Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

FEASIBILITY STUDY

SEI (Design Input Verification)

PART NAME :- BUSH (COVER INNER) PART NO. :-1500400500

CUSTOMER : PV CLEAN MOBILITY TECHNOLOGIES PVT.LTD. DATE:- 27.04.2021

M/C. Name & No. :AS PER LIST

Operator & Inspector Name :AS PER LIST


Feasibile
S.No. Characterstics Specification Checking Method Reason if not Feasibile
Yes No
1 INNER DIA. 6.00/6.03 DVC/PP ü

2 CONCENTRICITY 0.02 DAIL WITH V-BLOCK ü

3 CYLINDERCITY 0.02 DAIL WITH V-BLOCK ü

4 DIA 3.03/3.05 DMM ü

5 ROUGHNESS Ra 0.4 RT ü

6 ROUGHNESS Ra 0.8 RT ü

7 CHAMFER 4×0.2 × 45° PP ü

8 TOTAL LENGTH 4.85/5.15 DVC ü

PART SHOULD BE FREE


9 APPREAENCE FROM BURR,SHARP EDGES VISUALLY ü

UNSPECIFIED FILLET &


10 CHAMFER 0.2 PP ü

HEAT TREATMENT (CORE SUPPILIER/THIRD


11 HARDNESS) 35~40 HRC PARTY ü

RECEIVING INSPECTION OF
12 PVCMT AT SAMPLE BASIS

1) MILLIPORE VALUE 1 mg MAX ü

2)MAXIMUM PARTICLE SIZE 500 um ü

SUPPILIER/THIRD
17 MATERIAL AISI 410 PARTY ü

18 COMPONENT WEIGHT 1.0 g WEIGHING SCALE ü

Feasible (if Feasible then Write Yes) : YES

Not Feasible (Give Your Comments) :


Sign. CFT Members :
1. Mr. PARAMVIR SINGH 6. Mr. VINAY SINGH
2. Mr. PRAKASH TRIPATHI 7. Mr.
4. Mr. BANWARI SINGH 8. Mr.
5. Mr. RAJGIR 9. Mr.
DOC No:-SEI/PD/F-02A
Rev. No. : 00
Eff. Date : 01.10.2018

Remarks

You might also like