Professional Documents
Culture Documents
Installation PT EN (Rev 1)
Installation PT EN (Rev 1)
2010-09 September-01-2010 20
Installation Process
page 1
Version Date Total pages
2010-09 September-01-2010 20
1 Deck part
6 Piping
1. Pump
2. Rear outrigger
page 2
Installation Process
Version Date Total pages
Deck part – Cutting the deck 2010-09 September-01-2010 20
Remove the U-
U-bolt from Mark the cutting point
chassis : Refer to cutting table
Separate the deck from chassis
Separate the
loadrest
page 3
Installation Process
Version Date Total pages
Deck part – Cutting the deck 2010-09 September-01-2010 20
page 4
Installation Process
Version Date Total pages
Deck part – Installed Hook-ring 2010-09 September-01-2010 20
Fix the U-
U-bolt on the deck that
located at the tip of boom head
page 5
Installation Process
Version Date Total pages
Reinforce a chassis frame 2010-09 September-01-2010 20
page 6
Installation Process
Version Date Total pages
Reinforce a chassis frame 2010-09 September-01-2010 20
page 7
Installation Process
Version Date Total pages
Reinforce a chassis frame 2010-09 September-01-2010 20
page 8
Installation Process
Version Date Total pages
Reinforce a chassis frame 2010-09 September-01-2010 20
page 9
Installation Process
Version Date Total pages
Assemble a Rear outrigger 2010-09 September-01-2010 20
page 10
Installation Process
Version Date Total pages
P.T.O & Pump part 2010-09 September-01-2010 20
Assemble a gasket
page 11
Installation Process
Version Date Total pages
P.T.O & Pump part 2010-09 September-01-2010 20
Assembly position with Pump Connection port Grease this point before assembly
with air tank
page 12
Installation Process
Version Date Total pages
P.T.O & Pump part 2010-09 September-01-2010 20
PTO Switch
page 13
Installation Process
Version Date Total pages
P.T.O & Pump part– Air Circuit 2010-09 September-01-2010 20
1 A56169 P,T,O 1
12 A Hyd. Pump 1 B
page 14
Installation Process
Version Date Total pages
Installed Crane & Deck 2010-09 September-01-2010 20
Stopper
page 15
Installation Process
Version Date Total pages
Installed Crane & Deck 2010-09 September-01-2010 20
Assemble the U-
U-bolt
Assemble the Boom-
Boom-pin
Check whether the deck is situated
horizontally (if not, use the flat bar)
page 16
Installation Process
Version Date Total pages
Installed Crane & Deck 2010-09 September-01-2010 20
page 17
Installation Process
Version Date Total pages
Piping - Pump 2010-09 September-01-2010 20
OUT-line of pump
IN-
IN-line of pump
The IN-
IN-line of pump connects
to oil tank of crane body
The Out-
Out-line of pump connects
to out-
out-line of diverter valve
page 18
Installation Process
Version Date Total pages
Piping – Rear outrigger 2010-09 September-01-2010 20
Pipe bending
page 19
Installation Process
Version Date Total pages
Installation of accelerator cable 2010-09 September-01-2010 20
Mechanical
Mechanical Engine
Engine
Electronic
Electronic Engine
Engine
Connect the cable after make
a hole under the pedal
page 20