Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

544980059.

xls MITCHELL ENGINEERING PROGRAMS

COPYRIGHT 1992 MITCHELL ENGINEERING PO BOX 1492 GOLDEN CO USA 303 273 3744 TUBING AND WELLBORE

TUBING MOVEMENT AND STRESSES SECTION

Ref: Lubinski, et al, "Helical --- Tubing --- Packers"; JPT, June 1962, p. 655 #5

BOTTOM SECOND THIRD FOURTH FIFTH


SECTION SECTION SECTION SECTION SECTION #4
4.000 4.000 4.000 4.000 4.000 Tubing OD; in

3.548 3.548 3.548 3.548 3.548 Tubing ID; in #3

9.500 9.500 9.500 9.500 9.500 Tubing Wt.; lb/f #2

7.511 7.511 7.511 7.511 7.511 Hole Dia; in #1 BOT.

2,400 2,400 2,400 2,400 2,400 Length of Section; ft

0.30 0.30 0.30 0.30 0.30 Poisson's Ratio of Tubing; in/in

7E-06 7E-06 7E-06 7E-06 7E-06 Adiabatic Linear Expansion Coef; in/in/F

3E+07 3E+07 3E+07 3E+07 3E+07 Modulus of Elasticity of Tubing; psi

3.250 Packer Bore Dia; in

0 Slack-off(+) / Pick-up(-); lb

0 Initial Internal Surface Pressure in Tubing; psi

8,000 Final Internal Surface Pressure in Tubing; psi

0 Initial Surface Pressure Outside Tubing; psi

0 Final Surface Pressure Outside Tubing; psi

8.60 8.60 8.60 8.60 8.60 Initial Internal Fluid Density in Tubing; ppg

8.60 8.60 8.60 8.60 8.60 Final Internal Fluid Density in Tubing; ppg

8.60 8.60 8.60 8.60 8.60 Initial Fluid Density Outside Tubing; ppg

8.60 8.60 8.60 8.60 8.60 Final Fluid Density Outside Tubing; ppg

100 100 100 100 100 Initial Average Temperature of Tubing; F

100 100 100 100 100 Final Average Temperature of Tubing; F

FREE MOTION PACKER


Seal Length Required to Prevent Lift-out

79 Tubing Movement at Packer + LIFT-OUT / - EXTEND DEEPER INTO PACKER; inch

6.61 Tubing Movement + Lift-out / - Extend; feet

7993 Length of Buckled Tubing (Distance up to Neutral Point of Buckling); feet


STRESSES AND LOADS
-21,163 -43,963 -66,763 -89,563 -112,363 Tension at Top of Section; lb ( - tension/ + compression)

-74,363 Tension- /Comp+ at a Depth of 4000 feet.

8,000 8,000 8,000 8,000 8,000 Burst Pressure at Top of Section; psi (+ burst/ - collapse)

-8,000 -8,000 -8,000 -8,000 -8,000 Collapse Pressure at Bottom of Section; psi (- burst/ + collapse)

79,821 72,628 67,570 65,146 65,174 Max. von Mises Stress at Bottom of Section; psi
BOTTOM SECOND THIRD FOURTH FIFTH
SECTION SECTION SECTION SECTION SECTION

UP-MOTION ONLY PACKER


Seal Length Required to Prevent Lift-off
79 inch

6.61 feet

FREE MOTION Packer Stresses, Pressures, Loads, & Neutral Point Apply

Page 1 of 3
544980059.xls MITCHELL ENGINEERING PROGRAMS

FIXED PACKER
GREEN CELL AND BROWN CELL BELOW MUST MATCH
STEPS: click on BROWN (CENTER) cell below
click on "FORMULA"; click on "GOAL SEEK"
click In "To value" BOX; enter the value in the GREEN (RIGHT) cell
click In "By changing cell" BOX; click on BLUE (LEFT) cell; click "OK"
29,723 -56.67 -56.67

3,580 Length of Buckled Tubing (Distance up to Neutral Point of Buckling); feet

-36,643 New Packer to Tubing Force; lb (- tension / + compression )

STRESSES AND LOADS


-35,006 -57,806 -80,606 -103,406 -126,206 Tension at Bottom of Section; lb ( - tension/ + compression)

-57,806 -80,606 -103,406 -126,206 -149,006 Tension at Top of Section; lb (- tension/ + compression)

-111,006 Tension at 4000 feet. (- tension / + compression)

8,000 8,000 8,000 8,000 8,000 Burst at Top of Section; psi (+ burst/ - collapse)

-8,000 -8,000 -8,000 -8,000 -8,000 Collapse Pressure at Bottom of Section; psi (- burst/ + collapse)

68,219 65,342 65,093 65,944 67,608 Max. von Mises Stress at Bottom of Section; psi

0 7,437 14,873 22,310 29,747 Slack off Stress at Bottom of Section; psi
BOTTOM SECOND THIRD FOURTH FIFTH
SECTION SECTION SECTION SECTION SECTION

CHART VALUES FOR FIXED PACKER ONLY


TUBING TENSION(+) BURST(+) VON MISES VON MISES
DEPTH COMP'N(-) COLP'E(-) BOT' SECT' AT SLACKOFF
1000 FT 1000 LB PSI PSI PSI
======== ======== ======== ======== ========
0 -149 8
2 -126 8 68 30
5 -103 8 66 22
7 -81 8 65 15
10 -58 8 65 7
12 -35 8 68 0

TENSION (1,000 LBS)

-160 -140 -120 -100 -80 -60 -40 -20


0

4
DEPTH (1,000 FT)

10

12

14

8 8
0

4
DEPTH (1,000 FT)

10

12

14 (-) (1,000 PSI)


BURST(+) COL'SE Page 2 of 3
544980059.xls MITCHELL ENGINEERING PROGRAMS

8 8
0

4
DEPTH (1,000 FT)

10

12

14 (-) (1,000 PSI)


BURST(+) COL'SE

65 65 66 66 67 67 68 68 69
0

4
DEPTH (1,000 FT)

10

12

14 von MISES AT BOT' OF SEC' (1,000 PSI)

0 5 10 15 20 25 30 35
0

4
DEPTH (1,000 FT)

10

12

14 von MISES at BOT' of SECT' at INIT'L SLACKOFF (1,000 PSI)

Page 3 of 3

You might also like