90 m3 1 No. 11 Hrs Batching Plant 2 (Full Production)
90 m3 1 No. 11 Hrs Batching Plant 2 (Full Production)
Batching Plant 1
45 m3 1 no. 45 m3/hr 22 hrs
(full production)
Batching Plant 2
90 m3 1 no. 90 m3/hr 11 hrs
(full production)
Concrete Trucks 8m3
24 m3 3 no. 72 m3/hr 14 hrs
( 3 loads per hour)
Concrete Pumps
96 m3 1 no. 96 m3/hr 10 hrs
(8m3 every 5 minutes)
7 hrs
14 hrs
10 hrs
% needed Combined
121.21%
60.61%
121.21%
33.33% 33.33%
33.33% 33.33%