Professional Documents
Culture Documents
Machine To Machine Applicatoin As KWH Meter Controlling
Machine To Machine Applicatoin As KWH Meter Controlling
Controlling
Gunawan Wibisono Euis Suryati
Dept of Electrical Engineering, Universitas Indonesia Faculty of Computer Engineering, Diploma
Kampus Baru UI Depok, 16424, INDONESIA Institut Pertanian Bogor, INDONESIA
gunawan@eng.ui.ac.id mayhoneys@gmail.com
Abstract—At the moment, PT. PLN (PLN) as national residential customer had not been installed and implemented
electricity company have to visit customer place to disconnect or yet. In order to reduce cost and improve services to customer,
switch off (permanent break) the KWh meter if the customer did PLN have to install smart KWh meter that have capability to
not pay the billing on time. It is important to design of a system break the electricity to the customers if they don’t pay the
that could automatically disconnect electricity that flow to billing one month after deadline. This system can be
customer temporary or/and permanent when the bill is not paid implemented if PT PLN billing system can monitor directly the
by customer while deadline is overdue. In this research, M2M as status customer payment. Recently, the machine to machine
KWh meter controlling system will be designed and evaluated its (M2M) communication system is widely implemented in smart
performance. The proposed system is designed to minimize the
metering system, transportation, logistic, and many
time for breaking and improve PLN services. The proposed
system consists of KWh meter, actuator and sensor,
applications at factory.
communication devices and application. The command to It is important to design of a system that could
actuator to disconnect or switch off (permanent break) is based automatically break both temporary and permanent to
on the billing status of the customer at deadline of payment electricity that flow to customer when the bill is not paid by
period. If the customer didn’t pay the billing until deadline at the customer when deadline is overdue. In this research, M2M as
second month, the electricity will be disconnected to customer KWh meter controlling system will be designed and evaluated
KWh meter, while the KWh meter will be permanent broke its performance. The proposed system is designed to minimize
(switched off) if the customer didn’t pay the billing until the
the time for breaking and improve PLN services. The proposed
deadline of the third months. It is shown from the tested results,
that the proposed KWh meter is working properly. It is also
system consists of KWh meter, actuator and sensor,
shown from the tested results of the KWh meter controlling that communication devices and application. It is shown from the
the response time to device to disconnect or switch off is shorter results that the proposed system is working properly.
than the time response SMS notification that sent to the
customer. II. SYSTEM DESIGN
Keywords—PLN; M2M; KWh meter; disconnect; permanent The proposed M2M application as KWH meter controlling
break consists of KWh meter, actuator and sensor, communication
devices, and billing system application. Fig.1. shows the
proposed KWh meter controlling.
I. INTRODUCTION
978-602-50431-0-9/17/$31.00 ©2017 IEEE Customers of
the national electrical power company in Indonesia PT. PLN
(Persero) have to pay their electricity usage billing among 1st -
20th day every month. When customers do not pay after the
deadline on 20th each month, they gave penalty that have to be
paid by customers. If the billing and penalty don’t be paid by
customer until 20th next month, PT. PLN will break temporary
electrical at customer residence by sealing the kWh meter. It
was conducted by coming to customers residence and break the
KWh meter kit without any notice. If the billing and penalty
can’t be paid by customer until 3 months, PT PLN breaks
permanently by depriving all customer electrical installations.
In this case, PT PLN have to come manually to customer
residence to break the electrical connection, it takes time,
energy, and cost. Now, even PLN has automatic meter reading
Fig. 1. The proposed KWh meter controlling
(AMR) system, the AMR system is only installed and
implemented at big industry, small and medium industries,
978-602-50431-1-6/17/$31.00 ©2017 IEEE 425 2017 15th Intl. Conf. QiR: Intl. Symp. Elec. and Com. Eng
At the PT PLN side, the billing statement is sent to the
industrial customer via SMS to mention deadline and the
amount of electricity usage. If the industrial customer doesn’t III. IMPLEMENTATION SYSTEM
pay the billing at last month of the electrical usage, PT PLN
send warning statement to the customer on the next (second) Fig. 3 shows fabricated the proposed KWh meter that is
month. If in the second month, the industrial customer can’t consisted of power supply/adapter, Arduino microcontroller
pay the billing, PT PLN will break off the electricity via switch with Ethernet shield and GSM shield, relay and contactor.
on the contactor at KWh meter with notification, after Arduino microcontroller controls all signals that come to and
receiving SP1. The break off process is done automatically, from actuator in this case using relay. Ethernet shield module is
which did by sending switch on signal via communication used for data communication using Wi-Fi module while GSM
device to activate the actuator. If the industrial customer can shield is used using cellular. Microcontroller will activate relay
pay the bill, then PT PLN send switch off to de-activate the switch on to the contactor that connect to the electric motors
actuator. If until in the third month, the industrial customer and tree-phase systems. If the industrial customer paid the
can’t pay the bill, PT PLN will send switch on signal to electricity billing, the PLN will send switch off signal
activate the actuator without by depriving all customer command to de-activate relay.
electrical installations, after receiving SP2. Fig.2. shows the
flow diagram of KWh meter controlling process.
Contactor
Adaptor
GSM Shield
SIM900
Relay Arduino
Ethernet
Shield
426
9. 0 Disconnect Deliver response of the proposed KWh meter test using GSM
10. 1 Connect - connection. It is shown from Table 3, that the proposed KWh
meter is working properly.
Table 2. shows the response of the proposed KWh meter
controlling based on deadline billing period. It is shown that
the proposed KWh meter has been worked well.
TABLE II. THE RESPONSE OF KWH METER USING WI-FI BASED ON TABLE III. THE DEVICE RESPONSE OF THE PROPOSED KWH METER
DEADLINE BILLING PERIOD USING GSM CONNECTION
Fig. 5. Time response of device and SMS notification of the proposed KWh
Fig. 4. Time response of device and SMS notification of the proposed KWh meter using GSM
meter using Wi-Fi
It is shown from Figs. 4 and 5 that the device response of
It is shown from Fig 4. That the time response of SMS
the proposed KWh meter using GSM is longer than that using
notification is longer than that of time response of device. It is
Wi-Fi, it is because the signal from PLN is directly sent to
because the signal on/off for activation or de-activation of relay
KWh meter rather than using GSM that has to send via
is sent directly, while SMS notification is sent from PLN to
operator equipment. While the SMS notification response time
provider, then send to the KWh meter.
of the proposed KWh meter using GSM is as same as using
The proposed KWh meter using GSM connection is tested Wi-Fi connection.
as same as using Wi-Fi connection. In GSM connection, the
signal is sent via SMS message. Table 3. shows the device
427
V. CONCLUSION REFERENCES
M2M application as KWh meter controlling has been [1] Aminullah, Safriadi N, Sukamto AS., “Design of Application of Home
designed, tested, and evaluated. The proposed system is Automation IP Based on Android,’ Journal of Education and Research
Information (JEPIN), Vol. 2 No. 1. Pontianak, 2015 (in Bahasa)
designed to minimize the time for breaking and improve PLN
[2] Amit B and Lokhande SS, “Wireless ARM-Based Automatic Meter
services. The proposed system consists of KWh meter, actuator Reading & Control System (WAMRCS),” International conference on
and sensor, communication devices and application. The Pervasive Computing (ICPC). Pune.
command to actuator to disconnect or switch off (permanent [3] Andrianto Susanto A, “Application of Remoto Control For Lamp Based
break) is based on the billing status of the customer at deadline on Android,” Pros National Seminar on Technology and Infomation,
of payment period. It is shown from the results that the Kudus
proposed KWh meter using both Wi-Fi and GSM connections [4] Ashna K and Sudish NG, “GSM Based Automatic Energy Meter
is working properly. The device time response of the proposed Reading System with Instant Billing,” IEEE. India.
KWh meter using GSM is longer than that using Wi-Fi. While [5] Dinata I and Sunanda W, “Implementation of Web based Energi
the time response of SMS notification of the proposed KWh Electric Wireless Monitoring,” J National Electrical Engineering, Vol. 4,
No. 1 March 2015.
meter using Wi-Fi is as same as using GSM connection.
[6] Erawan, “Analysis and Design of Monitoring Server Network Using
PHP, SNMP, and SMS Gasteways,” Thesis, Bina Nusantara Universitas,
ACKNOWLEDGMENT 2012 (in Bahasa)
[7] Perdana SP, Syahrial, and Saodah S,”Design of Current Electric
This research is supported by Hibah Publikasi Protection Using Microcontroller ATMEGA328 with Arduino Uno,” J.
Internasional Terindeks untuk Tugas Akhir Mahasiswa (Hibah Online Institut Teknologi Nasional. Bandung, 2012 (in Bahasa).
PITTA) No. 783/UN2.R3.1/HKP.05.00/2017. [8] Seong Ho Ju, “An Efficient Home Energy Management System based
on Automatic Meter Reading,” IEEE International Symposium on
Power Line Communications and Its Application. Korea.
428