00 m'
J1 = 4.00 x 12.00 = 48.00 m'
B1 = 1.00 x 3.00 = 3.00 m'
29.02 m2 29.02 m2
529.15 m2 529.15 m2
2 Pengecatan 1 m2 plafon ( 1 lapis cat dasar, 2 lapis cat penutup) luas total
186.28 x 1.00 = 186.28 m2
= 186.28 m2 186.28 m2
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
E. MUSHOLA
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bauwplank 11.50 ls
= 11.50 X 1.00 = 11.50 ls
11.50 ls
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m
Panjang total pondasi batu kali 27.07 m3
arah H = 3.25 + 5.00 + 6.25 + + = 14.50 m'
14.50 m'
14.50 m'
2.27 m3
29.59 m3 29.59 m3
III PEKERJAAN PONDASI
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
Gedung
Pbk =( 0.30 + 0.95 ) x 1.35 x 29.00 m' = 24.47 m3
2
6.12
Jumlah total
= 24.47 + 6.12 = 30.59 m3 30.59 m3
Jumlah total
= 5.51 = 5.51 m3 5.51 m3
IV PEKERJAAN DINDING
1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
24.89 m2
Luas Perlubangan
P3 = 0.80 x 0.50 x (1.00) = (0.40) m2
P7 = 1.30 x 0.50 x (1.00) = (0.65) m2
(1.05) m2
Luas Netto = 24.89 + (1.05) = 23.84 m2
101.68 m2
= (20.86) m2
Perlubangan
Luas Netto = 101.68 + (20.86) = 80.81 m2 = 80.81 m2
= 80.81 m2
V PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.
= 2.00 x 104.65 = 209.30 m2
= 16.90 x (1.00) = (16.90) m2
2 Pemasangan 1 m2 acian.
= 192.41 x 1.00 = 192.41 m2
VI PEKERJAAN KAYU
1 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II ( kruing )
= 0.01 x 6.15 x 1.00 = 0.06 m3 0.20 m3
= 0.01 x 1.70 x 1.00 = 0.02 m3
= 0.01 x 6.00 x 1.00 = 0.06 m3
= 0.01 x 2.90 x 1.00 = 0.03 m3
= 0.01 x 6.00 x 1.00 = 0.04 m3
0.20 m3
2 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruing )
= 0.01 x 5.00 x 4.00 = 0.19 m3 0.50 m3
= 0.01 x 2.50 x 4.00 = 0.10 m3
= 0.01 x 5.50 x 4.00 = 0.21 m3
0.50 m3
= 67.50 m2
4 Lisplang GRC Board tebal 9 mm, L = 30 cm (terpasang & pengecatan), motif kayu
= 7.50 x 4.00 = 30.00 m1 30.00 m1
30.00
= 67.50 m2
22.00
7 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
= 7.00 x 7.00 = 49.00 m2 58.75 m2
= 3.00 x 3.25 = 9.75 m2
58.75
32.15
52.50
24.00
1.98 m3 1.98 m3
2 Rabat Beton
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Tritisan = 1.00 x 3.50 x 1.00 x 0.10 = 0.35 m3
= 1.50 x 1.75 x 1.00 x 0.10 = 0.26 m3
0.61 m3 0.61 m3
3 Sloof 15/25
a. Begisting = 0.25 x 2 x 29.00 = 14.50 m2 x 0.50 7.25 m2
b. Pembesian
-Besi 5 D 13 = 5.00 x 1.04 x 29.00 = 150.80 kg
-Begel Ø 8 - 150 = 193.00 x 0.393 x 0.70 = 53.09 kg
203.89 kg 203.89 kg
4 Kolom 11/11
= 4 x 22 x 1.00 = 88.00 m1 106.00 m3
= 3 x 6 x 1.00 = 18.00 m1
106.00
5 Balok 15/30
a. Begisting
= 0.375 x 2 x 6.00 = 4.50 m2 x 0.50 2.25 m2
b. Pembesian
-Besi 6 D 13 = 6.00 x 1.04 x 6.00 = 37.44 kg
-Begel Ø 6 - 150 = 40.00 x 0.22 x 0.80 = 7.04 kg
44.48 kg 44.48 kg
6 Balok 15/20
a. Begisting
= 0.2 x 2 x 31.75 = 12.70 m2 x 0.50 6.35 m2
b. Pembesian
-Besi 5 D 13 = 5.00 x 1.04 x 31.75 = 165.10 kg
-Begel Ø 8 - 150 = 212.00 x 0.393 x 0.60 = 49.99 kg
215.09 kg 215.09 kg
8 Plat Atap
a. Begisting = 2.00 x 4.25 x 1.00 = 8.50 m2 x 0.50 10.63 m2
= 1.50 x 8.50 x 1.00 = 12.75 m2
21.25 m2
b. Pembesian
-Besi Ø 10 - 150 = 2.10 x 0.62 x 56.00 = 72.91 kg
-Besi Ø 10 - 150 = 4.35 x 0.62 x 26.00 = 70.12 kg
362.76 kg 362.76 kg
2.55
6.00 m2
b. Pembesian
-Besi Ø 10 - 150 = 0.80 x 0.62 x 67.00 = 33.23 kg
-Besi Ø 10 - 150 = 10.00 x 0.62 x 4.00 = 24.80 kg
58.03 kg 58.03 kg
0.60
= 36.88 m2 36.88 m2
2 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
= 1.50 x 1.75 x 1.00 = 2.63 m2
= 2.63 m2 2.63 m2
= 10.90 m1 10.90 m1
= 16.35 m2 16.35 m2
9.00 bh 9.00 bh
44.00 bh 44.00 bh
44.00 bh 44.00 bh
2.00 bh 2.00 bh
25.61 m2 25.61 m2
6 Grendel pintu
P3 = 5.00 x 1.00 = 5.00 m'
P7 = 2.00 x 1.00 = 2.00 m'
J8 = 2.00 x 10.00 = 20.00 m'
1.47 m2 1.47 m2
13.64 m2 13.64 m2
192.41 m2 192.41 m2
2 Pengecatan 1 m2 plafon ( 1 lapis cat dasar, 2 lapis cat penutup) luas total
56.15 x 1.00 = 56.15 m2
= 56.15 m2 56.15 m2
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
C. KANTOR PELAYANAN
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bauwplank 53.50 ls
= 53.50 X 1.00 = 53.50 ls
53.50 ls
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m
Panjang total pondasi batu kali 146.12 m3
arah H = 45.00 + 28.50 + 43.50 + 5.50 + = 122.50 m'
122.50 m'
74.00 m'
4.64 m3
153.20 m3 153.20 m3
III PEKERJAAN PONDASI
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
Gedung
Pbk =( 0.30 + 0.80 ) x 1.35 x 157.00 m' = 116.57 m3
2
Jumlah total
= 116.57 + 29.33 = 145.90 m3 145.90 m3
Jumlah total
= 31.44 = 31.44 m3 31.44 m3
IV PEKERJAAN DINDING
1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
23.20 m2
2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
90.00 m2
Luas Perlubangan
P1 = 2.00 x 0.50 x (2.00) = (2.00) m2
P3 = 0.80 x 0.50 x (10.00) = (4.00) m2
P4 = 0.70 x 0.50 x (4.00) = (1.40) m2
PS = 0.80 x 0.50 x (1.00) = (0.40) m2
(7.80) m2
707.27 m2
= (133.26) m2
Perlubangan
Luas Netto = 707.27 + (133.26) = 574.01 m2 = 574.01 m2
= 574.01 m2
V PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.
= 2.00 x 656.21 = 1,312.42 m2
= 32.24 x (1.00) = (32.24) m2
2 Pemasangan 1 m2 acian.
= 1,280.18 x 1.00 = 1,280.18 m2
= 31.10 x 0.10 = 3.11 m2
3 Sponengan
= 2.85 x 2.00 x 1.00 = 5.70 m1
= 2.55 x 4.00 x 1.00 = 10.20 m1
= 2.00 x 4.00 x 1.00 = 8.00 m1
= 3.60 x 2.00 x 1.00 = 7.20 m1
VI PEKERJAAN KAYU
1 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II ( kruing )
= 0.01 x 10.00 x 13.00 = 1.46 m3 6.99 m3
= 0.01 x 5.00 x 13.00 = 0.62 m3
= 0.01 x 10.00 x 13.00 = 1.25 m3
= 0.01 x 6.60 x 13.00 = 0.82 m3
= 0.01 x 2.00 x 13.00 = 0.25 m3
= 0.01 x 22.00 x 13.00 = 2.06 m3
6.99 m3
2 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruing )
= 0.01 x 47.50 x 2.00 = 0.91 m3 3.57 m3
= 0.01 x 41.50 x 2.00 = 0.80 m3
= 0.01 x 35.50 x 2.00 = 0.68 m3
= 0.01 x 8.00 x 4.00 = 0.31 m3
= 0.01 x 1.50 x 4.00 = 0.06 m3
= 0.01 x 32.50 x 1.00 = 0.31 m3
= 0.01 x 7.00 x 10.00 = 0.50 m3
3.57 m3
= 533.00 m2
4 Lisplang GRC Board tebal 9 mm, L = 30 cm (terpasang & pengecatan), motif kayu
= 41.00 x 2.00 = 82.00 m1 105.00 m1
= 11.50 x 2.00 = 23.00 m1
105.00
= 533.00 m2
61.50
7 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
= 38.50 x 9.00 = 346.50 m2 463.00 m2
= 2.00 x 3.50 = 7.00 m2
= 1.00 x 8.50 = 8.50 m2
= 3.00 x 3.00 = 9.00 m2
= 3.00 x 4.00 = 12.00 m2
= 0.80 x 100.00 = 80.00 m2
463.00
383.00
436.80
24.36
80.00
18.70 m3 18.70 m3
2 Rabat Beton
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Tritisan = 16.50 x 2.00 x 1.00 x 0.10 = 3.30 m3
= 15.00 x 2.00 x 1.00 x 0.10 = 3.00 m3
6.30 m3 6.30 m3
4 Kolom 20/20
a. Begisting = 0.2 x 4 x 4.00 = 3.20 m2 x 0.50 60.80 m2
= 3.20 x 38.00 = 121.60 m2
b. Pembesian
-Besi 4 Ø 10 = 4.00 x 4.00 + 0.30 = 17.20 m1
= 17.20 x 38.00 x 0.62 = 405.23 kg
-Begel Ø 6 - 150 = 1,013.00 x 0.22 x 0.70 = 156.00 kg
561.23 kg 561.23 kg
5 Kolom 11/11
= 4 x 23 x 1.00 = 92.00 m1 119.00 m3
= 3 x 9 x 1.00 = 27.00 m1
119.00
6 Balok 15/30
a. Begisting
= 0.375 x 2 x 19.00 = 14.25 m2 x 0.50 7.13 m2
b. Pembesian
-Besi 6 D 13 = 6.00 x 1.04 x 19.00 = 118.56 kg
-Begel Ø 6 - 150 = 127.00 x 0.22 x 0.80 = 22.35 kg
140.91 kg 140.91 kg
7 Balok 15/20
a. Begisting
= 0.2 x 2 x 201.50 = 80.60 m2 x 0.50 40.30 m2
b. Pembesian
-Besi 5 D 13 = 5.00 x 1.04 x 201.50 = 1,047.80 kg
-Begel Ø 8 - 150 = 1,343.00 x 0.393 x 0.60 = 316.68 kg
1,364.48 kg 1,364.48 kg
9 Plat Atap
a. Begisting = 4.00 x 5.50 x 1.00 = 22.00 m2 x 0.50 25.00 m2
= 4.00 x 3.00 x 1.00 = 12.00 m2
= 4.00 x 4.00 x 1.00 = 16.00 m2
50.00 m2
b. Pembesian
-Besi Ø 10 - 150 = 4.10 x 0.62 x 74.00 = 188.11 kg
-Besi Ø 10 - 150 = 5.60 x 0.62 x 54.00 = 187.49 kg
855.60 kg 855.60 kg
6.00
10 Shading
a. Begisting = 0.60 x 48.70 x 1.00 = 29.22 m2 x 0.50 14.61 m2
29.22 m2
b. Pembesian
-Besi Ø 10 - 150 = 0.80 x 0.62 x 325.00 = 161.20 kg
-Besi Ø 10 - 150 = 48.70 x 0.62 x 4.00 = 120.78 kg
281.98 kg 281.98 kg
2.92
7.02 m2
b. Pembesian
-Besi Ø 10 - 150 = 0.56 x 0.62 x 130.00 = 45.14 kg
-Besi Ø 10 - 150 = 19.50 x 0.62 x 2.00 = 24.18 kg
69.32 kg 69.32 kg
0.70
12 Balok 15/40
a. Begisting
= 0.375 x 2 x 5.50 = 4.13 m2 x 0.50 2.06 m2
b. Pembesian
-Besi 8 D 13 = 8.00 x 1.04 x 5.50 = 45.76 kg
-Begel Ø 6 - 150 = 37.00 x 0.22 x 1.00 = 8.14 kg
53.90 kg 53.90 kg
13 Kolom 30/30
a. Begisting = 0.3 x 4 x 3.00 = 3.60 m2 x 0.50 7.20 m2
= 3.60 x 4.00 = 14.40 m2
b. Pembesian
-Besi 6 D 13 = 6.00 x 3.00 + 0.30 = 19.80 m1
= 19.80 x 4.00 x 1.04 = 82.37 kg
-Besi 4 Ø 10 = 2.00 x 3.00 + 0.30 = 6.60 m1
= 6.60 x 4.00 x 0.62 = 16.37 kg
-Begel Ø 6 - 150 = 80.00 x 0.22 x 1.10 = 19.36 kg
101.73 kg 101.73 kg
= 359.00 m2 359.00 m2
2 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
= 3.00 x 3.00 x 1.00 = 9.00 m2
= 2.00 x 3.00 x 1.00 = 6.00 m2
= 15.00 m2 15.00 m2
= 20.80 m1 20.80 m1
= 31.20 m2 31.20 m2
= 12.64 m2 12.64 m2
304.00 bh 304.00 bh
304.00 bh 304.00 bh
14.00 bh 14.00 bh
180.80 m2 180.80 m2
2 Grendel pintu
P3 = 2.00 x 10.00 = 20.00 bh
P4 = 2.00 x 4.00 = 8.00 bh
J3 = 2.00 x 6.00 = 12.00 bh
J1 = 4.00 x 6.00 = 24.00 bh
J2 = 6.00 x 16.00 = 96.00 bh
B1 = 1.00 x 4.00 = 4.00 bh
B2 = 1.00 x 2.00 = 2.00 bh
P1 = 2.00 x 2.00 = 4.00 bh
170.00 bh 170.00 bh
XIII PEKERJAAN BESI DAN ALUMINIUM
1 Pemasangan 1 m kusen pintu alluminium
P3 = 7.32 x 10.00 = 73.20 m'
P4 = 7.10 x 4.00 = 28.40 m'
J3 = 4.80 x 6.00 = 28.80 m'
J1 = 9.66 x 6.00 = 57.96 m'
J2 = 15.48 x 16.00 = 247.68 m'
B1 = 2.74 x 4.00 = 10.96 m'
B2 = 4.73 x 2.00 = 9.46 m'
P1 = 16.48 x 2.00 = 32.96 m'
74.83 m2 74.83 m2
XIV PEKERJAAN PENGECATAN
1 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
1,283.29 x 1.00 = 1,283.29 m2
1,283.29 m2 1,283.29 m2
2 Pengecatan 1 m2 plafon ( 1 lapis cat dasar, 2 lapis cat penutup) luas total
463.00 x 1.00 = 463.00 m2
= 463.00 m2 463.00 m2
XIV PEKERJAAN INSTALASI LISTRIK
1 Instalasi Listrik
SL 18 watt = 33.00 bh = 33.00 ttk
Pijar 5 w = 9.00 bh = 9.00 ttk
Stop kontak = 15.00 bh = 15.00 ttk
= 57.00 ttk
= 57.00 ttk 57.00 ttk
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
B. PEMBANGUNAN PENDOPO
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bauwplank 34.00 ls
= 34.00 X 1.00 = 34.00 ls
34.00 ls
190.00 m2
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m
Panjang total pondasi batu kali 40.20 m3
arah H = 16.00 + 16.00 + 5.00 = 37.00 m'
37.00 m'
33.00 m'
15.70 m3
Jumlah total
= 14.00 = 14.00 m3 14.00 m3
IV PEKERJAAN DINDING
1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
5.70 m2
2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
29.42 m2
Luas Perlubangan
= 0.20 x 0.50 x (6.00) = (0.60) m2
(0.60) m2
Luas Netto = 29.42 + (0.60) = 28.82 m2
135.55 m2
= (10.48) m2
Perlubangan
Luas Netto = 135.55 + (10.48) = 125.07 m2 = 125.07 m2
= 125.07 m2
V PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.
= 2.00 x 132.47 = 264.94 m2
= 0.60 x 3.95 x 6.00 = 14.22 m2
= 0.60 x 1.45 x 17.00 = 14.79 m2
= 0.80 x 1.50 x 17.00 = 20.40 m2
3 Sponengan
= 4.00 x 3.95 x 6.00 = 94.80 m1
= 4.00 x 1.45 x 17.00 = 98.60 m1
= 4.00 x 1.50 x 17.00 = 102.00 m1
VI PEKERJAAN KAYU
1 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II ( kruing )
= 0.01 x 5.50 x 2.00 = 0.11 m3 0.42 m3
= 0.01 x 2.80 x 2.00 = 0.05 m3
= 0.01 x 6.80 x 2.00 = 0.13 m3
= 0.01 x 2.90 x 2.00 = 0.06 m3
= 0.01 x 5.00 x 2.00 = 0.07 m3
0.42 m3
2 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas II ( kruing )
= 0.01 x 4.25 x 19.00 = 0.58 m3 0.85 m3
= 0.01 x 6.15 x 6.00 = 0.27 m3
0.85 m3
0.48 m3
3.19 m3
= 33.00 m2
= 410.50 m2
7 Lisplang GRC Board tebal 9 mm, L = 30 cm (terpasang & pengecatan), motif kayu
= 18.00 x 2.00 = 36.00 m1 141.60 m1
= 16.50 x 2.00 = 33.00 m1
= 4.20 x 2.00 = 8.40 m1
= 1.00 x 4.00 = 4.00 m1
= 17.70 x 1.00 = 17.70 m1
= 18.70 x 1.00 = 18.70 m1
= 5.20 x 2.00 = 10.40 m1
= 6.70 x 2.00 = 13.40 m1
141.60
= 443.50 m2
61.70
10 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
= 4.50 x 5.00 = 22.50 m2 22.50 m2
22.50
22.50
= 410.50 m2
19.00
14 Pasang Papan pembungkus kolom beton (2 x 30 )cm, kayu Jati finising politur
= 7.08 x 4.00 = 28.32 m2 28.32 m2
28.32
0.68 m3
27.65 m2
22.38 m3 22.38 m3
2 Rabat Beton
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Tritisan = 17.60 x 1.00 x 0.80 x 0.10 = 1.41 m3
= 4.40 x 4.00 x 0.80 x 0.10 = 1.41 m3
= 5.90 x 2.00 x 0.80 x 0.10 = 0.94 m3
= 7.50 x 2.00 x 0.30 x 0.10 = 0.45 m3
= 11.80 x 2.00 x 0.70 x 0.10 = 1.65 m3
5.86 m3 5.86 m3
285.61 kg 285.61 kg
4 Sloof 15/20
a. Begisting = 0.2 x 2 x 108.00 = 43.20 m2 x 0.50 21.60 m2
b. Pembesian
-Besi 4 Ø 12 = 4.00 x 0.89 x 108.00 = 383.18 kg
-Begel Ø 6 - 150 = 720.00 x 0.22 x 0.60 = 95.04 kg
478.22 kg 478.22 kg
5 Kolom 30/30
a. Begisting = 0.3 x 4 x 9.75 = 11.70 m2 x 0.50 23.40 m2
= 11.70 x 4.00 = 46.80 m2
b. Pembesian
-Besi 4 Ø 12 = 4.00 x 9.75 + 0.50 = 41.00 m1
= 41.00 x 4.00 x 0.89 = 145.47 kg
-Besi 4 Ø 12 = 4.00 x 9.75 + 0.89 = 42.55 m1
= 42.55 x 9.75 x 0.89 = 367.97 kg
-Begel Ø 8 - 150 = 260.00 x 0.39 x 1.10 = 112.40 kg
625.83 kg 625.83 kg
-
6 Kolom 20/20
a. Begisting = 0.2 x 4 x 6.55 = 5.24 m2 x 0.50 36.68 m2
= 5.24 x 14.00 = 73.36 m2
b. Pembesian
-Besi 4 Ø 12 = 4.00 x 6.55 + 0.50 = 28.20 m1
= 28.20 x 14.00 x 0.89 = 350.19 kg
-Begel Ø 8 - 150 = 611.00 x 0.39 x 0.70 = 168.09 kg
518.27 kg 518.27 kg
8 Balok 20/35
a. Begisting
= 0.45 x 2 x 135.00 = 121.50 m2 x 0.50 60.75 m2
b. Pembesian
-Besi 5 Ø 12 = 5.00 x 0.89 x 135.00 = 598.73 kg
-Besi 2 Ø 10 = 2.00 x 0.62 x 135.00 = 167.40 kg
-Begel Ø 86 - 125 = 1,080.00 x 0.22 x 1.00 = 237.60 kg
1,003.73 kg 1,003.73 kg
9 Balok 15/20
a. Begisting
= 0.2 x 2 x 57.00 = 22.80 m2 x 0.50 11.40 m2
b. Pembesian
-Besi 4 Ø 12 = 4.00 x 0.89 x 57.00 = 202.24 kg
-Begel Ø 6 - 150 = 380.00 x 0.22 x 0.60 = 50.16 kg
252.40 kg 252.40 kg
b. Pembesian
-Besi 4 Ø 12 = 4.00 x 0.89 x 16.00 = 56.77 kg
-Begel Ø 6 - 150 = 107.00 x 0.22 x 0.60 = 14.12 kg
70.89 kg 70.89 kg
b. Pembesian
-Besi 4 Ø 12 = 4.00 x 0.89 x 82.50 = 292.71 kg
-Begel Ø 6 - 150 = 550.00 x 0.22 x 0.60 = 72.60 kg
365.31 kg 365.31 kg
12 Plat Shading
a. Begisting = 0.60 x 5.00 x 1.00 = 3.00 m2 x 0.50 1.50 m2
3.00 m2
b. Pembesian
-Besi Ø 8 - 150 = 0.80 x 0.39 x 33.00 = 10.38 kg
-Besi Ø 8 - 150 = 5.00 x 0.39 x 4.00 = 7.86 kg
18.24 kg 18.24 kg
0.02
= 276.82 m2 276.82 m2
2 Pemasangan 1 m2 dinding batu tempel candi
= 1.20 x 0.90 x 16.00 = 17.28 m2
= 0.90 x 0.90 x 7.00 = 5.67 m2
= 2.00 x 0.90 x 4.00 = 7.20 m2
= 30.15 m2 30.15 m2
538.81 m2 538.81 m2
2 Pelaburan 1 m2 bidang kayu dengan politur luas total
99.65 x 0.32 = 31.89 m2
22.80 x 0.30 = 6.84 m2
153.61 x 0.40 = 61.44 m2
= 100.17 m2 100.17 m2
3 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
658.24 x 1.00 = 658.24 m2
658.24 m2 658.24 m2
4 Pengecatan 1 m2 plafon ( 1 lapis cat dasar, 2 lapis cat penutup) luas total
433.00 x 1.00 = 433.00 m2
= 433.00 m2 433.00 m2
4.00 bh 4.00 bh
1.00 bh 1.00 bh
4 Pasang Tulisan (bahan alluminium)
= 1.00 x 1.00 = 1.00 bh
1.00 bh 1.00 bh
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
A. PAGAR DAN HALAMAN
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bauwplank 10.00 ls
= 10.00 X 1.00 = 10.00 ls
10.00 ls
II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam 1 m
Panjang total pondasi batu kali 101.36 m3
arah H = 49.00 + 36.00 + 22.00 + 18.50 + = 125.50 m'
= - + - + - + + = - m'
125.50 m'
19.00 m'
32.00 m3
2,235.31 m3 2,235.31 m3
III PEKERJAAN PONDASI
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
Gedung
Pbk =( 0.30 + 0.80 ) x 1.20 x 144.50 m' = 95.37 m3
2
Jumlah total
= 95.37 = 95.37 m3 95.37 m3
Jumlah total
= 23.12 = 23.12 m3 23.12 m3
IV PEKERJAAN DINDING
1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
15.04 m2
247.05 m2
V PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.
= 2.00 x 262.09 = 524.18 m2
= 0.20 x 17.00 = 3.40 m2
= 0.27 x 17.00 = 4.59 m2
= 0.30 x 4.00 = 1.20 m2
= 144.50 x 0.50 = 72.25 m2
= 95.50 x 0.40 = 38.20 m2
3 Pemasangan 1 m2 acian.
= 643.82 x 1.00 = 643.82 m2
= 80.57 x 0.10 = 8.06 m2
4 Sponengan
= 4.03 x 17.00 x 1.00 = 68.57 m1
= 3.00 x 4.00 x 1.00 = 12.00 m1
2 Kolom 20/20
a. Begisting = 0.2 x 4 x 4.15 = 3.32 m2 x 0.50 28.22 m2
= 3.32 x 17.00 = 56.44 m2
b. Pembesian
-Besi 4 Ø 10 = 4.00 x 4.15 + 0.30 = 17.80 m1
= 17.80 x 17.00 x 0.62 = 187.61 kg
-Begel Ø 6 - 150 = 470.00 x 0.22 x 0.70 = 72.38 kg
259.99 kg 259.99 kg
3 Kolom 11/11
= 3.75 x 33 x 1.00 = 123.75 m1 123.75 m3
123.75
496.00 kg 496.00 kg
= 4.13 m2 4.13 m2
= 15.25 m2 15.25 m2
= 17.50 m2 17.50 m2
= 28.35 m2 28.35 m2
651.88 m2 651.88 m2
XIV PEKERJAAN INSTALASI LISTRIK
1 Instalasi Listrik
Lampu Taman = 8.00 bh = 8.00 ttk
Pijar 5 w = - bh = - ttk
Stop kontak = - bh = - ttk
= 8.00 ttk
= 8.00 ttk 8.00 ttk
MC.0 CCO.1
SELISIH TAMBAH SELISIH KURANG
HARGA
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN JUMLAH JUMLAH JUMLAH JUMLAH KET
( Rp ) VOLUME HARGA VOLUME HARGA VOLUME HARGA VOLUME HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
2 A.2.2.1.15a. 1 M2 pasang paving blok segi 4, t = 8 cm m2 84,000.00 - - 1,694.11 142,305,454.94 - - 1,694.11 142,305,454.94
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 20.81 340,026.73 0.34 5,552.27 - - 21.15 345,579.00
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 14.76 1,750,646.70 - - 7.04 834,875.23 7.72 915,771.47
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 2,235.31 186,410,883.31 947.55 79,019,849.55 - - 3,182.86 265,430,732.87
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 23.12 6,463,797.12 - - 23.12 6,463,797.12 - -
2 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 247.05 22,798,206.34 - - 208.89 19,276,919.32 38.16 3,521,287.02
3 A. 4.4.1.20. Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP m2 103,248.53 - - 287.55 29,688,650.18 - - 287.55 29,688,650.18
2 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m2 35,337.50 5.74 202,837.25 1.19 41,910.28 - - 6.93 244,747.53
3 A.4.4.2.27. Pemasangan 1 m2 acian m2 23,815.00 651.88 15,524,522.20 - - 322.85 7,688,737.05 329.03 7,835,785.15
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 36.13 6,016,692.77 4.84 806,333.42 - - 40.97 6,823,026.19
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 1,016.32 13,270,928.70 - - 83.32 1,088,014.88 933.00 12,182,913.83
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 5.42 4,814,109.23 - - 0.62 552,460.78 4.80 4,261,648.45
A.4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi m2 154,429.00 16.00 2,470,864.00 - - 2.56 395,338.24 13.44 2,075,525.76
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 496.00 6,476,681.20 - - 245.70 3,208,320.66 250.30 3,268,360.54
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 5.63 5,000,633.75 - - 3.61 3,209,998.29 2.02 1,790,635.46
3 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 31.02 7,824,857.04 - - - - 31.02 7,824,857.04
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 197,116.70 - - 36.52 7,198,701.88 - - 36.52 7,198,701.88 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 286.08 3,735,582.58 117.86 1,539,003.40 - - 403.94 5,274,585.98
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 3.10 2,753,457.31 5.27 4,682,795.96 - - 8.37 7,436,253.26
4 Kolom 11/11
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 63,268.15 123.75 7,829,433.56 - - 123.75 7,829,433.56 - -
A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 95.50 8,287,657.13 59.93 5,200,830.28 - - 155.43 13,488,487.40
2 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel candi m2 236,692.50 15.25 3,609,560.63 - - 15.25 3,609,560.63 - -
2 Ditaksir Pagar besi terpasang dan pengecatan m2 350,000.00 28.35 9,922,500.00 - - 28.35 9,922,500.00 - -
5 LS Pasang Pagar dan Pintu Besi Ulir (Lengkap) m2 455,000.00 - - 54.35 24,729,705.00 - - 54.35 24,729,705.00
6 Ditaksir Pasang Grill Saluran m' 180,000.00 - - 19.90 3,582,000.00 - - 19.90 3,582,000.00
7 LS Pasang Roda Pintu dia. 2,5" bh 50,000.00 - - 6.00 300,000.00 - - 6.00 300,000.00
2 A.4.7.1.10. Pengecatan permukaan baja (galbani) secara semprot dengan m2 82,832.60 - - 58.33 4,831,708.39 - - 58.33 4,831,708.39
5 Ls Pasang tulisan ( bahan alumunium ) unit 3,500,000.00 1.00 3,500,000.00 - - - - 1.00 3,500,000.00
B PEMBANGUNAN PENDOPO
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
2 A.2.2.1.15a. 1 M2 pasang paving blok segi 4, t = 8 cm ls 84,000.00 190.00 15,960,000.00 - - - - 190.00 15,960,000.00
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 12.06 197,055.38 - - - - 12.06 197,055.38
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 35.16 4,170,239.70 - - - - 35.16 4,170,239.70
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 145.38 12,123,783.38 - - - - 145.38 12,123,783.38
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 14.00 3,914,064.00 - - - - 14.00 3,914,064.00
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 125.07 11,541,678.47 - - - - 125.07 11,541,678.47
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 22.38 15,945,199.93 - - - - 22.38 15,945,199.93
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 5.86 4,432,940.35 - - - - 5.86 4,432,940.35
A.4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi m2 154,429.00 4.48 691,841.92 - - - - 4.48 691,841.92
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 285.61 3,729,445.40 - - - - 285.61 3,729,445.40
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 2.06 1,829,716.79 - - - - 2.06 1,829,716.79
4 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 21.60 3,597,026.40 - - - - 21.60 3,597,026.40
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 478.22 6,244,513.07 - - - - 478.22 6,244,513.07
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 3.24 2,877,806.99 - - - - 3.24 2,877,806.99
5 Kolom 30/30
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 23.40 5,902,696.80 - - - - 23.40 5,902,696.80 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 625.83 8,171,978.62 - - - - 625.83 8,171,978.62
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 3.51 3,117,624.24 - - - - 3.51 3,117,624.24
6 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 54.68 13,793,139.36 - - - - 54.68 13,793,139.36 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 768.44 10,034,155.04 - - - - 768.44 10,034,155.04
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 5.47 4,858,519.83 - - - - 5.47 4,858,519.83
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 2.00 504,504.00 - - - - 2.00 504,504.00 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 17.16 224,072.28 - - - - 17.16 224,072.28
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 0.09 79,939.08 - - - - 0.09 79,939.08
8 Balok 20/35
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 60.75 15,484,689.00 4.05 1,032,312.60 - - 64.80 16,517,001.60 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 1,003.73 13,106,530.69 66.91 873,699.07 - - 1,070.64 13,980,229.76
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 9.45 8,393,603.72 0.63 559,573.58 - - 10.08 8,953,177.31
9 Balok 15/20
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 11.40 2,905,768.80 - - - - 11.40 2,905,768.80 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 252.40 3,295,795.03 - - - - 252.40 3,295,795.03
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 1.71 1,518,842.58 - - - - 1.71 1,518,842.58
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 3.20 815,654.40 - - - - 3.20 815,654.40 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 70.89 925,669.21 - - - - 70.89 925,669.21
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 0.48 426,341.78 - - - - 0.48 426,341.78
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 16.50 4,205,718.00 - - - - 16.50 4,205,718.00 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 365.31 4,770,154.05 - - - - 365.31 4,770,154.05
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 2.48 2,202,765.85 - - - - 2.48 2,202,765.85
12 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 1.50 479,028.00 - - - - 1.50 479,028.00 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 18.24 238,174.73 - - - - 18.24 238,174.73
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 0.02 17,764.24 - - - - 0.02 17,764.24
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 0.48 5,112,802.20 - - - - 0.48 5,112,802.20 CCO
4 A.4.6.1.15.a Pemasangan 1 m3 konstruksi gordeng expose , kayu kelas II ( kruink ) m3 10,778,171.25 3.19 34,382,366.29 - - - - 3.19 34,382,366.29
5 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II m2 153,051.25 33.00 5,050,691.25 - - - - 33.00 5,050,691.25
6 A.4.6.1.17.a Pemasangan 1 m2 rangka atap genteng beton expose , m2 178,351.25 410.50 73,213,188.13 - - - - 410.50 73,213,188.13
8 A.4.5.2.3.a Pemasangan 1 m2 atap genteng palentong besar/super m2 59,793.25 443.50 26,518,306.38 - - - - 443.50 26,518,306.38
9 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar m1 63,189.50 61.70 3,898,792.15 - - - - 61.70 3,898,792.15
10 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 22.50 1,733,366.25 - - - - 22.50 1,733,366.25
11 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 22.50 777,125.25 - - - - 22.50 777,125.25
13 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 19.00 361,935.75 - - - - 19.00 361,935.75
14 Ls Pasang papan pembungkus kolom beton (2x30) cm, m2 325,000.00 28.32 9,204,000.00 - - - - 28.32 9,204,000.00
15 A.4.6.1.2. Membuat dan memasang rangka pagar, kayu kruink m3 10,925,172.50 0.68 7,429,117.30 - - - - 0.68 7,429,117.30
16 A.4.6.1.10. Membuat dan memasang pagar, kayu kruink m2 667,975.00 27.65 18,469,508.75 - - - - 27.65 18,469,508.75
2 A.4.4.3.58. Pemasangan 1 m2 dinding natu tempel candi m2 239,442.50 30.15 7,219,191.38 - - - - 30.15 7,219,191.38
2 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 49,024.25 100.17 4,910,759.12 - - - - 100.17 4,910,759.12 CCO
3 A.4.7.1.10. Pengecatan tembok baru Interior ex. Catylac ( 1 lapis plamir, 1 lapis m2 17,222.98 658.24 11,336,851.06 - - - - 658.24 11,336,851.06
4 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 433.00 5,686,545.70 - - - - 433.00 5,686,545.70
2 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30 x 30 tinggi 35 cm bh 318,991.75 4.00 1,275,967.00 - - - - 4.00 1,275,967.00
3 Ditaksir Pasang logo keramik ( ukuran 35 x 45 ) cm unit 750,000.00 1.00 750,000.00 - - - - 1.00 750,000.00
4 Ditaksir Pasang Tulisan ( bahan alumunium ) unit 2,250,000.00 1.00 2,250,000.00 - - - - 1.00 2,250,000.00
C KANTOR PELAYANAN
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 42.44 693,451.92 - - 23.77 388,359.22 18.67 305,092.70
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 34.87 4,135,843.53 - - 8.89 1,054,183.46 25.98 3,081,660.07
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 153.20 12,775,922.50 - - 43.99 3,668,324.28 109.21 9,107,598.23
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 31.44 8,789,869.44 - - 0.32 89,464.32 31.12 8,700,405.12
2 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 97,798.25 82.20 8,039,016.15 - - 1.00 97,798.25 81.20 7,941,217.90
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 574.01 52,970,647.32 - - 88.80 8,194,767.05 485.21 44,775,880.27
2 A.4.4.2.27. Pemasangan 1 m2 acian m2 23,815.00 1,283.29 30,561,551.35 - - 179.60 4,277,250.21 1,103.69 26,284,301.14
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 18.70 13,323,290.38 - - 0.50 354,812.76 18.20 12,968,477.62
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 6.30 4,765,789.12 - - - - 6.30 4,765,789.12
3 Sloof 15/20
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 50.38 8,389,731.02 - - 0.50 83,264.50 49.88 8,306,466.52
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 1,417.26 18,506,333.06 - - 13.98 182,548.39 1,403.28 18,323,784.67
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 7.56 6,352,240.04 - - 0.08 67,219.47 7.48 6,285,020.57
4 Kolom 30/30
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 7.20 1,816,214.40 - - - - 7.20 1,816,214.40 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 101.73 1,328,372.54 - - - - 101.73 1,328,372.54
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 1.08 907,462.86 - - - - 1.08 907,462.86
5 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 60.80 15,336,921.60 - - - - 60.80 15,336,921.60 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 561.23 7,328,443.12 - - - - 561.23 7,328,443.12
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 6.08 5,108,679.82 - - 0.30 252,073.02 5.78 4,856,606.80
6 Kolom 15/15
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 252,252.00 119.00 30,017,988.00 - - 4.60 1,160,359.20 114.40 28,857,628.80 CCO
7 Balok 15/40
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 282,612.00 2.06 582,180.72 - - - - 2.06 582,180.72 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 53.90 703,816.77 - - - - 53.90 703,816.77
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.33 277,280.32 - - - - 0.33 277,280.32
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 282,612.00 7.13 2,015,023.56 - - - - 7.13 2,015,023.56 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 140.91 1,839,978.12 - - - - 140.91 1,839,978.12
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.86 722,609.32 - - - - 0.86 722,609.32
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 86,781.75 40.30 3,497,304.53 - - 0.40 34,712.70 39.90 3,462,591.83
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 1,364.48 17,817,141.06 - - 13.47 175,888.90 1,351.01 17,641,252.15
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 6.05 5,083,472.52 - - 0.06 50,414.60 5.99 5,033,057.91
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 97.00 8,417,829.75 - - - - 97.00 8,417,829.75
11 Plat atap
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 25.00 5,563,800.00 - - - - 25.00 5,563,800.00
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 855.60 11,172,275.07 - - - - 855.60 11,172,275.07
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 6.00 5,041,460.35 - - - - 6.00 5,041,460.35
12 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 14.61 4,665,732.72 - - - - 14.61 4,665,732.72 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 281.98 3,682,045.49 - - - - 281.98 3,682,045.49
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 2.92 2,453,510.70 - - - - 2.92 2,453,510.70
13 Plat lisplang
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 3.51 1,120,925.52 - - - - 3.51 1,120,925.52 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 69.32 905,168.43 - - - - 69.32 905,168.43
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.70 588,170.37 - - - - 0.70 588,170.37
2 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, m3 9,944,550.00 6.99 69,512,404.50 - - - - 6.99 69,512,404.50
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 3.57 38,026,466.36 - - - - 3.57 38,026,466.36 CCO
4 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II m2 153,051.25 533.00 81,576,316.25 - - - - 533.00 81,576,316.25
5 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif kayu m1 22,500.00 105.00 2,362,500.00 - - - - 105.00 2,362,500.00
6 A.4.5.2.3.a Pemasangan 1 m2 atap genteng palentong besar/super m2 59,793.25 533.00 31,869,802.25 - - - - 533.00 31,869,802.25
7 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar m1 63,189.50 61.50 3,886,154.25 - - - - 61.50 3,886,154.25
8 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 463.00 35,668,825.50 - - - - 463.00 35,668,825.50
9 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 383.00 13,228,398.70 - - - - 383.00 13,228,398.70
2 A.5.1.1 10. Pemasangan 1 buah bak air fibreglass vol 1 m3 bh 342,354.10 4.00 1,369,416.40 - - - - 4.00 1,369,416.40
3 A.5.1.1 14. Pemasangan 1 buah floor drain bh 26,331.25 4.00 105,325.00 - - - - 4.00 105,325.00
4 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm bh 318,991.75 4.00 1,275,967.00 - - - - 4.00 1,275,967.00
5 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” m1 45,375.00 4.00 181,500.00 - - - - 4.00 181,500.00
6 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 14,250.50 60.00 855,030.00 - - - - 60.00 855,030.00
7 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m` 33,310.75 12.00 399,729.00 - - - - 12.00 399,729.00
8 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 72,312.63 12.00 867,751.50 - - - - 12.00 867,751.50
9 Ditaksir Fiber glas tangki air kap 1100 ltr bh 1,450,000.00 1.00 1,450,000.00 - - - - 1.00 1,450,000.00
2 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium m2 466,303.75 74.83 34,893,509.61 - - - - 74.83 34,893,509.61
3 Ls Pemasangan pintu tempered t = 12 mm ( komplit ) unit 10,000,000.00 4.00 40,000,000.00 - - - - 4.00 40,000,000.00
2 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu bh 21,921.63 304.00 6,664,174.00 - - - - 304.00 6,664,174.00
3 A.4.6.2.9. Pemasangan 1 buah kait angin bh 25,641.00 304.00 7,794,864.00 - - - - 304.00 7,794,864.00
4 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 97,083.25 14.00 1,359,165.50 - - - - 14.00 1,359,165.50
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 213,889.50 15.00 3,208,342.50 0.34 72,187.71 - - 15.34 3,280,530.21 CCO
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 38,173.30 20.80 794,004.64 - - - - 20.80 794,004.64 CCO
4 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm m2 204,226.00 31.20 6,371,851.20 - - - - 31.20 6,371,851.20
5 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel candi m2 236,692.50 12.64 2,991,793.20 - - - - 12.64 2,991,793.20
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 463.00 6,080,532.70 - - - - 463.00 6,080,532.70
2 A.5.1.1 15. Membuat Septic Tank bh 1,150,000.00 1.00 1,150,000.00 - - - - 1.00 1,150,000.00
D SERBA GUNA
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 16.96 277,119.33 - - 8.85 144,572.63 8.11 132,546.70
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 13.13 1,557,316.48 - - 3.25 385,993.28 9.88 1,171,323.19
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 54.80 4,569,977.50 - - 15.83 1,319,810.34 38.97 3,250,167.16
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 12.56 3,511,474.56 0.96 268,392.96 - - 13.52 3,779,867.52
2 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 97,798.25 40.30 3,941,269.48 11.13 1,088,494.52 - - 51.43 5,029,764.00
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 224.36 20,704,333.43 1.77 163,504.80 - - 226.13 20,867,838.23
2 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m2 32,392.25 4.48 145,117.28 - - - - 4.48 145,117.28
2 A.4.4.2.27. Pemasangan 1 m2 acian m2 23,815.00 529.15 12,601,707.25 39.90 950,218.50 - - 569.05 13,551,925.75
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 7.49 5,336,440.91 - - 0.99 708,467.75 6.50 4,627,973.16
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 4.10 3,101,545.30 - - - - 4.10 3,101,545.30
3 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 19.63 3,268,964.27 1.50 249,793.50 - - 21.13 3,518,757.77
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 552.08 7,208,964.03 42.20 551,040.21 - - 594.28 7,760,004.24
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 2.94 2,470,315.57 0.23 193,255.98 - - 3.17 2,663,571.55
4 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 6.00 1,513,512.00 - - - - 6.00 1,513,512.00 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 56.32 735,416.70 - - - - 56.32 735,416.70
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 0.60 504,146.03 - - 0.06 50,414.60 0.54 453,731.43
5 Kolom 15/15
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 252,252.00 106.00 26,738,712.00 - - 2.60 655,855.20 103.40 26,082,856.80 CCO
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 6.00 1,529,352.00 - - - - 6.00 1,529,352.00 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 118.67 1,549,572.09 - - - - 118.67 1,549,572.09
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.72 604,975.24 - - 0.24 201,658.41 0.48 403,316.83
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 86,781.75 13.30 1,154,197.28 1.20 104,138.10 - - 14.50 1,258,335.38
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 450.26 5,879,416.28 40.63 530,539.43 - - 490.89 6,409,955.71
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 2.00 1,680,486.78 0.18 151,243.81 - - 2.18 1,831,730.59
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 36.50 3,167,533.88 - - 4.50 390,517.88 32.00 2,777,016.00
9 Plat atap
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 7.00 1,557,864.00 - - 1.75 389,466.00 5.25 1,168,398.00
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 237.46 3,100,711.12 - - 59.77 780,466.20 177.69 2,320,244.92
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 1.40 1,176,340.75 - - 0.35 294,085.19 1.05 882,255.56
10 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 3.51 1,120,925.52 - - 0.68 215,562.60 2.84 905,362.92 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 67.70 884,014.75 - - 13.02 170,012.88 54.68 714,001.87
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.84 705,804.45 - - 0.16 134,102.85 0.68 571,701.60
2 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, m3 9,944,550.00 1.45 14,419,597.50 - - - - 1.45 14,419,597.50
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 1.47 15,657,956.74 - - - - 1.47 15,657,956.74 CCO
4 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m2 152,556.25 240.50 36,689,778.13 - - - - 240.50 36,689,778.13
5 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif kayu m1 22,500.00 61.00 1,372,500.00 - - - - 61.00 1,372,500.00
6 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil m2 59,211.63 240.50 14,240,395.81 - - - - 240.50 14,240,395.81
7 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong m1 65,939.50 34.00 2,241,943.00 - - - - 34.00 2,241,943.00
8 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 186.28 14,350,731.78 - - - - 186.28 14,350,731.78
9 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 143.72 4,963,930.71 - - - - 143.72 4,963,930.71
11 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 227.80 4,339,419.15 - - - - 227.80 4,339,419.15
2 A.5.1.1 10. Pemasangan 1 buah bak air fibreglass vol 1 m3 bh 342,354.10 2.00 684,708.20 - - - - 2.00 684,708.20
3 A.5.1.1 14. Pemasangan 1 buah floor drain bh 26,331.25 2.00 52,662.50 - - - - 2.00 52,662.50
4 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm bh 318,991.75 4.00 1,275,967.00 - - - - 4.00 1,275,967.00
5 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” m1 45,375.00 2.00 90,750.00 - - - - 2.00 90,750.00
6 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 14,250.50 24.00 342,012.00 - - - - 24.00 342,012.00
7 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m` 33,310.75 12.00 399,729.00 - - - - 12.00 399,729.00
8 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 72,312.63 12.00 867,751.50 - - - - 12.00 867,751.50
2 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium m2 466,303.75 29.02 13,532,134.83 - - 0.41 191,184.54 28.61 13,340,950.29
3 A.4.6.2.9. Pemasangan 1 buah kait angin bh 25,641.00 114.00 2,923,074.00 - - 2.00 51,282.00 112.00 2,871,792.00
4 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 97,083.25 6.00 582,499.50 - - 1.00 97,083.25 5.00 485,416.25
5 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm bh 115,371.85 42.05 4,851,386.29 - - 0.99 114,218.13 41.06 4,737,168.16
6 Ditaksir Grendel pintu bh 10,000.00 63.00 630,000.00 - - 2.00 20,000.00 61.00 610,000.00
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 213,889.50 9.00 1,925,005.50 - - 2.93 627,230.96 6.07 1,297,774.54 CCO
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 38,173.30 9.40 358,829.02 - - - - 9.40 358,829.02 CCO
4 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm m2 204,226.00 14.10 2,879,586.60 - - - - 14.10 2,879,586.60
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 186.28 2,446,396.61 - - - - 186.28 2,446,396.61
E MUSHOLLA
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - 1.00 500,000.00 - -
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 4.40 521,873.00 - - 4.40 521,873.00 - -
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 29.59 2,467,621.06 - - 29.59 2,467,621.06 - -
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 5.51 1,540,463.76 - - 5.51 1,540,463.76 - -
2 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 80.81 7,457,288.22 - - 80.81 7,457,288.22 - -
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 1.98 1,410,701.33 - - 1.98 1,410,701.33 - -
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 0.61 461,449.42 - - 0.61 461,449.42 - -
3 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 7.25 1,207,335.25 - - 7.25 1,207,335.25 - -
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 203.89 2,662,359.94 - - 203.89 2,662,359.94 - -
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 1.09 915,865.30 - - 1.09 915,865.30 - -
4 Kolom 15/15
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 63,268.15 106.00 6,706,423.90 - - 106.00 6,706,423.90 - -
5 Balok 15/30
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 2.25 573,507.00 - - 2.25 573,507.00 - -
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 44.48 580,812.06 - - 44.48 580,812.06 - -
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.27 226,865.72 - - 0.27 226,865.72 - -
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 86,781.75 6.35 551,064.11 - - 6.35 551,064.11 - -
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 215.09 2,808,607.58 - - 215.09 2,808,607.58 - -
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.95 798,231.22 - - 0.95 798,231.22 - -
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 20.00 1,735,635.00 - - 20.00 1,735,635.00 - -
8 Plat atap
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 10.63 2,365,727.76 - - 10.63 2,365,727.76 - -
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 362.76 4,736,856.60 - - 362.76 4,736,856.60 - -
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 2.55 2,142,620.65 - - 2.55 2,142,620.65 - -
9 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 3.00 958,056.00 - - 3.00 958,056.00 - -
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 58.03 757,745.58 - - 58.03 757,745.58 - -
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.60 504,146.03 - - 0.60 504,146.03 - -
2 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 0.50 5,325,835.63 - - 0.50 5,325,835.63 - -
3 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m2 152,556.25 67.50 10,297,546.88 - - 67.50 10,297,546.88 - -
4 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif kayu m1 22,500.00 30.00 675,000.00 - - 30.00 675,000.00 - -
5 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil m2 59,211.63 67.50 3,996,784.69 - - 67.50 3,996,784.69 - -
6 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong m1 65,939.50 22.00 1,450,669.00 - - 22.00 1,450,669.00 - -
7 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 58.75 4,526,011.88 - - 58.75 4,526,011.88 - -
8 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 32.15 1,110,425.64 - - 32.15 1,110,425.64 - -
10 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 52.50 1,000,085.63 - - 52.50 1,000,085.63 - -
2 A.5.1.1 10. Pemasangan 1 buah bak air fibreglass vol 1 m3 bh 342,354.10 1.00 342,354.10 - - 1.00 342,354.10 - -
3 A.5.1.1 14. Pemasangan 1 buah floor drain bh 26,331.25 1.00 26,331.25 - - 1.00 26,331.25 - -
4 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm bh 318,991.75 4.00 1,275,967.00 - - 4.00 1,275,967.00 - -
5 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” m1 45,375.00 4.00 181,500.00 - - 4.00 181,500.00 - -
6 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 14,250.50 24.00 342,012.00 - - 24.00 342,012.00 - -
7 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m` 33,310.75 12.00 399,729.00 - - 12.00 399,729.00 - -
8 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 72,312.63 12.00 867,751.50 - - 12.00 867,751.50 - -
2 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm m1 422,405.78 1.47 620,936.49 - - 1.47 620,936.49 - -
3 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium m2 466,303.75 2.52 1,175,085.45 - - 2.52 1,175,085.45 - -
4 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium m2 466,303.75 13.64 6,360,383.15 - - 13.64 6,360,383.15 - -
2 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu bh 21,921.63 44.00 964,551.50 - - 44.00 964,551.50 - -
3 A.4.6.2.9. Pemasangan 1 buah kait angin bh 25,641.00 44.00 1,128,204.00 - - 44.00 1,128,204.00 - -
4 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 97,083.25 2.00 194,166.50 - - 2.00 194,166.50 - -
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 213,889.50 2.63 562,529.39 - - 2.63 562,529.39 - -
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 38,173.30 10.90 416,088.97 - - 10.90 416,088.97 - -
4 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm m2 204,226.00 16.35 3,339,095.10 - - 16.35 3,339,095.10 - -
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 56.15 737,412.34 - - 56.15 737,412.34 - -
F RUMAH DINAS
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 20.41 333,490.90 - - 11.77 192,316.90 8.64 141,174.00
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 13.56 1,608,317.70 - - 4.18 496,194.48 9.38 1,112,123.22
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 48.00 4,002,900.00 - - 13.34 1,112,556.02 34.66 2,890,343.98
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 15.12 4,227,189.12 - - 0.72 201,294.72 14.40 4,025,894.40
2 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 97,798.25 40.11 3,922,687.81 2.00 195,596.50 - - 42.11 4,118,284.31
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 275.49 25,422,699.31 4.57 421,727.60 - - 280.06 25,844,426.91
2 A.4.4.2.27. Pemasangan 1 m2 acian m2 23,815.00 610.28 14,533,818.20 18.72 445,816.80 - - 629.00 14,979,635.00
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 6.00 4,274,852.53 - - 0.22 159,238.26 5.78 4,115,614.27
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 6.46 4,886,825.03 - - - - 6.46 4,886,825.03
3 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 24.38 4,059,977.02 - - 1.13 188,177.77 23.25 3,871,799.25
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 685.82 8,955,317.54 - - 31.66 413,410.74 654.16 8,541,906.80
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 3.66 3,075,290.81 - - 0.17 142,841.38 3.49 2,932,449.44
4 Kolom 15/25
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 25.60 6,457,651.20 - - - - 25.60 6,457,651.20 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 546.78 7,139,757.55 - - - - 546.78 7,139,757.55
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 2.40 2,016,584.14 - - - - 2.40 2,016,584.14
5 Kolom 15/15
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 63,268.15 60.00 3,796,089.00 - - - - 60.00 3,796,089.00
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 2.06 525,077.52 - - - - 2.06 525,077.52 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 40.83 533,150.99 - - - - 40.83 533,150.99
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.25 210,060.85 - - - - 0.25 210,060.85
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 19.50 4,970,394.00 - - 0.90 229,402.80 18.60 4,740,991.20 CCO
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 660.27 8,621,690.11 - - 30.47 397,871.93 629.80 8,223,818.19
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 2.93 2,461,913.14 - - 0.14 117,634.07 2.79 2,344,279.06
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 32.50 2,820,406.88 - - - - 32.50 2,820,406.88
9 Plat atap
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 0.75 166,914.00 - - - - 0.75 166,914.00
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 26.41 344,857.16 - - - - 26.41 344,857.16
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.18 151,243.81 - - - - 0.18 151,243.81
10 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 3.90 867,952.80 - - - - 3.90 867,952.80
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 75.39 984,429.43 - - - - 75.39 984,429.43
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.78 655,389.85 - - - - 0.78 655,389.85
A.4.1.1.33. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) m2 222,552.00 0.90 200,296.80 - - - - 0.90 200,296.80
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 17.36 226,683.84 - - - - 17.36 226,683.84
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.18 151,243.81 - - - - 0.18 151,243.81
2 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II m2 591,717.50 14.70 8,698,247.25 - - - - 14.70 8,698,247.25
3 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau m2 410,058.00 3.96 1,623,829.68 - - - - 3.96 1,623,829.68
4 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, m3 9,944,550.00 1.52 15,115,716.00 0.43 4,276,156.50 - - 1.95 19,391,872.50
5 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 1.84 19,599,075.10 0.06 639,100.27 - - 1.90 20,238,175.38 CCO
6 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m2 152,556.25 208.59 31,821,708.19 - - - - 208.59 31,821,708.19
7 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif kayu m1 22,500.00 55.20 1,242,000.00 - - - - 55.20 1,242,000.00
8 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil m2 59,211.63 208.59 12,350,952.86 - - - - 208.59 12,350,952.86
9 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong m1 65,939.50 52.20 3,442,041.90 - - 1.20 79,127.40 51.00 3,362,914.50
10 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 150.31 11,579,656.94 - - - - 150.31 11,579,656.94
11 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 117.60 4,061,774.64 - - - - 117.60 4,061,774.64
13 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 223.00 4,247,982.75 - - - - 223.00 4,247,982.75
2 A.5.1.1 5. Pemasangan 1 buah wastafel bh 696,960.00 1.00 696,960.00 - - - - 1.00 696,960.00 CCO
3 A.5.1.1 10. Pemasangan 1 buah bak air fibreglass vol 1 m3 bh 342,354.10 1.00 342,354.10 - - 1.00 342,354.10 - -
4 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel bh 267,093.75 1.00 267,093.75 - - - - 1.00 267,093.75
5 A.5.1.1 14. Pemasangan 1 buah floor drain bh 26,331.25 1.00 26,331.25 - - - - 1.00 26,331.25
6 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm bh 318,991.75 4.00 1,275,967.00 - - - - 4.00 1,275,967.00
7 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” m1 45,375.00 1.00 45,375.00 - - - - 1.00 45,375.00
8 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 14,250.50 32.00 456,016.00 - - - - 32.00 456,016.00
9 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m` 33,310.75 12.00 399,729.00 - - - - 12.00 399,729.00
10 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 72,312.63 12.00 867,751.50 - - - - 12.00 867,751.50
2 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu bh 21,921.63 36.00 789,178.50 - - - - 36.00 789,178.50
3 A.4.6.2.9. Pemasangan 1 buah kait angin bh 25,641.00 36.00 923,076.00 - - - - 36.00 923,076.00
4 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 97,083.25 15.00 1,456,248.75 - - - - 15.00 1,456,248.75
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 213,889.50 4.80 1,026,669.60 - - 2.30 492,480.57 2.50 534,189.03 CCO
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 38,173.30 9.90 377,915.67 - - - - 9.90 377,915.67 CCO
4 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm m2 204,226.00 14.85 3,032,756.10 - - - - 14.85 3,032,756.10
5 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel susun sirih m2 239,442.50 5.58 1,336,089.15 - - - - 5.58 1,336,089.15
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 147.91 1,942,487.24 - - - - 147.91 1,942,487.24
LAPORAN MINGGUAN
3 A. 4.4.1.20. Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP m2 103,248.53 287.55 29,688,650.18 #REF! #REF! #REF! 94.89 #REF! #REF! #REF! #REF!
JUMLAH IV 44,590,890.70 #REF! #REF! #REF! #REF!
V PEKERJAAN PLESTERAN
1 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. m2 38,633.10 329.03 12,711,344.58 #REF! #REF! #REF! - #REF! #REF! #REF! #REF!
2 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m2 35,337.50 6.93 244,747.53 #REF! #REF! #REF! - #REF! #REF! #REF! #REF!
3 A.4.4.2.27. Pemasangan 1 m2 acian m2 23,815.00 329.03 7,835,785.15 #REF! #REF! #REF! - #REF! #REF! #REF! #REF!
4 Ls Sponengan m1 20,000.00 73.60 1,472,000.00 #REF! #REF! #REF! - #REF! #REF! #REF! #REF!
JUMLAH V 22,263,877.26 #REF! #REF! #REF! #REF!
VI PEKERJAAN BETON
1 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 40.97 6,823,026.19 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 933.00 12,182,913.83 #REF! #REF! #REF! - #REF! #REF! #REF! #REF!
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 4.80 4,261,648.45 #REF! #REF! #REF! - #REF! #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87
Menyetujui,
KaSi Bangunan Gedung Bidang Cipta Karya
Dinas Pekerjaan Umum Kab.Kebumen
Selaku Pejabat PelaksanaTeknis Kegiatan
CCO.1 CCO.2
SELISIH TAMBAH SELISIH KURANG
HARGA
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN JUMLAH JUMLAH JUMLAH JUMLAH KET
( Rp ) VOLUME HARGA VOLUME HARGA VOLUME HARGA VOLUME HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
2 A.2.2.1.15a. 1 M2 pasang paving blok segi 4, t = 8 cm m2 84,000.00 1,694.11 142,305,454.94 - - 1,694.11 142,305,454.94 - -
3 A.2.2.1.15b. 1 M2 pasang paving blok segi 4, t = 6 cm m2 79,000.00 - - 1,714.50 135,445,752.80 - - 1,714.50 135,445,752.80
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 21.15 345,579.00 0.19 3,185.73 - - 21.34 348,764.73
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 7.72 915,771.47 - - 0.09 10,766.60 7.63 905,004.88
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 3,182.86 265,430,732.87 1,239.02 103,326,470.64 - - 4,421.88 368,757,203.50
2 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 38.16 3,521,287.02 28.95 2,671,279.82 - - 67.11 6,192,566.83
3 A. 4.4.1.20. Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP m2 103,248.53 287.55 29,688,650.18 - - 19.94 2,059,085.43 267.60 27,629,564.75
JUMLAH IV 44,590,890.70 2,671,279.82 9,311,974.80 37,950,195.72
V PEKERJAAN PLESTERAN
1 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. m2 38,633.10 329.03 12,711,344.58 - - 86.46 3,340,206.24 242.57 9,371,138.35
2 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m2 35,337.50 6.93 244,747.53 - - 2.11 74,512.65 4.82 170,234.87
3 A.4.4.2.27. Pemasangan 1 m2 acian m2 23,815.00 329.03 7,835,785.15 - - 86.46 2,059,037.76 242.57 5,776,747.39
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 - - 6.83 5,169,273.68 - - 6.83 5,169,273.68
2 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 40.97 6,823,026.19 - - 0.02 3,663.64 40.95 6,819,362.55
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 933.00 12,182,913.83 - - 57.49 750,722.75 875.51 11,432,191.08
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 4.80 4,261,648.45 - - 0.00 2,067.76 4.80 4,259,580.69
A.4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi m2 154,429.00 13.44 2,075,525.76 - - - - 13.44 2,075,525.76
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 250.30 3,268,360.54 - - - - 250.30 3,268,360.54
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 2.02 1,790,635.46 - - - - 2.02 1,790,635.46
4 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 31.02 7,824,857.04 - - - - 31.02 7,824,857.04
A.4.1.1.22.b Pemasangan 1 m2 bekisting untuk kolom m2 197,116.70 36.52 7,198,701.88 - - 12.82 2,527,036.09 23.70 4,671,665.79
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 403.94 5,274,585.98 - - 14.39 187,842.66 389.56 5,086,743.32
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 8.37 7,436,253.26 - - - - 8.37 7,436,253.26
5 Kolom 11/11
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 63,268.15 - - 6.75 427,060.01 - - 6.75 427,060.01
A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 155.43 13,488,487.40 50.47 4,379,874.92 - - 205.90 17,868,362.33
5 LS Pasang Pagar dan Pintu Besi Ulir (Lengkap) m2 455,000.00 54.35 24,729,705.00 7.67 3,488,940.00 - - 62.02 28,218,645.00
6 Ditaksir Pasang Grill Saluran m' 180,000.00 19.90 3,582,000.00 3.80 684,000.00 - - 23.70 4,266,000.00
7 LS Pasang Roda Pintu dia. 2,5" bh 50,000.00 6.00 300,000.00 - - 6.00 300,000.00 - -
2 A.4.7.1.10. Pengecatan permukaan baja (galbani) secara semprot dengan m2 82,832.60 58.33 4,831,708.39 - - 58.33 4,831,708.39 - -
JUMLAH X - - - -
XI PEKERJAAN LAIN-LAIN
1 Ls Pasang saluran U 20 cm, termasuk pasangan dinding m1 75,500.00 53.20 4,016,600.00 165.80 12,517,900.00 - - 219.00 16,534,500.00
5 Ls Pasang tulisan ( bahan alumunium ) unit 3,500,000.00 1.00 3,500,000.00 - - - - 1.00 3,500,000.00
6 Ditaksir Pasang gorong gorong dia.100 m' 350,000.00 - - 17.00 5,950,000.00 - - 17.00 5,950,000.00
B PEMBANGUNAN PENDOPO
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
2 A.2.2.1.15a. 1 M2 pasang paving blok segi 4, t = 8 cm ls 84,000.00 190.00 15,960,000.00 - - 190.00 15,960,000.00 - -
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 12.06 197,055.38 - - 0.00 19.61 12.06 197,035.77
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 35.16 4,170,239.70 - - - - 35.16 4,170,239.70
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 145.38 12,123,783.38 - - 28.14 2,346,718.00 117.24 9,777,065.37
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 14.00 3,914,064.00 - - - - 14.00 3,914,064.00
2 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 97,798.25 28.82 2,818,545.57 - - - - 28.82 2,818,545.57
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 125.07 11,541,678.47 - - - - 125.07 11,541,678.47
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 22.38 15,945,199.93 0.40 284,990.17 - - 22.78 16,230,190.10
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 5.86 4,432,940.35 0.26 198,120.66 - - 6.12 4,631,061.01
A.4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi m2 154,429.00 4.48 691,841.92 1.28 197,669.12 - - 5.76 889,511.04
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 285.61 3,729,445.40 155.05 2,024,615.77 - - 440.66 5,754,061.16
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 2.06 1,829,716.79 0.59 524,045.10 - - 2.65 2,353,761.89
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 21.60 3,597,026.40 - - - - 21.60 3,597,026.40
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 478.22 6,244,513.07 - - - - 478.22 6,244,513.07
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 3.24 2,877,806.99 - - - - 3.24 2,877,806.99
5 Kolom 30/30
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 23.40 5,902,696.80 - - - - 23.40 5,902,696.80
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 625.83 8,171,978.62 - - 226.21 2,953,810.59 399.62 5,218,168.03
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 3.51 3,117,624.24 - - - - 3.51 3,117,624.24
6 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 54.68 13,793,139.36 - - 2.00 504,504.00 52.68 13,288,635.36
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 768.44 10,034,155.04 - - 35.69 466,012.88 732.75 9,568,142.16
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 5.47 4,858,519.83 - - 0.20 179,418.83 5.27 4,679,101.00
7 Kolom 15/15
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 2.00 504,504.00 - - 0.05 12,612.60 1.95 491,891.40
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 17.16 224,072.28 39.42 514,739.46 - - 56.58 738,811.74
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 0.09 79,939.08 0.20 177,642.41 - - 0.29 257,581.49
8 Balok 20/35
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 64.80 16,517,001.60 - - - - 64.80 16,517,001.60
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 1,070.64 13,980,229.76 - - - - 1,070.64 13,980,229.76
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 10.08 8,953,177.31 - - - - 10.08 8,953,177.31
9 Balok 15/20
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 11.40 2,905,768.80 - - - - 11.40 2,905,768.80
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 252.40 3,295,795.03 - - - - 252.40 3,295,795.03
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 1.71 1,518,842.58 - - - - 1.71 1,518,842.58
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 3.20 815,654.40 - - - - 3.20 815,654.40
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 70.89 925,669.21 - - - - 70.89 925,669.21
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 0.48 426,341.78 - - - - 0.48 426,341.78
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 16.50 4,205,718.00 - - - - 16.50 4,205,718.00
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 365.31 4,770,154.05 - - - - 365.31 4,770,154.05
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 2.48 2,202,765.85 - - - - 2.48 2,202,765.85
12 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 1.50 479,028.00 - - - - 1.50 479,028.00
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 18.24 238,174.73 - - 0.61 7,965.27 17.63 230,209.45
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 0.02 17,764.24 0.22 195,406.65 - - 0.24 213,170.89
2 A.4.6.1.13.a Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas II (kruink m3 10,071,050.00 0.85 8,560,392.50 - - - - 0.85 8,560,392.50
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 0.48 5,112,802.20 - - - - 0.48 5,112,802.20
4 A.4.6.1.15.a Pemasangan 1 m3 konstruksi gordeng expose , kayu kelas II ( kruink ) m3 10,778,171.25 3.19 34,382,366.29 - - - - 3.19 34,382,366.29
5 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II m2 153,051.25 33.00 5,050,691.25 - - - - 33.00 5,050,691.25
6 A.4.6.1.17.a Pemasangan 1 m2 rangka atap genteng beton expose , m2 178,351.25 410.50 73,213,188.13 - - - - 410.50 73,213,188.13
7 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif k m1 22,500.00 141.60 3,186,000.00 0.40 9,000.00 - - 142.00 3,195,000.00
8 A.4.5.2.3.a Pemasangan 1 m2 atap genteng palentong besar/super m2 59,793.25 443.50 26,518,306.38 - - - - 443.50 26,518,306.38
9 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar m1 63,189.50 61.70 3,898,792.15 - - - - 61.70 3,898,792.15
10 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 22.50 1,733,366.25 5.40 416,007.90 - - 27.90 2,149,374.15
11 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 22.50 777,125.25 5.40 186,510.06 - - 27.90 963,635.31
13 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 19.00 361,935.75 - - - - 19.00 361,935.75
14 Ls Pasang papan pembungkus kolom beton (2x30) cm, m2 325,000.00 28.32 9,204,000.00 - - - - 28.32 9,204,000.00
15 A.4.6.1.2. Membuat dan memasang rangka pagar, kayu kruink m3 10,925,172.50 0.68 7,429,117.30 - - - - 0.68 7,429,117.30
16 A.4.6.1.10. Membuat dan memasang pagar, kayu kruink m2 667,975.00 27.65 18,469,508.75 - - - - 27.65 18,469,508.75
2 A.4.4.3.58. Pemasangan 1 m2 dinding natu tempel candi m2 239,442.50 30.15 7,219,191.38 - - 1.35 323,247.38 28.80 6,895,944.00
2 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 49,024.25 100.17 4,910,759.12 - - - - 100.17 4,910,759.12
3 A.4.7.1.10. Pengecatan tembok baru Interior ex. Catylac ( 1 lapis plamir, 1 lapis m2 17,222.98 658.24 11,336,851.06 - - - - 658.24 11,336,851.06
4 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 433.00 5,686,545.70 5.40 70,917.66 - - 438.40 5,757,463.36
2 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30 x 30 tinggi 35 cm bh 318,991.75 4.00 1,275,967.00 - - 4.00 1,275,967.00 - -
3 Ditaksir Pasang logo keramik ( ukuran 35 x 45 ) cm unit 750,000.00 1.00 750,000.00 - - - - 1.00 750,000.00
4 Ditaksir Pasang Tulisan ( bahan alumunium ) unit 2,250,000.00 1.00 2,250,000.00 - - - - 1.00 2,250,000.00
5 Ditaksir Pasang papan back ground unit 3,500,000.00 - - 1.00 3,500,000.00 - - 1.00 3,500,000.00
C KANTOR PELAYANAN
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
JUMLAH I 500,000.00 - - 500,000.00
II PEKERJAAN TANAH
1 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m m3 49,018.75 62.24 3,050,927.00 4.47 219,015.78 - - 66.71 3,269,942.78
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 18.67 305,092.70 - - - - 18.67 305,092.70
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 25.98 3,081,660.07 0.24 28,661.50 - - 26.22 3,110,321.57
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 109.21 9,107,598.23 - - 42.12 3,512,386.30 67.09 5,595,211.92
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 31.12 8,700,405.12 - - - - 31.12 8,700,405.12
2 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 97,798.25 81.20 7,941,217.90 44.63 4,364,246.91 - - 125.83 12,305,464.81
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 485.21 44,775,880.27 - - 71.77 6,622,932.00 413.44 38,152,948.26
2 A.4.4.2.27. Pemasangan 1 m2 acian m2 23,815.00 1,103.69 26,284,301.14 - - 21.66 515,947.21 1,082.02 25,768,353.93
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 18.20 12,968,477.62 0.24 172,169.69 - - 18.44 13,140,647.31
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 6.30 4,765,789.12 0.11 80,640.18 - - 6.41 4,846,429.29
A.4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi m2 154,429.00 - - 1.28 197,669.12 - - 1.28 197,669.12
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 - - 97.92 1,278,684.90 - - 97.92 1,278,684.90
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 - - 0.59 522,268.68 - - 0.59 522,268.68
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 49.88 8,306,466.52 - - - - 49.88 8,306,466.52
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 1,403.28 18,323,784.67 - - 151.75 1,981,524.94 1,251.53 16,342,259.72
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 7.48 6,285,020.57 - - - - 7.48 6,285,020.57
5 Kolom 30/30
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 7.20 1,816,214.40 5.88 1,483,241.76 - - 13.08 3,299,456.16
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 101.73 1,328,372.54 53.24 695,198.60 - - 154.97 2,023,571.14
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 1.08 907,462.86 0.88 739,414.18 - - 1.96 1,646,877.05
6 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 60.80 15,336,921.60 - - 1.60 403,603.20 59.20 14,933,318.40
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 561.23 7,328,443.12 409.95 5,353,055.36 - - 971.18 12,681,498.48
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 5.78 4,856,606.80 - - 0.16 134,438.94 5.62 4,722,167.86
7 Kolom 15/15
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 252,252.00 114.40 28,857,628.80 - - 1.40 353,152.80 113.00 28,504,476.00
8 Balok 15/40
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 282,612.00 2.06 582,180.72 0.22 62,174.64 - - 2.28 644,355.36
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 53.90 703,816.77 - - 6.16 80,436.20 47.74 623,380.57
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.33 277,280.32 - - - - 0.33 277,280.32
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 282,612.00 7.13 2,015,023.56 0.42 118,697.04 - - 7.55 2,133,720.60
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 140.91 1,839,978.12 38.33 500,506.43 - - 179.24 2,340,484.55
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.86 722,609.32 0.35 294,085.19 - - 1.21 1,016,694.50
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 86,781.75 39.90 3,462,591.83 - - 5.39 467,753.63 34.51 2,994,838.19
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 1,351.01 17,641,252.15 - - 290.53 3,793,689.90 1,060.48 13,847,562.26
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 5.99 5,033,057.91 - - 0.81 680,597.15 5.18 4,352,460.77
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 97.00 8,417,829.75 - - - - 97.00 8,417,829.75
12 Plat atap
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 25.00 5,563,800.00 - - - - 25.00 5,563,800.00
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 855.60 11,172,275.07 - - - - 855.60 11,172,275.07
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 6.00 5,041,460.35 - - - - 6.00 5,041,460.35
13 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 14.61 4,665,732.72 16.78 5,358,726.56 - - 31.39 10,024,459.28
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 281.98 3,682,045.49 81.54 1,064,735.05 - - 363.52 4,746,780.54
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 2.92 2,453,510.70 2.10 1,766,527.71 - - 5.02 4,220,038.41
14 Plat lisplang
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 3.51 1,120,925.52 - - - - 3.51 1,120,925.52
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 69.32 905,168.43 - - - - 69.32 905,168.43
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.70 588,170.37 - - - - 0.70 588,170.37
2 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, m3 9,944,550.00 6.99 69,512,404.50 - - - - 6.99 69,512,404.50
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 3.57 38,026,466.36 - - 0.03 319,550.14 3.54 37,706,916.23
4 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II m2 153,051.25 533.00 81,576,316.25 - - 9.10 1,392,766.38 523.90 80,183,549.88
5 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif k m1 22,500.00 105.00 2,362,500.00 - - 3.00 67,500.00 102.00 2,295,000.00
6 A.4.5.2.3.a Pemasangan 1 m2 atap genteng palentong besar/super m2 59,793.25 533.00 31,869,802.25 - - 9.10 544,118.58 523.90 31,325,683.68
7 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar m1 63,189.50 61.50 3,886,154.25 0.10 6,318.95 - - 61.60 3,892,473.20
8 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 463.00 35,668,825.50 - - 54.61 4,206,841.37 408.39 31,461,984.13
9 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 383.00 13,228,398.70 - - 14.13 487,931.04 368.87 12,740,467.66
10 A.4.5.1.7.a Pemasangan 1 m2 langit-langit kalsiboard m2 32,937.30 80.00 2,634,984.00 - - 40.48 1,333,301.90 39.52 1,301,682.10
11 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 436.80 8,320,712.40 - - 159.70 3,042,165.23 277.10 5,278,547.18
2 A.5.1.1 10. Pemasangan 1 buah bak air fibreglass vol 1 m3 bh 342,354.10 4.00 1,369,416.40 - - 4.00 1,369,416.40 - -
3 A.5.1.1 14. Pemasangan 1 buah floor drain bh 26,331.25 4.00 105,325.00 1.00 26,331.25 - - 5.00 131,656.25
4 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm bh 318,991.75 4.00 1,275,967.00 - - 4.00 1,275,967.00 - -
5 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” m1 45,375.00 4.00 181,500.00 3.00 136,125.00 - - 7.00 317,625.00
6 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 14,250.50 60.00 855,030.00 9.80 139,654.90 - - 69.80 994,684.90
7 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m` 33,310.75 12.00 399,729.00 2.50 83,276.88 - - 14.50 483,005.88
8 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 72,312.63 12.00 867,751.50 1.00 72,312.63 - - 13.00 940,064.13
9 Ditaksir Fiber glas tangki air kap 1100 ltr bh 1,450,000.00 1.00 1,450,000.00 - - - - 1.00 1,450,000.00
10 Ditaksir Pasang sumur bor m' 180,000.00 - - 8.00 1,440,000.00 - - 8.00 1,440,000.00
11 Ditaksir Pasang mesin pompa air listrik PW-120 jet bh 1,250,000.00 - - 1.00 1,250,000.00 - - 1.00 1,250,000.00
2 A.4.2.1.13. Pemasangan 1 m2 pintu/jendela kaca rangka alluminium m2 466,303.75 74.83 34,893,509.61 7.24 3,376,039.15 - - 82.07 38,269,548.76
3 Ls Pemasangan pintu tempered t = 12 mm ( komplit ) unit 10,000,000.00 4.00 40,000,000.00 - - - - 4.00 40,000,000.00
2 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu bh 21,921.63 304.00 6,664,174.00 - - - - 304.00 6,664,174.00
3 A.4.6.2.9. Pemasangan 1 buah kait angin bh 25,641.00 304.00 7,794,864.00 - - - - 304.00 7,794,864.00
4 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 97,083.25 14.00 1,359,165.50 - - - - 14.00 1,359,165.50
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 213,889.50 15.34 3,280,530.21 - - 6.70 1,432,524.93 8.64 1,848,005.28
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 38,173.30 20.80 794,004.64 1.95 74,437.94 - - 22.75 868,442.58
4 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm m2 204,226.00 31.20 6,371,851.20 9.74 1,989,263.35 - - 40.94 8,361,114.55
5 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel candi m2 236,692.50 12.64 2,991,793.20 - - 12.64 2,991,793.20 - -
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 463.00 6,080,532.70 - - 54.61 717,187.67 408.39 5,363,345.03
2 Ls Pasang meteran listrik baru 5500 Va unit 10,000,000.00 - - 1.00 10,000,000.00 - - 1.00 10,000,000.00
7 Ls lampu pijar 5W Philips bh 10,000.00 9.00 90,000.00 - - 4.00 40,000.00 5.00 50,000.00
8 Ls Lampu SL 18 Watt Phillips bh 35,500.00 33.00 1,171,500.00 4.00 142,000.00 - - 37.00 1,313,500.00
2 A.5.1.1 15. Membuat Septic Tank bh 1,150,000.00 1.00 1,150,000.00 1.00 1,150,000.00 - - 2.00 2,300,000.00
3 Ditaksir Membuat peresapan bh 750,000.00 1.00 750,000.00 1.00 750,000.00 - - 2.00 1,500,000.00
D SERBA GUNA
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 8.11 132,546.70 0.89 14,564.45 - - 9.00 147,111.15
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 9.88 1,171,323.19 - - - - 9.88 1,171,323.19
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 38.97 3,250,167.16 - - 21.01 1,751,922.56 17.97 1,498,244.61
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 13.52 3,779,867.52 - - - - 13.52 3,779,867.52
2 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 97,798.25 51.43 5,029,764.00 21.75 2,126,622.95 - - 73.18 7,156,386.94
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 226.13 20,867,838.23 - - 104.75 9,666,670.19 121.38 11,201,168.04
2 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m2 32,392.25 4.48 145,117.28 - - 3.15 101,970.80 1.33 43,146.48
3 A.4.4.2.27. Pemasangan 1 m2 acian m2 23,815.00 569.05 13,551,925.75 - - 189.69 4,517,467.35 379.36 9,034,458.40
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 6.50 4,627,973.16 - - - - 6.50 4,627,973.16
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 4.10 3,101,545.30 - - 1.39 1,047,807.91 2.71 2,053,737.39
3 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 21.13 3,518,757.77 - - - - 21.13 3,518,757.77
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 594.28 7,760,004.24 - - 74.97 978,945.14 519.31 6,781,059.10
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 3.17 2,663,571.55 - - - - 3.17 2,663,571.55
4 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 6.00 1,513,512.00 - - 0.86 216,936.72 5.14 1,296,575.28
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 56.32 735,416.70 - - 4.65 60,718.89 51.67 674,697.82
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 0.54 453,731.43 - - 0.03 25,207.30 0.51 428,524.13
5 Kolom 15/15
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 252,252.00 103.40 26,082,856.80 - - 8.60 2,169,367.20 94.80 23,913,489.60
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 6.00 1,529,352.00 - - - - 6.00 1,529,352.00
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 118.67 1,549,572.09 - - 12.46 162,700.50 106.21 1,386,871.59
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.48 403,316.83 0.20 168,048.68 - - 0.68 571,365.51
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 86,781.75 14.50 1,258,335.38 0.60 52,069.05 - - 15.10 1,310,404.43
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 490.89 6,409,955.71 - - 26.90 351,255.49 463.99 6,058,700.22
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 2.18 1,831,730.59 0.09 75,621.91 - - 2.27 1,907,352.50
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 32.00 2,777,016.00 3.00 260,345.25 - - 35.00 3,037,361.25
9 Plat atap
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 5.25 1,168,398.00 6.44 1,432,567.22 - - 11.69 2,600,965.22
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 177.69 2,320,244.92 22.28 290,928.34 - - 199.97 2,611,173.27
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 1.05 882,255.56 0.12 99,736.89 - - 1.17 981,992.45
10 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 2.84 905,362.92 0.82 260,910.58 - - 3.65 1,166,273.50
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 54.68 714,001.87 19.64 256,447.85 - - 74.32 970,449.72
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.68 571,701.60 - - 0.10 80,730.59 0.58 490,971.02
2 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, m3 9,944,550.00 1.45 14,419,597.50 0.07 696,118.50 - - 1.52 15,115,716.00
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 1.47 15,657,956.74 - - 0.13 1,384,717.26 1.34 14,273,239.48
4 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m2 152,556.25 240.50 36,689,778.13 - - 56.99 8,694,516.31 183.51 27,995,261.81
5 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif k m1 22,500.00 61.00 1,372,500.00 - - 6.26 140,850.00 54.74 1,231,650.00
6 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil m2 59,211.63 240.50 14,240,395.81 - - 56.99 3,374,600.77 183.51 10,865,795.04
7 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong m1 65,939.50 34.00 2,241,943.00 - - - - 34.00 2,241,943.00
8 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 186.28 14,350,731.78 - - 8.02 617,810.25 178.26 13,732,921.53
9 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 143.72 4,963,930.71 - - 4.55 157,238.34 139.17 4,806,692.37
10 A.4.5.1.7.a Pemasangan 1 m2 langit-langit kalsiboard m2 32,937.30 42.56 1,401,811.49 - - 3.47 114,193.62 39.09 1,287,617.87
11 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 227.80 4,339,419.15 - - 95.50 1,819,203.38 132.30 2,520,215.78
2 A.5.1.1 10. Pemasangan 1 buah bak air fibreglass vol 1 m3 bh 342,354.10 2.00 684,708.20 - - 2.00 684,708.20 - -
3 A.5.1.1 14. Pemasangan 1 buah floor drain bh 26,331.25 2.00 52,662.50 - - - - 2.00 52,662.50
4 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm bh 318,991.75 4.00 1,275,967.00 - - 4.00 1,275,967.00 - -
5 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” m1 45,375.00 2.00 90,750.00 - - - - 2.00 90,750.00
6 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 14,250.50 24.00 342,012.00 16.00 228,008.00 - - 40.00 570,020.00
7 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m` 33,310.75 12.00 399,729.00 - - 8.50 283,141.38 3.50 116,587.63
8 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 72,312.63 12.00 867,751.50 - - 5.00 361,563.13 7.00 506,188.38
10 Ditaksir Pasang sumur bor m' 180,000.00 - - 8.00 1,440,000.00 - - 8.00 1,440,000.00
11 Ditaksir Pasang mesin pompa air listrik PW-120 jet bh 1,250,000.00 - - 1.00 1,250,000.00 - - 1.00 1,250,000.00
9 Ditaksir Ember dan gayung unit 100,000.00 - - 2.00 200,000.00 - - 2.00 200,000.00
10 Ditaksir Fiber glas tangki air kap 1100 ltr unit 1,450,000.00 - - 1.00 1,450,000.00 - - 1.00 1,450,000.00
2 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium m2 466,303.75 28.61 13,340,950.29 0.84 391,695.15 - - 29.45 13,732,645.44
2 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu bh 21,921.63 112.00 2,455,222.00 6.00 131,529.75 - - 118.00 2,586,751.75
3 A.4.6.2.9. Pemasangan 1 buah kait angin bh 25,641.00 112.00 2,871,792.00 6.00 153,846.00 - - 118.00 3,025,638.00
4 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 97,083.25 5.00 485,416.25 - - - - 5.00 485,416.25
5 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm bh 115,371.85 41.06 4,737,168.16 - - 2.94 339,193.24 38.12 4,397,974.92
6 Ditaksir Grendel pintu bh 10,000.00 61.00 610,000.00 3.00 30,000.00 - - 64.00 640,000.00
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 213,889.50 6.07 1,297,774.54 - - - - 6.07 1,297,774.54
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 38,173.30 9.40 358,829.02 - - - - 9.40 358,829.02
4 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm m2 204,226.00 14.10 2,879,586.60 - - - - 14.10 2,879,586.60
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 186.28 2,446,396.61 - - 8.02 105,319.29 178.26 2,341,077.32
E MUSHOLLA
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 - - - - - - - -
JUMLAH I - - - -
II PEKERJAAN TANAH
1 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m m3 49,018.75 - - - - - - - -
JUMLAH II - - - -
III PEKERJAAN PONDASI
1 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP m3 516,466.50 - - - - - - - -
JUMLAH III - - - -
IV PEKERJAAN DINDING
1 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 97,798.25 - - - - - - - -
2 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 - - - - - - - -
JUMLAH IV - - - -
V PEKERJAAN PLESTERAN
1 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. m2 38,633.10 - - - - - - - -
JUMLAH V - - - -
VI PEKERJAAN BETON
1 Lantai kerja
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 - - - - - - - -
2 Rabat Beton
3 Sloof 15/25
4 Kolom 15/15
5 Balok 15/30
8 Plat atap
9 Shading
4 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif k m1 22,500.00 - - - - - - - -
7 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 - - - - - - - -
JUMLAH VII - - - -
VIII PEKERJAAN SANITASI
1 A.5.1.1 2. Pemasangan 1 buah closet jongkok porslen bh 290,097.50 - - - - - - - -
4 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm bh 318,991.75 - - - - - - - -
JUMLAH VIII - - - -
IX PEKERJAAN BESI DAN ALUMUNIUM
1 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium m1 81,947.80 - - - - - - - -
JUMLAH IX - - - -
X PEKERJAAN KUNCI DAN KACA
1 A.4.6.2.5. Pemasangan 1 buah engsel pintu bh 25,185.60 - - - - - - - -
JUMLAH X - - - -
XI PEKERJAAN PENUTUP LANTAI DAN DINDING
1 A.4.4.3.9.a Pemasangan 1m2 lantai keramik ukuran 40cm x40cm m2 199,798.50 - - - - - - - -
JUMLAH XI - - - -
XII PEKERJAAN PENGECATAN
1 A.4.7.1.10. Pengecatan tembok baru Interior ex. Catylac ( 1 lapis plamir, 1 lapis m2 17,222.98 - - - - - - - -
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 - - - - - - - -
JUMLAH XII - - - -
XIII PEKERJAAN INSTALASI LISTRIK
1 Ls Pemasangan meter listrik 900 watt unit 1,650,000.00 - - - - - - - -
JUMLAH XIII - - - -
XIV PEKERJAAN LAIN-LAIN
2 Ls Membuat Septic Tank bh 1,150,000.00 - - - - - - - -
JUMLAH XIV - - - -
- - -
F RUMAH DINAS
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 8.64 141,174.00 - - - - 8.64 141,174.00
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 9.38 1,112,123.22 0.01 1,707.95 - - 9.39 1,113,831.17
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 34.66 2,890,343.98 - - 20.96 1,748,103.12 13.70 1,142,240.86
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 14.40 4,025,894.40 - - - - 14.40 4,025,894.40
2 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 97,798.25 42.11 4,118,284.31 - - 7.68 751,090.56 34.43 3,367,193.75
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 280.06 25,844,426.91 - - 42.02 3,877,826.79 238.04 21,966,600.12
2 A.4.4.2.27. Pemasangan 1 m2 acian m2 23,815.00 629.00 14,979,635.00 - - 71.46 1,701,874.67 557.54 13,277,760.33
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 5.78 4,115,614.27 0.01 10,259.65 - - 5.79 4,125,873.92
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 6.46 4,886,825.03 - - 3.72 2,812,390.50 2.74 2,074,434.53
3 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 23.25 3,871,799.25 - - - - 23.25 3,871,799.25
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 654.16 8,541,906.80 - - 82.52 1,077,531.72 571.64 7,464,375.08
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 3.49 2,932,449.44 - - - - 3.49 2,932,449.44
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 25.60 6,457,651.20 6.80 1,715,313.60 - - 32.40 8,172,964.80
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 546.78 7,139,757.55 - - 20.58 268,730.04 526.20 6,871,027.52
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 2.40 2,016,584.14 0.17 142,841.38 - - 2.57 2,159,425.52
5 Kolom 15/15
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 63,268.15 60.00 3,796,089.00 - - 4.00 253,072.60 56.00 3,543,016.40
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 2.06 525,077.52 - - 2.06 525,077.52 - -
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 40.83 533,150.99 - - 40.83 533,150.99 - -
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.25 210,060.85 - - 0.25 210,060.85 - -
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 18.60 4,740,991.20 - - - - 18.60 4,740,991.20
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 629.80 8,223,818.19 - - 69.94 913,264.28 559.86 7,310,553.90
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 2.79 2,344,279.06 - - - - 2.79 2,344,279.06
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 32.50 2,820,406.88 - - - - 32.50 2,820,406.88
9 Plat atap
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 0.75 166,914.00 - - 0.75 166,914.00 - -
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 26.41 344,857.16 - - 26.41 344,857.16 - -
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.18 151,243.81 - - 0.18 151,243.81 - -
10 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 3.90 867,952.80 2.76 614,243.52 - - 6.66 1,482,196.32
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 75.39 984,429.43 60.03 783,861.23 - - 135.42 1,768,290.66
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.78 655,389.85 0.29 240,410.44 - - 1.07 895,800.28
11 Meja dapur
A.4.1.1.33. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) m2 222,552.00 0.90 200,296.80 0.37 82,344.24 - - 1.27 282,641.04
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 17.36 226,683.84 - - 5.84 76,257.70 11.52 150,426.14
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.18 151,243.81 0.03 27,223.89 - - 0.21 178,467.70
2 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau m2 591,717.50 14.70 8,698,247.25 - - 0.50 295,858.75 14.20 8,402,388.50
3 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I m2 410,058.00 3.96 1,623,829.68 - - - - 3.96 1,623,829.68
4 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, m3 9,944,550.00 1.95 19,391,872.50 0.07 696,118.50 - - 2.02 20,087,991.00
5 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 1.90 20,238,175.38 0.02 213,033.43 - - 1.92 20,451,208.80
6 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m2 152,556.25 208.59 31,821,708.19 - - 13.91 2,122,057.44 194.68 29,699,650.75
7 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif k m1 22,500.00 55.20 1,242,000.00 - - 2.90 65,250.00 52.30 1,176,750.00
8 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil m2 59,211.63 208.59 12,350,952.86 - - 13.91 823,633.70 194.68 11,527,319.16
9 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong m1 65,939.50 51.00 3,362,914.50 - - 4.29 282,880.46 46.71 3,080,034.05
10 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 150.31 11,579,656.94 3.47 267,400.63 - - 153.78 11,847,057.57
11 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 117.60 4,061,774.64 - - 1.78 61,548.32 115.82 4,000,226.32
12 A.4.5.1.7.a Pemasangan 1 m2 langit-langit kalsiboard m2 32,937.30 30.31 998,329.56 7.65 252,069.16 - - 37.96 1,250,398.72
13 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 223.00 4,247,982.75 - - 106.11 2,021,315.92 116.89 2,226,666.83
14 Ls Pemasangan rooster kayu bh 25,000.00 5.00 125,000.00 4.00 100,000.00 - - 9.00 225,000.00
4 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel bh 267,093.75 1.00 267,093.75 - - - - 1.00 267,093.75
5 A.5.1.1 14. Pemasangan 1 buah floor drain bh 26,331.25 1.00 26,331.25 - - - - 1.00 26,331.25
6 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm bh 318,991.75 4.00 1,275,967.00 - - 4.00 1,275,967.00 - -
7 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” m1 45,375.00 1.00 45,375.00 2.00 90,750.00 - - 3.00 136,125.00
8 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 14,250.50 32.00 456,016.00 - - 7.00 99,753.50 25.00 356,262.50
9 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m` 33,310.75 12.00 399,729.00 - - 8.00 266,486.00 4.00 133,243.00
10 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 72,312.63 12.00 867,751.50 - - 4.00 289,250.50 8.00 578,501.00
2 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu bh 21,921.63 36.00 789,178.50 - - - - 36.00 789,178.50
3 A.4.6.2.9. Pemasangan 1 buah kait angin bh 25,641.00 36.00 923,076.00 - - - - 36.00 923,076.00
4 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 97,083.25 15.00 1,456,248.75 - - - - 15.00 1,456,248.75
5 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm bh 115,371.85 13.33 1,537,906.76 - - 6.43 741,841.00 6.90 796,065.77
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 213,889.50 2.50 534,189.03 - - - - 2.50 534,189.03
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 38,173.30 9.90 377,915.67 - - 3.95 150,784.54 5.95 227,131.14
4 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm m2 204,226.00 14.85 3,032,756.10 0.35 71,479.10 - - 15.20 3,104,235.20
5 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel susun sirih m2 239,442.50 5.58 1,336,089.15 - - 5.58 1,336,089.15 - -
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 147.91 1,942,487.24 5.87 77,103.26 - - 153.78 2,019,590.49
CCO.2 MC.100
SELISIH TAMBAH SELISIH KURANG
HARGA
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN JUMLAH JUMLAH JUMLAH JUMLAH KET
( Rp ) VOLUME HARGA VOLUME HARGA VOLUME HARGA VOLUME HARGA
( Rp ) ( Rp ) ( Rp ) ( Rp )
2 A.2.2.1.15b. 1 M2 pasang paving blok segi 4, t = 6 cm m2 79,000.00 1,714.50 135,445,752.80 - - - - 1,714.50 135,445,752.80
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 21.34 348,764.73 - - - - 21.34 348,764.73
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 7.63 905,004.88 - - - - 7.63 905,004.88
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 4,421.88 368,757,203.50 - - - - 4,421.88 368,757,203.50
2 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 67.11 6,192,566.83 - - - - 67.11 6,192,566.83
3 A. 4.4.1.20. Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP m2 103,248.53 267.60 27,629,564.75 - - - - 267.60 27,629,564.75
2 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m2 35,337.50 4.82 170,234.87 - - - - 4.82 170,234.87
3 A.4.4.2.27. Pemasangan 1 m2 acian m2 23,815.00 242.57 5,776,747.39 - - - - 242.57 5,776,747.39
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 6.83 5,169,273.68 - - - - 6.83 5,169,273.68
2 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 40.95 6,819,362.55 - - - - 40.95 6,819,362.55
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 875.51 11,432,191.08 - - - - 875.51 11,432,191.08
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 4.80 4,259,580.69 - - - - 4.80 4,259,580.69
A.4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi m2 154,429.00 13.44 2,075,525.76 - - - - 13.44 2,075,525.76
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 250.30 3,268,360.54 - - - - 250.30 3,268,360.54
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 2.02 1,790,635.46 - - - - 2.02 1,790,635.46
4 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 31.02 7,824,857.04 - - - - 31.02 7,824,857.04
A.4.1.1.22.b Pemasangan 1 m2 bekisting untuk kolom m2 197,116.70 23.70 4,671,665.79 - - - - 23.70 4,671,665.79
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 389.56 5,086,743.32 - - - - 389.56 5,086,743.32
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 8.37 7,436,253.26 - - - - 8.37 7,436,253.26
5 Kolom 11/11
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 63,268.15 6.75 427,060.01 - - - - 6.75 427,060.01
A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 205.90 17,868,362.33 - - - - 205.90 17,868,362.33
2 Ditaksir Pasang Grill Saluran m' 180,000.00 23.70 4,266,000.00 - - - - 23.70 4,266,000.00
5 Ls Pasang tulisan ( bahan alumunium ) unit 3,500,000.00 1.00 3,500,000.00 - - - - 1.00 3,500,000.00
6 Ditaksir Pasang gorong gorong dia.100 m' 350,000.00 17.00 5,950,000.00 - - - - 17.00 5,950,000.00
833,231,626.77 - - 833,231,626.77
B PEMBANGUNAN PENDOPO
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 12.06 197,035.77 - - - - 12.06 197,035.77
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 35.16 4,170,239.70 - - - - 35.16 4,170,239.70
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 117.24 9,777,065.37 - - - - 117.24 9,777,065.37
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 14.00 3,914,064.00 - - - - 14.00 3,914,064.00
2 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 97,798.25 28.82 2,818,545.57 - - - - 28.82 2,818,545.57
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 125.07 11,541,678.47 - - - - 125.07 11,541,678.47
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 22.78 16,230,190.10 - - - - 22.78 16,230,190.10
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 6.12 4,631,061.01 - - - - 6.12 4,631,061.01
A.4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi m2 154,429.00 5.76 889,511.04 - - - - 5.76 889,511.04
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 440.66 5,754,061.16 - - - - 440.66 5,754,061.16
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 2.65 2,353,761.89 - - - - 2.65 2,353,761.89
4 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 21.60 3,597,026.40 - - - - 21.60 3,597,026.40
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 478.22 6,244,513.07 - - - - 478.22 6,244,513.07
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 3.24 2,877,806.99 - - - - 3.24 2,877,806.99
5 Kolom 30/30
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 23.40 5,902,696.80 - - - - 23.40 5,902,696.80
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 197,116.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 399.62 5,218,168.03 - - - - 399.62 5,218,168.03
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 3.51 3,117,624.24 - - - - 3.51 3,117,624.24
6 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 52.68 13,288,635.36 - - - - 52.68 13,288,635.36
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 197,116.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 732.75 9,568,142.16 - - - - 732.75 9,568,142.16
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 5.27 4,679,101.00 - - - - 5.27 4,679,101.00
7 Kolom 15/15
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 1.95 491,891.40 - - - - 1.95 491,891.40
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 197,116.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 56.58 738,811.74 - - - - 56.58 738,811.74
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 0.29 257,581.49 - - - - 0.29 257,581.49
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 64.80 16,517,001.60 - - - - 64.80 16,517,001.60
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 197,116.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 1,070.64 13,980,229.76 - - - - 1,070.64 13,980,229.76
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 10.08 8,953,177.31 - - - - 10.08 8,953,177.31
9 Balok 15/20
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 11.40 2,905,768.80 - - - - 11.40 2,905,768.80
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 197,116.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 252.40 3,295,795.03 - - - - 252.40 3,295,795.03
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 1.71 1,518,842.58 - - - - 1.71 1,518,842.58
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 3.20 815,654.40 - - - - 3.20 815,654.40
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 197,116.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 70.89 925,669.21 - - - - 70.89 925,669.21
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 0.48 426,341.78 - - - - 0.48 426,341.78
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 16.50 4,205,718.00 - - - - 16.50 4,205,718.00
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 197,116.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 365.31 4,770,154.05 - - - - 365.31 4,770,154.05
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 2.48 2,202,765.85 - - - - 2.48 2,202,765.85
12 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 1.50 479,028.00 - - - - 1.50 479,028.00
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 241,666.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 17.63 230,209.45 - - - - 17.63 230,209.45
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 0.24 213,170.89 - - - - 0.24 213,170.89
2 A.4.6.1.13.a Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas II (kruink m3 10,071,050.00 0.85 8,560,392.50 - - - - 0.85 8,560,392.50
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 0.48 5,112,802.20 - - - - 0.48 5,112,802.20
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 9,274,100.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 A.4.6.1.15.a Pemasangan 1 m3 konstruksi gordeng expose , kayu kelas II ( kruink ) m3 10,778,171.25 3.19 34,382,366.29 - - - - 3.19 34,382,366.29
5 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II m2 153,051.25 33.00 5,050,691.25 - - - - 33.00 5,050,691.25
6 A.4.6.1.17.a Pemasangan 1 m2 rangka atap genteng beton expose , m2 178,351.25 410.50 73,213,188.13 - - - - 410.50 73,213,188.13
7 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif k m1 22,500.00 142.00 3,195,000.00 - - - - 142.00 3,195,000.00
8 A.4.5.2.3.a Pemasangan 1 m2 atap genteng palentong besar/super m2 59,793.25 443.50 26,518,306.38 - - - - 443.50 26,518,306.38
9 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar m1 63,189.50 61.70 3,898,792.15 - - - - 61.70 3,898,792.15
10 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 27.90 2,149,374.15 - - - - 27.90 2,149,374.15
11 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 27.90 963,635.31 - - - - 27.90 963,635.31
13 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 19.00 361,935.75 - - - - 19.00 361,935.75
14 Ls Pasang papan pembungkus kolom beton (2x30) cm, m2 325,000.00 28.32 9,204,000.00 - - - - 28.32 9,204,000.00
15 A.4.6.1.2. Membuat dan memasang rangka pagar, kayu kruink m3 10,925,172.50 0.68 7,429,117.30 - - - - 0.68 7,429,117.30
16 A.4.6.1.10. Membuat dan memasang pagar, kayu kruink m2 667,975.00 27.65 18,469,508.75 - - - - 27.65 18,469,508.75
2 A.4.4.3.58. Pemasangan 1 m2 dinding natu tempel candi m2 239,442.50 28.80 6,895,944.00 - - - - 28.80 6,895,944.00
2 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 49,024.25 100.17 4,910,759.12 - - - - 100.17 4,910,759.12
2 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 43,478.49 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 A.4.7.1.10. Pengecatan tembok baru Interior ex. Catylac ( 1 lapis plamir, 1 lapis m2 17,222.98 658.24 11,336,851.06 - - - - 658.24 11,336,851.06
4 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 438.40 5,757,463.36 - - - - 438.40 5,757,463.36
2 Ditaksir Pasang logo keramik ( ukuran 35 x 45 ) cm unit 750,000.00 1.00 750,000.00 - - - - 1.00 750,000.00
3 Ditaksir Pasang Tulisan ( bahan alumunium ) unit 2,250,000.00 1.00 2,250,000.00 - - - - 1.00 2,250,000.00
4 Ditaksir Pasang papan back ground unit 3,500,000.00 1.00 3,500,000.00 - - - - 1.00 3,500,000.00
C KANTOR PELAYANAN
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 18.67 305,092.70 - - - - 18.67 305,092.70
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 26.22 3,110,321.57 - - - - 26.22 3,110,321.57
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 67.09 5,595,211.92 - - - - 67.09 5,595,211.92
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 31.12 8,700,405.12 - - - - 31.12 8,700,405.12
2 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 413.44 38,152,948.26 - - - - 413.44 38,152,948.26
V PEKERJAAN PLESTERAN
1 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. m2 38,633.10 1,036.45 40,041,338.31 - - - - 1,036.45 40,041,338.31
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 18.44 13,140,647.31 - - - - 18.44 13,140,647.31
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 6.41 4,846,429.29 - - - - 6.41 4,846,429.29
A.4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi m2 154,429.00 1.28 197,669.12 - - - - 1.28 197,669.12
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 97.92 1,278,684.90 - - - - 97.92 1,278,684.90
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 888,212.03 0.59 522,268.68 - - - - 0.59 522,268.68
4 Sloof 15/20
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 49.88 8,306,466.52 - - - - 49.88 8,306,466.52
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 1,251.53 16,342,259.72 - - - - 1,251.53 16,342,259.72
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 7.48 6,285,020.57 - - - - 7.48 6,285,020.57
5 Kolom 30/30
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 13.08 3,299,456.16 - - - - 13.08 3,299,456.16
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 154.97 2,023,571.14 - - - - 154.97 2,023,571.14
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 1.96 1,646,877.05 - - - - 1.96 1,646,877.05
6 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 59.20 14,933,318.40 - - - - 59.20 14,933,318.40
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 971.18 12,681,498.48 - - - - 971.18 12,681,498.48
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 5.62 4,722,167.86 - - - - 5.62 4,722,167.86
7 Kolom 15/15
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 252,252.00 113.00 28,504,476.00 - - - - 113.00 28,504,476.00
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 68,390.19 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8 Balok 15/40
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 282,612.00 2.28 644,355.36 - - - - 2.28 644,355.36
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 197,116.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 47.74 623,380.57 - - - - 47.74 623,380.57
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.33 277,280.32 - - - - 0.33 277,280.32
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 197,116.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 179.24 2,340,484.55 - - - - 179.24 2,340,484.55
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 1.21 1,016,694.50 - - - - 1.21 1,016,694.50
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 86,781.75 34.51 2,994,838.19 - - - - 34.51 2,994,838.19
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 1,060.48 13,847,562.26 - - - - 1,060.48 13,847,562.26
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 5.18 4,352,460.77 - - - - 5.18 4,352,460.77
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 97.00 8,417,829.75 - - - - 97.00 8,417,829.75
12 Plat atap
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 25.00 5,563,800.00 - - - - 25.00 5,563,800.00
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 855.60 11,172,275.07 - - - - 855.60 11,172,275.07
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 6.00 5,041,460.35 - - - - 6.00 5,041,460.35
13 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 31.39 10,024,459.28 - - - - 31.39 10,024,459.28
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 241,666.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 363.52 4,746,780.54 - - - - 363.52 4,746,780.54
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 5.02 4,220,038.41 - - - - 5.02 4,220,038.41
14 Plat lisplang
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 3.51 1,120,925.52 - - - - 3.51 1,120,925.52
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 241,666.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 69.32 905,168.43 - - - - 69.32 905,168.43
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.70 588,170.37 - - - - 0.70 588,170.37
2 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, m3 9,944,550.00 6.99 69,512,404.50 - - - - 6.99 69,512,404.50
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 3.54 37,706,916.23 - - - - 3.54 37,706,916.23
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 9,274,100.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II m2 153,051.25 523.90 80,183,549.88 - - - - 523.90 80,183,549.88
5 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif k m1 22,500.00 102.00 2,295,000.00 - - - - 102.00 2,295,000.00
6 A.4.5.2.3.a Pemasangan 1 m2 atap genteng palentong besar/super m2 59,793.25 523.90 31,325,683.68 - - - - 523.90 31,325,683.68
7 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar m1 63,189.50 61.60 3,892,473.20 - - - - 61.60 3,892,473.20
8 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 408.39 31,461,984.13 - - - - 408.39 31,461,984.13
9 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 368.87 12,740,467.66 - - - - 368.87 12,740,467.66
11 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 277.10 5,278,547.18 - - - - 277.10 5,278,547.18
2 A.5.1.1 14. Pemasangan 1 buah floor drain bh 26,331.25 5.00 131,656.25 - - - - 5.00 131,656.25
3 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” m1 45,375.00 7.00 317,625.00 - - - - 7.00 317,625.00
4 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 14,250.50 69.80 994,684.90 - - - - 69.80 994,684.90
5 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m` 33,310.75 14.50 483,005.88 - - - - 14.50 483,005.88
6 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 72,312.63 13.00 940,064.13 - - - - 13.00 940,064.13
7 Ditaksir Fiber glas tangki air kap 1100 ltr bh 1,450,000.00 1.00 1,450,000.00 - - - - 1.00 1,450,000.00
8 Ditaksir Pasang sumur bor m' 180,000.00 8.00 1,440,000.00 - - - - 8.00 1,440,000.00
9 Ditaksir Pasang mesin pompa air listrik PW-120 jet bh 1,250,000.00 1.00 1,250,000.00 - - - - 1.00 1,250,000.00
2 A.4.2.1.13. Pemasangan 1 m2 pintu/jendela kaca rangka alluminium m2 466,303.75 82.07 38,269,548.76 - - - - 82.07 38,269,548.76
3 Ls Pemasangan pintu tempered t = 12 mm ( komplit ) unit 10,000,000.00 4.00 40,000,000.00 - - - - 4.00 40,000,000.00
2 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu bh 21,921.63 304.00 6,664,174.00 - - - - 304.00 6,664,174.00
3 A.4.6.2.9. Pemasangan 1 buah kait angin bh 25,641.00 304.00 7,794,864.00 - - - - 304.00 7,794,864.00
4 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 97,083.25 14.00 1,359,165.50 - - - - 14.00 1,359,165.50
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 213,889.50 8.64 1,848,005.28 - - - - 8.64 1,848,005.28
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 38,173.30 22.75 868,442.58 - - - - 22.75 868,442.58
4 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm m2 204,226.00 40.94 8,361,114.55 - - - - 40.94 8,361,114.55
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 408.39 5,363,345.03 - - - - 408.39 5,363,345.03
2 A.5.1.1 15. Membuat Septic Tank bh 1,150,000.00 2.00 2,300,000.00 - - - - 2.00 2,300,000.00
D SERBA GUNA
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 9.00 147,111.15 - - - - 9.00 147,111.15
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 9.88 1,171,323.19 - - - - 9.88 1,171,323.19
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 17.97 1,498,244.61 - - - - 17.97 1,498,244.61
1 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP m3 516,466.50 32.53 16,801,946.41 - - - - 32.53 16,801,946.41
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 13.52 3,779,867.52 - - - - 13.52 3,779,867.52
2 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 97,798.25 73.18 7,156,386.94 - - - - 73.18 7,156,386.94
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 121.38 11,201,168.04 - - - - 121.38 11,201,168.04
2 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP m2 32,392.25 1.33 43,146.48 - - - - 1.33 43,146.48
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 6.50 4,627,973.16 - - - - 6.50 4,627,973.16
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 2.71 2,053,737.39 - - - - 2.71 2,053,737.39
3 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 21.13 3,518,757.77 - - - - 21.13 3,518,757.77
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 519.31 6,781,059.10 - - - - 519.31 6,781,059.10
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 3.17 2,663,571.55 - - - - 3.17 2,663,571.55
4 Kolom 20/20
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 5.14 1,296,575.28 - - - - 5.14 1,296,575.28
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 51.67 674,697.82 - - - - 51.67 674,697.82
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 0.51 428,524.13 - - - - 0.51 428,524.13
5 Kolom 15/15
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 252,252.00 94.80 23,913,489.60 - - - - 94.80 23,913,489.60
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 6.00 1,529,352.00 - - - - 6.00 1,529,352.00
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 106.21 1,386,871.59 - - - - 106.21 1,386,871.59
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.68 571,365.51 - - - - 0.68 571,365.51
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 86,781.75 15.10 1,310,404.43 - - - - 15.10 1,310,404.43
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 463.99 6,058,700.22 - - - - 463.99 6,058,700.22
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 2.27 1,907,352.50 - - - - 2.27 1,907,352.50
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 35.00 3,037,361.25 - - - - 35.00 3,037,361.25
9 Plat atap
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 11.69 2,600,965.22 - - - - 11.69 2,600,965.22
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 199.97 2,611,173.27 - - - - 199.97 2,611,173.27
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 1.17 981,992.45 - - - - 1.17 981,992.45
10 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 319,352.00 3.65 1,166,273.50 - - - - 3.65 1,166,273.50
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 74.32 970,449.72 - - - - 74.32 970,449.72
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.58 490,971.02 - - - - 0.58 490,971.02
2 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, m3 9,944,550.00 1.52 15,115,716.00 - - - - 1.52 15,115,716.00
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 1.34 14,273,239.48 - - - - 1.34 14,273,239.48
3 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 9,274,100.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m2 152,556.25 183.51 27,995,261.81 - - - - 183.51 27,995,261.81
5 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif k m1 22,500.00 54.74 1,231,650.00 - - - - 54.74 1,231,650.00
6 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil m2 59,211.63 183.51 10,865,795.04 - - - - 183.51 10,865,795.04
7 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong m1 65,939.50 34.00 2,241,943.00 - - - - 34.00 2,241,943.00
8 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 178.26 13,732,921.53 - - - - 178.26 13,732,921.53
9 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 139.17 4,806,692.37 - - - - 139.17 4,806,692.37
11 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 132.30 2,520,215.78 - - - - 132.30 2,520,215.78
2 A.5.1.1 14. Pemasangan 1 buah floor drain bh 26,331.25 2.00 52,662.50 - - - - 2.00 52,662.50
3 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” m1 45,375.00 2.00 90,750.00 - - - - 2.00 90,750.00
4 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 14,250.50 40.00 570,020.00 - - - - 40.00 570,020.00
5 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m` 33,310.75 3.50 116,587.63 - - - - 3.50 116,587.63
6 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 72,312.63 7.00 506,188.38 - - - - 7.00 506,188.38
7 Ditaksir Pasang sumur bor m' 180,000.00 8.00 1,440,000.00 - - - - 8.00 1,440,000.00
8 Ditaksir Pasang mesin pompa air listrik PW-120 jet bh 1,250,000.00 1.00 1,250,000.00 - - - - 1.00 1,250,000.00
9 Ditaksir Ember dan gayung unit 100,000.00 2.00 200,000.00 - - - - 2.00 200,000.00
10 Ditaksir Fiber glas tangki air kap 1100 ltr unit 1,450,000.00 1.00 1,450,000.00 - - - - 1.00 1,450,000.00
2 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium m2 466,303.75 29.45 13,732,645.44 - - - - 29.45 13,732,645.44
2 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu bh 21,921.63 118.00 2,586,751.75 - - - - 118.00 2,586,751.75
3 A.4.6.2.9. Pemasangan 1 buah kait angin bh 25,641.00 118.00 3,025,638.00 - - - - 118.00 3,025,638.00
4 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 97,083.25 5.00 485,416.25 - - - - 5.00 485,416.25
1 A.4.4.3.9.a Pemasangan 1m2 lantai keramik ukuran 40cm x40cm m2 137,257.45 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 213,889.50 6.07 1,297,774.54 - - - - 6.07 1,297,774.54
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 172,545.18 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 38,173.30 9.40 358,829.02 - - - - 9.40 358,829.02
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 18,995.31 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm m2 204,226.00 14.10 2,879,586.60 - - - - 14.10 2,879,586.60
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 178.26 2,341,077.32 - - - - 178.26 2,341,077.32
JUMLAH XII 8,874,785.12 - - 8,874,785.12
XIII PEKERJAAN INSTALASI LISTRIK
1 Ls Titik Lampu Titik 85,000.00 28.00 2,380,000.00 - - - - 28.00 2,380,000.00
7 Ls Pemindahan meteren lama 5500 watt unit 750,000.00 1.00 750,000.00 - - - - 1.00 750,000.00
E RUMAH DINAS
I PEKERJAAN PERSIAPAN
1 Ditaksir Pengukuran dan pemasangan bauwplank ls 500,000.00 1.00 500,000.00 - - - - 1.00 500,000.00
II PEKERJAAN TANAH
1 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m m3 49,018.75 30.07 1,473,954.60 - - - - 30.07 1,473,954.60
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 16,339.58 8.64 141,174.00 - - - - 8.64 141,174.00
3 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug m3 118,607.50 9.39 1,113,831.17 - - - - 9.39 1,113,831.17
4 A.2.3.1.14.a Pengurugan 1 m3 tanah cadas padat m3 83,393.75 13.70 1,142,240.86 - - - - 13.70 1,142,240.86
1 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP m3 516,466.50 39.60 20,452,073.40 - - - - 39.60 20,452,073.40
2 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) m3 279,576.00 14.40 4,025,894.40 - - - - 14.40 4,025,894.40
IV PEKERJAAN DINDING
1 A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu m2 201,619.00 1.20 241,942.80 - - - - 1.20 241,942.80
3 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu m2 92,281.75 238.04 21,966,600.12 - - - - 238.04 21,966,600.12
V PEKERJAAN PLESTERAN
1 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. m2 38,633.10 540.98 20,899,734.44 - - - - 540.98 20,899,734.44
VI PEKERJAAN BETON
1 Lantai kerja
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), m3 712,475.42 5.79 4,125,873.92 - - - - 5.79 4,125,873.92
2 Rabat Beton
A.4.1.1.1. Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), m3 756,474.46 2.74 2,074,434.53 - - - - 2.74 2,074,434.53
3 Sloof 15/25
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof m2 166,529.00 23.25 3,871,799.25 - - - - 23.25 3,871,799.25
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 571.64 7,464,375.08 - - - - 571.64 7,464,375.08
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 3.49 2,932,449.44 - - - - 3.49 2,932,449.44
4 Kolom 15/25
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk kolom m2 252,252.00 32.40 8,172,964.80 - - - - 32.40 8,172,964.80
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 526.20 6,871,027.52 - - - - 526.20 6,871,027.52
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), m3 840,243.39 2.57 2,159,425.52 - - - - 2.57 2,159,425.52
5 Kolom 15/15
A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm m1 63,268.15 56.00 3,543,016.40 - - - - 56.00 3,543,016.40
A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok m2 254,892.00 18.60 4,740,991.20 - - - - 18.60 4,740,991.20
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 559.86 7,310,553.90 - - - - 559.86 7,310,553.90
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 2.79 2,344,279.06 - - - - 2.79 2,344,279.06
A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm m1 86,781.75 32.50 2,820,406.88 - - - - 32.50 2,820,406.88
8 Shading
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai m2 222,552.00 6.66 1,482,196.32 - - - - 6.66 1,482,196.32
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 135.42 1,768,290.66 - - - - 135.42 1,768,290.66
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 1.07 895,800.28 - - - - 1.07 895,800.28
9 Meja dapur
A.4.1.1.33. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) m2 222,552.00 1.27 282,641.04 - - - - 1.27 282,641.04
A.4.1.1.17. Pembesian 1 kg dengan besi polos atau besi ulir kg 13,057.83 11.52 150,426.14 - - - - 11.52 150,426.14
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , m3 840,243.39 0.21 178,467.70 - - - - 0.21 178,467.70
1 A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu m3
k 10,925,172.50 0.95 10,378,913.88 - - - - 0.95 10,378,913.88
2 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau m2 591,717.50 14.20 8,402,388.50 - - - - 14.20 8,402,388.50
3 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I m2 410,058.00 3.96 1,623,829.68 - - - - 3.96 1,623,829.68
4 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, m3 9,944,550.00 2.02 20,087,991.00 - - - - 2.02 20,087,991.00
5 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) m3 10,651,671.25 1.92 20,451,208.80 - - - - 1.92 20,451,208.80
6 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m2 152,556.25 194.68 29,699,650.75 - - - - 194.68 29,699,650.75
7 Ls Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif k m1 22,500.00 52.30 1,176,750.00 - - - - 52.30 1,176,750.00
8 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil m2 59,211.63 194.68 11,527,319.16 - - - - 194.68 11,527,319.16
9 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong m1 65,939.50 46.71 3,080,034.05 - - - - 46.71 3,080,034.05
10 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun m2 77,038.50 153.78 11,847,057.57 - - - - 153.78 11,847,057.57
11 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board m2 34,538.90 115.82 4,000,226.32 - - - - 115.82 4,000,226.32
13 A.4.5.1.10. Pemasangan 1 m’ list langit-langit gypsum profil m1 19,049.25 116.89 2,226,666.83 - - - - 116.89 2,226,666.83
1 A.5.1.1 2. Pemasangan 1 buah closet jongkok porslen bh 290,097.50 1.00 290,097.50 - - - - 1.00 290,097.50
4 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel bh 267,093.75 1.00 267,093.75 - - - - 1.00 267,093.75
5 A.5.1.1 14. Pemasangan 1 buah floor drain bh 26,331.25 1.00 26,331.25 - - - - 1.00 26,331.25
7 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau 3/4” m1 45,375.00 3.00 136,125.00 - - - - 3.00 136,125.00
8 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” m1 14,250.50 25.00 356,262.50 - - - - 25.00 356,262.50
9 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” m` 33,310.75 4.00 133,243.00 - - - - 4.00 133,243.00
10 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” m1 72,312.63 8.00 578,501.00 - - - - 8.00 578,501.00
1 Ls Pintu besi Folding Gate ( Terpasang ) m2 275,000.00 8.44 2,321,550.00 - - - - 8.44 2,321,550.00
2 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu bh 21,921.63 36.00 789,178.50 - - - - 36.00 789,178.50
3 A.4.6.2.9. Pemasangan 1 buah kait angin bh 25,641.00 36.00 923,076.00 - - - - 36.00 923,076.00
4 A.4.6.2.11. Pemasangan 1 buah kunci slot bh 97,083.25 15.00 1,456,248.75 - - - - 15.00 1,456,248.75
2 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm m2 213,889.50 2.50 534,189.03 - - - - 2.50 534,189.03
3 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm m1 38,173.30 5.95 227,131.14 - - - - 5.95 227,131.14
4 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20cm x 20cm m2 204,226.00 15.20 3,104,235.20 - - - - 15.20 3,104,235.20
2 A.4.7.1.11. Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) m2 13,132.90 153.78 2,019,590.49 - - - - 153.78 2,019,590.49
LAPORAN MINGGUAN
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
3 Foot Plat 80/80 - #REF!
Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20. m2 154,429.00 13.44 2,075,525.76 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 250.30 3,268,360.54 0.11 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 888,212.03 2.02 1,790,635.46 0.06 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
4 Kolom 20/20 - #REF!
Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22.a m2 252,252.00 31.02 7,824,857.04 0.26 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 197,116.70 23.70 4,671,665.79 0.15 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 389.56 5,086,743.32 0.17 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 888,212.03 8.37 7,436,253.26 0.25 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
5 Kolom 11/11 - #REF!
Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35 m1 63,268.15 6.75 427,060.01 0.01 #REF! 0.00 - 0.00 #REF! 0.00 0.00
6 Ring Balok 10/15 - #REF!
Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36 m1 86,781.75 205.90 17,868,362.33 0.59 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH VI 78,129,871.51 #REF!
VII PEKERJAAN PENUTUP LANTAI DAN DINDING #REF!
1 Pemasangan 1m2 lantai keramik ukuran 40cm x40cm A.4.4.3.9.a m2 145,153.25 3.32 481,241.09 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 m2 dinding batu tempel candi A.4.4.3.58. m2 236,692.50 - - 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
JUMLAH VII 481,241.09 #REF!
VIII PEKERJAAN BESI DAN ALUMUNIUM #REF!
1 Pintu besi terpasang dan pengecatan Ditaksir m2 400,000.00 - - 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
2 Pagar besi terpasang dan pengecatan Ditaksir m2 350,000.00 - - 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
3 Pemasangan 1 kg besi profil A.4.2.1.1. kg 30,843.01 - - 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
4 Pasang kawat duri Ditaksir m1 10,000.00 - - 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
5 Pasang Pagar dan Pintu Besi Ulir (Lengkap) LS m2 455,000.00 62.02 28,218,645.00 0.93 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Pasang Grill Saluran Ditaksir m' 180,000.00 23.70 4,266,000.00 0.14 #REF! #REF! - 0.00 #REF! #REF! #REF!
7 Pasang Roda Pintu dia. 2,5" LS bh 50,000.00 - - 0.00 #REF!
8 Gembok LS bh 25,000.00 - - 0.00 #REF!
9 Pembuatan Tiang Bendera LS bh 2,500,000.00 1.00 2,500,000.00 0.08 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH VIII 34,984,645.00 #REF!
IX PEKERJAAN PENGECATAN #REF!
1 Pengecatan tembok baru Interior ex. Catylac ( 1 lapis plamir, 1 lapis A.4.7.1.10. m2 17,222.98 242.57 4,177,735.71 0.14 #REF! #REF! - 0.00 #REF! #REF! #REF!
cat dasar, 2 lapis cat penutup ) - #REF!
2 Pengecatan permukaan baja (galbani) secara semprot dengan A.4.7.1.10. m2 82,832.60 - - 0.00 #REF!
sistem 1 lapis cat mutakhir dengan tebal 200 um #REF!
JUMLAH IX 4,177,735.71 #REF!
X PEKERJAAN INSTALASI LISTRIK #REF!
1 Titik Lampu Ditaksir ttk 85,000.00 - - 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
2 Saklar Ganda Ditaksir bh 22,500.00 - - 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
3 Pemasangan Lampu Taman Ditaksir bh 525,000.00 - - 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
JUMLAH X - #REF!
XI PEKERJAAN LAIN-LAIN #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
1 Pasang saluran U 20 cm, termasuk pasangan dinding Ls m1 75,500.00 219.00 16,534,500.00 0.55 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Tanah subur Ls m3 120,000.00 6.43 771,840.00 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pembuatan taman Ls m2 225,000.00 16.08 3,618,000.00 0.12 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pasang logo keramik ( uk 35 x 45 ) cm Ls bh 750,000.00 1.00 750,000.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Pasang tulisan ( bahan alumunium ) Ls unit 3,500,000.00 1.00 3,500,000.00 0.12 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Pasang gorong gorong dia.100 Ditaksir m' 350,000.00 17.00 5,950,000.00 0.20 - 0.00 - 0.00 - 0.00 0.00
7 Pasang atap galvalume Ditaksir m2 450,000.00 66.39 29,874,375.00 0.99 - 0.00 - 0.00 - 0.00 0.00
JUMLAH XI 60,998,715.00 #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
5 Kolom 30/30 - #REF!
Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22.a m2 252,252.00 23.40 5,902,696.80 0.20 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 399.62 5,218,168.03 0.17 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.7. m3 888,212.03 3.51 3,117,624.24 0.10 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
6 Kolom 20/20 - #REF!
Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22.a m2 252,252.00 52.68 13,288,635.36 0.44 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 732.75 9,568,142.16 0.32 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.7. m3 888,212.03 5.27 4,679,101.00 0.15 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
7 Kolom 15/15 - #REF!
Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22.a m2 252,252.00 1.95 491,891.40 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 56.58 738,811.74 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.7. m3 888,212.03 0.29 257,581.49 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
8 Balok 20/35 - #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 254,892.00 64.80 16,517,001.60 0.55 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 1,070.64 13,980,229.76 0.46 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.7. m3 888,212.03 10.08 8,953,177.31 0.30 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
9 Balok 15/20 - #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 254,892.00 11.40 2,905,768.80 0.10 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 252.40 3,295,795.03 0.11 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.7. m3 888,212.03 1.71 1,518,842.58 0.05 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
10 Balok latai 15/20 - #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 254,892.00 3.20 815,654.40 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 70.89 925,669.21 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.7. m3 888,212.03 0.48 426,341.78 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
11 Ring balok 15/20 - #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 254,892.00 16.50 4,205,718.00 0.14 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 365.31 4,770,154.05 0.16 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.7. m3 888,212.03 2.48 2,202,765.85 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
12 Shading - #REF!
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.a m2 319,352.00 1.50 479,028.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.7. m3 13,057.83 17.63 230,209.45 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 888,212.03 0.24 213,170.89 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH VI 147,280,110.59 #REF!
VII PEKERJAAN KAYU, ATAP DAN PLAFOND #REF!
1 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, A.4.6.1.13. m3 9,944,550.00 0.42 4,176,711.00 0.14 #REF! #REF! - 0.00 #REF! #REF! #REF!
kayu kelas II (kruink ) - #REF!
2 Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas II (kruink ) A.4.6.1.13.a m3 10,071,050.00 0.85 8,560,392.50 0.28 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) A.4.6.1.15. m3 10,651,671.25 0.48 5,112,802.20 0.17 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 m3 konstruksi gordeng expose , kayu kelas II ( kruink ) A.4.6.1.15.a m3 10,778,171.25 3.19 34,382,366.29 1.14 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II A.4.6.1.17. m2 153,051.25 33.00 5,050,691.25 0.17 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Pemasangan 1 m2 rangka atap genteng beton expose , A.4.6.1.17.a m2 178,351.25 410.50 73,213,188.13 2.42 #REF! #REF! - 0.00 #REF! #REF! #REF!
kayu kelas II ( kruink ) - #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
7 Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif kay Ls m1 22,500.00 142.00 3,195,000.00 0.11 #REF! #REF! - 0.00 #REF! #REF! #REF!
8 Pemasangan 1 m2 atap genteng palentong besar/super A.4.5.2.3.a m2 59,793.25 443.50 26,518,306.38 0.88 #REF! #REF! - 0.00 #REF! #REF! #REF!
9 Pemasangan 1 m’ bubung genteng palentong besar A.4.5.2.6. m1 63,189.50 61.70 3,898,792.15 0.13 #REF! #REF! - 0.00 #REF! #REF! #REF!
10 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun A.4.6.1.20. m2 77,038.50 27.90 2,149,374.15 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
11 Pemasangan 1 m2 langit-langit gypsum board A.4.5.1.7. m2 34,538.90 27.90 963,635.31 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
ukuran (120x240x9) mm, tebal 9 mm - #REF!
12 Pemasangan 1 m2 langit-langit kalsiboard A.4.5.1.7.a m2 32,937.30 410.50 13,520,761.65 0.45 #REF! #REF! - 0.00 #REF! #REF! #REF!
ukuran (120x240x9) mm, tebal 4 mm - #REF!
13 Pemasangan 1 m’ list langit-langit gypsum profil A.4.5.1.10. m1 19,049.25 19.00 361,935.75 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
14 Pasang papan pembungkus kolom beton (2x30) cm, Ls m2 325,000.00 28.32 9,204,000.00 0.30 #REF! #REF! - 0.00 #REF! #REF! #REF!
kayu jati finishing politur - #REF!
15 Membuat dan memasang rangka pagar, kayu kruink A.4.6.1.2. m3 10,925,172.50 0.68 7,429,117.30 0.25 #REF! #REF! - 0.00 #REF! #REF! #REF!
16 Membuat dan memasang pagar, kayu kruink A.4.6.1.10. m2 667,975.00 27.65 18,469,508.75 0.61 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH VII 216,206,582.80 #REF!
VIII PEKERJAAN BESI DAN ALUMUNIUM #REF!
1 Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm A.4.2.1.18. m1 103,541.63 10.00 1,035,416.25 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH VIII - 1,035,416.25 #REF!
IX PEKERJAAN KUNCI DAN KACA - #REF!
1 Pemasangan 1 buah engsel pintu A.4.6.2.5. bh 25,185.60 12.00 302,227.20 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Grendel pintu Ditaksir bh 10,000.00 6.00 60,000.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH IX - 362,227.20 #REF!
X PEKERJAAN PENUTUP LANTAI DAN DINDING - #REF!
1 Pemasangan 1m2 lantai keramik ukuran 40cm x40cm A.4.4.3.9.a m2 145,153.25 276.82 40,181,322.67 1.33 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 m2 dinding natu tempel candi A.4.4.3.58. m2 239,442.50 28.80 6,895,944.00 0.23 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH X 47,077,266.67 #REF!
XI PEKERJAAN PENGECATAN #REF!
1 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis A.4.7.1.4. m2 44,480.15 538.81 23,966,349.62 0.79 #REF! #REF! - 0.00 #REF! #REF! #REF!
cat dasar, 2 lapis cat penutup) - #REF!
2 Pelaburan 1 m2 bidang kayu dengan politur A.4.7.1.7. m2 49,024.25 100.17 4,910,759.12 0.16 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pengecatan tembok baru Interior ex. Catylac ( 1 lapis plamir, 1 lapis A.4.7.1.10. m2 17,222.98 658.24 11,336,851.06 0.38 #REF! #REF! - 0.00 #REF! #REF! #REF!
cat dasar, 2 lapis cat penutup ) - #REF!
4 Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.11. m2 13,132.90 438.40 5,757,463.36 0.19 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH XI 45,971,423.17 #REF!
XII PEKERJAAN INSTALASI LISTRIK #REF!
1 Titik Lampu Ls Titik 85,000.00 13.00 1,105,000.00 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Saklar ganda Ls bh 22,500.00 6.00 135,000.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Stop Kontak Ls bh 22,500.00 2.00 45,000.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 MCB Ls bh 250,000.00 1.00 250,000.00 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Lampu gantung artistik Ls bh 1,750,000.00 1.00 1,750,000.00 0.06 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Lampu SL 18watt phillips Ls bh 35,500.00 11.00 390,500.00 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH XII 3,675,500.00 #REF!
XIII PEKERJAAN LAIN-LAIN #REF!
1 Pasang saluran U 20 cm termasuk pas dinding Ls m1 75,500.00 49.60 3,744,800.00 0.12 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 buah bak kontrol pasangan bata 30 x 30 tinggi 35 cm A.5.1.1 15. bh 318,991.75 - - 0.00 #REF!
3 Pasang logo keramik ( ukuran 35 x 45 ) cm Ditaksir unit 750,000.00 1.00 750,000.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pasang Tulisan ( bahan alumunium ) Ditaksir unit 2,250,000.00 1.00 2,250,000.00 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Pasang papan back ground Ditaksir unit 3,500,000.00 1.00 3,500,000.00 0.12 #REF! #REF! 1.00 0.12 #REF! #REF! #REF!
JUMLAH XIII 10,244,800.00 #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
JUMLAH ( B ) 555,538,614.28 #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
4 Kolom 30/30 - #REF!
Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22.a m2 252,252.00 13.08 3,299,456.16 0.11 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 154.97 2,023,571.14 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), A.4.1.1.5. m3 840,243.39 1.96 1,646,877.05 0.05 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm,w/c=0,87 - #REF!
5 Kolom 20/20 - #REF!
Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22.a m2 252,252.00 59.20 14,933,318.40 0.49 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 971.18 12,681,498.48 0.42 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), A.4.1.1.5. m3 840,243.39 5.62 4,722,167.86 0.16 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm,w/c=0,87 - #REF!
6 Kolom 15/15 - #REF!
Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35. m1 252,252.00 113.00 28,504,476.00 0.94 #REF! #REF! - 0.00 #REF! #REF! #REF!
7 Balok 15/40 - #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 282,612.00 2.28 644,355.36 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 47.74 623,380.57 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 0.33 277,280.32 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
8 Ring balok 15/30 - #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 282,612.00 7.55 2,133,720.60 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 179.24 2,340,484.55 0.08 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 1.21 1,016,694.50 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF! -
9 Ring balok 15/20 - #REF! -
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 86,781.75 34.51 2,994,838.19 0.10 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 1,060.48 13,847,562.26 0.46 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 5.18 4,352,460.77 0.14 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
10 Balok Latai 10/15 - #REF!
Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36. m1 86,781.75 97.00 8,417,829.75 0.28 #REF! #REF! - 0.00 #REF! #REF! #REF!
11 Plat atap - #REF! -
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.a m2 222,552.00 25.00 5,563,800.00 0.18 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 855.60 11,172,275.07 0.37 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 6.00 5,041,460.35 0.17 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
12 Shading - #REF!
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.a m2 319,352.00 31.39 10,024,459.28 0.33 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 363.52 4,746,780.54 0.16 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 5.02 4,220,038.41 0.14 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
13 Plat lisplang - #REF!
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.a m2 319,352.00 3.51 1,120,925.52 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 69.32 905,168.43 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 0.70 588,170.37 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 #REF!
JUMLAH VI 198,762,496.04 #REF!
VII PEKERJAAN KAYU, ATAP DAN PLAFOND #REF!
1 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I A.4.6.1.11. m3 652,159.75 24.36 15,886,611.51 0.53 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, A.4.6.1.13. m3 9,944,550.00 6.99 69,512,404.50 2.30 #REF! #REF! - 0.00 #REF! #REF! #REF!
kayu kelas II (kruink ) - #REF!
3 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) A.4.6.1.15. m3 10,651,671.25 3.54 37,706,916.23 1.25 #REF! #REF! - 0.00 #REF! #REF! #REF!
Page 231 of 297
M21 (2)
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
4 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II A.4.6.1.17. m2 153,051.25 523.90 80,183,549.88 2.65 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif kay Ls m1 22,500.00 102.00 2,295,000.00 0.08 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Pemasangan 1 m2 atap genteng palentong besar/super A.4.5.2.3.a m2 59,793.25 523.90 31,325,683.68 1.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
7 Pemasangan 1 m’ bubung genteng palentong besar A.4.5.2.6. m1 63,189.50 61.60 3,892,473.20 0.13 #REF! #REF! - 0.00 #REF! #REF! #REF!
8 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun A.4.6.1.20. m2 77,038.50 408.39 31,461,984.13 1.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
9 Pemasangan 1 m2 langit-langit gypsum board A.4.5.1.7. m2 34,538.90 368.87 12,740,467.66 0.42 #REF! #REF! - 0.00 #REF! #REF! #REF!
ukuran (120x240x9) mm, tebal 9 mm - #REF!
10 Pemasangan 1 m2 langit-langit kalsiboard A.4.5.1.7.a m2 32,937.30 39.52 1,301,682.10 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
ukuran (120x240x9) mm, tebal 4 mm - #REF!
11 Pemasangan 1 m’ list langit-langit gypsum profil A.4.5.1.10. m1 19,049.25 277.10 5,278,547.18 0.17 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH VII 291,585,320.05 #REF!
VIII PEKERJAAN SANITASI #REF!
1 Pemasangan 1 buah closet jongkok porslen A.5.1.1 2. bh 290,097.50 4.00 1,160,390.00 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 buah bak air fibreglass vol 1 m3 A.5.1.1 10. bh 342,354.10 - - 0.00 #REF!
3 Pemasangan 1 buah floor drain A.5.1.1 14. bh 26,331.25 5.00 131,656.25 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1 15. bh 318,991.75 - - 0.00 #REF!
5 Pemasangan 1 buah kran diameter ½” atau 3/4” A.5.1.1 19. m1 45,375.00 7.00 317,625.00 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” A.5.1.1 26. m1 14,250.50 69.80 994,684.90 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
7 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” A.5.1.1 29. m` 33,310.75 14.50 483,005.88 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
8 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” A.5.1.1 32. m1 72,312.63 13.00 940,064.13 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
9 Fiber glas tangki air kap 1100 ltr Ditaksir bh 1,450,000.00 1.00 1,450,000.00 0.05 #REF! #REF! - 0.00 #REF! #REF! #REF!
10 Pasang sumur bor Ditaksir m' 180,000.00 8.00 1,440,000.00 0.05 - 0.00 1.00 0.01 1.00 0.01 12.50
11 Pasang mesin pompa air listrik PW-120 jet Ditaksir bh 1,250,000.00 1.00 1,250,000.00 0.04 - 0.00 2.00 0.08 2.00 0.08 200.00
12 Ember dan gayung Ditaksir bh 100,000.00 4.00 400,000.00 0.01 - 0.00 3.00 0.01 3.00 0.01 75.00
JUMLAH VIII 8,567,426.15 -
IX PEKERJAAN BESI DAN ALUMUNIUM #REF!
1 Pemasangan 1 m kusen pintu alluminium A.4.2.1.11. m1 81,947.80 489.42 40,106,892.28 1.33 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 m2 pintu kaca rangka alluminium A.4.2.1.13. m2 466,303.75 82.07 38,269,548.76 1.27 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pemasangan pintu tempered t = 12 mm ( komplit ) Ls unit 10,000,000.00 4.00 40,000,000.00 1.32 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH IX 118,376,441.04 #REF!
X PEKERJAAN KUNCI DAN KACA #REF!
1 Pemasangan 1 buah engsel pintu A.4.6.2.5. bh 25,185.60 42.00 1,057,795.20 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 buah engsel jendela kupu-kupu A.4.6.2.6. bh 21,921.63 304.00 6,664,174.00 0.22 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pemasangan 1 buah kait angin A.4.6.2.9. bh 25,641.00 304.00 7,794,864.00 0.26 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 buah kunci slot A.4.6.2.11. bh 97,083.25 14.00 1,359,165.50 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Pemasangan 1 m2 kaca tebal 5 mm A.4.6.2.17. bh 115,371.85 180.80 20,859,230.48 0.69 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Grendel pintu Ditaksir bh 10,000.00 170.00 1,700,000.00 0.06 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH X 39,435,229.18 #REF!
XI PEKERJAAN PENUTUP LANTAI DAN DINDING #REF!
1 Pemasangan 1m2 lantai keramik ukuran 40cm x40cm A.4.4.3.9.a m2 145,153.25 360.23 52,288,990.71 1.73 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm A.4.4.3.36. m2 213,889.50 8.64 1,848,005.28 0.06 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm A.4.4.3.41. m1 38,173.30 22.75 868,442.58 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 m2 dinding keramik 20cm x 20cm A.4.4.3.54. m2 204,226.00 40.94 8,361,114.55 0.28 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Pemasangan 1 m2 dinding batu tempel candi A.4.4.3.58. m2 236,692.50 - - 0.00 #REF!
JUMLAH XI 63,366,553.12 #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
XII PEKERJAAN PENGECATAN #REF!
1 Pengecatan tembok baru Interior ex. Catylac ( 1 lapis plamir, 1 lapis A.4.7.1.10. m2 17,222.98 1,082.02 18,635,603.41 0.62 #REF! #REF! - 0.00 #REF! #REF! #REF!
cat dasar, 2 lapis cat penutup ) - #REF!
2 Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.11. m2 13,132.90 408.39 5,363,345.03 0.18 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH XII 23,998,948.44 #REF!
XIII PEKERJAAN INSTALASI LISTRIK #REF!
1 Pemasangan meter listrik lama 5500 watt Ls unit 750,000.00 - - 0.00 #REF!
2 Pasang meteran listrik baru 5500 Va Ls Titik 10,000,000.00 1.00 10,000,000.00 0.33 - 0.00 - 0.00 - 0.00 0.00
3 Titik Lampu Ls Titik 85,000.00 57.00 4,845,000.00 0.16 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Saklar ganda Ls bh 22,500.00 3.00 67,500.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Saklar tunggal Ls bh 20,000.00 13.00 260,000.00 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 stop kontak Ls bh 22,500.00 15.00 337,500.00 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
7 lampu pijar 5W Philips Ls bh 10,000.00 5.00 50,000.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
8 Lampu SL 18 Watt Phillips Ls bh 35,500.00 37.00 1,313,500.00 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH XIII 16,873,500.00 #REF!
XIV PEKERJAAN LAIN-LAIN #REF!
1 Pasang saluran U 20 cm termasuk pas dinding Ls m1 75,500.00 112.36 8,483,180.00 0.28 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Membuat Septic Tank A.5.1.1 15. bh 1,150,000.00 2.00 2,300,000.00 0.08 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Membuat peresapan Ditaksir bh 750,000.00 2.00 1,500,000.00 0.05 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Tanah Subur Ditaksir m3 120,000.00 8.96 1,075,320.00 0.04 #REF! 0.00 - 0.00 #REF! 0.00 0.00
5 Pembuatan taman Ditaksir m2 225,000.00 59.34 13,351,500.00 0.44 #REF! 0.00 - 0.00 #REF! 0.00 0.00
JUMLAH XIV 26,710,000.00 #REF!
JUMLAH ( C ) 974,215,887.11 #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
V PEKERJAAN PLESTERAN - #REF!
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. A.4.4.2.6. m2 38,633.10 370.29 14,305,450.60 0.47 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP A.4.4.2.23. m2 32,392.25 1.33 43,146.48 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pemasangan 1 m2 acian A.4.4.2.27. m2 23,815.00 379.36 9,034,458.40 0.30 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Sponengan Ls m1 15,000.00 48.00 720,000.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH V - 24,103,055.48 #REF!
VI PEKERJAAN BETON - #REF!
1 Lantai kerja - #REF!
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), A.4.1.1.4. m3 712,475.42 6.50 4,627,973.16 0.15 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
2 Rabat Beton - #REF!
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), A.4.1.1.1. m3 756,474.46 2.71 2,053,737.39 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
3 Sloof 15/25 - #REF!
Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21. m2 166,529.00 21.13 3,518,757.77 0.12 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 519.31 6,781,059.10 0.22 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), A.4.1.1.5. m3 840,243.39 3.17 2,663,571.55 0.09 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm,w/c=0,87 - #REF!
4 Kolom 20/20 - #REF!
Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22.a m2 252,252.00 5.14 1,296,575.28 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 51.67 674,697.82 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), A.4.1.1.5. m3 840,243.39 0.51 428,524.13 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm,w/c=0,87 - #REF!
5 Kolom 15/15 - #REF!
Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35. m1 252,252.00 94.80 23,913,489.60 0.79 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Ring balok 15/30 - #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 254,892.00 6.00 1,529,352.00 0.05 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 106.21 1,386,871.59 0.05 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 0.68 571,365.51 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
7 Ring balok 15/20 - #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 86,781.75 15.10 1,310,404.43 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 463.99 6,058,700.22 0.20 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 2.27 1,907,352.50 0.06 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
8 Balok Latai 10/15 - #REF!
Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36. m1 86,781.75 35.00 3,037,361.25 0.10 #REF! #REF! - 0.00 #REF! #REF! #REF!
9 Plat atap - #REF!
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.a m2 222,552.00 11.69 2,600,965.22 0.09 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 199.97 2,611,173.27 0.09 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 1.17 981,992.45 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
10 Shading - #REF!
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.a m2 319,352.00 3.65 1,166,273.50 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 74.32 970,449.72 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 0.58 490,971.02 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 #REF!
JUMLAH VI 70,581,618.48 #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
VII PEKERJAAN KAYU, ATAP DAN PLAFOND #REF!
1 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I A.4.6.1.11. m3 652,159.75 7.98 5,204,234.81 0.17 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, A.4.6.1.13. m3 9,944,550.00 1.52 15,115,716.00 0.50 #REF! #REF! - 0.00 #REF! #REF! #REF!
kayu kelas II (kruink ) - #REF!
3 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) A.4.6.1.15. m3 10,651,671.25 1.34 14,273,239.48 0.47 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II A.4.6.1.16. m2 152,556.25 183.51 27,995,261.81 0.93 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif kay Ls m1 22,500.00 54.74 1,231,650.00 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Pemasangan 1 m2 atap genteng palentong kecil A.4.5.2.1. m2 59,211.63 183.51 10,865,795.04 0.36 #REF! #REF! - 0.00 #REF! #REF! #REF!
7 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m1 65,939.50 34.00 2,241,943.00 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
8 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun A.4.6.1.20. m2 77,038.50 178.26 13,732,921.53 0.45 #REF! #REF! - 0.00 #REF! #REF! #REF!
9 Pemasangan 1 m2 langit-langit gypsum board A.4.5.1.7. m2 34,538.90 139.17 4,806,692.37 0.16 #REF! #REF! - 0.00 #REF! #REF! #REF!
ukuran (120x240x9) mm, tebal 9 mm - #REF!
10 Pemasangan 1 m2 langit-langit kalsiboard A.4.5.1.7.a m2 32,937.30 39.09 1,287,617.87 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
ukuran (120x240x9) mm, tebal 4 mm - #REF!
11 Pemasangan 1 m’ list langit-langit gypsum profil A.4.5.1.10. m1 19,049.25 132.30 2,520,215.78 0.08 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH VII 99,275,287.67 #REF!
VIII PEKERJAAN SANITASI #REF!
1 Pemasangan 1 buah closet jongkok porslen A.5.1.1 2. bh 290,097.50 2.00 580,195.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 buah bak air fibreglass vol 1 m3 A.5.1.1 10. bh 342,354.10 - - 0.00 #REF!
3 Pemasangan 1 buah floor drain A.5.1.1 14. bh 26,331.25 2.00 52,662.50 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1 15. bh 318,991.75 - - 0.00 #REF!
5 Pemasangan 1 buah kran diameter ½” atau 3/4” A.5.1.1 19. m1 45,375.00 2.00 90,750.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” A.5.1.1 26. m1 14,250.50 40.00 570,020.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
7 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” A.5.1.1 29. m` 33,310.75 3.50 116,587.63 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
8 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” A.5.1.1 32. m1 72,312.63 7.00 506,188.38 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
9 Pasang sumur bor Ditaksir m' 180,000.00 8.00 1,440,000.00 0.05 - 0.00 - 0.00 - 0.00 0.00
10 Pasang mesin pompa air listrik PW-120 jet Ditaksir bh 1,250,000.00 1.00 1,250,000.00 0.04 - 0.00 - 0.00 - 0.00 0.00
11 Ember dan gayung Ditaksir unit 100,000.00 2.00 200,000.00 0.01 - 0.00 - 0.00 - 0.00 0.00
12 Fiber glas tangki air kap 1100 ltr Ditaksir unit 1,450,000.00 1.00 1,450,000.00 0.05 - 0.00 - 0.00 - 0.00 0.00
JUMLAH VIII 6,256,403.50 #REF!
IX PEKERJAAN BESI DAN ALUMUNIUM #REF!
1 Pemasangan 1 m kusen pintu alluminium A.4.2.1.11. m1 81,947.80 169.96 13,927,848.09 0.46 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 m2 pintu kaca rangka alluminium A.4.2.1.13. m2 466,303.75 29.45 13,732,645.44 0.45 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH IX 27,660,493.53 #REF!
X PEKERJAAN KUNCI DAN KACA #REF!
1 Pemasangan 1 buah engsel pintu A.4.6.2.5. bh 25,185.60 15.00 377,784.00 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 buah engsel jendela kupu-kupu A.4.6.2.6. bh 21,921.63 118.00 2,586,751.75 0.09 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pemasangan 1 buah kait angin A.4.6.2.9. bh 25,641.00 118.00 3,025,638.00 0.10 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 buah kunci slot A.4.6.2.11. bh 97,083.25 5.00 485,416.25 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Pemasangan 1 m2 kaca tebal 5 mm A.4.6.2.17. bh 115,371.85 38.12 4,397,974.92 0.15 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Grendel pintu Ditaksir bh 10,000.00 64.00 640,000.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH X 11,513,564.92 #REF!
XI PEKERJAAN PENUTUP LANTAI DAN DINDING #REF!
1 Pemasangan 1m2 lantai keramik ukuran 40cm x40cm A.4.4.3.9.a m2 199,798.50 123.85 24,744,045.23 0.82 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm A.4.4.3.36. m2 213,889.50 6.07 1,297,774.54 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm A.4.4.3.41. m1 38,173.30 9.40 358,829.02 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 m2 dinding keramik 20cm x 20cm A.4.4.3.54. m2 204,226.00 14.10 2,879,586.60 0.10 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH XI 29,280,235.39 #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
XII PEKERJAAN PENGECATAN #REF!
1 Pengecatan tembok baru Interior ex. Catylac ( 1 lapis plamir, 1 lapis A.4.7.1.10. m2 17,222.98 379.36 6,533,707.80 0.22 #REF! #REF! - 0.00 #REF! #REF! #REF!
cat dasar, 2 lapis cat penutup ) - #REF!
2 Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.11. m2 13,132.90 178.26 2,341,077.32 0.08 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH XII 8,874,785.12 #REF!
XIII PEKERJAAN INSTALASI LISTRIK #REF!
1 Titik Lampu Ls Titik 85,000.00 28.00 2,380,000.00 0.08 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Saklar ganda Ls bh 22,500.00 2.00 45,000.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Saklar tunggal Ls bh 20,000.00 6.00 120,000.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 stop kontak Ls bh 22,500.00 6.00 135,000.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 lampu pijar 5W Philips Ls bh 10,000.00 6.00 60,000.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Lampu SL 18 Watt Phillips Ls bh 35,500.00 16.00 568,000.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
7 Pemindahan meteren lama 5500 watt Ls bh 750,000.00 1.00 750,000.00 0.02 #REF! #REF! 1.00 0.02 #REF! #REF! #REF!
JUMLAH XIII 4,058,000.00 #REF!
XIV PEKERJAAN LAIN-LAIN #REF!
1 Pasang saluran U 20 cm termasuk pas dinding Ls m1 75,500.00 - - 0.00 #REF!
2 Membuat Septic Tank Ls bh 1,150,000.00 1.00 1,150,000.00 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Membuat peresapan Ls bh 750,000.00 1.00 750,000.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Tanah Subur Ls m3 120,000.00 0.40 47,880.00 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
5 Pembuatan taman Ls m2 225,000.00 1.00 224,437.50 0.01 #REF! 0.00 - 0.00 #REF! 0.00 0.00
JUMLAH XIV 2,172,317.50 #REF!
JUMLAH ( D ) 327,502,920.96 #REF!
E MUSHOLLA #REF!
I PEKERJAAN PERSIAPAN #REF!
1 Pengukuran dan pemasangan bauwplank Ditaksir ls 500,000.00 - - 0.00 #REF! - - - - - -
JUMLAH I - #REF!
II PEKERJAAN TANAH #REF!
1 Penggalian 1 m3 tanah biasa sedalam 1 m A.2.3.1.1. m3 49,018.75 - - 0.00 #REF! - - - - - -
2 Pengurugan kembali 1 m3 galian tanah A.2.3.1.9. m3 16,339.58 - - 0.00 #REF! - - - - - -
3 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 118,607.50 - - 0.00 #REF! - - - - - -
4 Pengurugan 1 m3 tanah cadas padat A.2.3.1.14.a m3 83,393.75 - - 0.00 #REF! - - - - - -
JUMLAH II - #REF!
III PEKERJAAN PONDASI #REF!
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP A.3.2.1.4. m3 516,466.50 - - 0.00 #REF! - - - - - -
2 Pemasangan 1 m3 batu kosong (anstamping) A.3.2.1.9. m3 279,576.00 - - 0.00 #REF! - - - - - -
JUMLAH III - #REF!
IV PEKERJAAN DINDING #REF!
1 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu A. 4.4.1.8. m2 97,798.25 - - 0.00 #REF! - - - - - -
campuran 1SP : 3PP #REF!
2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu A. 4.4.1.11. m2 92,281.75 - - 0.00 #REF! - - - - - -
campuran 1SP : 6PP #REF!
3 Pemasangan main dinding GRC Ls m2 42,000.00 - - 0.00 #REF! - - - - - -
JUMLAH IV - #REF!
V PEKERJAAN PLESTERAN #REF!
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. A.4.4.2.6. m2 38,633.10 - - 0.00 #REF! - - - - - -
2 Pemasangan 1 m2 acian A.4.4.2.27. m2 23,815.00 - - 0.00 #REF! - - - - - -
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
JUMLAH V - #REF!
VI PEKERJAAN BETON #REF!
1 Lantai kerja #REF!
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), A.4.1.1.4. m3 712,475.42 - - 0.00 #REF! - - - - - -
slump (12 ± 2) cm, w/c = 0,87 #REF!
2 Rabat Beton #REF!
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), A.4.1.1.1. m3 756,474.46 - - 0.00 #REF! - - - - - -
slump (12 ± 2) cm, w/c = 0,87 #REF!
3 Sloof 15/25 #REF!
Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21. m2 166,529.00 - - 0.00 #REF! - - - - - -
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 - - 0.00 #REF! - - - - - -
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), A.4.1.1.5. m3 840,243.39 - - 0.00 #REF! - - - - - -
slump (12 ± 2) cm,w/c=0,87 #REF!
4 Kolom 15/15 #REF!
Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35. m1 63,268.15 - - 0.00 #REF! - - - - - -
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
5 Balok 15/30 #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 254,892.00 - - 0.00 #REF! - - - - - -
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 - - 0.00 #REF! - - - - - -
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 - - 0.00 #REF! - - - - - -
slump (12 ± 2) cm, w/c = 0,87 #REF!
6 Ring balok 15/20 #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 86,781.75 - - 0.00 #REF! - - - - - -
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 - - 0.00 #REF! - - - - - -
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 - - 0.00 #REF! - - - - - -
slump (12 ± 2) cm, w/c = 0,87 #REF!
7 Balok Latai 10/15 #REF!
Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36. m1 86,781.75 - - 0.00 #REF! - - - - - -
8 Plat atap #REF!
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.a m2 222,552.00 - - 0.00 #REF! - - - - - -
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 - - 0.00 #REF! - - - - - -
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 - - 0.00 #REF! - - - - - -
slump (12 ± 2) cm, w/c = 0,87 #REF!
9 Shading #REF!
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.a m2 319,352.00 - - 0.00 #REF! - - - - - -
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 - - 0.00 #REF! - - - - - -
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 - - 0.00 #REF! - - - - - -
slump (12 ± 2) cm, w/c = 0,87 #REF!
JUMLAH VI - #REF!
VII PEKERJAAN KAYU, ATAP DAN PLAFOND #REF!
1 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, A.4.6.1.13. m3 9,944,550.00 - - 0.00 #REF! - - - - - -
kayu kelas II (kruink ) #REF!
2 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) A.4.6.1.15. m3 10,651,671.25 - - 0.00 #REF! - - - - - -
3 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II A.4.6.1.16. m2 152,556.25 - - 0.00 #REF! - - - - - -
4 Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif kay Ls m1 22,500.00 - - 0.00 #REF! - - - - - -
5 Pemasangan 1 m2 atap genteng palentong kecil A.4.5.2.1. m2 59,211.63 - - 0.00 #REF! - - - - - -
6 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m1 65,939.50 - - 0.00 #REF! - - - - - -
7 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun A.4.6.1.20. m2 77,038.50 - - 0.00 #REF! - - - - - -
8 Pemasangan 1 m2 langit-langit gypsum board A.4.5.1.7. m2 34,538.90 - - 0.00 #REF! - - - - - -
ukuran (120x240x9) mm, tebal 9 mm #REF!
9 Pemasangan 1 m2 langit-langit kalsiboard A.4.5.1.7.a m2 32,937.30 - - 0.00 #REF! - - - - - -
ukuran (120x240x9) mm, tebal 4 mm #REF!
10 Pemasangan 1 m’ list langit-langit gypsum profil A.4.5.1.10. m1 19,049.25 - - 0.00 #REF! - - - - - -
JUMLAH VII - #REF!
VIII PEKERJAAN SANITASI #REF!
1 Pemasangan 1 buah closet jongkok porslen A.5.1.1 2. bh 290,097.50 - - 0.00 #REF! - - - - - -
2 Pemasangan 1 buah bak air fibreglass vol 1 m3 A.5.1.1 10. bh 342,354.10 - - 0.00 #REF! - - - - - -
3 Pemasangan 1 buah floor drain A.5.1.1 14. bh 26,331.25 - - 0.00 #REF! - - - - - -
4 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1 15. bh 318,991.75 - - 0.00 #REF! - - - - - -
5 Pemasangan 1 buah kran diameter ½” atau 3/4” A.5.1.1 19. m1 45,375.00 - - 0.00 #REF! - - - - - -
6 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” A.5.1.1 26. m1 14,250.50 - - 0.00 #REF! - - - - - -
7 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” A.5.1.1 29. m` 33,310.75 - - 0.00 #REF! - - - - - -
8 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” A.5.1.1 32. m1 72,312.63 - - 0.00 #REF! - - - - - -
JUMLAH VIII - #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
IX PEKERJAAN BESI DAN ALUMUNIUM #REF!
1 Pemasangan 1 m kusen pintu alluminium A.4.2.1.11. m1 81,947.80 - - 0.00 #REF! - - - - - -
2 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm A.4.2.1.12. m1 422,405.78 - - 0.00 #REF! - - - - - -
3 Pemasangan 1 m2 pintu kaca rangka alluminium A.4.2.1.13. m2 466,303.75 - - 0.00 #REF! - - - - - -
4 Pemasangan 1 m2 pintu kaca rangka alluminium A.4.2.1.13. m2 466,303.75 - - 0.00 #REF! - - - - - -
5 Pemasangan kubah Ls bh 2,000,000.00 - - 0.00 #REF! - - - - - -
JUMLAH IX - #REF!
X PEKERJAAN KUNCI DAN KACA #REF!
1 Pemasangan 1 buah engsel pintu A.4.6.2.5. bh 25,185.60 - - 0.00 #REF! - - - - - -
2 Pemasangan 1 buah engsel jendela kupu-kupu A.4.6.2.6. bh 21,921.63 - - 0.00 #REF! - - - - - -
3 Pemasangan 1 buah kait angin A.4.6.2.9. bh 25,641.00 - - 0.00 #REF! - - - - - -
4 Pemasangan 1 buah kunci slot A.4.6.2.11. bh 97,083.25 - - 0.00 #REF! - - - - - -
5 Pemasangan 1 m2 kaca tebal 5 mm A.4.6.2.17. bh 115,371.85 - - 0.00 #REF! - - - - - -
6 Grendel pintu Ditaksir bh 10,000.00 - - 0.00 #REF! - - - - - -
JUMLAH X - #REF!
XI PEKERJAAN PENUTUP LANTAI DAN DINDING #REF!
1 Pemasangan 1m2 lantai keramik ukuran 40cm x40cm A.4.4.3.9.a m2 199,798.50 - - 0.00 #REF! - - - - - -
2 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm A.4.4.3.36. m2 213,889.50 - - 0.00 #REF! - - - - - -
3 Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm A.4.4.3.41. m1 38,173.30 - - 0.00 #REF! - - - - - -
4 Pemasangan 1 m2 dinding keramik 20cm x 20cm A.4.4.3.54. m2 204,226.00 - - 0.00 #REF! - - - - - -
JUMLAH XI - #REF!
XII PEKERJAAN PENGECATAN #REF!
1 Pengecatan tembok baru Interior ex. Catylac ( 1 lapis plamir, 1 lapis A.4.7.1.10. m2 17,222.98 - - 0.00 #REF! - - - - - -
cat dasar, 2 lapis cat penutup ) #REF!
2 Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.11. m2 13,132.90 - - 0.00 #REF! - - - - - -
JUMLAH XII - #REF!
XIII PEKERJAAN INSTALASI LISTRIK #REF!
1 Pemasangan meter listrik 900 watt Ls unit 1,650,000.00 - - 0.00 #REF! - - - - - -
2 Titik Lampu Ls Titik 85,000.00 - - 0.00 #REF! - - - - - -
3 Saklar ganda Ls bh 22,500.00 - - 0.00 #REF! - - - - - -
4 Saklar tunggal Ls bh 20,000.00 - - 0.00 #REF! - - - - - -
5 stop kontak Ls bh 22,500.00 - - 0.00 #REF! - - - - - -
6 lampu pijar 5W Philips Ls bh 10,000.00 - - 0.00 #REF! - - - - - -
7 Lampu SL 18 Watt Phillips Ls bh 35,500.00 - - 0.00 #REF! - - - - - -
JUMLAH XIII - #REF!
XIV PEKERJAAN LAIN-LAIN #REF!
1 Membuat Septic Tank Ls bh 1,150,000.00 - - 0.00 #REF! - - - - - -
2 Membuat peresapan Ls bh 750,000.00 - - 0.00 #REF! - - - - - -
3 Tanah Subur Ls m3 120,000.00 - - 0.00 #REF! - - - - - -
4 Pembuatan taman Ls m2 225,000.00 - - 0.00 #REF! - - - - - -
JUMLAH XIV - #REF!
JUMLAH ( E ) - #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
II PEKERJAAN TANAH - #REF!
1 Penggalian 1 m3 tanah biasa sedalam 1 m A.2.3.1.1. m3 49,018.75 30.07 1,473,954.60 0.05 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pengurugan kembali 1 m3 galian tanah A.2.3.1.9. m3 16,339.58 8.64 141,174.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 118,607.50 9.39 1,113,831.17 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pengurugan 1 m3 tanah cadas padat A.2.3.1.14.a m3 83,393.75 13.70 1,142,240.86 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH II - 3,871,200.63 #REF!
III PEKERJAAN PONDASI - #REF!
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP A.3.2.1.4. m3 516,466.50 39.60 20,452,073.40 0.68 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 m3 batu kosong (anstamping) A.3.2.1.9. m3 279,576.00 14.40 4,025,894.40 0.13 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH III - 24,477,967.80 #REF!
IV PEKERJAAN DINDING - #REF!
1 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu A. 4.4.1.2. m2 201,619.00 1.20 241,942.80 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
campuran 1SP : 3PP - #REF!
2 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu A. 4.4.1.8. m2 97,798.25 34.43 3,367,193.75 0.11 #REF! #REF! - 0.00 #REF! #REF! #REF!
campuran 1SP : 3PP - #REF!
3 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu A. 4.4.1.11. m2 92,281.75 238.04 21,966,600.12 0.73 #REF! #REF! - 0.00 #REF! #REF! #REF!
campuran 1SP : 6PP - #REF!
JUMLAH IV - 25,575,736.67 #REF!
V PEKERJAAN PLESTERAN - #REF!
1 Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. A.4.4.2.6. m2 38,633.10 540.98 20,899,734.44 0.69 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 m2 acian A.4.4.2.27. m2 23,815.00 557.54 13,277,760.33 0.44 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH V 34,177,494.76 #REF!
VI PEKERJAAN BETON #REF!
1 Lantai kerja #REF!
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), A.4.1.1.4. m3 712,475.42 5.79 4,125,873.92 0.14 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
2 Rabat Beton - #REF!
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), A.4.1.1.1. m3 756,474.46 2.74 2,074,434.53 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
3 Sloof 15/25 - #REF!
Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21. m2 166,529.00 23.25 3,871,799.25 0.13 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 571.64 7,464,375.08 0.25 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), A.4.1.1.5. m3 840,243.39 3.49 2,932,449.44 0.10 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm,w/c=0,87 - #REF!
4 Kolom 15/25 - #REF!
Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22.a m2 252,252.00 32.40 8,172,964.80 0.27 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 526.20 6,871,027.52 0.23 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), A.4.1.1.5. m3 840,243.39 2.57 2,159,425.52 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm,w/c=0,87 - #REF!
5 Kolom 15/15 - #REF!
Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35. m1 63,268.15 56.00 3,543,016.40 0.12 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Ring balok 15/30 - #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 254,892.00 - - 0.00 #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 - - 0.00 #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 - - 0.00 #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
7 Ring balok 15/20 - #REF!
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23.a m2 254,892.00 18.60 4,740,991.20 0.16 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 559.86 7,310,553.90 0.24 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 2.79 2,344,279.06 0.08 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
8 Balok Latai 10/15 - #REF!
Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36. m1 86,781.75 32.50 2,820,406.88 0.09 #REF! #REF! - 0.00 #REF! #REF! #REF!
9 Plat atap - #REF!
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.a m2 222,552.00 - - 0.00 #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 - - 0.00 #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 - - 0.00 #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
10 Shading - #REF!
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24.a m2 222,552.00 6.66 1,482,196.32 0.05 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 135.42 1,768,290.66 0.06 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 1.07 895,800.28 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 - #REF!
11 Meja dapur - #REF!
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) A.4.1.1.33. m2 222,552.00 1.27 282,641.04 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.17. kg 13,057.83 11.52 150,426.14 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275) , A.4.1.1.5. m3 840,243.39 0.21 178,467.70 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
slump (12 ± 2) cm, w/c = 0,87 #REF!
JUMLAH VI 63,189,419.64 #REF!
VII PEKERJAAN KAYU, ATAP DAN PLAFOND #REF!
1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kel A.4.6.1.2. m3 10,925,172.50 0.95 10,378,913.88 0.34 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II A.4.6.1.5. m2 591,717.50 14.20 8,402,388.50 0.28 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I at A.4.6.1.6. m2 410,058.00 3.96 1,623,829.68 0.05 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, A.4.6.1.13. m3 9,944,550.00 2.02 20,087,991.00 0.66 #REF! #REF! - 0.00 #REF! #REF! #REF!
kayu kelas II (kruink ) - #REF!
5 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II ( kruink ) A.4.6.1.15. m3 10,651,671.25 1.92 20,451,208.80 0.68 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II A.4.6.1.16. m2 152,556.25 194.68 29,699,650.75 0.98 #REF! #REF! - 0.00 #REF! #REF! #REF!
7 Lisplang GRC Board tebal 9 mmL = 30 cm (terpasang dan cat ) motif kay Ls m1 22,500.00 52.30 1,176,750.00 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
8 Pemasangan 1 m2 atap genteng palentong kecil A.4.5.2.1. m2 59,211.63 194.68 11,527,319.16 0.38 #REF! #REF! - 0.00 #REF! #REF! #REF!
9 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m1 65,939.50 46.71 3,080,034.05 0.10 #REF! #REF! - 0.00 #REF! #REF! #REF!
10 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu Tahun A.4.6.1.20. m2 77,038.50 153.78 11,847,057.57 0.39 #REF! #REF! - 0.00 #REF! #REF! #REF!
11 Pemasangan 1 m2 langit-langit gypsum board A.4.5.1.7. m2 34,538.90 115.82 4,000,226.32 0.13 #REF! #REF! - 0.00 #REF! #REF! #REF!
ukuran (120x240x9) mm, tebal 9 mm - #REF!
12 Pemasangan 1 m2 langit-langit kalsiboard A.4.5.1.7.a m2 32,937.30 37.96 1,250,398.72 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
ukuran (120x240x9) mm, tebal 4 mm - #REF!
13 Pemasangan 1 m’ list langit-langit gypsum profil A.4.5.1.10. m1 19,049.25 116.89 2,226,666.83 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
14 Pemasangan rooster kayu Ls bh 25,000.00 9.00 225,000.00 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH VII 125,977,435.25 #REF!
VIII PEKERJAAN SANITASI #REF!
1 Pemasangan 1 buah closet jongkok porslen A.5.1.1 2. bh 290,097.50 1.00 290,097.50 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 buah wastafel A.5.1.1 5. bh 696,960.00 1.00 696,960.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pemasangan 1 buah bak air fibreglass vol 1 m3 A.5.1.1 10. bh 342,354.10 - - 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
4 Pemasangan 1 buah bak cuci piring stainlessteel A.5.1.1 12. bh 267,093.75 1.00 267,093.75 0.01 #REF! 0.00 - 0.00 #REF! 0.00 0.00
5 Pemasangan 1 buah floor drain A.5.1.1 14. bh 26,331.25 1.00 26,331.25 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1 15. bh 318,991.75 - - 0.00 #REF!
7 Pemasangan 1 buah kran diameter ½” atau 3/4” A.5.1.1 19. m1 45,375.00 3.00 136,125.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
Page 241 of 297
M21 (2)
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
8 Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” A.5.1.1 26. m1 14,250.50 25.00 356,262.50 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
9 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” A.5.1.1 29. m` 33,310.75 4.00 133,243.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
10 Pemasangan 1 m’ pipa PVC tipe AW diameter 4” A.5.1.1 32. m1 72,312.63 8.00 578,501.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH VIII 2,484,614.00 #REF!
IX PEKERJAAN BESI DAN ALUMUNIUM #REF!
1 Pintu besi Folding Gate ( Terpasang ) Ls m2 275,000.00 8.44 2,321,550.00 0.08 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH IX 2,321,550.00 #REF!
X PEKERJAAN KUNCI DAN KACA #REF!
1 Pemasangan 1 buah engsel pintu A.4.6.2.5. bh 25,185.60 27.00 680,011.20 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1 buah engsel jendela kupu-kupu A.4.6.2.6. bh 21,921.63 36.00 789,178.50 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pemasangan 1 buah kait angin A.4.6.2.9. bh 25,641.00 36.00 923,076.00 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 buah kunci slot A.4.6.2.11. bh 97,083.25 15.00 1,456,248.75 0.05 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Pemasangan 1 m2 kaca tebal 5 mm A.4.6.2.17. bh 115,371.85 6.90 796,065.77 0.03 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 Grendel pintu Ditaksir bh 10,000.00 29.00 290,000.00 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH X 4,934,580.22 #REF!
XI PEKERJAAN PENUTUP LANTAI DAN DINDING #REF!
1 Pemasangan 1m2 lantai keramik ukuran 40cm x40cm A.4.4.3.9.a m2 199,798.50 113.32 22,641,265.92 0.75 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm A.4.4.3.36. m2 213,889.50 2.50 534,189.03 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Pemasangan 1 m’ plint keramik ukuran 5cm x 20cm A.4.4.3.41. m1 38,173.30 5.95 227,131.14 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Pemasangan 1 m2 dinding keramik 20cm x 20cm A.4.4.3.54. m2 204,226.00 15.20 3,104,235.20 0.10 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Pemasangan 1 m2 dinding batu tempel susun sirih A.4.4.3.58. m2 239,442.50 - - 0.00 #REF!
JUMLAH XI 26,506,821.28 #REF!
XII PEKERJAAN PENGECATAN #REF!
1 Pengecatan tembok baru Interior ex. Catylac ( 1 lapis plamir, 1 lapis A.4.7.1.10. m2 17,222.98 557.54 9,602,457.87 0.32 #REF! #REF! - 0.00 #REF! #REF! #REF!
cat dasar, 2 lapis cat penutup ) - #REF!
2 Pengecatan 1 m2 plafond ( 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.11. m2 13,132.90 153.78 2,019,590.49 0.07 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH XII 11,622,048.36 #REF!
XIII PEKERJAAN INSTALASI LISTRIK #REF!
1 Pemasangan meter listrik 900 watt Ls unit 750,000.00 1.00 750,000.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
2 Titik Lampu Ls Titik 85,000.00 30.00 2,550,000.00 0.08 #REF! #REF! - 0.00 #REF! #REF! #REF!
3 Saklar ganda Ls bh 22,500.00 2.00 45,000.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
4 Saklar tunggal Ls bh 20,000.00 8.00 160,000.00 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 stop kontak Ls bh 22,500.00 8.00 180,000.00 0.01 #REF! #REF! - 0.00 #REF! #REF! #REF!
6 lampu pijar 5W Philips Ls bh 10,000.00 5.00 50,000.00 0.00 #REF! #REF! - 0.00 #REF! #REF! #REF!
7 Lampu SL 18 Watt Phillips Ls bh 35,500.00 17.00 603,500.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH XIII 4,338,500.00 #REF!
BOBOT
HARGA NILAI
CCO.1 S / D MINGGU LALU MINGGU INI S / D MINGGU INI TIMBAN
KODE SATUAN BOBOT
NO JENIS PEKERJAAN SAT G
ANALISA
(Rp) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
XIV PEKERJAAN LAIN-LAIN #REF!
1 Pasang saluran U 20 cm termasuk pas dinding Ls m1 75,500.00 - - 0.00 #REF!
2 Tanah Subur Ls m3 120,000.00 0.54 64,800.00 0.00 #REF! 0.00 - 0.00 #REF! 0.00 0.00
3 Pembuatan taman Ls m2 225,000.00 0.90 202,500.00 0.01 #REF! 0.00 - 0.00 #REF! 0.00 0.00
4 Membuat Septictank Ls bh 1,150,000.00 1.00 1,150,000.00 0.04 #REF! #REF! - 0.00 #REF! #REF! #REF!
5 Membuat Peresapan Ls bh 750,000.00 1.00 750,000.00 0.02 #REF! #REF! - 0.00 #REF! #REF! #REF!
JUMLAH XIV 2,167,300.00
JUMLAH ( F ) 332,144,668.60
DIBULATKAN 3,324,897,000.00
Konsultan Pengawas
CV ADHI JAYA CONSULTANT
IRWAN SETIADI, ST
Inspektoor
LAPORAN MINGGUAN
TOTAL
NO PERHITUNGAN VOLUME
VOLUME
A BACKUP JEMBATAN
I PEKERJAAN PERSIAPAN
I PEKERJAAN BESI
Rangka JEMBATAN
Jembatan Besi L 60.60.6
= Panjang x jml x BJ x jml
215.60 kg
437.04 Kg
1,232.00 kg
1,612.00 kg
3,272.00 bh
LAPORAN MINGGUAN
NILAI
HARGA MC.0 % S / D MINGGU LALU MINGGU INI S / D MINGGU INI
BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN
( Rp ) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
(%) (%) (%)
PORAN MINGGUAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
-
-
-
-
-
-
-
04 April 2019
LAPORAN MINGGUAN
HARGA NILAI
MC.0 % S / D MINGGU LALU MINGGU INI S / D MINGGU INI
SATUAN BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT
( Rp BOBOT BOBOT BOBOT
) VOLUME JUMLAH HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)
PORAN MINGGUAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
-
-
-
-
-
-
-
17 April 2019
LAPORAN MINGGUAN
HARGA NILAI
MC.0 % S / D MINGGU LALU MINGGU INI S / D MINGGU INI
SATUAN BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT
( Rp BOBOT BOBOT BOBOT
) VOLUME JUMLAH HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)
PORAN MINGGUAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
-
-
40.00
-
-
-
-
24 April 2019
LAPORAN MINGGUAN
NILAI BOBOT
HARGA MC.0 % S / D MINGGU LALU MINGGU INI S / D MINGGU INI
BOBOT TIMBA-NG
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN
( Rp ) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT (%)
(%) (%) (%)
LAPORAN BULANAN
NILAI
HARGA MC.0 % S / D BULAN LALU BULAN INI S / D BULAN INI
BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN
( Rp ) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
(%) (%) (%)
APORAN BULANAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
-
-
100.00
-
-
-
-
01 Mei 2019
LAPORAN MINGGUAN
HARGA NILAI
MC.0 % S / D MINGGU LALU MINGGU INI S / D MINGGU INI
SATUAN BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT
VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
( Rp ) (%) (%) (%)
PORAN MINGGUAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
19.91
16.44
100.00
1.49
-
-
-
08 Mei 2019
LAPORAN MINGGUAN
HARGA NILAI
MC.0 % S / D MINGGU LALU MINGGU INI S / D MINGGU INI
SATUAN BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT
( Rp BOBOT BOBOT BOBOT
) VOLUME JUMLAH HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)
PORAN MINGGUAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
47.37
39.13
100.00
34.05
-
-
-
15 Mei 2019
LAPORAN MINGGUAN
NILAI
HARGA MC.0 % S / D MINGGU LALU MINGGU INI S / D MINGGU INI
BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN
( Rp ) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
(%) (%) (%)
PORAN MINGGUAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
66.76
55.14
100.00
66.60
16.28
13.96
11.77
22 Mei 2019
LAPORAN MINGGUAN
HARGA NILAI
MC.0 % S / D MINGGU LALU MINGGU INI S / D MINGGU INI
SATUAN BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT
( Rp BOBOT BOBOT BOBOT
) VOLUME JUMLAH HARGA (%) VOLUME VOLUME VOLUME
(%) (%) (%)
PORAN MINGGUAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
100.00
100.00
100.00
100.00
40.70
100.00
100.00
29 Mei 2019
LAPORAN BULANAN
NILAI
HARGA MC.0 % S / D BULAN LALU BULAN INI S / D BULAN INI
BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN
( Rp ) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
(%) (%) (%)
APORAN BULANAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
100.00
100.00
100.00
100.00
40.70
100.00
100.00
29 Mei 2019
LAPORAN MINGGUAN
NILAI
HARGA MC.0 % S / D MINGGU LALU MINGGU INI S / D MINGGU INI
BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN
( Rp ) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
(%) (%) (%)
PORAN MINGGUAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
100.00
100.00
100.00
100.00
89.55
100.00
100.00
05 Juni 2019
LAPORAN MINGGUAN
NILAI
MC.0 % S / D MINGGU LALU MINGGU INI S / D MINGGU INI
HARGA BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN
( Rp ) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME VOLUME BOBOT
(%) BOBOT (%) (%)
PORAN MINGGUAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
10 Juni 2019
LAPORAN BULANAN
NILAI
HARGA MC.0 % S / D BULAN LALU BULAN INI S / D BULAN INI
BOBOT
NO KODE ANALISA JENIS PEKERJAAN SAT SATUAN
( Rp ) VOLUME JUMLAH HARGA (%) VOLUME BOBOT VOLUME VOLUME BOBOT
(%) BOBOT (%) (%)
APORAN BULANAN
BOBOT
TIMBA-NG
(%)
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
10 Juni 2019