CHINHOYI UNIVERSITY OF TECHNOLOGY

SCHOOL OF ENGINEERING SCIENCES & TECHNOLOGY


DEPARTMENT OF FUELS AND ENERGY

Student Particulars:

Name
__________________________
Registration Number
__________________________
Email
__________________________

Attachment Particulars:

Company of Attachment _______________________


Period of Attachment _______________________
Name of Course Industrial Attachment Continuous
Assessment (CUFE 481)
Introduction

This book is to assist the student to keep record of the training. It will show the
departments and sections in which the student has worked and the time spent in
each.

Notice of Resumption of Attachment

The student is supposed to notify the Attachment coordinator and register with the
university for both semesters of attachment period.

Daily Report

The daily work carried out during the period of training is to be recorded clearly
with sketches and diagrams where applicable.

Weekly Summary Report

This is a summary of the work done in a week and should cover a report of work
covered. Students are required to present the logbook weekly to the industry-based
supervisor for assessment of content and progress.

Attachment Log Book

The logbook will be filled by the student at the end of every working day and should
comprehensively indicate the tasks done and the skills learnt in that particular day.

Academic Supervisor

The university supervisor will check the logbook when he/she visits the students to
ensure that proper training is being received, and record his/her comments.
(Student must remind the academic supervisor).

Industry Based Supervisor


The industry-based supervisor(s) will make comments on a weekly basis on the log
book.

Academic Supervisor Comments

1st Visit
………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

2nd Visit

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

Student’s Weekly Progress Chart Week Ending: 23/04/21

Day Description of Work Done New Skills Learnt

Identified all pipes in the All pipes have distinct colours


19/04/2 turbine plant. with respect to their purpose.
1

Identified all valves in the Use bypass valves.


20/04/2 plant. Learnt their purposes
1 and functions.

21/04/21 General discussion on the


main routes taken by
different types of water in
and out of the plant.

 We noticed a defect  Blowing of lines remove welding


22/04/2 hence glunt blowing, slag, loose foreign materials, iron
1 main and isolating pieces, rust etc. from the system.
valve. Receiver 3
crossover receiver 4.

23/04/21
 Looked into the steam Steam admitted into the turbine
circuit in detail. HP side should be saturated but
 Drew the steam usually that which exits will be
saturated.
circuit.

Notes
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………….
.

Industrial Supervisor Comments.

Student’s Weekly Progress Chart Week Ending : 30/04/21


Day Description of Work Done New Skills Learnt

26/04/21  We did the raw water Water comes in to the plant via
circulation system. 2 routes: southern (inner and
 Drew the circuit. outer) and northern lines.

27/04/21  Did the spec process in the


economiser.
 Equip, temperature and
pressures involved.
 Looked into the small
copper tubes (double pass)
in the economiser and their
function.

28/04/21  Looked into the cooling Range sys is used.


water circuit in detail.
 Drew the cooling water
circuit.

29/04/21  We switched on BFP 8 in  Purpose of main and


place of BFP 3 since we turbine auxiliary parts is
were firing 3 boilers energy conversion.
because BFP8 operates on
higher current.

30/04/21 We had to dose boiler 9 with Outer dosing tank valves are
Caustic soda and 100g Calgon. odd and inner are even.

Notes
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………….
.

Industrial Supervisor Comments.

Student’s Weekly Progress Chart Week Ending:……………………………………


Day Description of Work Done New Skills Learnt
Notes
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………

…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………….
.

Industrial Supervisor Comments.