Draft Specification No. 118 With 1 To 12
Draft Specification No. 118 With 1 To 12
Draft Specification No. 118 With 1 To 12
Scanned by CamScanner
.. ,
'1Y ./"\..
( S;}t ~
Encl . As above. Direc or TI{PSI)
1
for Director Generai/TI.
Copy to: 1. Secretary, Electrical, Railway Board, Rail Bhavan, New Delhi-110001.
2. Secretary, Railway Electrification, Railway Board, Rail Bhavan, New
Delhi - 110001.
./
( Sujeet Mishra)
Encl. As above. Director TI(PSI)
for Director Generai/TI.
olv
1 c~ r1
Addendum Corrigendum Slip No.10 (August, 2012) to technical specification No.ETI!PSI/118 (10/93) for
21.6/30.24 MVA, ONAN/ONAF, 220 or 132 or 110 or 66/27 kV single phase traction power transformer,
is based on the above as under
1. I Annexure J Nitrogen Added new Annexure - I Nitrogen injection fire prevention and extinguishing
- I Injection Fire system for oil filled transformers provided for more than 10 MVA in line with IE
Prevention Rule 2003 clause No .64.
and TECHNICAL SPECIFICATIONS FOR NITROGEN INJECTION FIRE PREVENTION AND
Extinguishing EXTINGUISHING SYSTEM FOR OIL FILLED TRANSFORMER
System for 1.0 GENERAL DESCRIPTION:
oil Filled Nitrogen injection fire protection system designed for oil filled transformers
I
Transformer. shall prevent tank explosion and the fire during internal faults resulting in an arc,
where tank explosion will normally take few seconds after arc generation and also
extinguish the external oil fires on transformer top cover due to tank explosion
and /or external failures like bushing fires, OLTC fires and fire from surrounding
equipment's.
The system shall drain a pre- determined quantity of oil from the tank top
through outlet valve to reduce the tank pressure and inject nitrogen gas at high
pressure from the lower side of the tank through inlet valves to create stirring
action and reduce the temperature of top oil surface below flash point to
extinguish the fire .
Conservator tank oil shall be isolated during bushing bursting, tank
explosion and oil fire to prevent aggravation of fire.
Transformer isolation shall be an essential pre-condition for activating the
system. The system shall be designed to operate automatically . However it shaH
be designed for manual operation, in case of failure of power supply.
~ + ll
provided. The fire protection system will take signal from HV 1 LV circuit breaker.
4.0 SYSTEM ACTIVATING SIGNALS:
4.1 Transformer isolation shall be an es_sential pre-condition for activating the
system. Provision shall be provided to isolate the Traction Power
Transformer through Master trip relay or circuit breaker (HV and LV side in
series) before Nitrogen Injection and after oil depressurization.
4.2 There shall be two modes of operation of Fire protection system i.e. Fire
Prevention Mode & Fire Extinction Mode. In these mode the safety equipment
to be involved are tabulated blow. The logic of their operation shall be
finalised during design approval.
8.2 Fire retardant low smoke (FRLS) cable 1.5 mm sq. with necessary no. of
conductors for connection between transformer signal box/ marshalling box
to control box and control box to fire extinguishing cubicle shall be used.
8 .3 Fire retardant low smoke (FRLS) cable 1.5 mm sq. with necessary no. of conductors
for connection between control box to DC supply source and fire extinguishing
cubicle to AC supply source, signal box/ marshalling box to on transformer shall be
used .
9.0 PREVIOUS EXPERIENCE FOR QUALIFYING SUPPLIER:
The supplier shall have a minimum experience of two years in the design,
manufacturing, erection, testing and commissioning of nitrogen inje ction fire
protection system on power transformers of similar or higher rating. At least
2 sets of the system shall be in successful operation for a minimum period
of the 2 years. The supplier shall furnish the details of nitrogen injection fire
protection systems supplied by them so far, giving order reference, name
and address of the customer, indicating the dates of commissioning as well
as performance certificate of successful and satisfactory operation for
minimum two years from the customers.
10.0 TESTS
10.1 TYPE TESTS
Type test reports including that for detectors along with declared response
time as per test approval certificate letter shall be submitted along with the
tender.
The system shall be tested by international or a national testing body (NABL
accredited recognized laboratory. Tariff Advisory Committee {TAC's)
approval, if any, shall be submitted with the tender.
10.2 FACTORY TEST
Tests will be carried out on individual equipment of the system and the
total system in the supplier's workshop in presence of purchaser's
representative .
10.3 PERFORMANCE TEST
l- +"
Performance test of the complete system shall be carried out after complete
erection at site by the supplier's representative. These tests shall include
simulation and verification of the response of the complete system without
actual draining of the oil and injection of the nitrogen gas.
In addition to above, additional tests as required necessary shall be
conducted.
11.0 DRAWINGS AND MANUALS
Detailed layout drawing along with the equipment drawing to be given in the
tender along with complete bill of materials. After awarding of contract,
detailed dimensional drawing of the system complete bill of materials
including location and size of plinth for cubicle and recommended capacity of
oil soak- pit shall be submitted for purchaser's approval. After approva l 10
(ten) sets of all above drawings and 5 (five) sets of operation and
maintenance instruction manual (bound) shall be submitted for purchaser's
use.
12.0 SPARES:
One full set of spare nitrogen gas filled cylinder, one set of the installed no.
of fire sensors shall be provided in addition to additional other
recommended spares. The list of recommended spares is to be submitted
along with the tender.
2.0 13.1.3.1 Silica Gel Add new clause No. 13.1.3.1 Orange silica gel (round balls 2 to 5 mm with
Breather. quantity of two DT0-8 silica gel connecting with flanged mounting two pipes
page 19 control through two different valves as per DIN: 42567 & IS: 3401 to provided .
3.0 13.1.4 Pressure Add new clause No. 13.1.4.1 Shroud Pressure Relief Device will be used and have
Relief provision of discharge of oil from PRO to safe place by closed pipeline. This
Page 19
Device( PRO) avoids hazards of fire and it is safe to persons working near Transformer & it is
environment friendly.
13 .6.6System should include ana log outputs for each measurement channel.
~ 4-·,
Temperature resolution of the ana log outputs shall be ±0.1 °C and
precision of+/- 0.5°C and the system shall offer user programmable
temperature alarm outputs with 8 relays. The cooling system (fans
&Pumps) should be operated through these relays. The temperature
settings for the relays shall be made as per the end-user request.
13.6. 7 All inputs and outputs of the system shall meet the requirements of surge
test of IEEE C37.90 .1-2002 in which a 4000 V surge is applied to all the
inputs and outputs without permanent damage to the instrument. The
system should electronically store testing records of components and al low
for on board diagnostics and instructions, including a signal strengt h
reading to verify integrity of fiber optic connections. System should
contain a battery for date/time stamp of data readings. The system should
comply with IEC61850 protocol, along with DNP3.0, Modbus, TCP/IP and
ASCII.
13.6.8 The transformer manufacturer should submit details showing that the
probes are located in the hottest point of the winding, while submitting
drawings for approval. The manufacturer are free to use more than 4
probes if design so required.
13.6.10 Temperature Rise Test Measurements shall be made with the fibre Optic
Thermometers.
The equipment shall be operational during temperature tests and be
demonstrated during these tests. During probe verification, the hottest
probes for each phase shall be
Identified, and temperature data for all probes recorded and reported in
the test report.
Io t- 11
5.0 13.7 Retro- Add new clause No. 13 .7 Retro - fitment on existing transformer to incorporate
fitment of A&C 8&9.
page 19 traction
power Retro- fitment to be done only by OEMs/RDSO approved source . After ret ro-
transformer fitment to incorporate A&C Slips 8 & 9, all routine tests & temperature rise tests
For ONAF with over loadings ONAN/ONAF mode , all fan failure check with loading -condition
mode and functional check of fans through RTCC Panel & marshalling box shall be
verified . Before verification necessary drawings/SOGP/QAP shall be submitted to
RDSO for approval of retro- fitment . The first retrofitted shall be inspected by
RDSO .
All transformer manufacturers are required to submit their drawings/SOGP/QAP to RDSO for approval and first
Transformer manufacture duly incorporating A&C No. 10 shall be inspected by RDSO during in - house type tests.
'1 t- 1/
Annexure -6
'FUR e!c;
-s
R9TtWAY 3.c. TRACT1ON SUBSTATiOXS CQ
- e4
Telegram : 'RAILMANAK', Luckuow -ma - m R - h %mau
Telex : 0535 - 2424 RDSO -IN ~ ~ 3 i k ~ m m ~
fax : 9 I4522450709 /458500 mm3- 226011
Tdephone : 2151200 estn. 2586 & 2450 Government of India - Ministr)' of Railways
E-Mail: dti 1!@rdso.railnet.gov.ill or Research Designs & Standards Organisation
brijendra-pin@@hotmail.com LUCKNOW - 22601 1
Northern Railway Baroda House, New Delhi - 1 10 001. Fax No.: 011 - 23387198
Southern Railway, Park Town .Chennai- 600 003 Fax No. :044 - 25353690
Eastern Railway: FairIie Place, Kokata - 700 001 Pax No.: 033 - 22200412
Western RaiIway, Church Gate ,Mumbai- 400 020 Fax No.: 022 - 22073829
Central Railway, Station Building, Mumbai CST - 400 001.Fax No.: 022 - 22620867
South Central Railway, Rail Nilayam, Secunderabad - 500371 Fax No. 040 - 27832445
South Eastern Railway, Garden Reach, Kolkata - 700043. FAX No. 033 - 24391566
North Central Railway, Allahabad -21 1 001 FAX No. 0532 - 2561008
East Central Railway, Hazipur (Bihar). FAX No. 06224 - 274738
East Coast Railway, Bhubneshwar
South Eastern Central Railway, Bilaspur.
South West Central Railway, Hubli
North Eastern Railway, Gorakhpur.
Central Organization for Railway Electrification, FAX No. 0532 - 2609226
Nawab Yusuf Road. Allahabad- 2 11 00 1 .
Sub: Addendum /Corrigendum slip No. 9(January 2008) to the technical specification
No. ETI/PSI/118 f 10/93) for 2 1.6 MVA, 220/27 LV, 132127 kV, 110i27 kV,
66/27 kV,50 Hz single phase traction power transformer.
1252 ~ w l es&xr~
r shal be prondsd sud, matboth gmup of fans
shaif start independently a1 different temperatures. The control
I I
iii) No of fans.
~ i r & t o rT I
for Director Genert~VTI.
i. . - ---.A
equipment radiators are to be s p e of thickness 4.5 nim. 'Ihe extcrnnl painting of the
1 radiators has to be as per clause 15 of this specification. The radiators &
i -
accessories should be given external paint coats first coat of epoxy zinc rich (
' , hnving minimum 83% zinc) prinicr ( 50 micron Ihuckncss ) intem~cdiatccoal of
r
epoxy chemical and corrosion resistant paint ( 100 micron thickness ) and final
t
coat of polyurethane paint ( 50 micron Ulickness) ?he totnl dry filni thickness of
p i n t shnll be minimum 200 micron. I h c shade of Ulc p i n t shell bc grcy sllrrdc ,
my-
l '
6.0 6.5.24 Vnpour 1 Add ncw clause No. 6.5.24
I
~8
"?he core and winding of the lrrinsformn have to be dnwl profcrnhly wlng
vapur phase dr)inu 1'0 rnc11r-c:tln: ranovnl of I I I O I ~ I I U Cfroln ~ h c~~nnaforn~cr
1110 1'1 valtre trflar tl~yi~rg
Ittitfolo lw nr111t\.t%I U O I U ~to~ I V I I I ~ I C tl1t111
manuf~rcturir at lhic W O X ~ ? ~ . ' --L
' ~ ( I W O )i l l 1110
(B.P.Singh)
Direct01*/71-1
For Jirector Genel-aiI'1'1
REFERENCE COPY
..
Addendum/C:chi.rigcn~i~imSlip No. 7(Juar 2001) 10 t h e 7'cchnicn! Specifia:aiicina
Naa.ETEP,";I/B 586 10/93) fer If 0/,2'7 kV or 132/2'7 k%' o r I h Q/Z7 ol- 66/27 1i.Y
SjngIe I%asc, 0h.43'I'raetioas Pawen. Transforauer.
'--'-- ---..^-"
/ Clause , / --As per AGLC Slip- No.6
.l-.-..----^--."--.I_.- ------ - --711-.-.11_
---------
1I
---___l_______^___lI_-I
As Ar~tcr~ded
1
--"---I-- .CI""- -------- +
I
--
---_
II-
-I-
"_-_I_
1
''Rl~i?,r~:~kc~:ri-m silali hiwe ?he core I sl~i!ll. prcTct i i l ) ! ~~ I : I V C f j i ~II
"hdanofh~li~rcis
ci~tiitlg!jciliiy i f 1 ifierr ~{oricsarid i cote c u t t ~ i t ~faciit~y ill t!~cis\.ic.li.I,:; nnci
pi-opcr iiioniiaiinpj and quaii:y 1
,
piolicr i;\oni\orii;g and t l \ ~ i \ l i t ycoiilrril to I
/
ctxlfr-01 $ 3 inuolcl any mixing with
deikctivc:lsc~c~iidgrade mat crials " 1
avo14 a tiv tii~xirlgwith riei'cct~\~~/s~;ccli:d
grad:: matcsinls "
.*
I
< . .--,
' "..,
: ;I
..- . - -.
1
. '
L..
1ST
accessorf es. sentence of the
. . , existing clause
. 7 *.
may be deleted
and read as ,
" The parts, fittings
and accessories for
the s~bject
transformer shall
I . . be used only of
those
manufacturers
I approved by RI3SO
0 9 IICl t t1f:l l i t a t , Ql.
-.- .* -.- -..--. .-....-- -----
,;i &c:ir
.-,-.--- -- -
.ANNl:XUfZIi-G,"
". -----. -
*- A - - ---- - -"--A
? *.xr*r . .
<,!.I . .
r r .
. - . . . .*x ..-........... g, :;: "
. .
. - . 1
,3
'
..,. 4 --8.,v,,.
.
..:.
; . .. .
-*.,
: Y1. :
,,
: 1.4:
2
* .T::,5.,I . , . ..
;. . , ,-.,#.,* r
...,.:3." . i,q sf i;. , .
. . . . ' . -.. ..-\ ),,
., < . , .#"f
, . . ,.
, , , .
. , 1.
. .., - . " 5, j
,
for Direcfio: General/TI-I
i
i 4 <
>
:'
@..r,q,*.'
'.< : . y e . .
'
'
,
I
,
. . " '? D
r , '<
.i :. ..
P,.!
. . .>. '
.. r . .;: ...
,: , 4 :
" . _ . , . r :
I
: . .. .
r
.>' .
'.$. . L
" : T , .
I . .
-, ,
% ,
2 . .
.
I
- ; ? . .
' i , i s ,
. . ' I -'
., . j :
t ANNEXURE -6
UST OF RDSO'S APPROVED:-SOURCES(VENDORS)-FOR PARTS , FITTINGS e
ACCESSORIES
. ,
OF TFPAe6fXQMtPg)WER,%RANSFORMERS. (Ref. Clause .- 13.4) -
, t & . ; : :.I;,L:*
.
;;i;;,a>:ia:
,.
q
-tL
****
'.#
, e.*>,&;&% ,,&.<
..
'f '
*
1 9 ' " f { : *? ? : 4 i r: -3
' I .
;
i . *4 +
,g f.
, "
-,*;.. , .
* ,
B
, ...
,coriforrnlng to IEEMA - -. . ,
''
. . .
trnpwr
*
-
2.:. ..:
e
5
f','
w
' a
Bushlng type current l,M/s Transformers & Electrlcals I(eralrr
transformer ;PS class ;:::;ii.l: ' Ltd.;.Angarnally ,
conformlng'to IS:2705 (MR'I 2.M/s Bharat Heayy Elcctrlcals Ltd., i)ha&i
& IV). 3.M/s AU Electro Maclilnes,Allahabtitl
, iqIQ~1 : 4,Pl/s Mahendra Electrical Works ,Thane:
5.M/s Protection & Control Engineers ,
(Dlqital type).
( 1.M/s Vlnayak & Transmlsslon ~ r o d u c f ?
. , &.Expansion type ) 1 (P) Ltd,,Mumbal I I
14G;+ 4 6 ,
j '.
conforming to IS:5561: . 2.M/s tdootan Engineering
2..
a
(a, ;,,
. ... C ! - i
' r k c t,r% Endustries,\dadOdara
.-"' ' . ., .
a .
1
- 9
-;- - 3.M/s Sree Engg. Corporation ,Cf~er-ina
= .I,.e..%..
I%;
9,. . , q . ,
.." r I : 4.9"4/s Best 81 Cromptor'l ,Chennal -
: : . f ; l l f ! . f j j .$?-;:: , -*
The, balance. Items, such . . ds t r a n k f o n n c r t a n k , c o n s e r v n t o r , M a r ~ I ~ a I1 c
b o x , ~ e m o t c . t a p .changer control cubicle etc. shall bc proc~rl.edlror-rl ihc rcpt.1 2 ;
sources duly tested In. rdance with the RDSO s p c c l f l c a t l o r ~ I\!o
~ ~ / ~ ~ 1 / l l 8 ( l 0 / 9 3 ) . ~ ip t1lt ~
r ' :-*4.
o~
3 ~ ~approval
~ < s 1 tl~ct-cof.
-&,. 1
'"$" I
MASTER COPY
/ 1
2. 5.1(14)
( page 7) 1 Maximum permissible The existing table may be replaced
losses with the following:
ITEM RATED PRIMARY
VOLTAGE Un,kV
66 118 132 220
NO-LOAD 9.0 9.0 9.0 11.0
LOSSES,kW
LOAD 85.0 85.0 8 5 . 0 85.0
LOSSES,kW
3. 6.2.8 New clause for "A suitable ladder of Aluminum shall
(Page 10) provision of a ladder. be provided on the tank for ease of
It
maintenance at site.
4. 6.5.1 Windings Add after the existing entries,
(Page 11)
"The configuration of the windings on
each leg after the core shali normally
be-LV wdg, HV wdg, regutatiesg
wdg (tap) Unless approved by
RDSO."
5. 7.1 Insulating oil Read the clause 16.5.2 as 16.5.1
(page 14)
with
reference to
A/C (Oct 97)
6. 16.1.3 ~esting of The existing entries may be read as ,
(page 21) transformer(Genera1)
"The type tests shall be carried out
in accordance with TIQ 2001 ver 0 :
- Quality Plan For Traction Power
F
trnspec
b
&TI
e\l!
cV
c9
w
Transformer Prototype Testing &
with the relevant standards as
modified or amplified by the
specification where ever applicable ,
at the works of the
successfuI tenderer/rnanufacturer ,
or at a reputed testing laboratory in
the presence of the authorised
representative of the purchaser/ DG
n, RDSO, Lucknow." -
16.0 (page Testing of Add new clause as 16.1.4,
21) transformer(Genera1)
-New clause "In the event of the tests not being
carried through to completion a t one
stretch for any reason attributable to
the successful tenderer/rnanufacturer
& it is required for the representative
of the purchaser /Director General
(Traction Installation), Research
Designs & Standards Organization
(DG/TI/RDSO),Lucknow ,to go again
or more number of times to the
works of the suceessful
tenderer/manufacturer or other place
(s) for continuing and/or completing
the tests on the prototype (s) of the
equipment ,the successfuI
tenderer/manufacturer shall
reimburse to the purchaser / DG T I
RDSO , Lucknow ,the cost for the
representative having to visit to the
works or other place (s) for the tests
more than once .The cost as claimed
by the purchaser /DG T I RQSO,
Lucknow shall be paid through a
Demand draft to the concern
accounts officer of the purchaser /DG
T I RDSO, Lucknow, as shall be
advised to the successful tenderer
/Manufacturer. "
trnspec
New clause for I A new clause to be added ,
dissolved ga5
analysis(DGA) "Following tests shall be conducted
on the m sipel of oil drawn from the
transformer tank before & after
temperature rise test:
1.DGA
2.Specific resistance
3.water content (ppm)
4.Electric strength(BDV)" -II
Smspec
;.?I;
.
4'
'
% ..-
-.1
<..
.iddendun~~~urii&lldwn slip h'o.3 ( October 1997 ) to the tec'lmical syecification
No. FI?IPSVI I8 ( 1043) $or 2 21.6 &lifA, GXAN? 220.a 132 or 1 I0 w 66 k?!2i/27 kV ,
" single-pilase tkc'tiod po$ei i i s i s h e i . ,
.,--
> i
i-
' As mended
- . .
- . - 4
i
..
under clause
... ..
: .,:
, -
. . ,., .
:
, ..-
,.
maintenance. q d * supc&ssion in senpice shall
. .
-. i
:. .
. . .. , ):.:'
I
:2
* -
,.
e of the ciause ( Wended in .e'C I
96 )) may be replaced with the /i .
, , . I !
.-
. I '
!
ec- 3
11owhg tests shall be cmisrj ozt ii.ni. ;., a . i
,
------,
i
.c3
@+', *
I -- -I ------ --' ,
i 1 t i,; I
----'*-I
7 t 3 II 4
! 4. / 16.5.2 h ii 1- T j ~ ett.9 undlef the'clmlse (inserted in:.W slip- 2 1
. i '.'(Jan96))mqbqr~lqcedu;ith&fo110w~ng:~ j -
1 . 1 i
=- 1 I
1I . I . , i
i i - ! I
addition to the reqair$ments of IS
% i
: 12463, j
i! j 1'
, 8. tl=giosulating oil fined in the trand-er shall
:
i
>
I
i
1 i dso meet the followim~additional nquiremen@.
j
3 j
I
!
!
i!
1 1
I ?{I) :&ididion stnbilify (test metbod as per
IS : 12422 - 1988 j
lJ
i
i 1 .
"
i
, \ ,
, ,I
1 ,. 1, .
i
- ,-..
1
i I
i
< 1 . ,*
, ,
, '1 ., (a) a)euhdisd!on vdu6 &r ,,
I*
j .
, '
I1 .I 1 -
d
I
j
1 .
oxidation (ma.) ... 0 2 mg kONig
i
i
j , (b), Total nlu& value after 1
. , . 1 oxidation {max). ... 0.05% by turns.
i
. .
I
( j
1 ti?) S.K. Vdue
- I
, . : 1.
i
. accelerd'ed ageir@.
.,. .
.... a s per S.No.
, '
1.'
!
'...
.
.. ,. onf,td!e-;
ofIS:335-1993. .i
1'
.s
.
*., , '
.
. '
..
. ,.
. , .
... 0.25to'.O.3~
,
I1]
-.
. .
... .. . .. , . ..
I I
4. ,
. ,., .
. ,
. . ...': .
. .
. . .
..,.
, ,
.
, .. - ;, . . . 2.. . .- ' . . . 8. f
!
. . , . ., .. 1 . - ,
,
i-
+ i
i noticed, ihp rnai~f~chu-eriauecessfiritenderer- will j a
I
it
' / have to' depute their .engineem for nkcesswy I
i! I reinediai action without my eolrt to the Railways. 1
1 I For the purpose, if it is,required to be repaired at 1
i
,
, * i
I
, 1
! the iueucresaful tendem/ mnarn&tufes's works, the I
t h-ansfo~mmshall be take31 back to iheir works
!I
+
!
i i
1 pwnpdy ad after repairs; all nwesuay' tests
i1
I .
'I I , * I blcluding f f ~routine
e tests sl~allbe dme ou the
1 com$lete tsansfo~merin the presence dam! to h e j
i !i 1
satisfwtial crf the Ruilui'8.y'~Engiiieer. pfior to 1
i i j refuming the hausformer to sire. Such tests are !
,
I
II
!
.
1
1
i
tlccassaq to enswc
.
the quality of the
1I wor&nanship dwinlring sepals.i~ satisfactory.'
I
I
1 Tr,aini~g
=
f !
1
. 1
6. 21.1 >, i In theesecondsentence '11 weeksi may ba replaced
with 'iwo wce'as' and '6 tveeks' ma; be replaced'
- 1
<
I
i ' with 'one week,
-- i
A- --_,
, . L
,
.; .i 3-
. ? ' , "
. I . . > I
' ; . , ,. . . ,, ,. 3
.+ ,
;.
4 -3 .8
0 '
. . . . :,, a. .. .
_,.I I .
A d d e n d u r n / C o r r i g e n d u m S l i p No.2 ( J a n u a r y 9 6 ) .t o t h e teehr.r i c a l
s p e , r ~ i i : ~ f i i a $ . i o~ r (21.6
' n o . ~ ~ , ~ ~ ~ ~ / ~ 3 1 ~ ~ 1 f1o 8 1 0 ' /MVfi,220/;:!..!.'7
93) b:V
o.r;:'.232/27,,r!kV or.25\,110127 k V o r 6 6 / 2 7 k:V, SO H z , s i rry 1 e (:~l.l;:\ci;e +
't'rsac,t:ian . p o w e r , t r a n q f o r p t e r .
. .
.,: ,>. . ' ,
-
: . { * , - . { , ? 4 .II . I
2 . .
----------1- 1 - - - . - - - - - - - - - - - - - - - - - - - - - - - . . . . . - . . . _ . . . _ L - . - _ - ~ . - I - _
I. . 2.1 ;..Governing s p e c i f . i c a t i o n 4 d d t h e f o l l o w i . n g as
,9
, '
(-page No.3) Sr.No.28:-
. .
. . "IS: 124h3 I n t ~ i b i ' t e i i
- :.. :
.. .'.
; * . .
M i . n e r a 1 j . n s ~ 1 1 a t . i r r g (.).i.I.c,."
. .
2. i. 7.1 ' -; I n s u l a t : i n j , o i l ( P a g e .14) The e : t i : ; t i n g f i r s t ;;entcnce
.
,
..
.*'. 'i. L
. . . . ..;. *..>; . .i
. . I
,
"I'
i s t o b e r e p 1 . a c o d ~ i . t ~ l .;1
"The t a r a n s f orrrter shall. be
s u p p l ieil with new
insulating i l c o n f urrrti ng
to IS : 335 o r inhibi.ted
I I i~ n e r a 1 I, 1-1 !;iIJ 1. t i, r I 11 i:)j. 1
c o r r f o r n t i n g t o J.S : .'12!1.63.
T h e o i l , i n a i l d i t i o r ~ t o 'ti.re
r e q u i ' t - e r s ~ e n t s o f I S : 335 ot-
I S : -1246::3, 51-tall. m e e t thi?
ailcli t I a n a l r e ~ q i tt-c?rrles\
i tr; 64.;
stipulated s 11 il~use
16.5:1.
L
"TIIc 01 1 s h a l . 1 t t a v e a l o c a l
/ r e m o t e i n d i c a t i o n ( i n con-
t r o l pitrlel) f o r o i l tentper-
6.
ature."
" T h e i n s u l a t i n g o i 1 f i I. l e d
in the transformev, in
a d d i t i o n to nleeting the
r e q u i r e m e n t s o f I S : 335 o r
IS : .124633, shall. alc:o
conforrr~ t o the foll(~witlg.
a d d i t i o n a l paralnet,t'r's.
( A ) For o i l conforming to
e i t h e r IS : 335 o r IS
: 12463.
( i ) U x i d a t i o n st+l?-j..j.j.ty-.-
(a) N e u t r a l i s a t i o n v a l . ~ . ~ e
a f t e r o:<I.clati01.1
( n.1a :.: .
: 0 2 n'~g / I:: .
(1:) 1-4 / 11 .
(b) T o t a l sludge v a l u e
after oxidatiu~r
(rr~a;:) :O.O5% b y w e i g h l , .
(ii) SK v a l u e : 4 t o . , t23':/.
'' (E) F o r o i l c o n f o r m i n g t o
o n l y IS : 12463
, t r a n s f oymer .,*;, ,, ,
, . , . ' l , , * , -- , - - - -
,*
. .
I$-------------------------------------------
t r u 8 * 1 ~ e* .
I
J-l(~rt.i r .
2-
r-----------------
:NO .+ :;.C,I q*?e .\~ -4 .+&t:,:l*deac,r
. j p t i en
i$------------CI----m------L-----------------------
4s amended.
) ; Tltle ~ h e e t ~ ~ ( C a g e and
.1) 21.8 MVA is to be replaced
-'- *a Heading (page, -2) w i t h 13.5 MVA and 21.6 MVA.
r \. . t
I Genqa-1
', ' . _ .I . "sketch No.ET1/Ps3/702-1" is to
b e r e p l a ~ e dwith "Sketch No.ETI/
\.
PSI/TOZ-1 mod 'C' .(enclosed).
"
I
-
I , .
, .I
, '
C
I
, , 3, "
s
,
.- v: La - ..?<., I ,
13.5
d %+
1)
ii> 21.6
5. Clause 5.1,(8)(page 6 ) The Table given against
1
Rated c u r r e n t , = t h t s clause i s t o he replaced
with :
I '
I
Item . . or rated Rated p r i m a r y v o l t a ~ eU n , k V . .
power . (MVA) ----------- .+----------.--- -------
66 110 132 220
..................................................................
. .
2. R a t e d secon-
dary c u r r s n t , A . ( i ) 13.5 500 500 500 SO0
.. (ii)21.8 800 U!ZO C~JU u o0
-----------------------------------------------------------.-------
I .
------------------------------------------------------------------
'tl..Na-load l o s s i ) 13.5 11.5 11.5 11.5 13.0
5,- . I
- .
' g .
Item
- . ,
. , . Secondary Pr irnary
:. p < a 8*..,
--------- '
-------- ,*
-I------"----
a ' I i
8 :
,
,
Item *' - . Secondary Primary
I
.
'
#
/
2. CT ratio
Y '
>..
."20 1 of p ~ i n taha11 be supplied b y t h e
a manufacturer with each transformar for
.. ,
an additional c o a t of paint to be
a
. .
. . I
,
I
applied at site aftor ersction/
. .I
: . , i.::.
commissioning o f t h e transformer.
' (12)Clause 16,4:1.2, . The existin8 first line is to b e
(page 28) O f f Circuit replaced with :
Tap Changer. '
. .*. '
* .'
" The test s h a l l be carried o u t at
- . I full rated current."
..- ..
, . . -
RE~EARCI-I:
DESIGNS AND * I
--
. . .
. I '
. .
, , - :
. .,
(.1 -';
..-.--- 1-
.RAIL LEVEL
l
* , .
...-,.*
. . 3. :
. .. . . \ .
?.
.. I
,
:
.
/' ,
8 .
W<<.:',=t
. I'
. . Q3
! .
.
- . ." -
./
I
,
.? + ,, ' .. . s.
6 2
NOTE.-
il .? , p+.
i
f '
. I
I cW3
*r
. ,
T H E ABOVE LIMJTATIONS ARE FOR TtlE ' O V E I I A I L a
DJMErJSlONS lNCLUOlNG ,RADIATORS M0ur.IT-x~ C3
' *- ' 7-v :3-' .,-
%- ... ,, . -..
\., . ON THE TANK
.,- ,,.
..-.... ... ...
pb
'-9" -'... , ,
($ERALL
.. ,,, DIMmSiOG OF 13*5/21 6 .MVA
, .
. I' ,/
"j, ,TRACTION TRANSFORMER
2 :r \
:, : ,.,
....
'r ..
..I. . ' ,
I A
8 .
1 .O SCOPE
-
1 . This specifichn applies t012l.6 MVA, ON&, 220 or,i32 or 110 .
I, *
' 8 "
* :
1.2 The trimsfher shall ' be complete 'with all part?,'-fitfin& and
accessories necess4 for its efficient. operatiqn j?t $,, un&nded tiaction
substation. All such pat&, fittings and acces$ories.~~&'bei'deemed
. to be
WI&,UI the scApe of this specific&on? wh&er .qpcpifi~~lys. inentiC!ied
. .- /
. herein or not.
/
1 2' * - . . <
+ '
: 2.1 * In the preparation of ,thissyecihaiion, assistance h& been 'derived .
fi011'1 the following Sta1h& and codes of Practices (latest kersion), q d
Indian Electjicity Rides wherever applicable:
*
_.
. I
I .I
'1
1 1S:5 cb1ours foi ready mix6dy ~ t s e1~@&$1s. ,
- ' a'(=*% ,
..2. 1$:3j5 * .NeiKinsulating I .
Q3
3. IS:1554 PVC insulded (Heas$ d*tY$ e!ec&c 'e&1& for 02
part-Ij worG.ng voltages . upid
. +l~,t~+g 1 I O Q ' V S : ; ~ . 9
4. IS:IS70 %.&nless snd E*et ?e&fi'&~~ steels. Gz~
(Pert-V) . ,, *. e3'
a
i 1 --A,
el3
5: IS:1576 SnEdpreasbnnrd for glestfid purposes. . ,
6 . IS:1866 Code of prwtic{ for m&ztiy&?~e
. -. and,supe$ion of
. msula!L~gd hequipment.
- z~m~erttl *
-
,
,
(Part. I t o lVj
8. 1S:2099 Bwfting 'for altematihg ~oltagesabove 1000 volts.
t
i
. . >
: -. fprst-~lj+ !._.. . . . .
., . . J,.
, . . .. .
' 20.
*_.I
I S ; & &% Qn-load
. . tq*I~.ai~dk.
. . . .. . . ..
.
.
I'
. ,
,
,
: and:~n&~tenanLr:
. o f transformers.
.
22 1,s:1 0 ~ 9 3Method of eiriiluatng the walysis of gjaseses h oil-med
, .':.. . .' '
. .. . .'.
engin.eerb~
. .
types;. . , ., .
5
.: . :, ., ?
. . . :. f . .
'
.. ..
.' . .;""
- I
. , I.
-
. ,
. ' , ? 2
( . I
I
.
. , .:' -
. / : . . ' '
! . w i r ~ i c at~~itli
~ jltstificdon
.
fllcrcfgr mc f ' - h t d r . ,lnN J ~ G&, & ,
it-j *&'Fppeci&C~On; if
.%
. .! '.
my,pr~posedby h;m sltall ba 3ucteiI a .&a t t ~ v t / & ~ ~ y & v e .~ . . i
f ,
$
' , I "
. "
4 -.
1. Mauln~umambient air temperature 50' C
2. Average ambient air temperzt&e + 40' C
ovir a period of 24 h o w .
3. M ~ U relative
M htyidity ,10096
4. B n n d rainfall l$an@~efrom
{
' a
t 200 k&'. , ;
9. Altitude - C
I
Xot exceedkg 000 m
10. M h ~ u np~ibient
> .
l air ternperkil-re noC
3.2 -The tr3nsfomer-wuald &rr be subjected to vibrations .c>naccount of .
4.1.3 Adjace~lt TSS arc fed from different phses of the tluee phae
system in rotation. Neutrnl sections in front of sectioning arid pardehg
post (SP) are provided in the 25 kV OHE for segregating #he different
phwes. It1 between tlie TSS and SP. sub-sectioning and paralleling posh
(SSP) we provided for pasdeling the up and down line OHE and &o for
sectionahsing aid f d t loc&sation. lit: attached sketch No. ETIPSU702-1
d Awlemre-I s h s the gen.erd scheme for traction power supply system.
4.1.4 The supply to the OHE can be switched onfoff through intemptors
which do not oper, automatically on ffaul but can be closed on to a f d t .
The fadt is cleared by the feeder circuit breaker provided at the traction
4.2.I The traction load is a frequently and -idy varying one between no-
load md overload. The TSS equipment is subject to frequent earth faults!
short circuitc; caused by failure o f insu1&0n, mqp@ of OHE touclUng the
earth, wire dropped by bid connecting the Om to earthi overhe
structure, and nriscrqani ixtivity. 031 an averqp the nunlber of f d t s / short
h about 40, but in exceptional casts the number could
c h i t s per m ~ m i.s
be as high as !20. Tne n~agnitudeof the fault current may vary beiwem
4P?and 100Yi of d ~ deade shofi-circuit \?due.
4,
\
-
' 123.- 6,000. .
' 144 10,000* .
245 a
,
. 20,000
~ ~ ~ n ? l Y I - W U - C - ~ b v l - . *U U & r ~ O O D D D D D ~ ~ " - ~ ~ ~ ~ ~ ~ ~ . ( u - . r
, +
.,,..:. . . '
_._.- :
. .
I . '
%
.
,% ?
.-*.-=
The fc3~~utz~r&g
3i+;%'9:gowm.,d'I.ipP&eg
. .. -
.& avadab1e:
,. , . '
..
.I_
L .
7
.--??
<
;,<
:.'
.? . j4-.rf-7.
L<.2 ,*k $:~.' .-+,:-
8 ~i.6G , t x . e y : .' . ' 8
for outdoor i n s t w o ~ l . - I
4. Rated pri&ary
voltage LTn,kV : 66 or 110 or 132 or 220'
5. Highest system
vdtage I.JIQkV : 72.5 or 123 or 145 or 345.
.
6. Rated'secondary
voltage (at
n0-l03d), kV ' : 27
I I
(
. H
*' .
b
(1
,
.. . .b
9. Pcf&i&~ . iioltagds . .
12 & 6.5) k. P;ifnpeif&,Ce' 1 f ,
. I
. "r
, ' 7 4
( I
I
*,.,
3
~
.
>-
it$, ,
steadi temperature ; , - , ' : . ) " A * I '
bii' ~orrtinuousoperation'+
at tated load (i.e: at ' , -
rded power). ' . ' - =
/I
r ,
I f : Pol&ty : Subtractive
, - L
I 4
' . ,' ,.
# 4 I
~eiCi~l$~ I C >E *
" ,
ther~noinerfcr).
. .
, . ' 1
t,by:5):
~ % '
*. 0 .
14. ~ a r d m u f npermissible ,
losses at the
principaltemnng.
... 1 .
. ' - . ;
. . ,. ,: ,
. .
primw voltags
..,
......L-du.) '
,
cn;'fi d-
-
.#
--...---..-- ~.
- U I Y L - C ~ - ~
'~ !
i ; . ,. 3
* i :,;y, ~
.
:. . voltage and fr:equeney . .
.!. .
sound level
98. Acous~~,~:
when enerped at, . : ..
. .- .
,. distance of one meter.
mtedvoltage?and at
nodad.
1. Type OH?sonhm QIP eondenser .
2. l3g?1estvoltage for
equipment. Urn,
$, kV ' 52 72.5 123 ' 'i45 245.
_ \ I
3. Rated current, A
4. Minimum creepage
histance.in'air,mm ‘ 1300 1813 30'75 3625 6i25
- - - .- f
31-Cc'"-_'_"_U----~~
.
I
1. fighest voltage fm .
e
eqU;ZgnzetUm,kV ' 52
.,
' ,
5. Minimum knee-point - 175 75' 15b 150 150
emf, V t
' 5
?
6. Maximum excitation
7, MaxiTt~u~n resistm~ce
of the secondary
winding, olm 0.5 0,5 0.25 0.25 0.25
----Cu--.--.----- ..L - , '
6.2 Tank
d
6.2.1 The tank fcr the transfom~ers l ~ be d of bell type coAstntction with
flwges 01% the outside, wd s~xdlhave a flat top. The .t%11gesof the upper
and lower tanks shall be jointed by bolts, nuts and washers. A mJtab1e
. gasket and metallic $toppers shall be provjded between the !liu:gc:es of u9pe.r
wd Iowa twk so as to prevent leakage of h d h g oil. The winding and
core shall be f i d l j r exposed when the bell tank cover is Med.
6.2.2 The tank shall be constructed fkom mild steel of a quality that
1
anjr defs:t/fla*~,:, wit11 a single tier cnnriiruction so
allows welding ~Sritho~zt
sliq~edas to reduce weldkg to the mi~~imum. The welded joints s h d he
i made using the latest welding, rechziniquesl rite t d s h d 5e adequately
a
strengthened for general rigidity to pernlit hoisfing of the t~m15forlnerfiUed
with oil by crane The tank body b~ be designed to withstand a vacuum -
of 76P m of Hg. .
6.2.3 The bank s h d lie fitted with four,iiftiiig pa& at,the lower end to (.
enable lifting of the trwsfomter filled with oil by means &lifting jecks.
k && be fitid with w under carriage and mounted on four
5.2.4 ~ h tank
, bi-directic~~~d swivelling type.Banged roners for being rolled on 1676m
(5' 6") gauge track on which it shall also &st in the find positi6n. The"
rollers,.s11dbe provided with detacl~abletype locking mangemerit to
enwe their l o c b g BAn: instding the trsnsformcr in the final position, to
r3reven.t any acci.dentldrnovekefit of the transfmner.
1
6.2.5 ' here shall7be' atleast five.'inspection covers of suitable size on the -
trmk to enable inspection df the lower portions of bushmgs, 8;nd the leads ,
as &dl~~& various connections of the motoriscd off-?ircUr:ttap-ch'mger.
,
<:. *
6.27 valves ukd in,the tcmsfomer shall onf form to. 1~::3639and
sh&$c of good -&&ty a;ld leakprobf. The msnufactwei &?we I ~ P J
'suit& ,antiatheftineasuris
. ,, are pr~videioi these valves $0 w . t i drkvenf;
3
*
$heftof 03 d.urinitransit'se~ce.
Z I .
A-.
. *
6.3. ~ ~ ~ i d t l i n ~
12
6.3.4 The t~mperatureindicatars shxd be so mounted&& their dials are at
a hr;zht of noi more 4J1.m1.6 m From the rail kvel. TwrsparenX ~6.11dous
L.
' 6.3 5 AU cables from the bushing current tsmsfamers, Buchholz relay,
mqg~elic02 level gauge, presmrc"rebf device snd tempeiclt~eb~dicatoru
shall be run tJuough suitable c(?ndtrits/ perforated covered cable trays upto
the rnarshdkg box. The cables shall be of 1100 Y grade. PVC insulated. -
PVC she?eathed,steel wire mtzoured, stranded coppm conductor conforning
to IS:1554 {Part-1). The cables s11d be adequately insulated for heat from
ti= t &'smf;ace md the sun.
*
6.3.6 in the mashaulng box shall bc clearly identified by
leitereclvfigured fcmtles of the interlock me, preferably of yclbw colow
with black lettersifigwes. he ac wd dc circuits s11a be cleiuly
distinguished a~dwell separated from 41 other.
6.4 . Core .. .
,'
,,. ,
' .' '.' .' ' -
'
. . I - 'I ~
. ,
..
'&&I
.t ,
6.4.2 ~ h hnirnation
k fw the'corc s l ~ dbe fn?e'from weves, drfomwim rt
'
.6.4.4 . Yokekorr: chnping bobs shall .hake adequate ,$headed length
beyond the face of the nuts for'tight~sh~
at a later stage, if .need arises.
Each of the core ciznnpitlg bolts ad the core c.lamping firmre work s h d be
insulated from the core laminations.snd tested aAer completion of the cme
.assen?bly to ensure thst they withstand a vofkqje, of 2 kV r.nl.s. with -
respect to core for a duration *f 60 s.). . L
6.5. Windings
. ,
6.5.3 N Q ~ z ~ Znu~ joint
~ , shall be used in the wincling caductor. If a joint
becomes inescapable, it s ? ~bed brazed with kgh silvir g o y gradc 8.4' !
C 2 -
Ag6- cpnforming !o IS:2927 or'electricdy butt-weidcd. . ' *. 1 , + a?
w .
43
6.55 .The' ratio .of6width to thlckr~esn of copperpconductor uscd for c,
'
,
win- rh3U be as small as possible: bid shalt not emeed 5:1 sd ns to avoid
tilt% of conductors. when the ~vindingc:hre ~mbjectedto Ad and r&al
fbrccs during short &ri:uits.
t
6.5.7 The windmgs shall be.so designed thai the transfer of lightning i d
mitchuzg sur_ef:sfrom primary to secondary winchgs and vice-versa is
kept to the minimurn level.
I .
I
*pcrio&caloverha~h. , . ,
i 4
I
I
I
.
6.5.1~ The success^: tendmk mmr?.fitu& . s ftA ~ i de(ails
of various s k e s of dqzir1g of ioilr, ,coil assenlbIy upto ' a d iiicluding oil '
. .
6.5.19 The vertical lockuy: sttips and slots 'ofthe radial spacers &d p.2
. be so designed es to withstand the:fmes pn&teddur: to short circuits.
'
.k
cQ
- r I L
W -
r-"4
6J.20 The vcaioal locbvlg strips &d radiat spacers s l ~ be
d nldc.of ,
I
,I. Reference to specification and grade of m a t e d . I
I
i
2. Souxce(s) of supply.
3. M~lrrufacturer~s
Test certific&es.
\
.:,s . .. ia.-
7.0 INSULATING OIL
!
. *
8:6 The bushi* shall be de-ed for the foUo- &UO~ hvel:
--
..
w arcing horns r h d be provide8 on both ttle p r i x r ~ qa d
;Gdjud~e
' s e c o gb Tbe hum .gap satring shall "bevaiA1.e indic+d.
B~w.: +a!''
- I t HighestvoItqpc~ . , *- . - '. .
I
' I
2. . . H U gq&ttiqg
~ 150 250 500 532 l3,O , -
v a i a e beween, m i and culi slid -
aoo ma p a p ~ oISQO
- - L -
I
- ---I-
-
---
1
3 -
3 .
-. - . * v 1 li 1 I. +&mi '
%.8 The dt:&gn and *conshuaian df ,fie bus- shall be., 5 c n m a
stresses due to ~xpmiunand con-tion h a n y part of the bush;~,n. shd. .
nor ikpd to its dekri&ti~nib~aksge. , . k
8.9 The buskings shall Fe frea from corona md ;'.,A! 2i:t c s s e radio
interfqence.
8.10 The buslzing tenni~~als shall be provided with knninal connectors
lyre and conform to the fo1lilu;ing:
of Ei~x~nlebdlic
9.3Apart from the BCTs required for the biased differential protection, e
BCT of accuracy clese 5 m ~ dconfom&~gto IS:2705,with ~uitsrbletappirip.
shdl be mounted inside one of the bushgs of the secondary side of the
transformer for IISE with the winding tempemtun in&cator (WTI).
9.4 The BCTs and the bushin@ shall be so mounted that renliwd of a
bushing without disturbing the cmeEt transfonaers. tenninas and +
.--..L-.~u.
EX! . wpnipnf
connectiollj or pipe work k ~EE;/ .
I
&
~9.6- The leads from the seko~~dary %&ding of the BCTS temhatRd in the
terminal box olr the bushing turret upto the xnarshdhg box shdl. be'of
1100 X\grade,~ V insulated,
C PVC sheafhed mo*ed, itr;ded copper .
a q&Ie bf cross-section not lesi than-4 mm' to IS:1554 (PF-I~.
A': , . ,
- Z I
-
terminal
10.1 T I I ~relativd oiientation in1*acd of the bushings +ilted.
. $a~yxtors,t&e 'm&,tank, radiators, ~coriservator,pressure relief device, oil
$i$ng and other pa& when m o k d on the transformeri
&@ be.such that
the vnious clearancis in air fiom bushing..liveparts shall not be less than
the appropate values given hereunder.: ,
/
----.------ C _ _ L----C-C-" --
I. Highest voltge for
equipment L5n, khT 52 72.5 123 145 245
7
&a Minimum cleardnce, mm 50Q ' 700 1 100 ' 1360 1900
1.
, a
\ UC.-..L---.I-------..-.--------~--~~UI-L----------~L~~-C
' , ,
I *
piping work, ons semi tor, ~p&ssufirelief &vice and swh other parts), I
I:
' ; a2 '
2
&
roof The tdR of tki ckbick shall be at a height of-abbut 1.5 m .&;in ,the *;ail
.level. ?hp'-iubicie
, . ihall be so positioned tk'gthe lutlge
*, o f the bperatmg
-
handle -. for n~muioperation is pl a height of ,about f.1m Trsm the rsil
Level, -.
2
i t
i
, >.. 'r
11.9 The tap-changer, .md its ,'control &quit shd be ge~igned fur .
aper&on fiaatl flie R e n ~ ~ Canpol
te C c m (RCC)by the Traction Power .
~
Controller (TPC) w& as Xirain the tapchangek cubicle. A locsVremote
switc11& .well$astlecessitty te&in&~ns fpr biesi@ds and telecomands
fioh the RCC-shall therefore
from and to +e t a p - c h e r wfor~oparati~n
I be prwided
, -
h the &-changer cubicle.
12.0
1
COOLIGGEQUIPMENT
. ,
type~ of cobling. -
12.1 The transfornter s l d be designed for O O N - -'
. a I " :->:=. ..+,-
.
* -
2 .
.
8 . t *
\
.'
.. . ! ' I
1 9
the centre for lifting the radilltorand the other for tying the uijit hl s e ~ i e .
..
\ .
!
I . I !
t I
W
th4 foregoing flau~es,the $-, &ti&$ ind~aCccssorie:i detailed hereunder c3
. -
. shall be supjdied with each tr&fonner. ' ~3
e
3
I t .
-. /
minimmi oil levek n~axin~.um oil ie?vel and oil levei to oil
tampemture of 30' C, 45' C cu~d 8859. The oillevkl indicator s h d be so
designed snd mounted that the oil level is clearly visible to w, operetor
I .
13,1-5 Fdter valves: The bottom and upper filter valves shall be of
m size and suitably baffled to reduce aeration of oil. The \ralves shall
', 50 m
1
I
,'.13.!1:7.- ~ a r t h i . nhrinid:
~ ,Two earthing terminals s h d b e :
provided the tank for its edling>dl!the ht$l~'of 3 nidd steel flats,, $,wh
of size 95 An x 8 h. s$bl be iI.k+1+j:mwke.dforp&g.
The k e d s .-.
. -
, :.:
I ... . .
-,*
'I,.
..
, :13.1,8 Buchbo?~rday: It s;al! be df'di;uble il~at;ttlpe~ yith, two
shut-o~ vc&.es of 80 mm Eize: :one,??@tween ' the ~onseyatortank and [he
' f it . . ,aid
~ ~ ~ j & orelay? . t8.e othcrbc~&en
.. . . the h s f o m x ~tcmk..
; a d ,the .fa ,,..
' for the B~rgiise df. sampling.thep, if any, collected in the Suchholz relay.
$ , I ;
. , 7' .
. . . ..;. '. .
*.?. 5 .
13.1.12 ~ a t i d gplate:' The rating plate shd inhicdi the rC&gsof the, '
iransfomler. the co~mectiondiagram of the windings, the garticdars o f the'
bushing current trmfoimers,and other-details as per IS:2026. The @ing
d Goth in Enghsh and Hindi version.
plate,s l ~ be
13.2 AU valves shall be of the dduble flkgetype and fitted with mitable r .
'
e l , , f, :
*, .
4 i '
"3%) . -3
I , I
I '
.,
' * ++
%z%W
svrfaes exposed >to weather shall .be given, 'one p h ~ e rcoat of zinc
c1ncbft1a end 2twd so& of grey p&t to shade No. 63 1 of IS:$. An
*
,J , :
f6,O TESTING OF T W F O R M E R
. ,*
..
it#'. . '. 16.~1 General:
I
. t
-
16.1.1 Once a purchase or& is placed for
supp1i bf a transformer . . ,
..i:
'. L
the dpzgns and &awings! tagether with tb,Qu&y Assuran~ePlan (QAP)
$,, -.$
4
I" '
. .;--~ .h bed fidshed t6 the purchaser/ Director Geneml (Traction Instdation), ,
-* - ' ~esearchDesigns and Standards Organisation @G(TI). R . D s ~ Lurkncaw. ~.
as the cam may be, within the period stipulated in the order. Cdly niter d
the dew and drawings as well as the QAP have been approved for
'prototypetests and a written advice given: to that effect, .shill the nrccessful -
ienderer/mmuf3~hner take up manufactwe of, the prototype of the
transformer. .It is & be cleatly,mdmstood that any change or modification
- : required by the above-'mth~riitees,tobe done inthe prototype shill be &ne
hptdltiously, not ~ v i t f ~ d approval
a n ~ having already been given foz ihe
J&@s and drawings ,$uqh change or modification s l a be kyqorated
k the drawings mJ.ndrcated'inCla~zse17.4of this spenfichn. '. 4
-c
ta~dererln~sll L
ufacttker. . .
- 7 .
I I
'I \
i6.l.4 The type tests shd be cGmie$ out oh' the prototype .
txm~sfonnerRt the works of the Successful tendererhna~uE&tueror at a
reputed testing labowtory ,& the presence of 'he represent&p&,of he
purchmerR)G(TI), RDSO,*Lucknow, in' accordance, with thii ''reievant
specifications wd ss ~odifiedot m~~lifGdby this specification.
,'I '
16.2 Tests during manufacture, ' 1
* . I ' _.
16.2 1 Thou& thc tcsts atscfjbed.bt'fon;shd form F& of the t h e
tests, the manufact;ure; shalt cany put thse tests'~neach and every unit ,
1. oil ~e&agetea.
.2. vacuGtest. -
I
de$e~tion6f flat &ites . .rebe. be of vacuum shall not exceed the values
.
'
i .
.
.
. f
!. 1
;*
:
sl,&cisea
,,
below:-
,'!!, ,, ' > '
, .s
~ - $4 . .
.
,
.;(.
;
: .. .
, . ... - >
I'
. . . .
-------T----*---i------rr-------------rr-----T--------------**--A--------*---
:,. , 8. ' .
. .:+'. .
- H o ~ ~ length of flat plate Permanent ..deflection, rmll..
~ n< : a
. ... -... . , I . <. ..'. 9 I :
..
. .
.L----.--r..----&--LI----**.-*--".--*------*------*----*b*-L----------*.------+---
f"
.
., a .,.P ?'"',
t i l .
.
- ' u$& and jri&@
. , , 1
750 5.d :. ,
. .,. , . . . . _
" ;175iji1mtoi@~.1nun
; , !I- ' . . . :;. :..9.5.. .
,.
:.
,.. . .
. ;. ,y.\z4- .> :
. 2.5:
.t , , %
, I.:4 s
225f&t025oomni
-
8 i . 4
..
* .
. . (I+ .
. . : , ..: . .. . . 7. 5 0 1 . ' & t o.. 3. ~ 0 0 ~ .: ; .
. IQ:O;: <.
16.2.1.4 fnsdatioa test for core boity: I1Yhrs test &dl be done m
described in C l w s e 6.4.4 of tks qooifieniion.
. 1 / .. 1
1. ~6h~erat&-kisetest. '
i .
':
-
'4:
.
! . , : Short-circuit
I .. ,,.
' test. . , ..,, , . *. . .-
: . , . , I,
, ,
!6
.. i',
' ,
.
l:;'., .. .. <," ; :?
t:partiq.
, a" ;, 4 5 ,3
:
., . . iq&&&ecfidjit'bf !
. " .;,;,:., I 'jp&h*
'.
qm.itY
,.,.... ;>
..;$ :, ; i: ;
A , .
,
7. ;
,
:.,:
M
I .
;:
i,
. ;,;:;!; ,,.:.:
) .
.. ,.
'
&
.A'.
* . ~
, ,!
- ' , I ,i
, , ' ? , .
,
~ Onrcs~of ,.(,~ . dwe&
, ,,
: .;
.
~ ".; ~
8,
.
..
'!:
., ,
, , i
<,
,v<, '
.,;,,
niaa~,
;,.<":
,t
,.,.I
, :,:i
:.,
:
"
;'
..,'
<'
.'
:
.,
'
2,. '
.
,
';,;,'
~
.. . .
,,
\. . , .
'
16.3.2.1 - T& temperatwe-rise test shall be done withothe tap-changer
'
on,the 'lowest tap positiA,n (-15%) in accordance ,witht h . ~ ~ : i d i 6 (.II)
~art
.
ewcapt as inowed hereufz&r. .' . $
$
. * I \
.
4
#
1 % kratedlo&:."', 9 4
w'
2.. M 15C% rated i6gb fox.15 min &r..continu&l' &a
'w
I I t )
'
' f s 1 .
attailled.
16.3.2.2 The points to be ensured durit1g the trrnpme-rise test
shall be: e
2.
- Thc oowh so fcd to the tmnsfonn~rshall be ciontinuoudy
L
3. ~n z t . ~ n ~G
t' ~ g&ady state temperature, h e c m z ~ in
t the
primary whdmg of the transformer shall be broup& to thc rated
nurent which shall be maintained for 1 h. At the end of the yrriod
%hJ
' 'il~ry w e r supply to the trauforn~crshall be spilched off and the r- *I z
_. I
lime.. of swjkhi~rg
.
off recorded.
..
.. r .
. . . .. i .t .?. '. ,:
.v.
,
.I
- .. I :,,...
.' I. . I , .
. . :
::''fm&maaa&:bf
I..:.
. .
I ' ,
.
. 4. h
hots-& , s h d commence as .
L C nThe
: . - . .p p o s ~ & . 4 ~ f i e F . , s ~off. ~ .
'.&all' be .aenbefo& heexpiry of 90 s.fromimi the ~t of otf,switcbg
.
. ..?,
.,..
.c.
; .:,
" .;. .
. .5 . ,
'
"' ., ;;'!$
.: .. , ."- ..
< , ,
-,
.
:5, ~hk &m~&&
...
:,df ;
, ,
I "
js red
, &.be reC.6fded. ,. "
J.+~\\ - c ! . I * #
t '
, <-
7. 2 % ~WTI and OTI.reahgs shd &u be &corded at half- :
ho*~lyi n t ~ d right
s &om the in&t the power sapply .is switched
onto commence the test tiu it is d h e d oft
,,,.
..
. ., . Z Z
1 .
I 1 .
by?
G a
t -.2. The current shall ttzimaRer'be incrcaed to 150% of the rated ~3
cwent and &laincd for a period of 15 mjn. the &b of L 15 c3
e,
min ,peri~it,
'h powersuDply be &tckd . . off..and the-time af
&clung off recorded. -. ' - ., t .
1 < . .., . .*
..
: :,I I ' I
' . ,.*
. ,. . 'as
. at t~<q thme of mitik~g ., off the : p ' ~SUPPIB.~
. ~~r , ,. ,
!: 8 .
$3.23.3 .2000/oload..
, . . f a . ,.
. ..
,
3 \
;i
t , .:
... . . 2
, .; .
1. . .:!: After
: . .
compl&idle..of t.be tcst at 15PA load, the transformer
i&
8c,
; :fed.
s l ~ d'be. powg wluch , s l d be ,a value so ss to cause
'
. iir~ul;~tiO;i.
.. . ;.of. rat+dunint. . in'the -ding : with
a < .i..
, piim:G, ,
I . , . This curred
secqqdq :.wkCtirq-p short-circited. . .
shalt be: circulated :. ; ,
.ihti,:,.;
%.
I < \
f&,
! .?.: ?$,.;,* b.
, ..::
,
:
. *, ,v. ~
, ' ?
. ,
I ,"'>'#, ,, ,
.. . ~
. . ., . .\*;
,
; ' ,. , , s y::
, ..I . $
:
.,
*. 5i41 .. :me,:temper-$ of.q&i&t, top oq . to+&'.h&m r & ~ . .,
,I -6 . #, { . .. % '
.: b.?',,
, ? 7
The, functioning'of the OTI md WTI shall be vaiiied during the tea
disc<&d aboirt. 36th fhe OTI and WTI . s M be recslrbrated, if necessary,
:to r@kt the ro@ibtiva tmperatuces concctly. In particdz3nt; ,the meding of
3 c- ;.
** 31,
- the WTI shd be rhe same ithe c&datcd v h e of the hot-spot
I ' >
of the w i n b g .
tcsm~erat~e
* .
16.3.2:7~eterml~atlo'n-of the 'thermal-t h e $stant of the WTI: The
tlknnd time c o n s ~ othef WI shall be detetmined for compmisop with
the thermal time constant of the wJ.dmg of the trsnsfomnk wah respect to
'
the &&formei oil. Fpr ,this dzupose; the indications of the WTI ,and the .
, OTI sh@el rcco;ded every 1 or 2 during @e first 1 h &om the instant ,
'
the ~ ~ f o r is ~ r From the slope of the
mloaded. pldted with the time
on ff ~eX-axis grid the Merence between the 'reachngs of the WTI and OTI
at the partiqdrrrmh
jcon the Y-& the lhinnal time constwt of the WTI
shall be determined. This value shall not vary qpreciab3.y h e the themcsl
tune constant of the winding as cdcdiitqd
'
theoretjcdy and .as.ascerkimd
from the slope of the caohne,ewes.
, .* , -
, . impulse tat
16.3.3 Lightning
,
:
.16.3.3.1 This test sh$ be done in accordance with I$:2026 tptttt.llI). ,
Each o'f the b-& o ~ shell
of the primary aid ~ k c windings' ~ be .test&. .
vvlth the folloPnng voltapcs: -
2."
/ L3tning impulse ' )
ag
w
.
-
16.3.3 &rt-circuit test @+-
-- . c5
c3
3 The short-circuit test shell, be condmd in- scc'ordwco a
f d l o h g sclredde:
with IS:2026 (Pat-I) witfi th,
4 .
I \
.
16.3.5.2 prior to commeniement'
ofsn'thet e ~ f f'iowing
. .. tests shall 6made :
measurements/ I ,
-
I
1.Insul@io1xresistance of the windings with respect to the e&h and
between the windings.
2. No-load current.
3. No-load loss.
4. Resistance of w i n h g s .
5. Percentage impedance voltages.
6. Load.10~~.
7. Voltage ratio.
8. Di-electric tests cornpri&ng:
1. impedance voltage. .
Pe~ce~~tage .
2. ~0-16adcment.
3. No-load loss.
16.3.5.7 Further testing and in$pection of the transformer subjected
test shall be cmied out per IS:2026 (Pad-I) wiOr the
:- the sl-!i~~?-circuit
~r~odificationthat :
+
. . i
. .!
i I
$' ;.
' .'&[,-. ,%,L
, .necessd~%ave
. . . ta
.
I
..>
b . e..,,dlsmtIed.con~pletelyfor
.
..
dek-ded
.
insp&tion. . . . . .
. . .....
. . .
,
,. ' . . '
.. - . . .. , .
. ~, .-. .
( '
.
~ . ' .:
.
'-
. ;: . , .
+ . I '
. . ,
. I
.. . . . , .. . ' >:
..
. I
._. .
. I
...;'I' ...
1 .
. .
. .
, 16.3.6.&, ~ c m m e n t , - o-iwb&ti~'~
f . 'i61ld kvsl of ,&e . km~former '
'
..I
Q"Q"Q"#
canied out at rated cwre~ltof 1600 A. The temperature rise I dnot exceed
the ~ t . s i j e' ~. 'i f iine dIS:8468.
. .
16A.1.3 hechanical . e n d a m e test: With the tap-cl~angerin oil, 100
*
-operations shall be done mmudy and 10,000 operations shall be done with
if{
16.4.1.4 Miul-volt &og test: The test sh& be done both before and
after the mechanical endurance test to assess the conditian of the contacts.
The tvarhtion h the milli-volt &op t?.Jlut:sd ~ dbe
l not more thm 20?=.6.
, *
) I L , , -
.
f ,
duration.
5. Visual inspecion.
2. V&catiofi ofdimensib;ms. . -
3. Electric&io&e test: .
- , 4 - Porosity€est.
5 Temperature cycle test.
.$. , .
Bending W:
f
\ .
' 1 c.7- -- -
16:4:2.2.- :' The tw' bsts sbaU be c d e d & t in~ircqordapwit&.I$@99
I
f
I
\
3 . Therinatstabilitytet.
#
- . f 8
# i
8 . 4. ~ e k ~ a & e - r i s e test. - I.
7.-.. ~antlye+a10ati1&fi&ii , .
.8: ^fi&dnesstest. ; , . * , ..
,,
@. Tightness t ~ satt flange; or other.h~g
.. -13.
. . Meac.urbment:of ~$rti3diYchqp
-. quantity.,
I .
4. *
r ' 7
-. > 1
16.4.4 ~&hbo&rday . , ~3
~ 3
< i
I
! c.3
'c3i
16.4.4.1 ' .I36 3u~hhoI.z ielay shall bk tested k accordance with.
q l IS:3637.
16.4.5 Terminal toanectors
2. Le+&agetest. I
16.4.5 Rotdiators
transformer: , %. , I % , '\ti
I .
1. Density at nnC. -
2. Kinetic viscosity at ~7~ C.
3. ixikrfwd tension at 27"
4. ~l~hp6h.t.
5. Neutrdkatiion value (acidity).
6. ~lectric&n~t'h(with2:5 n m iq).
7. . .Dielectric dissip&on fator (tan-delta). .
8.. - Specific resistgce 27' C md at 90' C.
9. Water content. '
7. M w r e m n t of l o 4 loss. ,
, ,
8. . Polarity test.
9.' Voltageratiotest. .
I 10. 33ie1ectric t~ compdpd&g:
. 1) . .Seppatc-source voltage withsta-i~dtest, wd
2) Induced overvohge w ~ t b t m dled. -
- 11: Recorhg of mcunent surge, oocillogsm (RSO).
12. Tests on m~it.orisedoff-ci~cuiktap-chsnger.
\ .
6t6.6.2 ' Visual examkatioa: A Gnad e x h k i o n shall bc mado to
' , "
positions,
J, '
.. -
16.6.9 Polariii test: ~ h polarity
< (subtractive) and marluns of the
terminals for the' shall 6e verified.
..
>
." *
16.6.11.1 .Indue& edoer~oltagewithstand k t : The test shdl be done
by app1y-islg Ihe tesi 'voltsge across the entire secondmy kinding as per
IS:2026 (Part 111). , .
.
..
t6.6.14 During the ro&e tests on any & if it is found that the sum *
.< 16.3.2.3.1(1), or if the no-load loss/ load loss at the phcipd tapping
.exceeds the i n d t n q @3c~&teid figures, then the transfonuer SWbe
rejected.
&-itten approval of the resdts of the tests 011 IIte prototype a %:3
communicated by B e Pui'chmerlL)qTI). -:RDSC?, l-l~know.to the ' 6b;~
succesiful tmdererIjnan~tfactwer~ shall he take up bulk mmt~factured the . 02
w
3h.tbsfO- - whiih shall be strictly with the , s h e nlatcriat. and ytocas,s of ~3
T-
~a~uf&tuse. 8s &opted for the ,hino b&~~unct:mc~s
nhterids other tharz those approved in &,desigddrnt~h-gs S'~~;rSIdr
s!xd
2whg
=
~3 *
c.3
the psoi&ype testing be used foi bulk manufacture on the plea that they lrad
been prior to the approval of the prototype.. . ,:.
i6.9 T)xc tenderer may quote separately 11%cl~argesfor sl~ort-circuitand
hmper;It.ure-rise tests. No clmrgcs shRU be payable for any other type a d
routine te.yts.
17.1 The tenderer slid fim1is11 dongwid1 his offer, 'in the profon~zaat
ANZexure-3. 'the Scl~eduleof Guaranteed Perfoma~zce,~ e h i c a and l
Otl~erPaticdars (SOOP) fur the tr-fonner. The partichrs shall be
complete $1 RU respects. If tSlerc. is any entry Wae "shall be fumihed later"
or a blmk is bR against any item the offer i s not likely to be considered as
the etrdudion of the offer is rendered diffic~dt~ imhcwnot be compared
.
with other bffers, if my.
A
-.
I
c . . ' 2
., .; ' '
. , . .
17.3.1 C alcu'Lxttionsfor:
.. 1) ~ s y m n e h i c ashort-circd
~ current.
Hoop stress hprimary and secondq whdmgs. .
.3) Contpressive presswe in the i.adial spscers,
4) Intenpd axial comgressivc f m .
53. Axialimlaahc-eforce. .
6 Radialb-gfh. .
7) R e h e to,collap!e.
1
- 8) IBendurg stress on cIam@ingring and'&nsfied &ood.
9) M&tm dowab1e torqae onpressure screws for .ail
- . clamping bo& at the tLne of tightening, i f my.
.- . . I
b
, :-. 8 M d u m midue o f . h h c m e a . A
. t. > .
.. . .
17.4 The succcssfd f&~erer~mmrtf&twer &dl ~11'trP;mit/.t DG(TI),
RDSO, -Lucknow for approval t . following det& dhnen.Oiuncd .
as per Indim Rdws)~estwdarh in sizes of 210 mm x 297 mior -
aiy hte& maftiPzes'the~e0f:- '
<
* 4 2 A
I
&. Croa s e c t i m ~ dview of the core aid ~vindirzpwith material
specifications a ~ mdces.
~d
8. Tap-cl~atgercubicle layout.
10. Namemd
. . rating plate of motorised off-circuit tap-chanper.
1:kaC:tt:nisbitss: \
. -
17. - Dimemiad i t r a w b ~V4 chgracteistic sixjratins p k ,for
I . bushg typeckenttr~formm. . .
- t .
,*
- ieetd.
- . .
2d. . Det&
. - crf radiators.
.&
"
. . . I
the bu%q$'
& attmhed st Appen&=i
.. : . -
, ' C., I -.
a . f
.. *.
em
i7.4.2.. : &-
q3i>rr)vd,dix copies oi each a'tiftlle apP'iot;ed driwings w
I ,
,
I
' %Z! ,
dwg
.t 'kith two sets of reprodm5bZe prints .for each &awing shall be
: Supphd.to ecich comqpce(s). $wider, two oop'ks if dra\;c*jng$along with s
urn set of rqrodlucibIe p&t,ish& bq r3<@d , - . .
.to BG(TI), (RDSO, c3 . - "
,.<LUC~OW.
+,
19.0, SPARES .
!, . 4
' . .- *
19.1 The tenderer s h d quote separate]y for the fonowjng .essential spares
. for aeverylot .of upto 5 ttwsfumers or part thereof
, +
10, Onesetafval~:es.
11; . Qie 'prtsi;cirerelief d.evi&,
.. > . , ,
I.mufwt.w~r~consi&s
',
as necessary fform&t.enmctce of tlte tratsfonner.
' '.
4 . 1 . I ,
20.0.E R E ~ T I OTESTING
~ ,. AVDCOMMISSIONING
I 20.1 The transforme shall be erected anJ c ~ n ~ i o n ebyd the
Ruchasm. The suc&sful tendereri~nstlufscturers k u invariabl~ make
wadable at site the services of ,an engineer of llis to awe, by his
continued presence. that the process of erection testing md commissioning
of the txansformer is in xcmdance with established practices. Foi tNs
.purpose prior inthation reg&-dingthe dateslperiod and lopati& at which
the transformers are to be etected a d testmg/conunissioningdone shall be
&en by the Purchaser ta the successful tmdcrer/mufactur~r.No charges
1
d d be payable by th6 purc11* to the succeaful tenderer~nmtzfwtwer
: for the senices of his nrginetr in-this rei&d.
.. , .
U).Z if az& trmfomrkr has been ieceived at site in e damaged condition ,
21.0 TRAINING. ,
\
. ?
16
fd-ureshllcluding tests, ifmy, to be done,and such other items with a view
to seeing that the trtu~sformerseqes theLpurposefor which it is-intended.
Besides technical guidance to ensure proper operati0n &d maintenance of
the traction transfu.nner shall be constant1.y rendered.
, .
, - 23.5 .re;l!?ciments and rep& that the &~c11as&sail c d .upok the .
snirbsdid te~zrJererfnianufacturt~to deljve*or perford &dcr this Wmanty '
SIP& be deliiexid ru~d by the succeSsful tend~errfman~ct~ier
proniptly and satisfactorily :and'in my case within 3 (Two) months ofthe ,,
- - ,date .bf &\rice td t& effect.
9
,
: t
I
,
%,e '
* ,
;*
, .. ., /
23.6 .If 'the successful tenderek/mu~t&r so deshs. the parts jhat ark - ,
I '
> -, I -
, . I
,
,
' i
1 ' I
OF T H TRANSFOK&:IER
.a:o TRASSPO~TAT~ON ~ ., .
. .
24.1 Thc t.msfomrer s k i be trmspobd depending llpotl Lhe trrmsport -
'
fwdities ay&.Ial,ie for the ti)utt!i:e: by'rail or truck or ship. ... I +
- 1
' . & , a pre4~1ueslightly abovk &nospheric pressure. Howcve< if there are . c\r
-lunilations:on- &oollnt of weight, the tank slid be ~ i e dwith-&tmge" a 2
,
u;ickr pressure and d;c oil for.the-first a g lie sttpp5ed separately itl
steel drums. In cpe the tankis fil~ddwith inext gas +c tim.p&ture srid c,-
c2#
prehiri at the. time of f%ng q!x%I! be m k- d conspifudy .on the I
I
, t r a n s m er . ' .
_ _ . * I *.
' i Create XO.k-' 1
of .4pprox.@,nissri~ p ~ koutside
x . II
\. i
4 , 1, 1 *ei&t in kgf. d~ncnsionsin mm.
~ten~/~ornponent 1 I
'iinthekrate ';
... .
<-
,
I I ,< 1 . r s I 1 -
. .
v.4 The pwlring s h d be-done, .properly' e . . ..no ~
,., thst
so. . anwoccurs
I . d*g transit. . .
* .. $..!.'
. . .'. . .
I '
. 4
2 7 , - 'tf
24.7 In case of overseas supply, psck'lg i h d be sea woaby.
wXURE-'P I .
, SCHEDULE OF GUARAN~E'EED PERFORMANCE,
, .
TECHNICAL
- . -MD.OTHER PARTICULARS ,
- 4.
I '
1 , ~A~vA
j.., .Pimry&&ent.: , .. , ,
" \
9 .
#)15@%'.nltedloadfbriS& .' A ,
iii) 2000h r@ed-lddfur 5 niin -- A- . '
. I
. . t 1 ' ,
. 1- ' 3
.! -0warj- kV
-ii)Secondary {at no-load) kV
.:
'
9. Tn~~perattwe rise above ambient.
tenlpe~idufl'::of 50" :
. I , I ,
.*:
,
.I / i ) , A ~ ~ ~ t ~ d ] ~ &.. , .' q . . a , ; OG, -
'
'
.- . for 5 n~
10. Hot-spot temnperature of ~vinding !.
over ambient temperature of 50 C:,
, . * , a
j) At rated load
o
ii:) N 15096ratcd load .r I
. c
for 15 min a I
, ,15. Losscs :
+ 1
(i)No-~ocldlo~sRtr&dfiequencyandat :
1.
priclcipal tapping + I
1) Principal tappl~g kW
$ -!~~~L'EJPI>~W- k1.y ,
ii) Secondary at :
1 Ij Principal tapping H f
2) +lP4tapping H
3) - 15% tapph~p
+
H
32. Regulstjon (at 75' C) wit11 rated ,
.
I
33.
amrent q d at power fador of:
Gffit5enaes :
power fator at :
1) 100% load
2) ?SO/; load
3 ) 50%10~d .
4) 2% load.
'
1) 1000~ldad
2) 750/ !oRd
3) 50% load
4) 25% load
at :
',
'
i) Them&
, ii) Dyll&nic
~
k
i
Ability to ivithifa~d
,
'
shdrt-circuit.:
:,+
I) rated current
2) 1500/0 rated c m n t
3) 20W0rated current.
<
.
/ b
&
..
'
I
. \
+' r i
. .
'
>
'I
. &
%
'
s
,I
"
I
.
&
,
.
,
%'
@%.
9'6
Oi;,
Orb
rslin
ntin
04
s
S
-
?,
. .. .
1
'
iP
9
.
<'
.>.
.
.,
.
26. TnnperatU~egradient between
oil md winding at :
i ) Rated current
ii) 1509i0rated current for
IS min
iii) 20m *d current for
1) W e d current O
c
ac
2) 150% rated current
for 15 min
3 ) 200% rated current OC
for 5 ra*
.,
ii) Estimated temperatwe rise of
top oil at :
. I
1) Rated c m c ~ ~ t % c..
i) Type of core
I
x.. . ;, ,
it) FI& d e n ~ € ~princiPip$
'at . . tesla
q rU ,
and fieqbency
iii) FZux d e ~ ~ iat yprincipal tesla
tapping at 110°/o rateJ'v(r1ttg~ . -, ,
aiid fre4iticy ., .
6 t
+
voltage , .
3) nluc denshy 1I& VMg
.rated voltagef:.
I
1
'
- . .
'vii) exciting VMig for msenibied . .
core at : -. I
veltage '
...rnted voltage
t . .
I
1) Pfbiry, "
2) Secondary
1
It*.
~u).Dhner&uns o f t11.ecopper ,
cmductor used in the winding :
1) rnlary
T, ~econdary
3 ) Tapped secondcay
ivj. Current density at rded \
cuaent : .
- , . * l I
3)Separote sourcepo\ler .
, ' frequency withstand voltage :
a) Primary ~ t - i n h g. ; kV
b) secolda& w i n h g kV
4) Induced ovewoItagc k~
uiths&d value
viiiriii)Minimum &shover distance .
- to ;e&l~irr oi!of .:
1) p r i m q t
2) Secondary t
4 i
xv) . M ~ n u m
pemfissible torque on NIII
p r s s m screws for coil clmping
at the time of tighte1&l8, if any. .
1) plus tappings -
- 2) minus tqq..Lngs
voltages on different
tapPlng~
ix.PhCcixb~~wm
rated though current A
1) Make md tyye
2) Rated voltage'
3) Rated curreirt '
4) Rated power
5) Spwd
6) Class of insulation
i) Primmy side ;. . .
3) Governing specScRtion
4) Type designation , :
5) Voltage class
6) Rated current
7) Visible power fieqmcy
discharge voltage
8j Wet me ~ n k u t epayer kV r.fi1.s
frequency~thstandvoitqe
9) ~i@t~lingimpulse withstand ' k~ peak
voltage
10) Creepage &stance .
11) Weight of assanbled bushing
Secondary side :.
I
7) Visib1epowcrfrequency
dischm& voltage
8) Wet onbninute power
frequency with&d voltage
a
- side : '
P~%nary
2) Govenling specification
3) TTnnsformati~n,ratio . *
4) , Class of accurzicy
' 5) . ~ m kd~ e ~ l t . A
6) Rated output a
Ggveming specification -
Transfomatiui~ratio-
- Class o f acctpcy
Rated current A
Rated output
Exciting emrent:at the rated mG
knee point emf
Rated knee point emf Y
Secondary winding resistance , Q ~ I
corrected to 75' C
Sliort time dlennal current k&s
rind duration
' .
i) Makeandtype
Type ofmounting
ii)
i)Overell dimensions (LxWxH) mm x mm x mm
I
i) M& andtypc
ij) Govenc~gspecific&on
iii) Prot:isi~~~ofsl~~-o~ud~es Yes&
on eit3 - - ;deof the relay
.-.P dam contact
ivv) Yrt?\=isi,.\--. Yemo
V) Provis;.\:inf trip contact Yes/Ni)
16) Rated c~u-rentof contacts A
37. i?etdilr of winding temperature indicator :
ii) .Govem>,r~g~pecitication.
iii) Lrum&src2 C
conizcts provided
jv) , ' Rated a:a;::i;?R ci' c~tt;fCfS.A
v) Djelegt~-i G -*it?-i~t;md valve
. .
kV
' ofcorb?&cts
' i) Makeandtype +
i)
Make &type
.. * 1
- 3) Govemi?g s~.pscificatio,n
iii) Diarieter of f i a ~ t nun
. , iv) ~u,rnb&~ o contacts
f pro&ded
,. v) R&ed GUIXII~ of contact . . A
vi) Dielectric withstand tjillue ' ks'
of contacts - ,
Y I
4) U e d cumnt 1
P W dischage value st
1.5Uml 43 kV r.m.s.
..I
i) Primvtviniting
Secondary winding
$8.
7 %%.at &e the caicdated
,. short-circuit currents fur :
v a l v e s , m e Qn e i t h e r -
side?
L AWd OLST SI 03 WVCI!H '
B&'~atp dt.1
i ~u~wdrnba
_ . ~qpapu~k~~~p'q~mana
W W d I plar ~O~.WSS&? apm& $1 .U.
80 Is warranty as per clause 23.0 ?, Ye,s&o
8d
\
L ,
+ -, * a.
: - E = 'Modulus of Elasticity,of conducto~
in kg$'ci2.. rn
ti' cA2'
- . c3 \
.
ez
.
- per wit impedance.
0
as3
' 24
Ns - of supports to be pkvided in the winding.
Vt~~ulrrr
. . '
s kgCm2.
.
I ,
f'f
Tereille stress inthc tie rods in.kglcn!.'.'
"1 =
2.
1 .
.Caicddon o~ymmetxicalshort circuit Ampere-tuns I\:x isc i
Nxlsc
-
2. Hoop stress I
\
,
< .
. . I
'.. (Kx~~'n'xRdl.
.
k 42 as derived from item - 1above.
,
"
'? -
The figure so .cdcul&d shall be less tkan 1250 kgicm:
I * I
. C-2
iph' x Rdc c3
referred to innex or outer winding
Xote : The vdue -of--------:-' 03
3.1~ .
. . ex2
w
shall.be incorporated in thk, formula depending upon ki.het11e-r .innS.r
e3
I . outer windu1.g stress is required to be calculated.
. \
&
,
4, -Bmstinp forg
&d~d .
'2,xx mxIphXN
Fr = -----A --- kg.
----------..-------
L .
5. Number
.. of wpprts to be provided in a.in&g mat conductor). I
0. ~ provided
Nunx'ber of ~ y p o d be t ~ 41 windha (Round conductoiJ
Pt =z *--L-----ylr-d-r---
- kglc~n'.
4
3 t .a; 44t ,
a derieved'fib~nitem - 8 above. '
, ' ~ as .
&
; ' c3
(ApplicaE,Ie only to disc iyind& using mctmgdar eondtzctor] * a
-
Fr = R& ,force as derived from itrm-4 above.
a Per unit number or iums out of circuit.
Nc = N u d e r of coils per limb.
" fa
w= -9--
--I---
.
..-
.
,
: I
. , kgkm.
.Dm. . ..
%%re: .
.i
,
>
- fa = Value & derived from item- 12 above in kg.
9%
'
? - kkdrntu~t
add height of the
c1x.i.e
,
distance froni neuhd for conductbr
across the
ahding
axis
~leutralcuds divided by 2. -
* . bd2
Ir
16= Moment.of hertia of the coil i.e.
, --------
I , 12
\
a b = Ra&:al depth of coil in crn2. - ,
b~iui~~tum
pen:&siMe
- i - ia 1250 kg/cmi.
vahe for .lllm
O W
,
14. . Cdculation of ben?i~gstress on clan* ~lgs,
I -
I .
x ' . .F. i ) 0,
m a x = + *..-L---CI.,&L- &'cm
. s t . 8b.t 2 .na -
where :
E; = V"
l? {
-.-.*- --..*.-*
- 1}
--.. ,.
- i(~-+-i)~
where,
K = Present worth of transformer in R@ees.
b
D = .Am& f &of combined no-lond and load
loises in Rupees.
'
i = Rate of campound i;lierest on wit ?rice of
trmn@bniteri ' 12% per u~u1.1t.
n - Life oftimsfortnm.
F = barf fictot= + ?
2: #
, 623
s -- TarifX CQ
a3g
' &m~jrrg values ofe BS 25 yew, F k 50 ?X, and T y; R y e e 3.5per kwh,
c
3
value of K is,
. e3
(1+0.12)~-1)
K = 30.66 {3+425 (1) ..L------.-2-....-----
0.12 (1*.12t'l
Research Designs & Standards Organisation
(Traction Installation directorate)
Addendum & Corrigendum Slip No. 12 to the Technical Specification No. ETI/PSI/118
(10/93) for 21.6/30.24MVA, ONAN/ONAF, 220 or 132 or 110 or 66/27kV Single Phase
Traction Power Transformer
1.0 The A&C slip no. 10 of Technical Specification No. ETI/PSI/118 (10/93) was issued on
21.08.2012. In the A&C slip no. 10, the Off Circuit tap Changer and Fire Extinguishing
System are categorized under Customer Hold Point (CHP) for carrying out stage
inspection of these accessories before fitment in Traction Power Transformer under
prototype test; however this A&C slip does not include the details regarding tests to be
conducted during the CHP as Factory Test. The same has been detailed in this A&C Slip
No. 12 with standard format. Tests to be conducted on the Off Circuit tap Changer
(OCTC) during CHP are also being included in this A&C slip no. 12.
2.0 Tests to be conducted during CHP of the Off Circuit Tap Changer (Factory Test)
2.1 Visual and dimensions check: Visual and dimensions check of the complete Motor
Drive unit (MDU) of the Off Circuit tap Changer shall be carried out as per the
approved drawings.
2.2 Mechanical Endurance test: The off circuit tap changer shall be fully assembled and
subjected for 1000 operations from end to end positions without any failures.
Page 1 of 8
(ii) Mechanical endurance test.
(iii) Milli - volt drop test.
(iv) Short circuit current test.
(v) Dielectric test
(vi) Auxiliary circuit Insulation tests
3.0 Tests to be conducted during stage Inspection (CHP) of Nitrogen Injection Fire
Prevention and Extinguishing system (Factory Test):
3.1 Visual Inspection: Visual examination of the NIFPES equipment i.e. Fire Extinguishing
Cubicle, Control box, Signal Box, Transformer Conservator Isolation Valve, Fire
Sensing components, Fire survival cables, Fire Retardant Low Smoke cables shall be
made with reference Clause 5.0 of Annexure-I of A&C Slip No. 10 to RDSO’s
specification ETI/PSI/118 (10/93) and approved drawings.
3.2 Functional Test: Following functional tests on the Fire Extinguishing Cubicle and
Control Box of NIFPES shall be carried out by activating the signals through test
panel/test rig for NIFPES. The testing shall be done at. 121V, 110V & 93.5V DC
supply (+110%, 100% & 85%) separately. After each test system shall be reset so
that system shall be ready for next test.
Functional Tests on the Fire Extinguishing Cubicle and Control Box of NIFPES
Page 3 of 8
pressure low the specified glow. pressure
(Nitrogen Gas pressure. Healthy condition …………
leaking) Indication lamp should kg/mm2
OFF
Audio Alarm should
activate
13. Differential (i) Activate the trip Relay trip Indicating
relay trip/ signal on test lamp should glow.
Over Current panel Healthy condition
Relay (OCR) Indication lamp should
Trip/ OFF
Restricted Audio Alarm should
Earth Fault activate
(REF) relay (ii) Deactivate the Healthy condition
trip trip signal on test Indication lamp should
panel turn ON
Relay trip Indicating
lamp should go OFF.
14. Pressure Relief (i) Activate the PRV trip Indicating
valve (PRV) signal on test lamp should glow.
Trip panel Healthy condition
Indication lamp should
OFF
Audio Alarm should
activate
(ii) Deactivate the Healthy condition
signal on test Indication lamp should
panel turn ON
PRV trip Indicating
lamp should go OFF.
15. HVCB Open Activate HVCB ‘ON’ No Change
signal on test panel
16. LVCB Open Activate LVCB ‘ON’ No Change
signal on test panel
17. HVCB Open & (i) Activate both Transformer Isolation
LVCB Open ‘HVCB’ & ‘LVCB’ indicating lamp should
(Transformer ON signal on the glow.
trip) test panel Healthy condition
Indication lamp should
OFF
Audio Alarm should
activate.
(ii) Reset both Healthy condition
signals Indication lamp should
turn ON
Transformer Isolation
indicating lamp should
go OFF.
18. DC Supply fail Switch OFF DC DC Supply Fail
Supply to Control indication should glow
Box Audio Alarm should
activate
Page 4 of 8
19. System test a) Activate following TCIV should close
for prevention signals: Oil Drain valve should
mode i. HVCB & LVCB open
(Auto mode) Open Nitrogen gas should
ii. Differential relay/ release
Over Current Audio Alarm should
relay/ Restricted activate.
Earth Fault relay Following Indication
trip lamps should glow
iii. Pressure Relief -Prevention Mode ON
Valve trip -TCIV close
-Oil drain valve open
-Nitrogen Gas release
Healthy Condition
Indication lamp should
go OFF.
b) Activate following TCIV should close
signals: Oil Drain valve should
i. HVCB & LVCB open
Open Nitrogen gas should
ii. Any other release
logic/safety Audio Alarm should
equipment to be activate.
used which has Following Indication
got the prior lamps should glow
approval of -Prevention Mode ON
RDSO before -TCIV close
manufacturing. -Oil drain valve open
-Nitrogen Gas release
Healthy Condition
Indication lamp should
go OFF.
20. System test Activate following TCIV should close
for Extinction signals: Oil Drain valve should
mode i. HVCB & LVCB open
(Auto mode) Open Nitrogen gas should
ii. Fire Sensing release
Component trip Audio Alarm should
iii. Bucholz relay trip activate.
Following Indication
lamps should glow
-Prevention Mode ON
-TCIV close
-Oil drain valve open
-Nitrogen Gas release
Healthy Condition
Indication lamp should
go OFF.
21. System test Activate following HVCB & LVCB should
for Extinction signals: Open
mode in i. Mode Selection TCIV should close
REMOTE switch in manual Oil Drain valve should
MANUAL mode open
Electrical ii. Press Manual Nitrogen gas should
mode on Extinction release
Control Box Operation Push Audio Alarm should
Button to ON in activate.
control cubicle. Following Indication
lamps should glow
Page 5 of 8
-Prevention Mode ON
-TCIV close
-Oil drain valve open
-Nitrogen Gas release
Healthy Condition
Indication lamp should
go OFF.
22. System test To be done on Fire Oil Drain valve should
for Extinction Extinguishing open
mode in Local Cubicle Nitrogen gas should
manual i. Push lever for Oil release
control on Fire drain.
Extinguishing ii. Push Lever for
Cubicle Nitrogen gas
(To be used in release.
case of d.c.
supply failure)
23. Panel Lighting Switch on 240V AC Panel Lights should be in
supply in fire working condition.
extinguishing cubicle
24. High voltage i. Apply 2kV AC for Should withstand.
test to be 1 minute between
separately terminal bar and
done on Box body
Control Box
and Signal
Box
25. Communication Check for the Digital The Control Box shall be
with SCADA Input/ Output compatible to be
provided on NIFPES interfaced with SCADA.
system for
communicating with
SCADA.
Page 6 of 8
3.4 Functional test on Fire Sensing Component:
3.5.1 Procedure:
(i) The Fire Sensing component shall be mounted on the Transformer tank.
(ii) All the necessary pipe connections shall be made between Transformer Tank to
Switchyard Cubicle.
(iii) The Control Box and Signal Box should also be connected.
(iv) Digital Storage Oscilloscope shall be used for the measurement of activation time of
system. Following Inputs shall be connected to the different channels of storage
Oscilloscope.
(a) Fire sensing component activation
(b) Oil drain valve latch activation
(c) Nitrogen valve open (Nitrogen Injection started)
(d) Nitrogen valve closed (Nitrogen injected )
(v) The NIFPES System shall be made ON.
(vi) The Bucholz Relay Trip and HVCB & LVCB Trip Signal shall be activated by test panel.
(vii) The Transformer Oil Temperature shall be raised up to 140±2 degree Celsius.
3.5.2 Observations:
Page 7 of 8
(g) Buchholz Relay trip
(h) Fire Detector ON
(i) Healthy Condition Indication lamp should be OFF.
Results:
SN Fire extinction period Requirement Observation
1. On commencement of Maximum 30 seconds (T2)= ………. seconds
Nitrogen Injection
2. On system activation up to Maximum 3 minutes (T3)= ………. seconds
post cooling
3.6 In addition to the tests at the works of NIFPES manufacturer, following test
certificates/details shall also be submitted during inspection of NIFPES:
i. Type, make, and quantity of Fire Sensing Component being used with actual
Railway Transformer.
ii. IP-65 protection certificate of the pressure reducer from international or a national
testing body (NABL accredited recognized laboratory).
iii. Type, make and quantity of the fire survival cable (750°C, 1.5 mm sq.) used for
connection of fire sensors/detectors and test report of the cable reflecting
withstands temperature.
iv. Type and make of the FRLS cable 1.5mm sq. used for connection among
transformer signal box/marshaling box/control box/fire extinguishing cubicle along
with Cable Manufacturer’s Test Certificate.
v. Type test report of the NIFPES along with the response time. Type test report shall
be of system tested by international or a national testing body (NABL accredited
recognized laboratory). NABL certificate of the testing agency shall also be
submitted.
vi. Customer’s Performance certificate for at least 2 sets of the system which has been
supplied and has been in operation for a minimum period of two years. The
certificate shall be verified with issuing authority.
vii. The copy of Manual of NIFPES.
viii. The purity certificate of Nitrogen of 99.99% purity for each cylinder.
ix. Necessary calculation regarding adequacy of the number of cylinders provided and
nitrogen release pressure for the operation of the NIFPES system in actual Railway
Transformer.
***
Page 8 of 8