Joint Commissioning Report
Certified that a Grid Connected SPV Power Plant of _________ kWp capacity has been installed at the
site
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________district ________________________________of ________________________________
__________________________which has been installed by M/s ________________________________
on ________________________________________. The systems is as per BIS/MNRE/UHBVN
specifications. The system has been checked for its performance on _____________________________
with/without installation of bi-directional meter and its working satisfactorily. The system is suitable for
installation of bi-directional and gross energy meters.