REQUESTFORINSPECTION(RFI)LOGSHEET,SGCPProject

FAHHAD SALEH GENERAL CONTRACTING COMPANY (FCC) / SAUDIARABIANSAIPEMCO.LTD.

SouthGasCompressionPlant(SGCP)PipelineProject

CONTRACT#6600042366,BI-10-01996-0006
Saipem Aramco Contract StatusOF StatusOF
PipelineTyp Date of Time of LineTag/Locat ItemTagNo. Drawing No PMT
Sl.No. ContractorRFIN0 EPMRFINo. Location Discipl. SATIP # Activity # SAIC # DescriptionofActivity Insp. Insp. or /Sub PID Insp. Status HardCop ScanCop Remarks
e Inspection Inspection ion & Rev# Insp.
Level Level Con Insp y y

SECURITY MDRK- RH-B- Compaction Inspection of select fill 1st layer


FCC-SGCP-CIV- SUPPORT TA151762- materials under the grade Slab at the grid line A- Angelo / Mario Mohamm
1 00178 N/A 18-Sep-21 8:30 AM BUILDING MDRK RH-B 151762-001- CIV SATIP-A-114-01 3.3 SAIC-A-1005 002-V0F2A B/1 and side walk way at GL B/1-5 & A-B/5 at W W Ziaul Haq Sanchez ed I Khan RE-SCH.
(SSB) BLDG-D83 Security Support Building , MDRK RH-B

SECURITY Fill Placement and Compaction Inspection of select


MDRK RH-B-
FCC-SGCP-CIV- SUPPORT TA151762- fill 1st layer materials under the grade Slab at the Angelo / Mario Mohamm
2 00183 N/A 18-Sep-21 8:00 AM BUILDING MDRK RH-B 151762-001- CIV SATIP-A-114-01 3.2 SAIC-A-1004 002-V0F2A grid line A-B/1 and side walk way at GL B/1-5 & A- W W Ziaul Haq Sanchez ed I Khan
BLDG-D83
(SSB) B/5 at Security Support Building , MDRK RH-B

SECURITY Fill Placement and Compaction Inspection of select


MDRK- RH-B-
FCC-SGCP-CIV- SUPPORT TA151762- fill 2nd layer materials under the grade Slab at the Angelo / Mario Mohamm
3 00184
N/A 18-Sep-21 8:45 AM
BUILDING
MDRK RH-B 151762-001- CIV SATIP-A-114-01 3.3 SAIC-A-1005
002-V0F2A grid line A-B/1 and side walk way at GL B/1-5 & A-
W W
Ziaul Haq Sanchez ed I Khan
BLDG-D83
(SSB) B/5 at Security Support Building , MDRK RH-B

SECURITY Compaction Inspection of select fill 2nd layer


MDRK RH-B-
FCC-SGCP-CIV- SUPPORT TA151762- materials under the grade Slab at the grid line A- Angelo / Mario Mohamm
4 00185
N/A 18-Sep-21 11:00 AM
BUILDING
MDRK RH-B 151762-001- CIV SATIP-A-114-01 3.2 SAIC-A-1004
002-V0F2A B/1 and side walk way at GL B/1-5 & A-B/5 at
W W
Ziaul Haq Sanchez ed I Khan
BLDG-D83
(SSB) Security Support Building , MDRK RH-B

SECURITY Fill Placement and Compaction Inspection of select


TINAT-GGM-
FCC-SGCP-CIV- SUPPORT TA-150855- fill 2nd layer around Electrical Duct Banks (05 No's) Angelo / Mario Mohamm
5 00186
N/A 18-Sep-21 9:15 AM
BUILDING
TINAT GGM 150528-001- CIV SATIP-A-114-01 3.2 SAIC-A-1004
001 Rev. 0F 3 between grid line A-B/1-5 at TINAT GGMSecurity
I W
Ziaul Haq Sanchez ed I Khan
BLDG-D84
(SSB) Support Building, TINAT GGM

SECURITY Compaction Inspection of select fill 2nd layer


TINAT-GGM-
FCC-SGCP-CIV- SUPPORT TA-150855- around Electrical Duct Banks (05 No's) between Angelo / Mario Mohamm
6 00187
N/A 18-Sep-21 10:30 AM
BUILDING
TINAT GGM 150528-001- CIV SATIP-A-114-01 3.3 SAIC-A-1005
001 Rev. 0F 3 grid line A-B/1-5 at TINAT GGMSecurity Support
W W
Ziaul Haq Sanchez ed I Khan
BLDG-D84
(SSB) Building, TINAT GGM

SECURITY Compressive Strength Inspection at Osaimi


Osaimi TINAT-GGM- Edgardo Mohamm
FCC-SGCP-CIV- SUPPORT Laboratory, Haradh for Lean concrete (4640 psi,
7 00188
N/A 18-Sep-21 9:00 AM
BUILDING
Laboratory 150528-001- CIV SATIP-Q-001-02 3.7 SAIC-Q-1017 N/A H W Romeo Bangco ed Al
Haradh BLDG-D84 7days) poured for the Ductbanks (5 nos) at the grid (Navab) Rashidi
(SSB) line A-B/ 2-5- (4 noS) at DR-D84-O/T-TA-150855-
001-0F3 & GLA/2-3-(1no) at DR-D84-Q-TA-150528-
002-0F2 and grounding clable blockout at Security
Support Building, at Osaimi laboratory Haradh