SPEAKERS:

SESSION I - SESSION V Virtual Training


Engr. Angelica P. Garcia
SESSION VI on
Engr. Joicy C. Lira
SESSION VII - SESSION VIII Detailed Engineering
Engr. Leoniel F. Labajo
SESSION IX
Design (DED) for Local
Engr. Geromie C. Operario
Road Projects
SESSION X
Engr. Kristoffer Jose R. Alcantara

SESSION XI
Ms. Glenda G. Gayo
SESSION XII
Engr. Michael Jay B. Autor

SESSION XIII
Mr. Jesus Morales and Engr. Eric I.
OBJECTIVES

SESSION I

Engr. Angelica P. Garcia


Resource Person
OBJECTIVE OF THIS ACTIVITY
At the end of the seminar-workshop, the participants shall be able to:
● Familiarize concepts in the preparation of Detailed Engineering Design
(DED); 2018 CMGP
● Clearly define the design criteria and survey procedures for road projects;
● Know the geometric relationships that exist between variable and constant
design considerations for local roads;
● Determine the different pavement types, and the use of different types of
joints and reinforcement to control the forces acting on the concrete
pavement;
● Understand the basic concepts of drainage design; and
● Prepare DED.
WHERE WILL WE APPLY THIS?
ROADS PROJECTS FUNDED UNDER:

2018 CMGP
LGU’s Own Budget for Development Projects

National Budget / Grants / Support Funds


(Including LGSF Projects)

International Grants / Loans

Other Sources
PROJECT CYCLE FOR
ROAD CONSTRUCTION

SESSION II

Engr Angelica P. Garcia


Resource Person
2018 CMGP
PROJECT CYCLE FOR ROAD CONSTRUCTION

Road Planning
2018 CMGP

● Spatial Framework

● Production Land Use

● Settlement Framework

● Protection Land Use


PROJECT CYCLE FOR ROAD CONSTRUCTION

Road Feasibility Road Funding


2018 CMGP

Determining feasibility for the road


project includes technical, economic,
environmental and social viabilities.

internal and external sources


such as financing or grants
PROJECT CYCLE FOR ROAD CONSTRUCTION

Road Design
2018 CMGP

Objective:
● Optimize efficiency
● Optimize safety
PROJECT CYCLE FOR ROAD CONSTRUCTION

Road ● If By Contract
Procurement ● If By Administration ( should be guided on
2018 CMGP Appendix 1 of RA 9184)

Implementing Unit Interaction Contractor


PROJECT CYCLE FOR ROAD CONSTRUCTION

Road Construction
2018 CMGP

Once awarded, the contractor proceeds with the


construction works after verifying and agreeing to
the as-stake plan prepared by the contractor in
reference to design plans of the procuring entity.
PROJECT CYCLE FOR ROAD CONSTRUCTION
Three Typical Stages of Road Construction

2018 CMGP
PROJECT CYCLE FOR ROAD CONSTRUCTION
Pre-construction Conference
2018 CMGP
PROJECT CYCLE FOR ROAD CONSTRUCTION
Pre-construction Survey (StakeOut)
2018 CMGP
PROJECT CYCLE FOR ROAD CONSTRUCTION
➔Testing of Materials
➔Clearing and Grubbing
➔Roadway
2018 CMGP and Drainage Excavation
➔Embankment Construction
➔Erosion Control Installation
Construction ➔Construction/Installation of Cross and Side
Drainage
➔Subbase Construction
➔Construction of Road Shoulders
➔Construction of Surface Course
PROJECT CYCLE FOR ROAD CONSTRUCTION

2018 CMGP

➔Pre-Final Inspection
➔Punch Listing
➔Final Inspection
➔Defects Liability Period
➔Turnover
PROJECT CYCLE FOR ROAD CONSTRUCTION

Road
Maintenance 2018 CMGP

To ensure that the completed road remains in


maintainable condition (in good or fair condition),
there should be regular maintenance works over
the road section.
PROJECT CYCLE FOR ROAD CONSTRUCTION

Monitoring and 2018 CMGP


Evaluation (ME)

These are the feedback mechanism that informs the new round of
road planning and subsequent design. This will determine whether
the objectives and targets of the road project have been
achieved within the desired period.
PROJECT CYCLE FOR ROAD CONSTRUCTION

Community
Consultations 2018 CMGP

For the welfare of the project beneficiaries, these should be conducted during
planning or identification, project feasibility, road design, road construction, and
monitoring and evaluation.
2018 CMGP
INTRODUCTION TO
ROAD DESIGN
SESSION
III

Engr Angelica P. Garcia


Resource Person
ROAD DESIGN
2018 CMGP

 Objectives of Road Design


- Optimize efficiency

- Optimize safety
EFFICIENCY
Less cost of construction and in
maintenance but optimum
2018 CMGP
standard (all weather road) and
livability

Livability: designing roads to foster broader


community goals, including providing access
to employment, schools, businesses and
residences, accommodate a range of travel
modes such as walking, bicycling, transit, and
automobiles, and minimizing fuel use,
emissions and environmental damage.
EFFICIENCY

2018 CMGP

ACPT Tech Brief, 2012, Junction National - Adrialuna - Bagong Buhay - Pagkakaisa Road, Oriental Mindoro
Figure 2: View of Concrete Reinforcement using Grade 60 bars
SAFE DESIGN PRINCIPLES
 A sound road surface  An adequate width or
cross-section

https://mycmpi.org/kenyas-social-exclusion-poor- Yungas Road, Bolivia


roads-poverty-youth-unemploment-insecurity-lari- https://www.prioritytire.com/blog/10-most-dangerous-
constituency/ roads-in-the-world/
SAFE DESIGN PRINCIPLES
 Control of Horizontal and  Good visibility/sight
vertical alignment distance
2018 CMGP

Figure 15.3, DPWH Highway Safety Design Standards Figure 15.9, DPWH Highway Safety Design Standards
Part 1: Road Safety Design Manual, May 2012 Part 1: Road Safety Design Manual, May 2012
SAFE DESIGN PRINCIPLES
 Management of traffic  Speed management
conflicts at intersections
2018 CMGP

https://www.bikesrepublic.com/news/video-us20000-illegal-
Figure 15.5, DPWH Highway Safety Design Standards Part scooter-street-race-philippines/
1: Road Safety Design Manual, May 2012
SAFE DESIGN PRINCIPLES

 Delineation and signing  Provision for pedestrians, cyclist


and people with disabilities
2018 CMGP

http://en.webfail.net/image/road-marking-fail-fail-picture.html

https://wonderfulengineering.com/these-22-road-construction-fails-will-make-you-roll-on-the-floor-laughing/
OVERALL ROAD DESIGN PROCEDURE
Design Considerations Value
Engineering,
Quality Assurance
Survey and Mapping and Control

Geotechnical Geometric Drainage Pavement Road Protection Quantity and


Investigation Design Design Design and Safety Cost Estimation
Measures

Design Output
DESIGN DATA COMPONENTS
P - Political
2018 CMGP
E - Economical
S - Social
T - Technological
E - Environmental
L - Legal
2018 CMGP
DESIGN PLAN
DESIGN
PHASES AS-STAKED PLAN

AS-BUILT DRAWINGS
INTRODUCTION TO
ENGINEERING SURVEY
SESSION
IV

Engr Angelica P. Garcia


Resource Person
ENGINEERING SURVEY

A technique, profession,
2018 CMGP

art, and science of


determining the terrestrial
or three-dimensional
positions of points and the
distances and angles
between them.
ENGINEERING ROLES IN PROJECT
PHASES
Rough Estimation and Alignment
2018 CMGP

Final Design and Detailed Quantity


Estimation

Baseline on the project horizontal


and vertical alignment execution

Baseline on quality for safe and


economic design

Baseline on deviation of the project


design to the executed project
BASIC COMPONENTS OF
ENGINEERING SURVEYS
USER HARDWARE SOFTWARE
2018 CMGP
- SURVEYOR
- TOTAL STATION -AUTOCAD CIVIL 3D
- CIVIL ENGINEER
- DIGITAL LEVEL -SURVEY SOFTWARE
- GEODETIC ENGINEER
- GNSS EQUIPMENT
- OTHER ADVANCED
SURVEY
EQUIPMENT
BASIC COMPONENTS OF
ENGINEERING SURVEYS
USER GEODETIC ENGINEER
2018 CMGP
RA 8560 “An act of regulating the practice of geodetic engineering in the Philippines” states that:
The practice of Geodetic Engineering Services shall embrace but not limited to the following activities:
(2) Horizontal and vertical control surveys and political boundaries
(7) Conduction of engineering surveys and the technical preparation of engineering survey
plans such as topographic, hydrographic, tidal, profile, cross-section, construction and
boundary surveys.

CIVIL ENGINEER

RA 544 “An act of regulating the practice of civil engineering in the Philippines” states that:
The practice of Civil Engineering Services shall embrace but not limited to the following activities:
(2) Field investigations and engineering data collection
OLD SURVEY INSTRUMENTS

2018 CMGP

ALIDADE WITH PLANE TABLE


OLD SURVEY INSTRUMENTS

2018 CMGP
CURRENT COMMON SURVEY INSTRUMENT

2018 CMGP
CURRENT COMMON SURVEY INSTRUMENT

2018 CMGP
CURRENT COMMON SURVEY INSTRUMENT

2018 CMGP

Notes to Remember:
● Topographic surveys for infra projects makes use of coordinate system
rather than the bearing distance system.
● The use of Electronic Controller provided the advancement in survey
procedure and processing.
CURRENT COMMON SURVEY INSTRUMENT

2018 CMGP
SURVEY PROCEDURES
FOR ROAD PROJECTS

SESSION V

Engr Angelica P. Garcia


Resource Person
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP

•Road Opening
•Road Upgrading (Gravel to Concrete or Asphalt)
•Road Realignment (Diversion Road, Alignment
Shifting, etc.)
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP

•Widening/Off-carriageway project
•Additional road component (shoulders, sidewalk, bike
lanes, etc.)
•Road Slip
SURVEY PROCEDURES FOR ROAD PROJECTS
SURVEY PROCEDURES FOR ROAD PROJECTS

● Maps from Mapping Agencies (NAMRIA) & Philippine Geoportal (www.geoportal.ph)


SURVEY PROCEDURES FOR ROAD PROJECTS

HazardHunterPH
https://hazardhunter.georisk.gov.ph/

https://hazardhunter.geo
risk.gov.ph/

“Country's one-stop shop for hazard assessment. Find out if a location is prone to seismic, volcanic, or
hydrometeorologic hazards. Generate hazard assessment reports. See which critical facilities and
areas in the Philippines are prone to different hazards. All hazard information used for assessment has
been generated by government agencies.”
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP

https://lipad.dream.upd.edu.ph/
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP

● Right-of-way
● Land Use
● Length
● Alignment and Grade VERIFY ON SITE
● Waterway Crossings
● Construction Cost
● Benefit to Users
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP

X`

● 3km interval
● Horizontal Accuracy: Third-order
accuracy (1:20000 or 5cm/km)
● Vertical Accuracy: Second Order
Accuracy 8.4 mm√K
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP

● 500m interval
● Horizontal Accuracy: Third-order
accuracy (1:20000 or 5cm/km) or
Azimuth Error of Closure: 4.5”√N
● Vertical Accuracy: Second Order
Accuracy 8.4 mm√K
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP

● 250m interval
● Horizontal Accuracy: Third-order
accuracy (1:20000 or 5cm/km)
or Azimuth Error of Closure:
4.5”√N
● Vertical Accuracy: Second Order
Accuracy 8.4 mm√K
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP
SURVEY PROCEDURES FOR ROAD PROJECTS

GPS Control: Bench Marks (BMs):


● TD = 40 cm ● TD = 30 cm
2018 CMGP
● BD = 45 cm ● BD = 35 cm
● L = 100 cm ● L = 100 cm
● EH = 20 cm ● EH = 20 cm

Intermediate Bench Marks (BMs):


● TD = 20 cm
● BD = 30 cm
● L = 80 cm
● EH = 20 cm
SURVEY PROCEDURES FOR ROAD PROJECTS

SAMPLE OF MONUMENT ERECTION


2018 CMGP
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP
Methods of TS Measurement:
● Reflectorless
● Using prism
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP
Methods of TS Measurement:
● Reflectorless
● Using prism
Internal Radio: Appx 3-10 kms
External Radio: Up to 30 kms
ROVER ROVER
SURVEY SURVEY
POINTS POINTS

ROVER
SURVEY
POINTS
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP
Width of Topo Survey:
1.Topographic points that will represent the terrain.
AT LEAST WITHIN THE LIMIT OF
2. Structures that will affect your project
RIGHT-OF-WAY

Rule of no. 1: Rule of no. 2:


1. Determine non-elevation and elevation
1. There were no strict rules in the spacing of
structures
topo points representing a terrain.
2. Determine structures that needs to be
1. As a rule of thumb: Get a points at least 2-5 represented by feature lines and breaklines on
meters on flat surface or at any changing plan.
elevation appx 50 – 100 mm. 3. Shot permanent structures only.
SURVEY PROCEDURES FOR ROAD PROJECTS

2018 CMGP
STANDARD DPWH SOFTWARE
FOR HIGHWAY DESIGN
-Especially designed for horizontal projects
-Compatible with coded surveying
-Dynamic drawing adjustment
-3D Viewing

Basic Components of AutoCAD Civil 3D on Highway Design:


-Survey Points -Profile -Cross-section sheets
-Surface -Assembly -Quantity
-Alignment -Corridor -Reports