Base Plate High Mast Poleeeee

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

Project:

Project no:
Author:

Project data
Project name
Project number
Author
Description
Date 20/08/2021
Design code AISC 360-16

Material
Steel A36, A572 Gr.65
Concrete 4000 psi

1/9
Project:
Project no:
Author:

Project item CON1

Design
Name CON1
Description
Analysis Stress, strain/ loads in equilibrium
Design code AISC - LRFD

Beams and columns


β – Direction γ - Pitch α - Rotation Offset ex Offset ey Offset ez X
Name Cross-section Forces in
[°] [°] [°] [mm] [mm] [mm] [mm]
M1 1 - 650 x 12 (CHS650,12) 0.0 -90.0 0.0 0 0 0 Node 0

Cross-sections
Name Material
1 - 650 x 12 (CHS650,12) A572 Gr.65

Anchors
Diameter fu Gross area
Name Bolt assembly
[mm] [MPa] [mm2]
36 A490M 36 A490M 36 1040.0 1018

Load effects (forces in equilibrium)


N Vy Vz Mx My Mz
Name Member
[kN] [kN] [kN] [kNm] [kNm] [kNm]
LE1 M1 -30.8 -24.4 -11.2 0.0 91.6 -291.2

2/9
Foundation block
Item Value Unit
CB 1
Dimensions 1850 x 1850 mm
Depth 2000 mm
Anchor 36 A490M
Anchoring length 450 mm
Shear force transfer Friction

Check

Summary
Name Value Check status
Analysis 100.0% OK
Plates 0.0 < 5% OK
Anchors 96.8 < 100% OK
Welds 42.9 < 100% OK
Concrete block 3.0 < 100% OK
Shear 21.7 < 100% OK
Buckling Not calculated

Plates
Thickness σEd εPl
Name Material Loads Check status
[mm] [MPa] [1e-4]
M1 A572 Gr.65 12.0 LE1 120.2 0.0 OK
BP1 A572 Gr.65(40) 75.0 LE1 12.6 0.0 OK
RIB1a A36 25.0 LE1 80.8 0.0 OK
RIB1b A36 25.0 LE1 62.2 0.0 OK
RIB1c A36 25.0 LE1 37.9 0.0 OK
RIB1d A36 25.0 LE1 13.7 0.0 OK
RIB1e A36 25.0 LE1 40.9 0.0 OK
RIB1f A36 25.0 LE1 75.7 0.0 OK
RIB1g A36 25.0 LE1 86.2 0.0 OK
RIB1h A36 25.0 LE1 73.0 0.0 OK
RIB1i A36 25.0 LE1 47.1 0.0 OK
RIB1j A36 25.0 LE1 9.2 0.0 OK
RIB1k A36 25.0 LE1 38.6 0.0 OK
RIB1l A36 25.0 LE1 67.0 0.0 OK

Design data

fy εlim
Material
[MPa] [1e-4]
A572 Gr.65 448.2 500.0
A572 Gr.65(40) 448.2 500.0
A36 248.2 500.0
Symbol explanation
εPl Strain
σEd Eq. stress

Overall check, LE1

Strain check, LE1


Equivalent stress, LE1

Anchors
Nf V φNcbg φNp φNsb φVcbg φVcp Utt Uts Utts
Item Loads Status
[kN] [kN] [kN] [kN] [kN] [kN] [kN] [%] [%] [%]
A1 LE1 106.7 0.0 459.7 0.0 0.0 127.4 1138.9 96.8 0.0 94.7 OK
A2 LE1 111.8 0.0 459.7 0.0 0.0 127.4 1138.9 96.8 0.0 94.7 OK
A3 LE1 83.0 0.0 459.7 0.0 0.0 272.4 1138.9 96.8 0.0 94.7 OK
A4 LE1 37.3 0.0 459.7 0.0 0.0 272.4 1138.9 96.8 0.0 94.7 OK
A5 LE1 0.0 0.0 0.0 0.0 0.0 272.4 1138.9 0.0 0.0 0.0 OK
A6 LE1 0.0 0.0 0.0 0.0 0.0 0.0 1138.9 0.0 0.0 0.0 OK
A7 LE1 0.0 0.0 0.0 0.0 0.0 0.0 1138.9 0.0 0.0 0.0 OK
A8 LE1 0.0 0.0 0.0 0.0 0.0 0.0 1138.9 0.0 0.0 0.0 OK
A9 LE1 0.0 0.0 0.0 0.0 0.0 0.0 1138.9 0.0 0.0 0.0 OK
A10 LE1 0.0 0.0 0.0 0.0 0.0 0.0 1138.9 0.0 0.0 0.0 OK
A11 LE1 29.3 0.0 459.7 0.0 0.0 0.0 1138.9 96.8 0.0 94.7 OK
A12 LE1 77.0 0.0 459.7 0.0 0.0 127.4 1138.9 96.8 0.0 94.7 OK

Design data

φNsa φVsa
Grade
[kN] [kN]
36 A490M - 1 473.2 263.6
Symbol explanation
Nf Tension force
V Resultant of shear forces Vy, Vz in bolt
φNsa Steel strength in tension – ACI 318-14 – 17.4.1
φVsa Steel strength in shear – ACI 318-14 – 17.5.1
φNcbg Concrete breakout strength in tension – ACI 318-14 – 17.4.2
φNp Pullout strength in tension – ACI 318-14 – 17.4.3
φNsb Concrete side-face blowout strength in tension – ACI 318-14 – 17.4.4
φVcbg Concrete breakout strength in shear – ACI 318-14 – 17.5.2
φVcp Concrete pryout strength in shear – ACI 318-14 – 17.5.3
Utt Utilization in tension
Uts Utilization in shear
Utts Utilization in tension and shear
Project:
Project no:
Author:

Welds
Th Ls L Lc Fn φRn Ut
Item Edge Xu Loads Status
[mm] [mm] [mm] [mm] [kN] [kN] [%]
BP1 RIB1a E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 8.0 88.1 9.1 OK
E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 8.1 88.1 9.2 OK
M1-arc 4 RIB1a E70xx ◢6.0◣ ◢8.5◣ 452 28 LE1 15.8 39.5 39.9 OK
E70xx ◢6.0◣ ◢8.5◣ 447 28 LE1 15.2 39.1 38.7 OK
BP1 RIB1b E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 4.6 88.1 5.3 OK
E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 5.7 88.1 6.5 OK
M1-arc 9 RIB1b E70xx ◢6.0◣ ◢8.6◣ 460 29 LE1 12.1 40.0 30.4 OK
E70xx ◢6.0◣ ◢8.6◣ 439 27 LE1 10.1 38.3 26.3 OK
BP1 RIB1c E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 1.9 88.1 2.2 OK
E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 3.4 88.1 3.9 OK
M1-arc 14 RIB1c E70xx ◢6.0◣ ◢8.7◣ 468 29 LE1 7.2 40.7 17.6 OK
E70xx ◢6.0◣ ◢8.7◣ 431 27 LE1 5.1 38.0 13.5 OK
BP1 RIB1d E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 1.7 88.1 1.9 OK
E70xx ◢12.5◣ ◢17.7◣ 250 28 LE1 4.0 88.2 4.5 OK
M1-arc 20 RIB1d E70xx ◢6.0◣ ◢8.3◣ 432 27 LE1 1.8 41.3 4.4 OK
E70xx ◢6.0◣ ◢8.3◣ 467 29 LE1 1.3 40.9 3.2 OK
BP1 RIB1e E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 3.5 88.1 4.0 OK
E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 4.4 88.1 5.0 OK
M1-arc 25 RIB1e E70xx ◢6.0◣ ◢8.4◣ 440 28 LE1 6.5 38.9 16.7 OK
E70xx ◢6.0◣ ◢8.4◣ 458 29 LE1 7.7 40.1 19.1 OK
BP1 RIB1f E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 5.9 88.1 6.7 OK
E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 6.5 88.1 7.4 OK
M1-arc 30 RIB1f E70xx ◢6.0◣ ◢8.5◣ 448 28 LE1 14.4 39.5 36.5 OK
E70xx ◢6.0◣ ◢8.5◣ 450 28 LE1 14.6 39.6 36.8 OK
BP1 RIB1g E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 7.2 88.1 8.2 OK
E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 7.3 88.1 8.3 OK
M1-arc 35 RIB1g E70xx ◢6.0◣ ◢8.6◣ 457 29 LE1 17.2 40.0 42.9 OK
E70xx ◢6.0◣ ◢8.6◣ 442 28 LE1 15.2 38.9 39.2 OK
BP1 RIB1h E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 6.7 88.1 7.6 OK
E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 6.4 88.1 7.3 OK
M1-arc 40 RIB1h E70xx ◢6.0◣ ◢8.6◣ 465 29 LE1 14.4 40.6 35.6 OK
E70xx ◢6.0◣ ◢8.6◣ 434 27 LE1 11.6 38.2 30.4 OK
BP1 RIB1i E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 4.9 88.1 5.5 OK
E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 3.8 88.1 4.3 OK
M1-arc 46 RIB1i E70xx ◢6.0◣ ◢8.3◣ 429 27 LE1 10.3 39.4 26.1 OK
E70xx ◢6.0◣ ◢8.3◣ 470 29 LE1 7.1 41.3 17.3 OK
BP1 RIB1j E70xx ◢12.5◣ ◢17.7◣ 250 28 LE1 2.5 88.2 2.9 OK
E70xx ◢12.5◣ ◢17.7◣ 250 28 LE1 1.7 88.2 1.9 OK
M1-arc 51 RIB1j E70xx ◢6.0◣ ◢8.4◣ 436 27 LE1 1.0 37.2 2.8 OK
E70xx ◢6.0◣ ◢8.4◣ 462 29 LE1 2.0 40.5 4.9 OK
BP1 RIB1k E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 3.9 88.1 4.4 OK 7 / 9
Project:
Project no:
Author:

Th Ls L Lc Fn φRn Ut
Item Edge Xu Loads Status
[mm] [mm] [mm] [mm] [kN] [kN] [%]
E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 2.6 88.1 2.9 OK
M1-arc 56 RIB1k E70xx ◢6.0◣ ◢8.4◣ 445 28 LE1 6.1 39.0 15.7 OK
E70xx ◢6.0◣ ◢8.4◣ 453 28 LE1 7.1 39.4 18.0 OK
BP1 RIB1l E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 6.9 88.1 7.8 OK
E70xx ◢12.5◣ ◢17.7◣ 249 28 LE1 5.6 88.1 6.4 OK
M1-arc 61 RIB1l E70xx ◢6.0◣ ◢8.5◣ 453 28 LE1 12.5 39.8 31.4 OK
E70xx ◢6.0◣ ◢8.5◣ 445 28 LE1 12.6 38.9 32.4 OK
BP1 M1 E70xx ◢5.7◣ ◢8.0◣ 2004 31 LE1 6.0 57.5 10.4 OK
E70xx ◢5.7◣ ◢8.0◣ 2004 31 LE1 6.0 57.6 10.4 OK

Symbol explanation
Xu Filler metal tensile strength
Th Throat thickness of weld
Ls Leg size of weld
L Length of weld
Lc Length of weld critical element
Fn Force in weld critical element
φRn Weld resistance AISC 360-16 J2.4
Ut Utilization

Concrete block
A1 A2 σ Ut
Item Loads 2 2 Status
[mm ] [mm ] [MPa] [%]
CB 1 LE1 524218 3422500 0.9 3.0 OK

Symbol explanation
A1 Loaded area
A2 Supporting area
σ Average stress in concrete
Ut Utilization

Shear in contact plane


V φVr Ut
Item Loads Status
[kN] [kN] [%]
BP1 LE1 26.9 124.0 21.7 OK

Symbol explanation
V Shear force
φVr Shear resistance
Ut Utilization

Buckling
Buckling analysis was not calculated.

Code settings
Item Value Unit Reference 8/9
Project:
Project no:
Author:

Item Value Unit Reference


Friction coefficient - concrete 0.40 - ACI 349 – B.6.1.4
Friction coefficient in slip-resistance 0.30 - AISC 360-16 – J3.8
Limit plastic strain 0.05 -
Weld stress evaluation Plastic redistribution
Detailing No
Distance between bolts [d] 2.66 - AISC 360-16 – J3.3
Distance between bolts and edge [d] 1.25 - AISC 360-16 – J.3.4
Concrete breakout resistance Yes
Base metal capacity check at weld fusion face Yes AISC 360-16 – J2-2

9/9

You might also like