Professional Documents
Culture Documents
RiskAssessment FireAlarmInstallation
RiskAssessment FireAlarmInstallation
RiskAssessment FireAlarmInstallation
Risk Assessment
Fire Alarm Installation
Project Location: Common Parts -
Client: Allsop Job Number: 899559 MK42 9GY
Flying Masonry Bits 12 PPE - Gloves, goggles and safety boots / Equipment guards and sa
Manual Handling 16 The manual handling is kept to a minimum / Consider manual han
property. Use lifting equipment or a team-lift if required.
Trip Hazards 16
Ladder checks and industrial EN 131 rated step ladders used. Acc
are followed and checked before works commence.
Working at height 16
Page 1 of
llation
ocation: Common Parts - Regency Mews SC, Walsingham Close, Bedford,
Y
ontrol Measures
10
htfully.
. Do not allow build up of waste on site.
ACTIVITY
Risk Assessment
Fire Alarm Installation
Vibration 9
All staff are trained to spot and identify potential ACM. Staff are i
ASBESTOS 25 and report any findings.
Document Ref 1
Doc Revision
Doc Rev Date Oct-15
Page 2 of
llation
ocation
ontrol Measures
12
Lone working 25
ACTIVITY
Health and Safety policy and procedures in place.
Company vehicle policy vehicles are locked when staff not near them
Mobile phones (charged and switched on) to be carried at all times – with emergency
numbers in phone. In-car mobile phone charger in case of battery failure
All incidents reported, investigated and recorded - Sickness monitoring Vehicles carry first
aid kits and fire extinguishers.
All staff are trained to use equipment and are competent Torches provided
Hi viz wear provided as well as PPE
Staff supplied with means to pick up used syringes safely All equipment is maintained and
tested as per policy Use of 110 volt and battery tools
Carry minimum of valuables and possessions, and keep them out of sight. Review lone
working policy regularly and remind staff to be aware of the need to be particularly careful
in lone working situations.
Ensure all staff are made aware of problem areas in the locality and any residents who may
present a risk to lone working.
Site specific hazards and controls must be entered on the DRA sheet and signed off by
contractor
Assessment is made on the day of the works when working externally to ensure that the
weather conditions are suitable for the types of works being completed.
Document Ref
ACTIVITY
Doc Revision
Doc Rev Date
12
Oct-15
Risk Assessment Fire Alarm Installation
HIGH
Likelihood
MEDIUM
LOW
Information, instruction and training requirements:
Site Supervisor to be made aware of potential hazards and appropriate control measures by Estimator / Contracts Man
authorisation to carry out projects of this size and risk status.
Supervisor to explain hazard areas associated with works. Staff supervision to continue and Supervisor to judge competence of operativ
analysis.
Safety courses should be attended or a programme for attendance established and should in
General Site Health and Safety Awareness; Basic fire training for site Supervisors, First Aid – basic first aid for site staff , Work on Live Roa
ACTIVITY
Risk Assessment
Fire Alarm Installation
Site specific Hazards Additional co
larm Installation Page 1 of
5
Certainly 5 10 15 20 25
4
Probable 4 8 12 16 20
3
Possible 3 6 9 12 15
2
Remote 2 4 6 8 10
1
Improbable 1 2 3 4 5
1 2 3 4 5
Negligible Minor Serious Major Fatal
Potential Severity
measures by Estimator / Contracts Manager before leaving for site. Supervisor must have
projects of this size and risk status.
visor to judge competence of operatives and provide feedback to management to facilitate training needs
analysis.
attendance established and should include where appropriate:
st aid for site staff , Work on Live Roads, Work on contaminated sites, Confined Spaces, Work at height, etc.
Document Ref 1
TY
Doc Revision
Doc Rev Date Oct-15
Page 1 of
larm Installation
Additional controls
Prepared by: Position
Date Signed:
Date Signed:
Date Signed: