Professional Documents
Culture Documents
Water Shutoff & Zone Transfer in Cambay #15 Well: Adjei Stephen Mtech Petroleum Eng Indian School of Mines
Water Shutoff & Zone Transfer in Cambay #15 Well: Adjei Stephen Mtech Petroleum Eng Indian School of Mines
Water Shutoff & Zone Transfer in Cambay #15 Well: Adjei Stephen Mtech Petroleum Eng Indian School of Mines
c/rise to surface
950m
High Press Gas
tubing
c/rise to 960m
Oil
1400 – 1404.5m
Oil
3
WELLBORE CLEAR AT 1425M
Water
PROBLEM STATEMENT & SOLUTION
THERE IS 100% WATER
CUT FROM THE
CAMBAY #15 WELL
TO CURB THIS, A
SQUEEZE CEMENT JOB
WILL BE CARRIED OUT
IN THE OPEN INTERVAL
AND & ZONE
TRANSFERRED TO
UPPER SANDS
4
CAUSES OF EXCESS WATER
PRODUCTION
CONING OR
CUSPING
CHANNELING
VISCOUR FINGERING
WATER
ENCROACHMENT
5
WHY THE NEED TO CONTROL WATER
PRODUCTION
6
NEED FOR WORKOVER
workover refers Completing for
Production from a New
to any remedial Reservoir
operation done Equipment failure (pump
failure)
on a well to Wellbore problems
restore, maintain ( sanding, formation
or enhance the damage, paraffin
accumulation, water and
recovery from gas coning)
the well Mechanical problems
(casing leaks, tubing
leaks, cement failure)
7
SQUEEZE CEMENTING
This refers to the process of injecting cement slurry
into a zone for purposes such as
To abandon a zone
8
PROCEEDIA FOR SQUEEZE JOB ON
CAMBAY #15
1. Well volume was displaced with water and
subdued/KILLED with brine of specific gravity 1.02
9
4. Tubing shoe (Tubing) was then adjusted up by 2m to 1423m
Other reasons;
• To ensure that the perforations are open and ready to accept
fluids.
• To obtain an estimate of proper cement slurry injection rate
• To estimate the pressure at which the squeeze job will be
performed
• To estimate amount of slurry to be used
10
PUMPING SLURRY
5. Cement slurry was
then squeezed into the
existing interval and
cement top kept at
1380m
6. Tubing was pulled
out AND waiting on
cement was done for
24hours
11
7. TCR bit was then run on 2 3/8’’ drill pipe to tag
cement top ,plug was then tested at 100 KSC, then
drilled to 1390m and TCR bit pulled out
12
HERMETICAL TESTING & RE-PERFORATION
11. Well was
hermetically tested to
check for leaks, brine
weight increased from
1.02 sp GR to 1.03 sp
GR
14.BOP was nippled down and X-mas tree nippled up. Kill
fluid was displaced with water
Finally well was activated by air compressor
14
Thank You!
15