SESSION XI
Ms. Glenda G. Gayo
SESSION XII
Engr. Michael Jay B. Autor
SESSION XIII
Mr. Jesus Morales and Engr. Eric I.
OBJECTIVES
SESSION I
2018 CMGP
LGU’s Own Budget for Development Projects
Other Sources
PROJECT CYCLE FOR
ROAD CONSTRUCTION
SESSION II
Road Planning
2018 CMGP
● Spatial Framework
● Settlement Framework
Road Design
2018 CMGP
Objective:
● Optimize efficiency
● Optimize safety
PROJECT CYCLE FOR ROAD CONSTRUCTION
Road ● If By Contract
Procurement ● If By Administration ( should be guided on
2018 CMGP Appendix 1 of RA 9184)
Road Construction
2018 CMGP
2018 CMGP
PROJECT CYCLE FOR ROAD CONSTRUCTION
Pre-construction Conference
2018 CMGP
PROJECT CYCLE FOR ROAD CONSTRUCTION
Pre-construction Survey (StakeOut)
2018 CMGP
PROJECT CYCLE FOR ROAD CONSTRUCTION
➔Testing of Materials
➔Clearing and Grubbing
➔Roadway
2018 CMGP and Drainage Excavation
➔Embankment Construction
➔Erosion Control Installation
Construction ➔Construction/Installation of Cross and Side
Drainage
➔Subbase Construction
➔Construction of Road Shoulders
➔Construction of Surface Course
PROJECT CYCLE FOR ROAD CONSTRUCTION
2018 CMGP
➔Pre-Final Inspection
➔Punch Listing
➔Final Inspection
➔Defects Liability Period
➔Turnover
PROJECT CYCLE FOR ROAD CONSTRUCTION
Road
Maintenance 2018 CMGP
These are the feedback mechanism that informs the new round of
road planning and subsequent design. This will determine whether
the objectives and targets of the road project have been
achieved within the desired period.
PROJECT CYCLE FOR ROAD CONSTRUCTION
Community
Consultations 2018 CMGP
For the welfare of the project beneficiaries, these should be conducted during
planning or identification, project feasibility, road design, road construction, and
monitoring and evaluation.
2018 CMGP
INTRODUCTION TO
ROAD DESIGN
SESSION
III
- Optimize safety
EFFICIENCY
Less cost of construction and in
maintenance but optimum
2018 CMGP
standard (all weather road) and
livability
2018 CMGP
ACPT Tech Brief, 2012, Junction National - Adrialuna - Bagong Buhay - Pagkakaisa Road, Oriental Mindoro
Figure 2: View of Concrete Reinforcement using Grade 60 bars
SAFE DESIGN PRINCIPLES
A sound road surface An adequate width or
cross-section
Figure 15.3, DPWH Highway Safety Design Standards Figure 15.9, DPWH Highway Safety Design Standards
Part 1: Road Safety Design Manual, May 2012 Part 1: Road Safety Design Manual, May 2012
SAFE DESIGN PRINCIPLES
Management of traffic Speed management
conflicts at intersections
2018 CMGP
https://www.bikesrepublic.com/news/video-us20000-illegal-
Figure 15.5, DPWH Highway Safety Design Standards Part scooter-street-race-philippines/
1: Road Safety Design Manual, May 2012
SAFE DESIGN PRINCIPLES
http://en.webfail.net/image/road-marking-fail-fail-picture.html
https://wonderfulengineering.com/these-22-road-construction-fails-will-make-you-roll-on-the-floor-laughing/
OVERALL ROAD DESIGN PROCEDURE
Design Considerations Value
Engineering,
Quality Assurance
Survey and Mapping and Control
Design Output
DESIGN DATA COMPONENTS
P - Political
2018 CMGP
E - Economical
S - Social
T - Technological
E - Environmental
L - Legal
2018 CMGP
DESIGN PLAN
DESIGN
PHASES AS-STAKED PLAN
AS-BUILT DRAWINGS
INTRODUCTION TO
ENGINEERING SURVEY
SESSION
IV
A technique, profession,
2018 CMGP
CIVIL ENGINEER
RA 544 “An act of regulating the practice of civil engineering in the Philippines” states that:
The practice of Civil Engineering Services shall embrace but not limited to the following activities:
(2) Field investigations and engineering data collection
OLD SURVEY INSTRUMENTS
2018 CMGP
2018 CMGP
CURRENT COMMON SURVEY INSTRUMENT
2018 CMGP
CURRENT COMMON SURVEY INSTRUMENT
2018 CMGP
CURRENT COMMON SURVEY INSTRUMENT
2018 CMGP
Notes to Remember:
● Topographic surveys for infra projects makes use of coordinate system
rather than the bearing distance system.
● The use of Electronic Controller provided the advancement in survey
procedure and processing.
CURRENT COMMON SURVEY INSTRUMENT
2018 CMGP
SURVEY PROCEDURES
FOR ROAD PROJECTS
SESSION V
2018 CMGP
•Road Opening
•Road Upgrading (Gravel to Concrete or Asphalt)
•Road Realignment (Diversion Road, Alignment
Shifting, etc.)
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
•Widening/Off-carriageway project
•Additional road component (shoulders, sidewalk, bike
lanes, etc.)
•Road Slip
SURVEY PROCEDURES FOR ROAD PROJECTS
SURVEY PROCEDURES FOR ROAD PROJECTS
HazardHunterPH
https://hazardhunter.georisk.gov.ph/
https://hazardhunter.geo
risk.gov.ph/
“Country's one-stop shop for hazard assessment. Find out if a location is prone to seismic, volcanic, or
hydrometeorologic hazards. Generate hazard assessment reports. See which critical facilities and
areas in the Philippines are prone to different hazards. All hazard information used for assessment has
been generated by government agencies.”
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
https://lipad.dream.upd.edu.ph/
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
● Right-of-way
● Land Use
● Length
● Alignment and Grade VERIFY ON SITE
● Waterway Crossings
● Construction Cost
● Benefit to Users
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
X`
● 3km interval
● Horizontal Accuracy: Third-order
accuracy (1:20000 or 5cm/km)
● Vertical Accuracy: Second Order
Accuracy 8.4 mm√K
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
● 500m interval
● Horizontal Accuracy: Third-order
accuracy (1:20000 or 5cm/km) or
Azimuth Error of Closure: 4.5”√N
● Vertical Accuracy: Second Order
Accuracy 8.4 mm√K
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
● 250m interval
● Horizontal Accuracy: Third-order
accuracy (1:20000 or 5cm/km)
or Azimuth Error of Closure:
4.5”√N
● Vertical Accuracy: Second Order
Accuracy 8.4 mm√K
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
Methods of TS Measurement:
● Reflectorless
● Using prism
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
Methods of TS Measurement:
● Reflectorless
● Using prism
Internal Radio: Appx 3-10 kms
External Radio: Up to 30 kms
ROVER ROVER
SURVEY SURVEY
POINTS POINTS
ROVER
SURVEY
POINTS
SURVEY PROCEDURES FOR ROAD PROJECTS
2018 CMGP
Width of Topo Survey:
1.Topographic points that will represent the terrain.
AT LEAST WITHIN THE LIMIT OF
2. Structures that will affect your project
RIGHT-OF-WAY
2018 CMGP
STANDARD DPWH SOFTWARE
FOR HIGHWAY DESIGN
-Especially designed for horizontal projects
-Compatible with coded surveying
-Dynamic drawing adjustment
-3D Viewing