Professional Documents
Culture Documents
Contractor Job Safety Inspection Checklist For 06.02.2021 (For ANWAR)
Contractor Job Safety Inspection Checklist For 06.02.2021 (For ANWAR)
Contractor Job Safety Inspection Checklist For 06.02.2021 (For ANWAR)
PMT Closure
Date of Issues Closure
Description of Findings Recommended Action Confirmation
Inspection Classification Date (Yes/No)
Observed that, Toilets septic tank has Inform to Construction Supervisor and
been overflowed and there is no water, X. Health and advice him to provide water and soap
30-May-21 31-May-21 No
soap and proper schedule to clean it on Welfare and get preventive action on it to
regular basis. clean it regularly.
It has been observed that, During the Temporarily Stopped by the area
painting activity painters are using normal XIV. Chemical safety officer and instructed to their
2-Jun-21 3-Jun-21 Yes
N-95 mask instead of using cartridge Handling supervisor to provide cartridge mask
mask . ASAP and they provided after while.
The site portable toilet doesn't have For cleaning and sanitation purposes
X. Health and
2-Jun-21 sufficient water supply for cleaning and sufficient water supply must be 3-Jun-21 No
Welfare
sanitation purpose. provided for the site's portable toilets.
Mario Caringal 2nd June 2021 Ossama A. Al-Shuwaikhat 2nd June 2021
SAPMT Safety Advisor Name, Signature & Date Contractor Safety Manager Name, Signature & Date