PROJECT MANAGEMENT cmg Part

Please tick the correct option Each question carry equal marks

Q.1. Planning is the subject matter of –


a. State list b. Central list c. Concurrent list d. None
Q.2. What are the 3 stage of project Cycle

Q.3. stage is the most neglected stage of project Planning.


a. Project Identification b. Project Formulation c. Project Appraisal
Q.4. Feasibility report is part of
a. Project Identification b. Project Formulation c. Project Appraisal
Q5. Match following
a. Man plant area 500 acre
b. Township and other facilities 1000 Acre
c. Ash Pond area 1200 acre
Q.6. Sec 4 notifications for private land acquisition is issued by revenue Dept.
Q.7. sec4 notice is issued to the private land owners of Govt. intention for
acquiring the private land for Govt. use.
Q.8. is a notice issued to the private land owners of definite intention to
acquire the specific areas on an urgent basis.
Q.9. Administrative overhead s a variable cost- True /False
Q.10. Sales and Distribution cost is a fixed cost- True /False
Q.11. Depreciation is a fixed cost- True /False
Q.12. involves a graphical portrayal of the interrelationships among the
elements of a project and arithmetic procedure which identifies the relative importance of
each element in the overall schedule.
Q.13. represents efforts applied over a period of time which has a definite
beginning and end.
Q.14. is a point of time indicating the start or completion of activity.
Q.15. Activity does not involve expenditure of resources
Q.16. The arrow representing an activity is a vector quantity True/ False
Q.17. An event does signify any expenditure of resources True/ False
Q.18. Dummy activities are generally represented by doted or solid arrows True/ False
Q.19. A dummy activity neither represents any expenditure of resources nor it has got
any duration - True/ False
Q. 20. is a graphical representation of the interdependency of all the
activities of the project.
Q.21. is the difference between earliest expected and latest allowable time
Q.22. CPM was first used by
a. Sony b. GE c. DUPONT d. FORD
Q.23. PERT was first used by
a. Japan Navy b. US Navy c. Indian Navy d. Royal Army
Q.24. An event cannot until all the activities leading to it are completed - True/ False
Q. 25. An event once occurred can occur again - True/ False
Q. 26. Length of arrows has no significance with time duration - True/ False
Q. 27. Event slack is always positive - True/ False
Part II Net Working techniques
Q.28. L2 level network is finalized by
a. Corporate monitoring group (CMG) b. Corporate planning Deptt. (CP)
c. Corporate engineering Deptt. D. Corporate contracts Deptt.
Q. 29. CRM stands for
a. Corporate review meeting b. Contracts review meeting
c. Cost review meeting d. Committee review meeting
Q. 30. L2 network is
a. Non contractual document b. Contractual document c. Judiciary document
Q. 31. L3 network is meant for
a. Apex level monitoring b. Functional monitoring c. Site level monitoring
Q. 32. Zero date of project starts from
a. Main plant award date
b. Date of start of boiler erection
c. Date of first PRT meting
d. Date of land acquisition
Q.33. Technical co-ordination meeting (TCM) is coordinated by
a. Contracts group b. Engineering department
c. Corporate monitoring group d. Site monitoring group
Q.34. Critical path in thermal power plant normally covers
a. Boiler erection b. TG erection c. Electrostatic precipitators d. Water treatment plant
Q.35. Top level management is appraised of about criticality of project by means of
a. Minutes of PRT meeting
b. Exception report generated by CMG
c. Minutes of CRM
Q. 36. Increase in fuel piece is
a. Pass through to the customer
b. Not a pass through and has to be born by the generator
c. No proper guidelines specified for such increase

Part III Marks 14


Write Short Notes on any tow
1. Site selection for a power station
2. Process of preparation of Feasibility study
3. Project time computation and finding Critical path
4. Issues And challenges in Project Mgmt.
CORPORATE PLANNING PART II

Max Marks 30
Q. 01. What is the generation of NTPC in billion units during 2005-06
Q.02. NTPC was ranked position among top 10 global thermal generation
Q.03. All India generation in billion units for year 2004-05 was BU’s
Q.04. Minimum project completion time for 500MW
a. 36 b. 37 c. 38 d. 39
Q.05 Man/Mega watt ratio of NTPC during year 2005-06 was
Q.06. Target of NTPC for year 2012 MW capacity

Q.07. JV with railway is situated at


Q.08.Ramman Hydel project is situated at
a. H.P. b. Aurnachal Pradesh c. Uttranchal d. West Bengal
Q.09. Lara Project is situated in
a. Jharkhand b. Bihar c. Chatisgarh d. Orrisa
Q.10. NTPC IPD -2005 was over subscribed by times
a. 14.13 b. 13.14 c. 11.34 d. 13.41
Q.11. Share of thermal is target by -2017 --------------------MW
Q.12. Share of hydro in target -2017-------------------MW
Q.13. Nuclear share targeted by 2017-----------------MW
Q.14. What is internal system of annual target setting & evaluation called
a. Service level agreement b. Memorandum of understanding c. None
Q.15. BCOMIT stands for :
B----------------------
C----------------------
O----------------------
M---------------------
I-----------------------
T----------------------
Q.16. What is current installed capacity of NTPC :
a. Less then 20,000 MW
b. Between 20000 to 25000 MW
Q.17. Which of these project was taken over by NTPC recently
a. Tanda b. Talcher c. Badarpur d. Unchahar
Q.18. NTPC is divided into Regions
a. Four b. Five c. Six d. Seven
Q.19. Name the recently formed joint Venture of GAIL and NTPC created
a. Dhabol power co. b. Ratnagiri Gas and power Private Ltd.
c. Konkan power corporation d. Reliance power company
Q.20. Which of these is a subsidiary set up for power training
a. NESCL b. NVVN c. NHL d. NSPCl
Q.21. Name of coal mining block allotted to NTPC
a. Pakhari Barwadi b. Brahmini c. Utkal d. a&b both
Q.22. The exciting nuclear power plants In India are owned by
a. Atomic energy Commission
b. Bhabha Atomic research center
c. Nuclear power corporation of India Ltd.
d. None of the above
Q.23. The NTPC was the formed in
a. 1978 b. 1975 c. 1981 d. 1982
Q.24. How many times of NTPC has achieved “ Excellent” category in the MOU with
GOI
a. More then 15 times b. Less then 15 times c. 15 times d. None
Q.25. How much of NTPC s equity is held by Govt. of India
a. 89.5% b. 100% c. 10.5% d. 50%
Q.26. How much % age of total profit generated by CPSU s is contributed by top 10
CPSUs
a. More then 50% b. 10% c between 10% and 50% d. Less then 10%
Q.27. By backward Integration in which business is NTPC venturing in to
a. Distribution b. Transmission
c. Coal mining and coal washeries d. Consultancy
Q.28. Total Number of Functional Directors in NTPC board
a. 10 b.6 c.4 d.6
Q.29. NVVN was formed for NTPC to foray in
a. Undertake business of sale and purchase of electric power
b. Undertake business of distribution and transmission
c. Undertake business of hydro
d. Undertake Consultancy
Q. 30. NTPC hydro LTD. Was formed to develop hydro electric power projects up to
a. 1000MW b 250 MW c. 500 MW d. 660 MW
Write short notes on any two
1. Corporate plan 2017
2. Power scenario in NTPC
3. MOU system in NTPC
4. Suggestive steps to meet 100% power requirement in India
5. Steps involved in Project Planning and approval process .
*****************

Key for CP& CMG


Q. No. Option Answer
1. 1. 123
2. b. Top down planning
3. c. Concurrent list
4. All a, b, c,
5. a. PROJECT Identification
6. Social cost benefit analysis
7. a. Project identification
8 b. Project formulation
9. Main plant area 1200 Acre
Township and other facilities 500 Acer
ASH Pond area 1000 Acer
10. Revenue
11. a. Sec 4
12. Sec 6&17
13. Sec 9
14. False
15. False
16 True
17. Project evaluation review technique
18. Critical path method
19. Critical path method
20. 5-6-1-3-2-4
21. b. 2
22. Activity
23 Event
24. False
25. False
26. True
27. True
28. True
29. Network
30. True
31. Slack
32. Mogen walker & James Kelly
33. c. DuPont
34. Boose Allan & Hamilton
35. b. US Navy
36. True
37. False
38. False
39. True
40. False
41. Turnover ratio = Annual sales value / Fixed cost
42. Crash cost

You might also like