Q. 01. What is the generation of NTPC in billion units during 2005-06
Q.02. NTPC was ranked position among top 10 global thermal generation
Q.03. All India generation in billion units for year 2004-05 was BU’s
Q.04. Minimum project completion time for 500MW
a. 36 b. 37 c. 38 d. 39
Q.05 Man/Mega watt ratio of NTPC during year 2005-06 was
Q.06. Target of NTPC for year 2012 MW capacity