Reviewer PD1096
Reviewer PD1096
Reviewer PD1096
4. WIDTH AND HEIGHT OF DOORS WILL BE NOT < ___________ MM, IN WIDTH, NOT
<_______M IN HEIGHT, OPENING WILL BE 90 DEGREES AND THE EXIT WAY CLEAR
WIDTH NOT <700MM
• 900,20
10. IF ONLY 2 EXITS REQUIRED, SHALL BE PLACED DISTANCED APART NOT <____ OF
THE PERIMETER AREA.
• 1/5
11. FOUNDATIONS – NOT <_______ MM BELOW THE GRADE, MAY ENCROACH _______
MM INTO PUBLIC SIDEWALK AREAS.
• 600,500
16. WINDOW OPENINGS FOR ROOM MUST HAVE AT LEAST _____ % OF THE FLOOR
AREA WITH A MINIMUM AREA OF ___ SQ.M.
• 10.1
17. WINDOW OPENINGS FOR BATHS AND TOILETS MUST HAVE AT LEAST ______ OF
THE FLOOR AREA WITH A MINIMUM AREA OF _____ SQ.M.
• 1/10, 240
19. WHICH ARE NOT INCLUDED FOR THE REQUIREMENTS FOR BUILDING PERMIT?
• TAX DOCUMENTS
28. THE WIDTH OF A STAIR WAY IF THE OCCUPANT LOAD OF LESS THAN 50 SHALL
NOT BE <________M.
• 0.80
29. THE SLOPE OF AN EXIT PASSAGE WAY WILL HAVE A MAXIMUM SLOPE OF
• 1/8
32. THE SIZE OF ROOM FOR HUMAN HABITATION MUST BE AT LEAST AN AREA OF
_______ SQ.M AND _____ M MINIMUM DISTANCE.
• 6,2
35. THE NUMBER OF EXITS FOR MEZZANINE WITH 185SQ.M AREA OR MORE THAN 18M
IN DIMENSION WILL BE EXITS
• 2
36. THE NUMBER OF EXITS FOR ABOVE 1ST STOREY WITH 10 OCCUPANT ____EXITS
• 2
42. THE DOOR THAT WILL BE REQUIRED IF THE EXIT DOOR SHALL SWING TO EXIT
TRAVEL IN HAZARDOUS AREAS W/ 50 OR MORE OCCUPANT LOAD.
• SWING
44. THE BUILDING PERMIT WILL BE NULL OR VOID IF THE CONSTRUCTION DIDN’T
COMMERCE THE WORK IN A PERIOD OF
• 12 MONTHS
45. THE BUILDING PERMIT WILL BE NULL OR VOID IF THE CONSTRUCTION HAS BEEN
ABANDONED FOR HOW MANY DAYS
• 120
47. STAIR WITH A STRAIGHT RUN, THE LANDING WILL BE A MAXIMUM OF ________ M
VERTICAL DISTANCE
• 1.2 Commented [a1]:
62. LOCATED PARTLY IN ONE (1) FIRE ZONE AND PARTLY IN ANOTHER
• HIGH RESTRICTIVE FIRE ZONES
63. IN WINDING STAIRWAYS, THE NARROWER SIDE OF THE TREAD WILL BE_______
• 150-300MM
67. HOW MANY SETS OF PLANS AND SPECIFICATION ARE NEEDED FOR THE
REQUIREMENTS OF BUILDING PERMIT?
• 5
68. HOW MANY DAYS IT WILL TAKE FOR THE ISSUANCE OF BUILDING PERMIT?
• 15 DAYS UPON PERMIT
71. FOR PROTECTIVE NETS/SCREEN THE G. I WIRE GAUGE MUST BE______ MM MESH
_____NET: CANVAS
• 16.38MM/ NYLON
77. FOR EXIT SIGN ILLUSTRATION THE MINIMUM LUX EQUIVALENT WILL BE
• 10.7
78. FOR CIRCULAR STAIR THAT WILL BE USED AS A EXIT THE MINIMUM WIDTH OF RUN
WILL BE <______MM
• 250
79. FOR ATTICS THE ACCESS WILL BE NOT <______ MM SQ.M OR IN DIAMETER, MIN
CLEAR HEADROOM OF _______MM
• 600,800
81. FIRE PUMPS WILL BE CONNECTED TO STREET MAIN W/ NOT LESS THAN
• 100MM DIAMETER
93. AREAS WITHIN WHICH ONLY CERTAIN TYPES OF BUILDINGS ARE PERMITS TO BE
CONSTRUCTED BASED ON THEIR USE OR OCCUPANCY, TYPES OF CONSTRUCTION.
• FIRE ZONES
99. SIZE & DIMENSIONS OF COURTS MIN. HORIZONTAL DIMENSION NOT <_____
• 2.0M
101. SECONDARY BLDG. LOCATED WIN THE SAME PREMISES THE USE OF INCIDENTAL
TO THAT MAIN BLDG.
• ANCILLARY BUILDING
102. PHYSICAL CHANGE MADE TO INCREASE ITS VALUE & IMPROVE ITS AESTHETIC
QUALITY.
• RENOVATION